Enercast — at the moment it matters
Enercast  /  Critical Notices  /  Archive  /  October 2026

Pipeline Notices — October 2026

1,083 notices recorded · 77 rated severity 4–5

Every notice, by week

77 notices

The month’s most market-relevant notices, highest severity first. Routine postings (severity 1–3) are on the week pages.

Columbia Gas Transmission (TCO)

Force Majeure – MXP Line, Effective October 14, 2026

SEV 5/5
Force Majeure 1.900 Bcf/d Until Further Notice

TCO has declared a new Force Majeure effective Gas Day October 14, 2026, due to a detected leak near the Saunders Creek Regulator Station in West Virginia on MXP Line-100 -- explicitly separate from the September 24 FM (Notice 26276009). Effective the Evening Cycle of October 15 and until further notice, scheduled volumes through the MXPSEG MA42 internal constraint are reduced to zero total capacity, with estimated firm service impact of 1.9 MMDth/d (1.9 Bcf/d). Live capacity data at MXPSEG (loc_id MXPSEG, dir TD1:SGQ:FTS) already shows NON-FIRM-RESTRICTED with zero operating capacity posted against 1.85 Bcf/d scheduled as of the timely cycle on Oct 14, corroborating the constraint. TCO will provide an update by Friday morning October 16.

New TCO force majeure on MXP Line-100 eliminates 1.9 Bcf/d of Appalachian firm transport capacity to zero effective Oct 15 evening cycle (MXPSEG already NON-FIRM-RESTRICTED at 1.85 Bcf/d scheduled vs zero operating capacity in the Oct 14 timely cycle); expect significant bullish pressure on Dominion South, TETCO M2, and downstream Mid-Atlantic basis, with bearish pressure at Appalachian receipt points where gas backs up in-basin -- this is a second, independent TCO FM active simultaneously with the Sep 24 event.
Reroute: Limited to moderate: TETCO (monitored) and Equitrans serve overlapping Appalachian markets and provide partial reroute, but with 1.9 Bcf/d of firm capacity offline and a simultaneous active TCO force majeure from September 24 still in effect, the combined system stress severely limits practical bypass options for affected shippers.
View original notice text
Loading…
Maintenance 0.400 Bcf/d cut (capped at 1.130 Bcf/d) Until Further Notice 6 Days

Revision 2 of CTPL's 2026 Planned Outage and Maintenance Summary extends the overall coverage window to January 16, 2027 and adds a new job (2026114): a 15-hour compressor maintenance event at Gillis Compressor Station on November 17, with a stated transport impact of 400,000 Dth/d (0.400 Bcf/d) and available capacity of 1.130 Bcf/d. The previously known highest-impact job (2026115, Station Upgrades at Gillis, 11/12-11/18, 6 days) remains unchanged with zero transport impact Dths and a TETCO CT109413 meter limit of zero. The dominant capacity-impact job is 2026115 by duration, but 2026114 carries the larger explicit transport impact at 0.400 Bcf/d for 15 hours.

New 15-hour Gillis compressor maintenance job (2026114, 11/17) posts 0.400 Bcf/d transport impact alongside the ongoing 6-day Station Upgrade (2026115, 11/12-11/18) zeroing the TETCO CT109413 meter, reducing Sabine Pass LNG feedgas throughput and applying bearish pressure on Henry Hub as LNG export capacity is curtailed; live CT109413 row confirms 0.650 Bcf/d operating capacity currently at zero scheduled flow.
Reroute: None: Creole Trail Pipeline is the dedicated feedgas header for Sabine Pass LNG; there is no alternative pipeline path to substitute for Gillis Compressor Station capacity serving this terminal.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure- Roswell Station

SEV 4/5
Force Majeure 0.175 Bcf/d

EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) effective November 1, 2026 Evening Cycle (Cycle 2). No restoration timeline has been provided; EPNG states it is evaluating repair options and will post a separate updated maintenance notice reflecting total impact.

EPNG Roswell force majeure removes 0.175 Bcf/d through the CAPROCK N constraint; expect bearish pressure at Waha/Permian as eastbound New Mexico takeaway is curtailed, with mild bullish pressure at SoCal border and Arizona delivery points as westbound supply is reduced.
Reroute: Moderate: Transwestern Pipeline (TW) serves overlapping SoCal border and Arizona markets and may absorb some displaced volumes, but the extent of spare capacity on TW is unknown; simultaneous TW tightness would eliminate this option entirely.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the East Mainline effective November 1, 2026 at 9:00 AM through November 2, 2026 at 8:59 AM. This notice (TW-121714) supersedes prior posting TW-121720, which covered October 31 - November 1; the effective window has shifted forward by one day. No capacity volume is stated in the notice, so the magnitude of the constraint is unquantified, but force majeure on TW's East Mainline represents a westbound constraint on Permian/San Juan outbound capacity.

TW East Mainline force majeure (volume unquantified) tightens westbound Permian/San Juan takeaway on Nov 1; expect bearish pressure at Waha and Transwestern Permian basis as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- EPNG is the only reroute alternative if TW capacity is materially reduced.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline for SoCal border and Arizona deliveries; however, if EPNG is also constrained simultaneously, no California reroute exists.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has reposted the East Mainline force majeure under a new notice ID (121720), effective Oct 31 9:00AM through Nov 1 8:59AM -- identical window and operational content to TW-121709 posted earlier the same day. No capacity volume has been quantified in either posting. The force majeure remains active on the East Mainline for the current gas day only.

TW East Mainline force majeure continues through Nov 1 8:59AM with no volume quantified -- expect bearish Waha/Transwestern Permian basis as basin gas backs up, and bullish pressure at SoCal Border and Arizona delivery points; this is an administrative repost with no new operational information versus TW-121709.
Reroute: Moderate: EPNG serves the same SoCal border and Arizona markets; however, if EPNG is simultaneously constrained, no California reroute exists and the bullish SoCal impact intensifies materially.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a force majeure on the East Mainline effective Oct 31 9:00AM through Nov 1 8:59AM, reissued under notice ID 121709 (supersedes TW-121698). No new operational information is present -- the window, reason, and location are identical to the prior posting. No capacity volume has been quantified in either notice.

TW East Mainline force majeure active through Nov 1 8:59AM -- expect bearish pressure at Waha and Transwestern Permian basis as Permian Basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points; no capacity volume quantified in either posting.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries from the Permian Basin; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline reposted the East Mainline force majeure under a new notice ID (121698) with no operational changes from TW-121687. The constraint remains in effect from Oct 31 9:00AM through Nov 1 8:59AM. No capacity volume has been quantified in either posting.

TW East Mainline force majeure remains active through Nov 1 8:59AM -- expect continued bearish pressure at Waha and Transwestern Permian basis as Permian Basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points; no capacity volume quantified.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries; however, if EPNG is simultaneously constrained, California reroute options become effectively zero.
View original notice text
Loading…
Golden Pass Pipeline

Minimum Flow Design

SEV 4/5
Operational Alert Until Further Notice

Golden Pass Pipeline LLC (Sabine Pass, TX to Starks, LA) posted a Critical notice on October 30, 2026 regarding a Minimum Flow Design requirement on its LNG export feed gas pipeline, which has capacity of up to 2.6 Bcf/d. The notice does not specify the magnitude of the minimum scheduled volume restriction or a restoration timeline. Given Golden Pass Pipeline serves an LNG export terminal, any feed gas constraint is a direct bearish signal for Gulf Coast domestic supply balances.

