Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS34 -UP3

SEV 4/5
Force Majeure Until Further Notice 1 Days

NGPL has declared a force majeure at Compressor Station 34 (Unit 3) effective June 11, 2026 at 3:21 PM, with restoration targeted for June 12, 2026 at 9:00 AM -- approximately 18 hours of impact. No specific capacity volume is stated in the notice. CS34 is located on NGPL's Gulf Coast-to-Midwest mainline corridor, and the unit outage constrains northbound throughput.

NGPL force majeure at CS34 Unit 3 constrains Gulf Coast-to-Chicago northbound capacity; expect bearish Henry Hub pressure as gas backs up at Gulf Coast origin points and bullish Chicago Citygate and NGPL Midcontinent basis versus Henry Hub for the duration.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Chicago and Midwest markets and may absorb displaced volumes, though NGPL is very high capacity and a compressor outage of unknown magnitude may not be fully offset by alternatives.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] Force Majeure - Caprock Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

El Paso Natural Gas has declared a force majeure at Caprock Station effective June 9, 2026 at 4:39 PM, with an expected restoration by June 10, 2026 at 9:00 AM -- approximately 16 hours of disruption. Caprock Station is a key compressor station on EPNG's system in the Permian Basin / Southeast New Mexico corridor, affecting outbound gas flows from the Permian Basin westward. No specific capacity volume was stated in the notice.

EPNG force majeure at Caprock Station tightens Permian outbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points, though the short ~16-hour window limits sustained market impact.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal Border and Arizona deliveries and may absorb some displaced Permian volumes, but spare capacity availability on TW is uncertain and full offset is unlikely during the outage window.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure capacity constraint at the Guyman Point Group, effective June 8, 2026 at 9:00 AM through June 9, 2026 at 8:59 AM -- approximately one calendar day. No specific capacity volume is stated in the notice. Guyman Point Group is a receipt/delivery cluster on the TW system in the Texas Panhandle/Oklahoma corridor, which serves as a key supply aggregation point feeding westbound flows toward SoCal border and Arizona markets.

TW force majeure at Guyman Point Group reduces westbound takeaway capacity on one of two primary SoCal border pipelines; expect bullish pressure at SoCal Border and Arizona delivery points and bearish pressure at Permian/San Juan Basin origin points, though the short one-day duration limits sustained market impact.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona from overlapping receipt areas, and likely has spare capacity to partially absorb diverted TW volumes. However, if EPNG is simultaneously constrained, California reroute potential drops to none.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/14/2026- TE Pipeline Conditions for 06/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/14/2026- ETNG Pipeline Conditions for 06/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/14/2026- AGT Pipeline Conditions for 06/15/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/13/2026- ETNG Pipeline Conditions for 06/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/12/2026- TE Pipeline Conditions for 06/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/12/2026- NEXUS Pipeline Conditions for 6/13/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/12/2026- ETNG Pipeline Conditions for 6/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/11/2026- AGT Operational Flow Order -- EFF 6/16

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

PIP RESTR SEG 204 & SEG 187 EFF 6-12-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

PIP RESTR SEG 204 & SEG 187 UPDATE 1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[CAPACITY CONSTRAINT] PIP RESTR SEG 204 & SEG 187 UPDATE 1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[MAINTENANCE] TGP Outage Impact Report

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[CAPACITY CONSTRAINT] PIP RESTR SEG 204 & SEG 187 UPDATE 1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Index 330 Pipeline Maintenance

SEV 3/5
Maintenance 0.175 Bcf/d Until Further Notice 40 Days

Gulf South Pipeline is performing planned maintenance on the Index 330 Pipeline segment in South-Central Louisiana (St. Martinville, Opelousas, Henderson-Cecilia area) from June 15 to July 25, 2026. Seven delivery points plus five farmtaps will be shut-in for the full duration, with capacity in the Arnaudville to Bayou Sale Scheduling Group impacted by up to 175,000 Dth/d (0.175 Bcf/d) from June 16 through July 24. The notice explicitly states that all service classes, including Primary Firm Service, are at risk.

Gulf South planned maintenance removes up to 0.175 Bcf/d from the Arnaudville-to-Bayou Sale corridor through July 24, with Primary Firm Service at risk; watch for mild bullish pressure at Transco Zone 4 and Henry Hub as South Louisiana distribution demand competes for alternative supply paths over a 40-day window.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping South Louisiana and Southeast markets and may absorb some displaced volumes, but the localized distribution-level nature of the shut-in points (city gates, farmtaps) limits the practical ability of shippers to reroute end-use deliveries.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/11/2026- TE Pipeline Conditions for 06/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/11/2026- AGT Pipeline Conditions for 06/12/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/11/2026- ETNG Pipeline Conditions for 6/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/11/2026- NEXUS Pipeline Conditions for 6/12/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/11/2026- AGT Customer Specific Operational Flow Order -- EFF 6/12

