Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Castor Station (From Tet)

Gulf South Pipeline · Loc 4551 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.002
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
+0.003
Bcf/d
30-day average
+0.003
30 of 30 days posted
30-day high
+0.007
Nov 10
30-day low
+0.001
Nov 2
Operating capacity
0.155
Bcf/d as posted, eve cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0020.0040.0060.008Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.002-0.001
Nov 26+0.003+0.000
Nov 25+0.003+0.002
Nov 24+0.001-0.001
Nov 23+0.002-0.002
Nov 22+0.004-0.000
Nov 21+0.004+0.002
Nov 20+0.002+0.001
Nov 19+0.001-0.002
Nov 18+0.003-0.001
Nov 17+0.003-0.002
Nov 16+0.005+0.000
Nov 15+0.005+0.000
Nov 14+0.005+0.002
Nov 13+0.003-0.003
Nov 12+0.006-0.001
Nov 11+0.007-0.000
Nov 10+0.007+0.002
Nov 9+0.005+0.000
Nov 8+0.005+0.000
Nov 7+0.005+0.002
Nov 6+0.003+0.000
Nov 5+0.003+0.001
Nov 4+0.002+0.000
Nov 3+0.002+0.002
Nov 2+0.001+0.000
Nov 1+0.001-0.001
Oct 31+0.001+0.000
Oct 30+0.001+0.000
Oct 29+0.001—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Castor Station (From Tet) (Gulf South Pipeline loc 4551) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/4551/