Tallgrass Energy

[Trailblazer Pipeline (TPC)] [OPERATIONAL ALERT] THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #14

SEV 5/5
Compressor Issue 0.808 Bcf/d Until Further Notice

Trailblazer Pipeline Segment 20 remains restricted to 0.808 Bcf/d effective Gas Day June 2, 2026, until further notice due to an ongoing third-party operational issue at Bertrand Compressor Station -- now in its 14th update. Primary firm, secondary firm, and ITS/AOR quantities are all explicitly at risk of not being scheduled. No restoration timeline has been provided.

Bertrand CS constraint caps Trailblazer at 0.808 Bcf/d with firm service at risk; because REX leases capacity at the same Bertrand CS facility, these two Rockies eastbound pipes are simultaneously constrained -- expect continued bearish pressure on Rockies basin (CIG/Cheyenne Hub) as eastbound takeaway remains impaired with no reroute.
Reroute: None: Trailblazer and REX share the Bertrand Compressor Station -- the same third-party facility constraining Trailblazer simultaneously affects REX Zone 1, eliminating the primary reroute alternative for Rockies eastbound volumes.
View original notice text
Loading…
Rockies Express

[OPERATIONAL ALERT] BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #14

SEV 5/5
Compressor Issue 1.115 Bcf/d Until Further Notice

Rockies Express Bertrand Compressor Station operational issue (Update #14) restricts Segment 250 West-to-East capacity to 1.115 Bcf/d effective Gas Day June 2, 2026, until further notice. Primary firm, secondary firm, and interruptible service are all at risk of not being scheduled. No restoration timeline has been provided.

REX Segment 250 constrained to 1.115 Bcf/d W-to-E with primary and secondary firm at risk; Trailblazer shares Bertrand CS and is simultaneously affected -- expect bullish pressure at Midcontinent and Chicago Citygate as Rockies takeaway is curtailed with zero independent reroute.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both are simultaneously constrained by the same facility, leaving no independent reroute for Rockies eastbound volumes. CIG provides limited alternative egress but cannot absorb full displaced volumes.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure capacity constraint at the Guyman Point Group, effective June 8, 2026 at 9:00 AM through June 9, 2026 at 8:59 AM -- a roughly 24-hour outage window. No specific volume figure is provided in the notice. Guyman is a major receipt/delivery group on TW serving the Oklahoma/Texas Panhandle corridor, with westbound flow implications toward SoCal border and Arizona delivery points.

TW force majeure at Guyman Point Group reduces westbound takeaway capacity for one day; expect bearish pressure at Waha and San Juan Basin receipt points with bullish pressure at SoCal Border and Arizona delivery points -- EPNG is the primary reroute alternative but may lack sufficient spare capacity to fully absorb curtailed TW volumes.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona delivery points from the same supply basin; however, if EPNG is also running near capacity, reroute relief will be limited and SoCal Border basis tightening could be material for the duration.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure capacity constraint at the Guyman Point Group, effective June 7, 2026 at 9:00 AM through June 8, 2026 at 8:59 AM -- a roughly 24-hour event. No specific capacity volume is stated in the notice. Guyman is a key receipt/delivery group on Transwestern serving the Oklahoma/Texas Panhandle corridor that feeds westbound flows toward SoCal Border and Arizona delivery points.

TW force majeure at Guyman Point Group removes unquantified westbound takeaway capacity for approximately 1 day; expect bullish pressure at SoCal Border and Arizona delivery points, with mild bearish pressure at upstream Panhandle/Anadarko Basin receipt points -- no volume disclosed so magnitude is uncertain but FM status warrants severity 4.
Reroute: Moderate: EPNG (El Paso Natural Gas) is the primary competing pipeline serving SoCal Border and Arizona markets from the east; however, if EPNG is also capacity-constrained, California supply relief would be severely limited. Guyman Point Group serves the Oklahoma/Texas Panhandle corridor, where EPNG may provide partial alternative westbound capacity.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure at the Guyman Point Group, effective June 7, 2026 at 9:00 AM through June 8, 2026 at 8:59 AM -- a one-day event. No specific capacity volume is stated in the notice. Guyman Point Group is a receipt cluster on Transwestern that pulls Permian and San Juan Basin production westbound toward SoCal Border and Arizona delivery markets.

TW force majeure at Guyman Point Group tightens westbound Permian/San Juan takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points -- no volume stated but reroute depends on available EPNG spare capacity.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline serving SoCal Border and Arizona from the Permian Basin; however, if EPNG is simultaneously constrained or running near capacity, reroute options are effectively none for California-bound volumes.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared Force Majeure at the Guyman Point Group, effective June 6 2026 at 9:00 AM through June 7 2026 at 8:59 AM -- a one-day event. No specific capacity volume is stated in the notice. Guyman Point Group is a receipt cluster on the Transwestern system in the Oklahoma/Texas Panhandle/San Juan Basin corridor, meaning gas cannot move westbound toward SoCal border and Arizona delivery points.