Golden Pass Pipeline minimum flow design notice constrains LNG export feed gas on a system capable of up to 2.6 Bcf/d; impact volume is unquantified but expect mild bearish pressure at Houston Ship Channel and Henry Hub as restricted feed gas volumes remain in the domestic market.
Reroute: None: Golden Pass Pipeline is a dedicated LNG export feed gas pipeline serving the Golden Pass LNG terminal at Sabine Pass, TX; no reroute exists for export volumes.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a new force majeure notice (TW-121687) extending the East Mainline capacity constraint by one additional gas day, now effective Oct 31 9:00AM through Nov 1 8:59AM, following the prior posting (TW-121681) that covered Oct 30 9:00AM through Oct 31 8:59AM. No capacity volume has been quantified in either posting. The extension indicates the force majeure condition on the East Mainline has not been resolved and continues into the Nov 1 gas day.

TW East Mainline force majeure extended through Nov 1 8:59AM; expect continued bearish pressure at Waha and Transwestern Permian basis as Permian Basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no capacity volume quantified but the constraint is a day longer than previously known.
Reroute: Moderate: EPNG serves the same SoCal border and Arizona markets and is the primary competing pipeline for westbound Permian gas; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has reposted its East Mainline force majeure under a new notice ID (121681), with no operational change from the prior posting TW-121668. The force majeure remains in effect from Oct 30 9:00 AM through Oct 31 8:59 AM, continuing to restrict westbound Permian/San Juan takeaway capacity. No capacity volume is quantified in this notice.

TW East Mainline force majeure continues through Oct 31; expect bearish pressure at Waha and Transwestern Permian basis as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- no capacity volume quantified and this posting is an administrative repost with no new operational information.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border deliveries, but simultaneous EPNG constraints would eliminate California reroute entirely; check EPNG status before assuming offset capacity is available.
View original notice text
Loading…
Capacity Constraint capped at 0.808 Bcf/d, cut unknown

Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remains unresolved, with primary firm, secondary firm, and ITS/AOR quantities all at risk of not being scheduled. REX shares Bertrand CS with Trailblazer, meaning no independent reroute exists.

Trailblazer Segment 20 cap tightens marginally to 0.808 Bcf/d (from 0.816 Bcf/d) with firm service still at risk UFN; expect continued bearish pressure at Cheyenne Hub (regional proxy) as Rockies eastbound takeaway is constrained, with no independent reroute available given REX's shared use of Bertrand CS.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both are simultaneously affected by the same third-party facility, so no independent reroute exists for Trailblazer Segment 20 volumes.
View original notice text
Loading…
Compressor Issue capped at 1.133 Bcf/d, cut unknown

REX Update #19 continues the Bertrand Compressor Station operational issue on Segment 250, raising the West-to-East capacity cap marginally to 1.133 Bcf/d (from 1.094 Bcf/d in Update #18), effective Timely cycle Gas Day November 1, 2026, until further notice. Primary firm, secondary firm, and ITS/AOR remain at risk of not being scheduled at this capacity level. No restoration timeline has been provided.

REX Seg 250 W-to-E cap ticked up to 1.133 Bcf/d from 1.094 Bcf/d -- a marginal easing but primary firm remains at risk UFN; Trailblazer shares Bertrand CS and cannot serve as an independent reroute, so Lebanon Hub and Midwest basis pressure persists with no effective bypass.
Reroute: None: Trailblazer leases capacity at Bertrand CS on REX and is simultaneously constrained by the same facility, making it an independent reroute in name only. No other viable westbound Rockies alternative can absorb displaced volumes.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2 - 4 -- UNPLANNED OUTAGE

SEV 4/5
Capacity Constraint capped at 1.528 Bcf/d, cut unknown

TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of approximately 1.528 Bcf/d at Tompkinsville, Barton, and Danville stations, with no restoration timeline provided (UFN). Receipt meters between Berne and Uniontown compressor stations are also experiencing higher-than-normal pressures until further notice.

TETCO unplanned Line 15 outage caps southbound 30-inch system capacity to ~1.528 Bcf/d at the Tompkinsville/Barton/Danville bottleneck with no restoration date; net reduction is unquantified without a pre-event baseline for these mainline stations, but the UFN duration and unplanned nature support bullish M-3 Mid-Atlantic basis pressure and bearish pressure on Appalachian M-2 receipt points as northbound Marcellus gas is stranded.
Reroute: Moderate: TETCO M-2 volumes may seek alternative southbound or eastbound paths via TCO (Columbia Gas Transmission) or Transco, but TETCO is one of the highest-capacity Appalachian takeaway pipes and partial reroute will not fully offset a multi-station mainline restriction.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2 - 4 -- Force Majeure

SEV 4/5
Force Majeure

TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this time'), and remediation plans are still being developed. No specific capacity volume has been stated in the notice, and the Tompkinsville, KY delivery meter (loc_id 70429) shows negligible scheduled flow (0.0 Bcf/d) as of 2026-10-30, suggesting the constraint is on the mainline compressor/segment rather than captured at that small delivery tap.

TETCO Force Majeure on Line 15 north of Tompkinsville, KY (UFN) restricts northbound capacity on the 30-inch system through Kentucky, bullish TETCO M-3 Mid-Atlantic basis as Appalachian-origin and Gulf Coast gas moving toward M-3 and Northeast markets faces reduced throughput; no volume quantified in notice.
Reroute: Limited to moderate: Texas Eastern (TETCO) is one of two dominant high-capacity pipelines moving gas north toward Mid-Atlantic and Northeast markets, with Transco providing the primary alternative for M-3 deliveries. However, Transco's own utilization in this corridor frequently runs high, and full reroute of any significant TETCO Line 15 volume constraint is unlikely without basis widening.
View original notice text
Loading…
Algonquin Gas Transmission

Weymouth Compressor Station Unplanned Outage

SEV 4/5
Compressor Issue capped at 0.020 Bcf/d, cut unknown 6 Days

Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through the duration of the outage, with an expected return to service for Gas Day October 23. The National Grid-Weymouth delivery point (loc_id 00827) showed zero scheduled throughput in the pre-event baseline (median 0.00 Bcf/d), suggesting the primary physical constraint falls on mainline south-to-north flow compression rather than the metered delivery tap itself.

