Home / Daily Summary / Storage / Meter

Bistineau Injection

Gulf South Pipeline · Loc 10401 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
-0.022
Bcf/d scheduled
Δ Day-over-day
+0.003
vs Nov 26
7-day average
-0.030
Bcf/d
30-day average
-0.031
30 of 30 days posted
30-day high
-0.006
Nov 18
30-day low
-0.053
Nov 12
Operating capacity
0.519
Bcf/d as posted, eve cycle
Utilization
4%
headroom 96%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

-0.060-0.040-0.0200.000Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.022+0.003
Nov 26-0.025+0.009
Nov 25-0.035-0.018
Nov 24-0.016+0.015
Nov 23-0.031+0.010
Nov 22-0.041-0.002
Nov 21-0.040-0.001
Nov 20-0.039+0.000
Nov 19-0.039-0.033
Nov 18-0.006+0.017
Nov 17-0.024+0.010
Nov 16-0.034+0.000
Nov 15-0.034+0.000
Nov 14-0.034+0.011
Nov 13-0.045+0.008
Nov 12-0.053-0.010
Nov 11-0.043-0.014
Nov 10-0.029-0.007
Nov 9-0.022-0.000
Nov 8-0.022+0.000
Nov 7-0.022+0.005
Nov 6-0.027-0.002
Nov 5-0.025-0.015
Nov 4-0.009+0.021
Nov 3-0.031-0.004
Nov 2-0.027+0.009
Nov 1-0.036+0.014
Oct 31-0.050-0.018
Oct 30-0.032+0.009
Oct 29-0.041—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Bistineau Injection (Gulf South Pipeline loc 10401) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/10401/