TW force majeure at Guyman Point Group constrains westbound capacity toward SoCal Border and Arizona for approximately one day; expect mild bullish pressure at SoCal Border with corresponding bearish pressure at Guyman/Panhandle receipt-side points -- no capacity figure provided limits sizing of the move.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona delivery points from the Southwest corridor, and likely has some spare capacity to absorb displaced Transwestern volumes for a one-day event. However, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Gulf South Pipeline

Unplanned Bistineau Compressor & Storage Field Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/07/2026- ETNG Pipeline Conditions for 6/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/07/2026- TE Pipeline Conditions for 6/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/07/2026- NEXUS Pipeline Conditions for 6/8/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Failure To Take Confirmed Quantities - Loc 24329 Stratton Ridge to Freeport LNG

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/06/2026- TE Pipeline Conditions for 6/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/06/2026- ETNG Pipeline Conditions for 6/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT MLV 533-2 - 534-2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR JUNE 2026 - UPDATE #1

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Vernon Planned Maintenance UPDATE

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/05/2026- TE Pipeline Conditions for 6/6/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/05/2026- ETNG Pipeline Conditions for 6/6/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/02/2026- ETNG Pipeline Conditions for 6/3/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/03/2026- ETNG Pipeline Conditions for 06/04/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/04/2026- ETNG Pipeline Conditions for 6/5/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/04/2026- TE Pipeline Conditions for 6/5/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/03/2026- TE Pipeline Conditions for 6/4/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/02/2026- TE Pipeline Conditions for 6/3/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] OFO CD1 LIFTED FOR Z 4,5&6 EFF 6-3-26

SEV 3/5
lifted ✓ Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR MLV 4-1 TO 8-1 EFF 6-2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] EMERGENT REPAIR MLV 4-1 TO 8-1 EFF 6-2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] EMERGENT REPAIR MLV 4-1 TO 8-1 EFF 6-2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/01/2026- TE Pipeline Conditions for 6/2/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/01/2026- NEXUS Pipeline Conditions for 06/02/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

06/01/2026- ETNG Pipeline Conditions for 6/2/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] SOC System Wide Pack - Update #1

SEV 3/5
Operational Alert Until Further Notice 1 Days

EPNG has issued a System-Wide Pack Operational Flow Order effective 06/01/2026 at 9:33 AM through 06/02/2026 at 9:00 AM. The OFO requires shippers to maintain or increase system line pack across the entire EPNG system, restricting nomination flexibility for one day. No specific capacity volume is stated in the notice.

EPNG system-wide pack OFO constrains shipper scheduling flexibility across the full Permian-to-California corridor for approximately one day; expect mild bearish pressure at Waha as outbound nominations are restricted, with modest bullish signal at SoCal Border and Arizona delivery points if westbound throughput is curtailed.
Reroute: Moderate: Transwestern Pipeline (TW) serves overlapping SoCal border and Arizona markets and can absorb some displaced Permian westbound volumes, though pack OFOs typically reflect system-wide stress that may limit the degree of reroute benefit.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Montz Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Index 1-2 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Heidelberg Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Index 818 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Index 817 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Index 817 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Index 817 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Posted Maintenance Events for 06/05/2026 - 06/11/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Carthage Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Carthage Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/06/2026- NEXUS Pipeline Conditions for 6/7/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Failure to Take Confirmed Quantities at Location 23074

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/05/2026- NEXUS Pipeline Conditions for 6/6/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Index 301-6 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

ID1 Scheduled Quantities Posting Delayed 6/5/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

OFO DAILY CD1 LIFTED EFFECTIVE 6-4-2026

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/03/2026- TE Operational Flow Order -- EFF 6/5

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

OFO CD1 LIFTED FOR Z 4,5&6 EFF 6-3-26

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] SOC Lifted - System Wide Pack

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] OFO CD1 LIFTED FOR Z 4,5&6 EFF 6-3-26

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Failure to Take Confirmed Quantities at Various Locations

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Safe Harbor Waiver - Loc 24329 Stratton Ridge

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Corpus Christi LNG

Quorum Server Maintenance June 04, 2026, 10:15PM to June 05, 2026, 12:00AM

UNSCORED
Informational
View original notice text
Loading…
Corpus Christi LNG

CTPL MAY 2026 Invoices

UNSCORED
Informational
View original notice text
Loading…
Corpus Christi LNG

CTPL – Gas Quality Daily Report CORRECTION_March 6, 2026 to June 3, 2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/07/2026- AGT Pipeline Conditions for 6/8/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/06/2026- AGT Pipeline Conditions for 6/7/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/05/2026- AGT Pipeline Conditions for 6/6/2026