Weymouth CS zero-flow restriction from Oct 18 blocks south-to-north Algonquin mainline compression for up to 6 gas days, tightening New England supply access and expect bullish pressure at Algonquin Citygate; the pre-event National Grid-Weymouth delivery meter showed 0.00 Bcf/d scheduled (loc_id 00827), so the volume impact is unquantified from posted meter data alone but the mainline compression loss is real and directionally bullish for New England basis.
Reroute: Limited to none: Algonquin and Iroquois are the two primary pipelines serving New England; Weymouth is a key mainline compression point on Algonquin's south-to-north mainline, and no bypass compressor path exists to fully replace its function for northbound flow into Boston-area markets.
View original notice text
Loading…
Algonquin Gas Transmission

AGT Force Majeure

SEV 4/5
Force Majeure 7 Days

Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of approximately 7 days. No specific capacity volume is stated in the notice; pre-event flow data for the Weymouth area is not directly available in the POINT HISTORY block, so a grounded net reduction cannot be calculated.

AGT Weymouth force majeure tightens New England supply through October 23; expect bullish pressure at Algonquin Citygate as a key Boston-area compressor is offline with no reroute alternative -- Iroquois is the only partial mitigation but does not serve the same downstream points.
Reroute: Limited to none: Algonquin is one of two primary pipelines serving New England, and Weymouth compressor serves the Boston delivery area specifically; Iroquois Gas Transmission provides partial alternative for some southern New England and New York metro points but cannot replace Weymouth-dependent volumes into the Boston market.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure on the East Mainline effective Oct 30, 2026 9:00 AM through Oct 31, 2026 8:59 AM. This notice extends the prior posting (TW-121675) by one day, shifting the effective window forward from Oct 29-30 to Oct 30-31. No specific capacity volume is stated; the event affects the mainline outbound corridor moving Permian and San Juan Basin gas toward SoCal and Arizona markets.

TW East Mainline force majeure extended through Oct 31 tightens Permian/San Juan takeaway westbound; expect bearish pressure at Waha and TW Permian basis with bullish pressure at SoCal Border and Arizona delivery points, though no capacity volume is quantified in this notice.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary competing pipeline; however, a simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the East Mainline for the gas day Oct 29-30, 2026 (9:00 AM Oct 29 through 8:59 AM Oct 30). This notice (TW-121675) is a repost of the same event under a new notice ID with no operational change from TW-121664 rev 1 -- the constraint window and FM basis are identical. No capacity volumes are stated in the notice.

TW East Mainline FM remains active for Oct 29-30 gas day with no new operational content vs prior posting; bearish pressure at Permian and San Juan basin as westbound takeaway is cut, bullish SoCal Border and Arizona delivery points -- no volume figure to quantify the cut.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets as the primary competing pipeline, but any simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a new notice (TW-121664) for a force majeure on the East Mainline, revising the effective window earlier to Oct 29 9:00AM through Oct 30 8:59AM -- one full gas day earlier than the prior notice TW-121656, which covered Oct 30-Oct 31. This represents a net shortening of the constraint by one gas day, as the window appears to have been pulled forward rather than extended. No capacity volumes are stated in the notice.

TW East Mainline force majeure window revised forward to Oct 29-30 (from Oct 30-31 in prior notice), effectively shortening total constraint duration by one gas day -- bearish update for the event, but the FM remains active today trapping Permian and San Juan supply at the basin with ongoing bearish pressure at Waha and bullish pressure at SoCal Border and Arizona delivery points.
Reroute: Moderate: EPNG serves the same SoCal Border and Arizona markets from the Permian Basin, but if EPNG is simultaneously constrained no California reroute exists; check EPNG conditions before assuming offset.
View original notice text
Loading…
Force Majeure capped at 2.800 Bcf/d, cut unknown 10 Days

Gas Transmission Northwest has declared a Force Majeure due to an unexpected equipment failure at Wallula Compressor Station Unit A, impacting capacity at Flow Past Kingsgate (LOC #3500). Effective 10/29 intraday, no incremental volumes will be scheduled; from 10/30 through 11/7, available capacity at Kingsgate is restricted to 2,800 MMcf/d (2.800 Bcf/d). GTN warns that Firm Primary, Firm Secondary, and Interruptible curtailments may result, with the Reservation Charge Crediting Mechanism applicable.

GTN force majeure caps Flow Past Kingsgate at 2.800 Bcf/d through 11/7 with firm curtailments at risk; without a grounded pre-event baseline, the net reduction is unquantified but the Firm Primary curtailment warning is bullish for Pacific Northwest (Stanfield, Sumas) and PG&E Malin basis through the outage window.
Reroute: Limited: Northwest Pipeline (NWP) provides some Pacific Northwest supply alternative, but cannot fully replace Kingsgate import volumes; Ruby Pipeline serves California via Malin from the Rockies but originates from a different supply basin and may lack sufficient spare capacity to offset constrained Canadian flows.
View original notice text
Loading…
Force Majeure 1 Days

GTN has declared a Force Majeure due to an unexpected equipment failure at Starbuck Compressor Station Unit D, impacting Flow Past Kingsgate (LOC #3500). The restriction is limited to the intraday window on 10/29 only -- no incremental volumes will be scheduled for the remainder of that gas day. Critically, GTN states there is no capacity impact for 10/30 through 11/7, making the operational disruption a single-day intraday event despite the 11/8 end date on the notice; firm, secondary, and interruptible curtailments are possible during the active 10/29 window.

GTN FM at Starbuck Compressor Unit D curtails incremental Kingsgate nominations on 10/29 intraday only -- bullish Sumas and PNW border basis near-term, with no stated physical impact beyond today; watch for update if outage extends into 10/30 flow.
Reroute: Limited: GTN is one of the primary Western Canadian import corridors into the Pacific Northwest and California via Malin; partial reroute may be possible via Northwest Pipeline for PNW-destined volumes, but California-bound gas via Malin has fewer alternatives.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a new force majeure notice (TW-121656) extending the East Mainline capacity constraint by one gas day -- the effective window now covers Oct 30 9:00AM through Oct 31 8:59AM, replacing the prior notice TW-121649 which covered Oct 29-30. No capacity volume is stated in either notice. The force majeure on the East Mainline continues to constrain westbound Permian and San Juan Basin takeaway for another gas day.

TW East Mainline force majeure now extended through Oct 31 8:59AM (one additional gas day vs prior notice), continuing to trap Permian and San Juan supply at the basin -- expect ongoing bearish pressure at Waha and Transwestern Permian basis, with bullish pressure at SoCal Border and Arizona delivery points; no capacity volume stated but the constraint is confirmed active for the Oct 30-31 gas day.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary alternative to Transwestern; however, if EPNG is simultaneously constrained, California reroute options are effectively none.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline declared a force majeure on the East Mainline effective Oct 29 at 9:00 AM through Oct 30 at 8:59 AM. No capacity volume is stated in the notice. This posting (TW-121649) is an administrative repost of TW-121637 under a new notice ID with no change to the effective window, location, or operational content.

TW East Mainline force majeure constrains westbound Permian/San Juan takeaway for one gas day (Oct 29-30) with no stated volume; expect bearish pressure at Transwestern Permian and Waha basis as basin gas backs up, with corresponding bullish pressure at SoCal Border and Arizona delivery points -- capacity data shows SOCAL NEEDLES running at 63.6% utilization (0.541 Bcf/d scheduled of 0.850 Bcf/d operating) in the evening cycle, consistent with some westbound flow restriction.
Reroute: Moderate: EPNG is the primary alternative for SoCal border and Arizona deliveries, but a simultaneous EPNG constraint would eliminate California reroute entirely; absent a confirmed EPNG event, partial offset is possible.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure -Waha to Gresham Update #2

SEV 4/5
Force Majeure

EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial Receipt/Delivery and Armadillo Delivery points from Update #1. Pipeline replacement is required and the capacity reduction remains in effect until further notice. The cumulative scope of zeroed points is expanding with each update, and no restoration timeline has been provided.

