BBT Mississippi (Petal Storage)

Gulf South Pipeline · Loc 23380 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.020
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.016
Bcf/d
30-day average
+0.015
30 of 30 days posted
30-day high
+0.020
Nov 27
30-day low
+0.000
Nov 3
Operating capacity
0.147
Bcf/d as posted, eve cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.020+0.000
Nov 26+0.020+0.000
Nov 25+0.020+0.015
Nov 24+0.005-0.005
Nov 23+0.010-0.010
Nov 22+0.020+0.000
Nov 21+0.020+0.000
Nov 20+0.020+0.000
Nov 19+0.020+0.000
Nov 18+0.020+0.000
Nov 17+0.020+0.008
Nov 16+0.012-0.005
Nov 15+0.017+0.003
Nov 14+0.014-0.006
Nov 13+0.020+0.001
Nov 12+0.019+0.001
Nov 11+0.018-0.002
Nov 10+0.020+0.000
Nov 9+0.020+0.000
Nov 8+0.020+0.000
Nov 7+0.020+0.000
Nov 6+0.020+0.000
Nov 5+0.020+0.005
Nov 4+0.015+0.015
Nov 3+0.000+0.000
Nov 2+0.000+0.000
Nov 1+0.000-0.010
Oct 31+0.010+0.000
Oct 30+0.010+0.000
Oct 29+0.010—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational