Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Tres Palacios Storage

Gulf South Pipeline · Loc 23351 · Gulf Coast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.092
Bcf/d scheduled
Δ Day-over-day
+0.012
vs Nov 26
7-day average
+0.096
Bcf/d
30-day average
+0.077
30 of 30 days posted
30-day high
+0.195
Nov 24
30-day low
+0.003
Nov 3
Operating capacity
1.541
Bcf/d as posted, eve cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.092+0.012
Nov 26+0.080-0.049
Nov 25+0.128-0.067
Nov 24+0.195+0.128
Nov 23+0.067+0.014
Nov 22+0.053-0.002
Nov 21+0.055-0.022
Nov 20+0.077+0.012
Nov 19+0.066-0.020
Nov 18+0.085+0.007
Nov 17+0.078-0.018
Nov 16+0.096+0.000
Nov 15+0.095+0.004
Nov 14+0.092-0.025
Nov 13+0.117+0.076
Nov 12+0.041-0.011
Nov 11+0.052-0.008
Nov 10+0.060-0.039
Nov 9+0.099-0.018
Nov 8+0.117-0.006
Nov 7+0.123+0.059
Nov 6+0.064+0.028
Nov 5+0.036-0.059
Nov 4+0.095+0.092
Nov 3+0.003-0.061
Nov 2+0.064+0.040
Nov 1+0.024-0.033
Oct 31+0.057-0.003
Oct 30+0.060+0.030
Oct 29+0.030—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Tres Palacios Storage (Gulf South Pipeline loc 23351) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/23351/