EPNG FM on Line 1600 (Waha to Gresham) continues to expand scope with WA CORN now zeroed in addition to Imperial and Armadillo; expect continued bearish pressure at Waha as Permian basin gas backs up, with sustained bullish pressure at SoCal Border and Arizona delivery points as westbound capacity remains cut UFN with pipeline replacement required.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some displaced Permian volumes, though the cumulative scope of this FM across multiple constraint points limits full offset; simultaneous TW constraint would eliminate California reroute entirely.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure -Waha to Gresham Update #1

SEV 4/5
Force Majeure

EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045) and Armadillo Delivery (loc 50647) -- are being reduced to zero Dth/d effective October 29 Intraday 1 Cycle, as they fall within the isolated valve section. The FM constraint on Line 1600 remains in effect until further notice with no restoration timeline.

EPNG FM on Line 1600 (Waha to Gresham) expands scope with Imperial and Armadillo points zeroed and pipeline replacement now required, extending UFN duration; expect continued bearish pressure at Waha as Permian basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points on reduced westbound capacity.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and can absorb some displaced Permian volumes, but the UFN duration and expanding scope of this FM increase the risk that TW spare capacity is insufficient to fully offset the Line 1600 loss.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Waha to Gresham

SEV 4/5
Force Majeure capped at 0.250 Bcf/d, cut unknown

EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Evening Cycle on October 29; Blake Draw Receipt and Delivery points (loc 49073/49074) are simultaneously curtailed to 55,241 Dth/d and zero respectively. The restriction is in effect until further notice with no stated restoration timeline.

EPNG FM on Line 1600 (Waha to Gresham) curtails westbound Permian takeaway to 0.250 Bcf/d initially then zero UFN; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- live capacity data for Blake Draw Receipt (loc 49073, id2 cycle, 2026-10-28) showed 0.176 Bcf/d operating capacity pre-event, consistent with the notice magnitude, though that reading predates the force majeure declaration.
Reroute: Moderate: Transwestern Pipeline (TW) also serves the SoCal border from Permian/San Juan origins and is the primary competing alternative, though spare capacity is not confirmed; if TW is simultaneously constrained, California reroute options become very limited.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure on the East Mainline effective Oct 29, 2026 at 9:00 AM through Oct 30, 2026 at 8:59 AM (approximately 24 hours). This is a revised posting of a prior notice (TW-121643) that covered Oct 28-29; the window has shifted one day forward with no stated capacity volume. No specific capacity restriction volume is provided in the notice.

TW East Mainline force majeure (Oct 29-30) restricts westbound Permian/San Juan takeaway with no stated volume; expect bearish pressure at Transwestern Permian and Waha basis with bullish SoCal Border and Arizona delivery points, and note the effective window shift one day later than the prior posting represents a later-than-expected resolution signal.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets from the Permian Basin and could absorb some displaced volumes, but any simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has reposted the East Mainline force majeure under a new notice ID (TW-121643), covering Gas Day Oct 28 through Oct 29 8:59AM -- identical to TW-121630 in every operational respect. No capacity figures are stated; the prior posting showed SOCAL NEEDLES running at 53.8% utilization (0.457 Bcf/d scheduled of 0.850 Bcf/d operating capacity) on Oct 28 id2, suggesting meaningful headroom at the California border but an unquantified net cut on the East Mainline itself. This is an administrative repost with no new operational information.

TW East Mainline FM continues through Gas Day Oct 29 (same window as TW-121630); bearish Waha/Permian as basin takeaway remains curtailed, bullish SoCal Border and Arizona -- net cut unquantified but SOCAL NEEDLES showed 0.457 Bcf/d scheduled of 0.850 Bcf/d operating capacity on Oct 28 id2 (note: 1-day lag, may not yet reflect FM impact).
Reroute: Moderate: EPNG serves the same SoCal border and Arizona delivery markets as Transwestern; however, if EPNG is also constrained simultaneously, no California reroute exists.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a new notice (TW-121630) for the East Mainline force majeure covering Gas Day Oct 28 9:00AM through Oct 29 8:59AM -- one gas day earlier than the prior notice TW-121625 which covered Oct 29-30. This appears to be a parallel/replacement posting that shifts the active FM window back by one day rather than extending it forward. No capacity volumes are stated; net reduction remains unquantified.

TW East Mainline FM now posted for Gas Day Oct 28 (pulled back from Oct 29-30 in prior notice); bearish pressure at Waha/Permian as basin takeaway remains cut, bullish SoCal Border and Arizona -- net cut unquantified but SOCAL NEEDLES showing 53% utilization (0.450 Bcf/d scheduled of 0.850 Bcf/d operating capacity as of Oct 28 id1 cycle), suggesting meaningful headroom remains at the California border delivery point.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets as the primary competing pipeline; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a new Force Majeure notice (TW-121625) extending the East Mainline capacity constraint by one full gas day, now covering Gas Day Oct 29 (9:00AM Oct 29 through 8:59AM Oct 30), compared to the prior notice TW-121616 which covered Gas Day Oct 28. This is a daily extension pattern -- the FM remains unresolved with no restoration timeline stated. Capacity impact remains unquantified in the notice text; the East Mainline is the primary westbound artery carrying Permian and San Juan Basin gas toward SoCal Border and Arizona.

TW East Mainline FM extended into Gas Day Oct 29-30 with no restoration timeline; expect continued bearish pressure at Waha/Permian and bullish pressure at SoCal Border and Arizona delivery points, though net cut remains unquantified -- capacity data shows SOCAL NEEDLES at 61.8% utilized (0.525 Bcf/d scheduled of 0.850 Bcf/d operating capacity) as of evening Oct 28, suggesting headroom may be absorbing some impact but does not confirm no constraint.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline for SoCal Border deliveries and serves overlapping Arizona markets; however, a simultaneous EPNG constraint would eliminate California reroute entirely, and EPNG capacity headroom is unconfirmed here.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has reposted its East Mainline force majeure under a new notice ID (TW-121616, replacing TW-121606) with no change to the operational details -- the constraint remains in effect for Gas Day Oct 28 through Oct 29 08:59AM. No capacity volume has been stated in either posting, leaving the net cut unquantified. The live TW capacity table for Oct 28 (evening cycle) shows no mainline segment rows that directly match the East Mainline constraint, so the physical impact cannot be corroborated from available data.

