Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Ratcliffe Plant Southern Company (Mississippi Power Co)

Gulf South Pipeline · Loc 24511 · Kemper County, MS
Power plant delivery · counted in Power Generation · owner Mississippi Power Co
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.050
30 of 30 days posted
30-day high
0.107
Nov 11
30-day low
0.000
Nov 27
Operating capacity
0.309
Bcf/d as posted, eve cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000-0.059
Nov 130.059-0.040
Nov 120.100-0.007
Nov 110.107+0.001
Nov 100.106+0.007
Nov 90.099+0.010
Nov 80.089+0.000
Nov 70.089-0.010
Nov 60.099-0.005
Nov 50.104+0.005
Nov 40.099-0.005
Nov 30.104+0.015
Nov 20.089+0.000
Nov 10.089+0.009
Oct 310.080+0.000
Oct 300.080-0.015
Oct 290.095—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineRatcliffe Plant Southern Company (Mississippi Power Co)

Gulf South PipelinePlant location from EIA Form 860 (plant 57037).

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Ratcliffe Plant Southern Company (Mississippi Power Co) (Gulf South Pipeline loc 24511) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/24511/