Gas day Nov 27
+0.002
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
+0.003
Bcf/d
30-day average
+0.003
30 of 30 days posted
30-day high
+0.007
Nov 10
30-day low
+0.001
Nov 2
Operating capacity
0.155
Bcf/d as posted, eve cycle
Utilization
1%
headroom 99%
Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | +0.002 | -0.001 |
| Nov 26 | +0.003 | +0.000 |
| Nov 25 | +0.003 | +0.002 |
| Nov 24 | +0.001 | -0.001 |
| Nov 23 | +0.002 | -0.002 |
| Nov 22 | +0.004 | -0.000 |
| Nov 21 | +0.004 | +0.002 |
| Nov 20 | +0.002 | +0.001 |
| Nov 19 | +0.001 | -0.002 |
| Nov 18 | +0.003 | -0.001 |
| Nov 17 | +0.003 | -0.002 |
| Nov 16 | +0.005 | +0.000 |
| Nov 15 | +0.005 | +0.000 |
| Nov 14 | +0.005 | +0.002 |
| Nov 13 | +0.003 | -0.003 |
| Nov 12 | +0.006 | -0.001 |
| Nov 11 | +0.007 | -0.000 |
| Nov 10 | +0.007 | +0.002 |
| Nov 9 | +0.005 | +0.000 |
| Nov 8 | +0.005 | +0.000 |
| Nov 7 | +0.005 | +0.002 |
| Nov 6 | +0.003 | +0.000 |
| Nov 5 | +0.003 | +0.001 |
| Nov 4 | +0.002 | +0.000 |
| Nov 3 | +0.002 | +0.002 |
| Nov 2 | +0.001 | +0.000 |
| Nov 1 | +0.001 | -0.001 |
| Oct 31 | +0.001 | +0.000 |
| Oct 30 | +0.001 | +0.000 |
| Oct 29 | +0.001 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Recent notices on Gulf South Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →
Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Storage meters on Gulf South Pipeline
- Enstor Katy Storage +0.369 Bcf/d
- Petal Storage Injection/Withdrawal +0.114 Bcf/d
- Tres Palacios Storage +0.092 Bcf/d
- Bistineau Injection Expansion -0.091 Bcf/d
- Bistineau Withdrawal Expansion +0.056 Bcf/d
- Bistineau Injection -0.022 Bcf/d
- BBT Mississippi (Petal Storage) +0.020 Bcf/d
- Bobcat Storage +0.013 Bcf/d
Cite thisEnercast PipeScrape, Castor Station (From Tet) (Gulf South Pipeline loc 4551) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/4551/