TW East Mainline FM remains active for Gas Day Oct 28-29 with no new operational information vs TW-121606 -- bearish Waha/Permian and bullish SoCal Border and Arizona delivery points, but net cut remains unquantified; no change to prior trading signal.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border deliveries, but simultaneous EPNG constraints would eliminate California reroute options entirely; absent a confirmed EPNG constraint, partial offset via EPNG is possible.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the M/L Thoreau West System effective Oct 28, 2026 9:00AM through Oct 29, 2026 8:59AM. This appears to be an extension of the prior notice TW-121610 (which covered Oct 27-28), rolling the constraint forward by one gas day. No specific capacity restriction volume is stated; the Thoreau West mainline had been moving approximately 1.07 Bcf/d (range 1.00-1.11) westbound in the pre-event period.

TW force majeure on the Thoreau West mainline extends into Gas Day Oct 28-29, constraining roughly 1.07 Bcf/d of westbound flow; expect bearish pressure on Transwestern Permian/San Juan basin basis and bullish pressure at SoCal Border and Arizona delivery points, with EPNG as the only reroute alternative.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline for SoCal border and Arizona deliveries, but a simultaneous EPNG constraint would leave California with no viable reroute. Absent a concurrent EPNG event, partial offset is possible at higher cost.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure on the East Mainline, now effective Oct 28 9:00 AM through Oct 29 8:59 AM (Gas Day Oct 28). This posting (TW-121606) supersedes TW-121609, shifting the effective window forward one full gas day; no capacity volume figures are stated in either notice. The event is a one-day outage with a defined end date.

TW East Mainline force majeure restricts westbound Permian/San Juan takeaway for Gas Day Oct 28, bullish SoCal Border and Arizona delivery points and bearish Waha; no capacity volume stated so net cut is unquantified -- live TW capacity data is from Oct 27 and does not yet reflect the event.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary alternative for TW East Mainline volumes; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a revised force majeure notice for the East Mainline covering Gas Day Oct 27 9:00AM through Oct 28 8:59AM -- the window has shifted one day earlier relative to TW-121599, which covered Oct 28-29. No capacity volume is stated in either posting. The split-direction signal remains unchanged: westbound takeaway from the Permian/San Juan basins is restricted, tightening supply to SoCal and Arizona delivery markets for the affected gas day.

TW East Mainline force majeure window has shifted to Oct 27-28 (previously Oct 28-29), effectively bringing the constraint end one day earlier -- bearish Waha/Permian basis as westbound takeaway is curtailed, bullish SoCal Border and Arizona delivery points, with capacity impact unquantified; SOCAL NEEDLES posted 0.850 Bcf/d operating capacity at 61.1% utilized (0.520 Bcf/d scheduled) on the prior gas day, reflecting pre-event conditions.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets as the primary competing pipeline, but any simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
Force Majeure 0.171 Bcf/d cut (capped at 0.560 Bcf/d) Until Further Notice 9 Days

ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 MMcf/d removed Nov 1-5, resulting in an estimated 21-23% reduction to contracted firm primary MDQ. Firm primary, firm secondary, and interruptible curtailments are all anticipated through November 5.

ANR SWML Northbound force majeure removes up to 0.171 Bcf/d of northbound Gulf Coast-to-Midwest capacity with confirmed firm primary curtailments of 21-23% of contracted MDQ through Nov 5; live SWML NORTHBOUND (FPSWMLNB TD1) shows operating capacity already reduced to 0.617 Bcf/d at 86.8% utilization pre-event, consistent with the stated 0.560 Bcf/d ceiling -- expect bullish pressure at ANR ML 7 and Midwest delivery points vs Henry Hub.
Reroute: Moderate: TETCO, Trunkline (TGC), and portions of the Gulf South system serve overlapping Gulf Coast-to-Midwest corridors, but SWML is a key northbound segment and alternative pipes may have limited spare capacity during late-October demand ramp.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has issued a new force majeure notice (TW-121602) covering the M/L Thoreau West System for the Oct 27-28 gas day window (effective Oct 27 9:00AM through Oct 28 8:59AM). This supersedes TW-121600, which had covered Oct 28-29; the window has been moved one day earlier, implying the constraint is ending sooner than previously posted. Pre-event westbound flow past Station 3 (Leupp, AZ) was approximately 1.08 Bcf/d (range 1.04-1.11 Bcf/d over Oct 20-26), but the curtailed quantum remains unquantified.

TW Thoreau West FM window shifts to Oct 27-28 (pulled back one day from Oct 28-29), a mild easing signal; pre-event westbound flow was ~1.08 Bcf/d, curtailed volume still unquantified, but bullish SoCal Gas and Arizona delivery basis persists through the Oct 28 gas day with corresponding bearish pressure at Waha and San Juan basin points.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and may absorb some displaced volumes, but simultaneous EPNG constraints would eliminate any California reroute entirely.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has posted a fresh notice extending the East Mainline force majeure into Gas Day Oct 28 (effective Oct 28 09:00AM through Oct 29 08:59AM), one day beyond the prior notice TW-121591 which covered Gas Day Oct 27. No capacity volumes are stated; the split-direction signal -- bearish Permian/Waha, bullish SoCal Border and Arizona -- remains in effect with impact unquantified. The live capacity table shows SOCAL NEEDLES at 63% utilization with 0.315 Bcf/d headroom and TRANS PECOS I/C at 55% with 0.225 Bcf/d headroom for Gas Day Oct 27 evening cycle, but these predate the Gas Day Oct 28 effective window and do not yet reflect the continued constraint.

TW East Mainline force majeure extends into Gas Day Oct 28, tightening the prior window by one day; split-direction signal unchanged -- bearish Waha/Permian as westbound takeaway remains restricted, bullish SoCal Border and Arizona delivery points, with capacity impact unquantified but SOCAL NEEDLES showing 0.315 Bcf/d headroom in the pre-event cycle.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border deliveries, but a simultaneous EPNG constraint would leave no California reroute; absent that, EPNG may absorb a portion of displaced Transwestern volumes.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has reposted the East Mainline force majeure under a new notice ID (TW-121591), effective Oct 27 9:00 AM through Oct 28 8:59 AM -- identical operational window and location to TW-121582 posted the prior evening. No new capacity figures or operational changes appear in this posting. The force majeure remains active for Gas Day Oct 27 with no quantified volume impact stated.

TW East Mainline force majeure remains in effect for Gas Day Oct 27 with no operational change vs TW-121582; split-direction signal unchanged -- bearish Waha/Permian as westbound takeaway is restricted, bullish SoCal Border and Arizona delivery points, with capacity impact still unquantified.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries; however, a simultaneous EPNG constraint would eliminate California reroute entirely. No confirmed EPNG constraint is noted in this posting.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the Mainline Thoreau West System effective Oct 27 at 9:00AM through Oct 28 at 8:59AM (one gas day). This notice (TW-121592) is a repost of TW-121583 filed the prior evening with no operational change -- same location, same window, same force majeure reason. Pre-event westbound flow through Station 3 (Leupp, AZ) was running at a median of approximately 1.08 Bcf/d (range 1.04-1.11 Bcf/d); no new capacity ceiling is stated so the net cut remains unquantified.