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Gulf South Pipeline

Intra Day 2 Cycle for 6/5/2026 Nomination Deadline Extended

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

06/03/2026- AGT Pipeline Conditions for 6/4/2026

UNSCORED
Informational
View original notice text
Loading…
Gulf South Pipeline

ID1 Scheduled Quantities Posting Delayed 6/5/2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/05/2026- TE Meter Underperformance

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] GUYMAN POINT GROUP

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/03/2026- AGT Operational Flow Order -- EFF 6/5

UNSCORED
Informational
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

RESRICTIONS FOR 06-05-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Force Majeure] Force Majeure - Guymon Lateral (Guymon Point Group) - Pipeline Repair

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/01/2026- TE Hanover Compressor Station Maintenance -- COMPLETE

UNSCORED
Informational
View original notice text
Loading…
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR JUNE 2026 - UPDATE #1

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/04/2026- AGT Pipeline Conditions for 6/5/2026

UNSCORED
Informational
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/04/2026- NEXUS Pipeline Conditions for 6/5/2026

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP SUMMER MAINTENANCE MTG 5-16-2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/03/2026- NEXUS Pipeline Conditions for 6/4/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/01/2026- AGT Pipeline Conditions for 06/02/2026

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] OFO DAILY CD1 LIFTED EFFECTIVE 6-4-2026

UNSCORED
lifted ✓ Informational
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] OFO DAILY CD1 LIFTED EFFECTIVE 6-4-2026

UNSCORED
lifted ✓ Informational
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

06/02/2026- NEXUS Pipeline Conditions for 06/03/2026

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

06/02/2026- AGT Pipeline Conditions for 06/03/2026

UNSCORED
Informational
View original notice text
Loading…
Trunkline Gas Company

[Trunkline Gas Company] [Maint] Trunkline South Texas Maintenance Update #4

UNSCORED
Informational
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

MONTHLY STORAGE TRANSFER REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

TMY Scheduled Quantities Posting Delayed for 6/2/2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

06/01/2026- TE Hanover Compressor Station Maintenance -- COMPLETE

UNSCORED
Informational
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[STORAGE] MONTHLY STORAGE TRANSFER REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[STORAGE] MONTHLY STORAGE TRANSFER REMINDER

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

ID1 Scheduled Quantities Posting Delayed 6/5/2026

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Annual Planned Maintenance 2025- 2026 Rev 24

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Minimum Flow Design

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Notice of Revised Baseline GPPL Tariff December 1, 2025

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Updated Fuel Rates for April 1, 2026

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Mile Post 33 Ready for Operations

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Golden Pass Pipeline

Mile Post 69 Ready for Operations

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] EMERGENT REPAIR AT MLV 533-2 - 534-2

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] EMERGENT REPAIR AT MLV 533-2 - 534-2

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] SEGMENT 2-CS801-UNIT MAINT

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] Force Majeure - Line 1102 Update #1

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] TGP Outage Impact Report

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] TGP Outage Impact Report

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] FORCE MAJEURE-REMEDIATION-CS341-UPD1

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] SEG 25 - STATION MAINT - CS 343 - UPD1

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM - UPD2

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM-UPD3

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] OUTAGE IMPACT REPORT - 6-4-26

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] OUTAGE IMPACT REPORT - 6-4-26

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] OUTAGE IMPACT REPORT - 6-4-26

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Tallgrass Interstate Gas Transmission (TIGT)] [FORCE MAJEURE] SEGMENT 60 - NOTICE OF FORCE MAJEURE - LIFTED

SEV 1/5
lifted ✓ Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] SOC Lifted - System Wide Draft

SEV 1/5
lifted ✓ Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Operations Planning Report V3 June 2026

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] PHMSA MEGA RULE-CS184/154 PLM-UPD3

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] Initial Force Majeure - Line 1102

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] Updated June 2026 Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] TGP SUMMER MAINTENANCE MTG 5-16-2026

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[MAINTENANCE] TGP SUMMER MAINTENANCE MTG 5-16-2026

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Kinder Morgan (multi-pipeline)

[OPERATIONAL FLOW ORDER] SOC Declaration - System Wide Draft

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Tallgrass Interstate Gas Transmission (TIGT)] [FORCE MAJEURE] SEGMENT 60 - NOTICE OF FORCE MAJEURE

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Safe Harbor Waiver - Loc 24329 Stratton Ridge

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Index 301-6 Pipeline Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Carthage Compressor Station Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Index 818 Pipeline Maintenance

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Failure to Take Confirmed Quantities at Various Locations

SEV 1/5
Seeded

Seeded on first parser run -- alert suppressed.

No alert -- historical backfill.
Reroute: Not assessed.
View original notice text
Loading…
October 2026
504 notices
September 2026
782 notices
August 2026
2,480 notices
July 2026
703 notices
June 2026
586 notices
May 2026
506 notices
April 2026
722 notices
March 2026
467 notices