Gas day Nov 27
+0.056
Bcf/d scheduled
Δ Day-over-day
-0.006
vs Nov 26
7-day average
+0.055
Bcf/d
30-day average
+0.051
30 of 30 days posted
30-day high
+0.113
Nov 9
30-day low
+0.001
Oct 29
Operating capacity
0.471
Bcf/d as posted, eve cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.056-0.006
Nov 26+0.062-0.025
Nov 25+0.088+0.040
Nov 24+0.048+0.004
Nov 23+0.044-0.008
Nov 22+0.052+0.020
Nov 21+0.032+0.001
Nov 20+0.031-0.002
Nov 19+0.033+0.004
Nov 18+0.029+0.001
Nov 17+0.028-0.036
Nov 16+0.063-0.013
Nov 15+0.077+0.015
Nov 14+0.062+0.016
Nov 13+0.045-0.029
Nov 12+0.074+0.005
Nov 11+0.069+0.000
Nov 10+0.069-0.045
Nov 9+0.113+0.076
Nov 8+0.037+0.010
Nov 7+0.027-0.011
Nov 6+0.038-0.004
Nov 5+0.042-0.002
Nov 4+0.044-0.010
Nov 3+0.054+0.027
Nov 2+0.027-0.052
Nov 1+0.079-0.003
Oct 31+0.082+0.069
Oct 30+0.013+0.012
Oct 29+0.001—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Bistineau Withdrawal Expansion (Gulf South Pipeline loc 22807) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/22807/