TW force majeure on the Thoreau West mainline (pre-event flow ~1.08 Bcf/d westbound) continues to remove unquantified westbound capacity for the Oct 27-28 gas day window; expect sustained bullish pressure at SoCal Gas and Arizona delivery points with bearish pressure at Transwestern Permian and San Juan basin-side prices -- this posting carries no new operational information versus TW-121583.
Reroute: Moderate: EPNG serves the same SoCal border and Arizona delivery markets from the Permian Basin. However, if EPNG is simultaneously constrained, no California reroute exists; confirm EPNG availability before assuming offset.
View original notice text
Loading…
Operational Alert ≈1.030 Bcf/d est. cut vs recent flow (capped at 0.400 Bcf/d) Until Further Notice 1 Days

Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quantities; however, the scheduled cap has been raised from 0 Dth/d (yesterday's full curtailment) to 400,000 Dth/d (0.400 Bcf/d), representing a partial restoration. Pre-event baseline at this location was 1.43 Bcf/d (median over Oct 20-26), leaving a net reduction of approximately 1.03 Bcf/d still offline.

Gulf South SMP continues at Stratton Ridge (loc 24329) for gas day Oct 27 with nominations capped at 0.400 Bcf/d versus a pre-event median of 1.43 Bcf/d (range 0.00-1.44), stranding approximately 1.03 Bcf/d of Freeport LNG feed gas onshore and maintaining bearish pressure on Henry Hub and Gulf Coast basis; partial restoration from yesterday's full zero-flow curtailment is a bullish update signal but material feedgas displacement persists until further notice.
Reroute: None: gas that cannot be taken by Freeport LNG remains stranded in the domestic supply pool with no alternative export outlet available on a same-day basis; other LNG terminals are independently contracted and cannot absorb displaced Gulf South volumes.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure on the M/L Thoreau West System effective Oct 27, 2026 at 9:00 AM through Oct 28, 2026 at 8:59 AM -- a one-day window. This is a continuation/shift of the event previously posted as TW-121585, which covered Oct 26-27; no capacity reduction volume is stated in the notice. Pre-event flow past the Thoreau West mainline (Station 3, Leupp AZ) was running at a median of approximately 1.08 Bcf/d over the prior week (range 1.04-1.11 Bcf/d); without a stated cap, the net reduction is unquantified.

TW force majeure on the Thoreau West mainline (pre-event flow ~1.08 Bcf/d westbound) cuts unquantified westbound capacity for Oct 27-28 gas days; expect bullish pressure at SoCal Gas and Arizona delivery points with bearish pressure at Transwestern Permian and San Juan basin-side prices as volumes back up upstream.
Reroute: Moderate: El Paso Natural Gas (EPNG) serves the same SoCal border and Arizona delivery markets and is the primary competing pipeline; however, simultaneous EPNG constraints would eliminate California reroute entirely, so available EPNG spare capacity should be confirmed before assuming full offset.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the East Mainline effective Oct 27 2026 9:00 AM through Oct 28 2026 8:59 AM (one gas day). This notice (TW-121582) is an administrative repost of TW-121570, carrying the same effective window and no new capacity figures or operational information. No volume impact is quantified in either posting.

TW East Mainline force majeure produces a split-direction signal for Oct 27: bearish Waha/Permian as westbound takeaway is cut, bullish SoCal Border and Arizona delivery points as westbound supply is reduced; exact cut remains unquantified and duration is one gas day with no new information vs prior posting TW-121570.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border deliveries; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the East Mainline effective Gas Day Oct 27 2026 at 9:00 AM, expiring Oct 28 2026 at 8:59 AM -- a single-day event. No specific capacity reduction figure is stated in the notice. The East Mainline carries Permian and San Juan Basin gas westbound toward SoCal and Arizona delivery points.

TW East Mainline force majeure on Oct 27 produces split-direction signal: bearish Waha/Permian as westbound takeaway is cut, bullish SoCal Border and Arizona delivery points as westbound supply is reduced; no capacity volume stated so exact cut is unquantified but duration is short at one gas day.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona from the Permian Basin; if EPNG has available capacity, partial reroute is possible, but any simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
Force Majeure ≈0.890 Bcf/d est. cut vs recent flow (capped at 0.220 Bcf/d) Until Further Notice 36 Days

ANR Pipeline has declared a force majeure at Greenville Compressor Station Unit #7 in Washington County, Mississippi, due to unexpected equipment failure, curtailing capacity on the Southeast Mainline at Delhi Southbound (LOC FPDELHSB). On 10/26, no incremental volumes will be scheduled; from 10/27-10/31 and 11/1-11/30, capacity is reduced by 220 MMcf/d leaving 994 MMcf/d and 1,027 MMcf/d respectively. Pre-event flow at DELHI SOUTHBOUND TD2 was running at a median of 1.11 Bcf/d, implying a net cut of approximately 0.89 Bcf/d against the 0.220 Bcf/d cap, with firm primary service estimated at 16% impact through October and 13% in November.

ANR force majeure at Greenville CS Unit 7 cuts Delhi Southbound from a pre-event median of ~1.11 Bcf/d to a 0.220 Bcf/d cap, a net reduction of ~0.89 Bcf/d, with primary firm curtailments of 13-16% -- expect bullish pressure on ANR ML 7 and Midwest/Michigan basis as southbound Gulf Coast throughput is materially reduced through November 30.
Reroute: Moderate: Texas Eastern (TETCO), Trunkline (TGC), and Columbia Gulf Transmission (CGT) serve overlapping Gulf Coast northbound corridors, but with ANR running tight systemwide (multiple OVER and zero-headroom points visible in live data), full reroute of 0.89 Bcf/d displaced volume is unlikely without basis widening.
View original notice text
Loading…
Operational Alert ≈1.430 Bcf/d est. Until Further Notice 1 Days

Gulf South Pipeline has implemented a System Management Plan at Location SLN 024329 Stratton Ridge (to Freeport LNG) effective 08:30 AM on October 26, 2026, reducing scheduled quantities to 0 Dth/d until further notice through at least October 27 at 09:00 AM. The curtailment was triggered by the customer's (Freeport LNG's) failure to take confirmed quantities, forcing Gulf South to balance nominations to zero. Pre-event flow at this location had been running at a median of 1.43 Bcf/d (range 1.02-1.46 Bcf/d over the prior 7 days), meaning approximately 1.43 Bcf/d of LNG feed gas has been zeroed out.

Gulf South SMP cuts Freeport LNG feed gas at Stratton Ridge (loc 24329) to 0 Dth/d from a pre-event median of 1.43 Bcf/d (range 1.02-1.46), stranding ~1.43 Bcf/d onshore and applying bearish pressure on Henry Hub and Gulf Coast basis until Freeport resumes taking nominations.
Reroute: None: this is a demand-side curtailment -- Freeport LNG is not taking gas, so the volume backs up onshore regardless of pipeline alternatives; no reroute to another LNG terminal is implied by this notice.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline declared a force majeure on the M/L Thoreau West System effective October 25, 2026 at 9:00 AM, with a stated end of October 26 at 8:59 AM -- a single gas day. No specific capacity volume is stated in the notice, but pre-event flow context shows the Thoreau West mainline (measured past Station 3 at Leupp, AZ) was moving a median of 1.11 Bcf/d westbound (range 1.04-1.26 Bcf/d) in the seven days prior. The prior posting TW-121544 was scored below threshold as informational; this notice explicitly designates Reason: Force Majeure and is treated as the first actionable event.

