Santa Rosa Cogen Plant (Santa Rosa Energy Center LLC)

Gulf South Pipeline · Loc 21134 · Santa Rosa County, FL
Power plant delivery · counted in Power Generation · owner Santa Rosa Energy Center LLC
Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.030
Nov 7
30-day low
0.000
Nov 26
Operating capacity
0.110
Bcf/d as posted, eve cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000-0.003
Nov 100.003+0.003
Nov 90.000-0.030
Nov 80.030-0.001
Nov 70.030+0.000
Nov 60.030+0.006
Nov 50.025+0.007
Nov 40.018-0.002
Nov 30.020-0.004
Nov 20.024+0.000
Nov 10.024-0.002
Oct 310.026+0.007
Oct 300.019+0.000
Oct 290.019+0.000
Oct 280.019—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineSanta Rosa Cogen Plant (Santa Rosa Energy Center LLC)

Gulf South PipelinePlant location from EIA Form 860 (plant 55242).

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Santa Rosa Cogen Plant (Santa Rosa Energy Center LLC) (Gulf South Pipeline loc 21134) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/21134/