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/08/2026- ETNG Pipeline Conditions for 6/9/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/09/2026- ETNG Pipeline Conditions for 6/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/10/2026- ETNG Pipeline Conditions for 6/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[CAPACITY CONSTRAINT] PIP RESTR SEG 204 & SEG 187 EFF 6-12-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[CAPACITY CONSTRAINT] PIP RESTR SEG 204 & SEG 187 EFF 6-12-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/10/2026- TE Pipeline Conditions for 6/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/10/2026- AGT Pipeline Conditions for 6/11/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR JUNE 2026 - UPDATE #2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[MAINTENANCE] EMERGENT REPAIR S CHURCH LAT EFF 6-10

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[MAINTENANCE] EMERGENT REPAIR S CHURCH LAT EFF 6-10

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR S CHURCH LAT EFF 6-10

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] OUTAGE IMPACT REPORT - 6-4-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] SEGMENT 2-CS801-UNIT MAINT

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/09/2026- TE Pipeline Conditions for 6/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/09/2026- TE Operational Flow Order -- EFF 6/11

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/09/2026- NEXUS Pipeline Conditions for 6/10/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Maintenance] LINE JM-1 INTEGRTY DIGS TERMIN

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Maintenance] LINE J INTEGRTY DIGS_TERMINATI

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/08/2026- TE Pipeline Conditions for 6/9/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/08/2026- NEXUS Pipeline Conditions for 6/9/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 9908 TVA Marshall County KY Power Plant

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Westlake Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Longview #2 Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Index 330 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 9415 Egan Hub Storage

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Index 296 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Posted Maintenance Events for 06/12/2026 - 06/18/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 8040 Florida

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 1884 Calvert City KY

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Panola Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

Sta 261 Agawam Unit Suction Valve

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[MAINTENANCE] Sta 261 Agawam Unit Suction Valve

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[MAINTENANCE] Sta 261 Agawam Unit Suction Valve

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[MAINTENANCE] MLV 204-4 TO MLV 209-4 PROJECT EXTENDED

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[MAINTENANCE] MLV 204-4 TO MLV 209-4 PROJECT EXTENDED

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] SEGMENT 26 - ILI TOOL RUNS

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] SEGMENT 25 - CS 302 - STA MAINT

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] OUTAGE IMPACT REPORT 6-11-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Safe Harbor Waiver - Loc 24329 Stratton Ridge

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Cameron LNG Feed

[MAINTENANCE] TGP SUMMER MAINTENANCE MTG 6-16-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Freeport LNG Feed

[MAINTENANCE] TGP SUMMER MAINTENANCE MTG 6-16-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Midcontinent Express

[MAINTENANCE] OUTAGE IMPACT REPORT - 6-4-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] SEG 25 - STATION MAINT - CS 343 - UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM - UPD2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM-UPD3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] TGP SUMMER MAINTENANCE MTG 6-16-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] TGP SUMMER MAINTENANCE MTG 6-16-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Failure to Take Confirmed Quantities at Location 12775

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 8040 Florida

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 32 EFFECTIVE 6-8

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 9908 TVA Marshall County KY Power Plant

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Annual Planned Maintenance 2025- 2026 Rev 25

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Safe Harbor Waiver - Loc 24329 Stratton Ridge

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Sabine Pass LNG

CTPL 2026 Planned Outage and Maintenance Summary – Updated 06.08.26

UNSCORED
Informational
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/14/2026- NEXUS Pipeline Conditions for 06/15/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/13/2026- AGT Pipeline Conditions for 06/14/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/12/2026- AGT Pipeline Conditions for 06/13/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/12/2026- AGT Pipeline Conditions for 6/12/2026 -- INTRADAY

UNSCORED
Informational
View original notice text
Loading…
East Tennessee Natural Gas

06/13/2026- Gainesboro to Monterey Isolation -- COMPLETE

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/12/2026- AGT Pipeline Conditions for 6/11/2026 -- INTRADAY

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Sea Robin Pipeline

[Sea Robin Pipeline] [Oper Alert] Sea Robin West Condensate Removal Facility Update

UNSCORED
Informational
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

MLV 204-4 TO MLV 209-4 PROJECT EXTENDED

UNSCORED
Informational
View original notice text
Loading…
Gulf South Pipeline

Index 387 Pipeline Maintenance

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/11/2026- AGT Operational Advisory

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/09/2026- AGT Pipeline Conditions for 6/10/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/11/2026- AGT W-1 Tool Run -- COMPLETE

UNSCORED
Informational
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR JUNE 2026 - UPDATE #2

UNSCORED
Informational
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/10/2026- NEXUS Pipeline Conditions for 6/11/2026

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP SUMMER MAINTENANCE MTG 6-16-26

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/08/2026- AGT Pipeline Conditions for 6/9/2026

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/08/2026- TE Somerset Station Outage -- COMPLETE

UNSCORED
Informational
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] EMERGENT REPAIR AT STA 32 EFFECTIVE 6-8

UNSCORED
Informational
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] EMERGENT REPAIR AT STA 32 EFFECTIVE 6-8

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Force Majeure] Force Majeure Complete - Guymon Lateral (Guymon Point Group) Revision 1 - Pipeline Repair

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
October 2026
504 notices
September 2026
782 notices
August 2026
2,480 notices
July 2026
703 notices
June 2026
586 notices
May 2026
506 notices
April 2026
722 notices
March 2026
467 notices