TW force majeure on the Thoreau West mainline removes an unquantified portion of ~1.11 Bcf/d of pre-event westbound flow; expect bullish pressure at SoCal Border and Arizona delivery points and bearish pressure at San Juan and Waha basis as westbound takeaway is disrupted, with limited reroute relief given current EPNG loading.
Reroute: Moderate but constrained: EPNG is the primary competing pipeline for SoCal border deliveries, but PHP TW Waha is already running at 100% utilization (0.025 Bcf/d scheduled against 0.025 Bcf/d operating capacity as of Oct 25 id2 cycle), indicating tight conditions at Permian interconnects; SOCAL NEEDLES on TW itself shows 36.6% headroom, suggesting some throughput remains on the western delivery end.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has extended a force majeure on the Thoreau West mainline by one gas day, now covering Oct 26 9:00 AM through Oct 27 8:59 AM (previously Oct 25-26). The notice states no specific capacity volume, but pre-event flow data shows the Thoreau West mainline was moving a median of approximately 1.11 Bcf/d westbound (range 1.04-1.26 Bcf/d over the prior week). No new cap is stated, so the net reduction remains unquantified but reflects a full or substantial interruption of that flow.

TW force majeure on Thoreau West mainline extended to gas day Oct 26-27, tightening westbound San Juan/Permian-to-California capacity for a second consecutive day; pre-event throughput past Station 3 (Leupp, AZ) was approximately 1.11 Bcf/d westbound -- expect continued bullish pressure at SoCal Border and Arizona delivery points, with bearish pressure at Transwestern Permian and San Juan basis, and note EPNG is the only reroute alternative for California-bound volumes.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline for SoCal border deliveries; however, EPNG is the sole realistic alternative and may lack sufficient spare capacity to fully absorb a mainline Thoreau West constraint. A simultaneous EPNG constraint would leave California with no reroute.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] M/L THOREAU WEST SYSTEM

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the M/L Thoreau West System, effective Oct 25 at 9:00 AM through Oct 26 at 8:59 AM (one gas day). This is a repost of the same event originally filed as TW-121527 on Oct 24; no operational changes are evident. Pre-event throughput past Station 3 (Leupp, AZ) was running at a median of approximately 1.11 Bcf/d westbound (range 1.04-1.26 Bcf/d), but no specific capacity cap is stated in this notice.

TW force majeure on the Thoreau West mainline cuts unquantified westbound capacity on the San Juan/Permian-to-California corridor for one gas day (Oct 25-26); expect bullish pressure at SoCal Border and Arizona delivery points, with offsetting bearish pressure at Waha/San Juan basis -- pre-event throughput was ~1.11 Bcf/d westbound, actual cut unquantified.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary alternative, but any simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the M/L Thoreau West System effective Oct 25 9:00 AM through Oct 26 8:59 AM (one gas day). This is a revision of prior notice TW-121532 (same event, same location), sliding the effective window forward by one day; no capacity figures are stated in either notice. Pre-event flow past Station 3 (Leupp, AZ) had been running at a median of approximately 1.11 Bcf/d westbound (range 1.02-1.26 Bcf/d over Oct 18-24), but the notice provides no cap or stated reduction, so net cut is unquantified.

TW force majeure on the Thoreau West mainline (pre-event ~1.11 Bcf/d westbound) cuts unquantified capacity on the San Juan/Permian-to-California corridor for one gas day (Oct 25-26); expect bullish pressure at SoCal Border and Arizona delivery points, with offsetting bearish pressure at Waha/San Juan as westbound takeaway is impaired -- update_direction is bearish because the prior notice (TW-121532) already covered Oct 24-25 and this posting simply shifts the FM window one day forward with no new operational escalation.
Reroute: Moderate: EPNG serves the same SoCal border market and provides a partial alternative, but if EPNG is simultaneously constrained no California reroute exists; check EPNG conditions before assuming full offset.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Force Majeure] Force Majeure - Station 3 (Leupp, AZ.) - Compressor Station mechanical Failure - Gas Day 10/24/26 (Until Further Notice)

SEV 4/5
Force Majeure capped at 1.100 Bcf/d, cut unknown

Transwestern Pipeline declared force majeure at Station 3 (Leupp, AZ) due to a compressor station mechanical failure, effective Gas Day October 24, 2026 until further notice. The Mainline Thoreau West System capacity is restricted to approximately 1.1 Bcf/d with no stated restoration timeline. No pre-event baseline is available in the notice itself to quantify the net reduction, but the 1.1 Bcf/d ceiling on a major westbound segment represents a material capacity constraint on Permian/San Juan outbound flows toward SoCal and Arizona.

TW force majeure at Station 3 caps Mainline Thoreau West at 1.1 Bcf/d UFN; expect bearish pressure at Waha/Permian as westbound takeaway tightens, with bullish pressure at SoCal Border and Arizona delivery points -- EPNG is the only remaining major California-bound alternative.
Reroute: Moderate: EPNG serves the same SoCal border and Arizona markets and is the primary competing pipeline, but a simultaneous EPNG constraint would leave California with no reroute option. At current TW capacity restriction levels, some westbound reroute via EPNG is possible but may not fully offset the constrained volumes.
View original notice text
Loading…
Force Majeure capped at 1.100 Bcf/d, cut unknown 9 Days

Transwestern Pipeline has declared a Force Majeure effective Gas Day October 24, 2026 due to a compressor station mechanical failure at Station 3 in Leupp, AZ. The Mainline Thoreau West System capacity is reduced to approximately 1.1 Bcf/d until further notice, with a currently stated end date of November 2, 2026. This is an unplanned event on a major westbound supply artery serving Arizona and California SoCal border markets.

Transwestern FM at Station 3 (Leupp, AZ) caps Thoreau West System at 1.1 Bcf/d; expect bullish pressure at SoCal Border and Arizona delivery points as westbound capacity is constrained, while Permian/Waha and San Juan basin points face bearish pressure from backed-up supply -- no pre-event baseline available to quantify the net reduction from the stated 1.1 Bcf/d ceiling, and EPNG is the only partial reroute for California markets.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary competing pipeline; however, if EPNG is simultaneously constrained, California supply reroute drops to none. TW and EPNG together represent the two dominant westbound arteries from the Permian and San Juan basins.
View original notice text
Loading…
Operational Alert Until Further Notice 1 Days

Gulf South Pipeline has issued a second consecutive Over-Under Performance notice (new ID 5038899) for Loc 24329 Stratton Ridge to Freeport LNG, covering Gas Day 10/21/2026 and until further notice -- an exact reissuance of yesterday's notice (GSPL-5038892) shifted forward one gas day. The customer continues to fail to take confirmed quantities at the Stratton Ridge delivery point, and Gulf South will reduce scheduling for remaining nomination cycles based on Projected Daily Quantities. Pre-event scheduled flow at Loc 24329 was 1.43 Bcf/d median (range 1.02-1.46 Bcf/d over the prior seven days), against 1.78 Bcf/d operating capacity; no explicit new cap or volume cut is stated in this notice.

