Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Bobcat Storage

Gulf South Pipeline · Loc 23361 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.013
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 26
7-day average
+0.006
Bcf/d
30-day average
+0.010
30 of 30 days posted
30-day high
+0.022
Nov 9
30-day low
+0.000
Nov 2
Operating capacity
0.194
Bcf/d as posted, eve cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.013+0.004
Nov 26+0.009-0.008
Nov 25+0.017+0.014
Nov 24+0.003+0.002
Nov 23+0.001+0.000
Nov 22+0.001+0.000
Nov 21+0.001-0.009
Nov 20+0.009-0.001
Nov 19+0.010-0.001
Nov 18+0.011-0.001
Nov 17+0.013-0.003
Nov 16+0.016-0.001
Nov 15+0.017+0.001
Nov 14+0.016-0.003
Nov 13+0.019-0.003
Nov 12+0.022+0.011
Nov 11+0.011-0.009
Nov 10+0.021-0.002
Nov 9+0.022+0.012
Nov 8+0.010+0.004
Nov 7+0.006+0.003
Nov 6+0.003-0.001
Nov 5+0.004+0.001
Nov 4+0.004-0.005
Nov 3+0.009+0.008
Nov 2+0.000+0.000
Nov 1+0.000-0.002
Oct 31+0.003-0.009
Oct 30+0.011+0.004
Oct 29+0.007—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Bobcat Storage (Gulf South Pipeline loc 23361) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/23361/