Freeport LNG feed gas curtailment at Stratton Ridge (Loc 24329) now extends a second consecutive gas day (10/21/2026 UFN); pre-event scheduled flow was ~1.43 Bcf/d median (1.02-1.46 range) vs 1.78 Bcf/d operating capacity, with displaced volumes remaining in the domestic Gulf Coast pool -- bearish Henry Hub regional proxy as long as the under-take persists.
Reroute: None: Stratton Ridge is the dedicated Gulf South delivery point feeding Freeport LNG; displaced feed gas volumes have no alternate export outlet and remain in the domestic market.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] ATOKA 2 POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure on the ATOKA 2 POINT GROUP, effective Oct 20 2026 9:00AM through Oct 21 2026 8:59AM. This is a third administrative repost of the same event (prior notices TW-121418 and predecessor), with only the notice ID and posting timestamp changed -- no new operational content. Pre-event scheduled flow at both identified Atoka receipt meters (ATOKA PECOS DIAMOND PL 8 INCH and AGAVE ATOKA #3 STA) was 0.00 Bcf/d throughout the prior week, so the physical cut is currently unquantifiable from flow data alone.

TW force majeure on ATOKA 2 POINT GROUP is a third administrative repost with no new operational content; pre-event flow at both Atoka receipt meters (loc_id 9168 and 500305) was 0.00 Bcf/d so the physical cut is currently unquantifiable, but minimum severity 4 applies given the active force majeure declaration -- split-direction signal: bearish Waha/Permian as TW takeaway is restricted, bullish SoCal Border and Arizona if volumes were scheduled.
Reroute: Moderate: EPNG serves the same SoCal border and Arizona delivery markets as Transwestern and could absorb some displaced volumes, but given the Atoka meters showed zero scheduled flow pre-event, immediate market impact appears minimal.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the ATOKA 2 POINT GROUP effective October 20, 2026 at 9:00 AM through October 21, 2026 at 8:59 AM. This is a second administrative repost (TW-121418 follows TW-121409 which followed TW-121397), with only the notice ID and posting timestamp changed -- no new operational content. Pre-event scheduled quantities at both identified Atoka receipt meters (ATOKA PECOS DIAMOND PL 8 INCH, loc_id 9168; AGAVE ATOKA #3 STA, loc_id 500305) were 0.00 Bcf/d, so the physical volume impact remains unquantifiable from available data.

TW force majeure on ATOKA 2 POINT GROUP is a second administrative repost with no new operational content; pre-event flow at both Atoka receipt meters was 0.00 Bcf/d so the physical cut is currently unquantifiable, but minimum severity 4 applies given the active force majeure declaration -- split-direction signal applies: bearish Waha/Permian as basin takeaway is curtailed, bullish SoCal Border and Arizona delivery points.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona delivery markets and may absorb displaced volumes, but a simultaneous EPNG constraint would leave no California reroute alternative.
View original notice text
Loading…
Force Majeure 0.061 Bcf/d cut (capped at 0.447 Bcf/d) 7 Days

Southern Natural Gas has escalated planned SESH maintenance at the Delhi and Gwinville Compressor Stations to a force majeure event affecting SNG-SESH capacity on Segment 380. Normal capacity of 507,689 Dth/d (0.508 Bcf/d) is reduced on six specific gas days between October 20-29, with the largest single-day reduction occurring October 28 when capacity falls to 447,000 Dth/d (a cut of ~60,689 Dth/d or ~0.061 Bcf/d). Out-of-Path and In-Path services are at risk based on current nominations.

SNG Segment 380 force majeure cuts SNG-SESH interconnect capacity by up to 0.061 Bcf/d on the worst day (Oct 28, restricted to 0.447 Bcf/d), with curtailments on six days through Oct 29; expect mild bullish pressure on Southern Natural La. and Southeast basis as out-of-path and in-path services face curtailment risk.
Reroute: Moderate: Gulf South and Transco serve overlapping Southeast markets and may absorb some displaced volumes; however, SNG is the dominant Southeast pipeline and SESH is a primary Gulf Coast interconnect, so full reroute is unlikely to offset all affected nominations on constrained days.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] ATOKA 2 POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the ATOKA 2 POINT GROUP, effective October 20 at 9:00 AM through October 21 at 8:59 AM. This is an administrative repost of TW-121397 (itself a repost of TW-121388) with only the notice ID and posting timestamp changed -- no new operational content. Pre-event scheduled flow at both identifiable Atoka receipt meters (ATOKA PECOS DIAMOND PL 8 INCH and AGAVE ATOKA #3 STA) was 0.00 Bcf/d across the prior week, so the physical volume impact is currently unquantifiable.

TW force majeure on ATOKA 2 POINT GROUP is a same-day administrative repost of TW-121397 with no new operational content; pre-event flow at both Atoka receipt meters was 0.00 Bcf/d, so the physical cut is currently unquantifiable, but minimum severity 4 applies given the active force majeure declaration -- split direction: bearish Waha/Permian as TW takeaway is constrained, bullish SoCal Border and Arizona delivery points.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona markets and is the primary alternative to Transwestern; however, if EPNG is simultaneously constrained, no California reroute exists.
View original notice text
Loading…
Maintenance 0.100 Bcf/d cut (capped at 0.700 Bcf/d) 2 Days

CGT is conducting planned maintenance at Lake Arthur Compressor Station on October 27-28, 2026, which will reduce delivery capacity at Cameron LNG (loc 4246) from its design capacity of 0.800 Bcf/d to 0.700 Bcf/d (Primary Only), a reduction of 0.100 Bcf/d. CGT explicitly warns that this restriction may result in curtailments to Interruptible, Secondary Firm, and Primary Firm services. Live capacity data for Cameron LNG (loc 4246) shows the point currently running at 0.696 Bcf/d scheduled against 0.800 Bcf/d operating capacity, confirming the new 0.700 Bcf/d cap is effectively at or just above current flows but Primary Firm curtailment risk makes this actionable.

CGT maintenance cuts Cameron LNG feed gas delivery cap by 0.100 Bcf/d (0.800 to 0.700 Bcf/d) on Oct 27-28 with explicit Primary Firm curtailment risk; gas that cannot be exported stays domestic, bearish for Henry Hub and Gulf Coast basis over the two-day window.
Reroute: Limited: Cameron LNG feed gas can only arrive via pipelines serving that terminal; no alternative LNG export outlet exists for these specific curtailed volumes, so the gas remains in the domestic market.
View original notice text
Loading…
Operational Alert Until Further Notice 1 Days

Gulf South Pipeline issued a Critical Over-Under Performance notice on Gas Day 10/20/2026 for Loc 24329 (Stratton Ridge to Freeport LNG), citing a customer's failure to take confirmed quantities and triggering scheduling reductions for remaining nomination cycles through at least Gas Day 10/21/2026. This is a recurrence of the same event posted on 10/17/2026 (GSPL-5038889). The live evening-cycle reading at Loc 24329 shows 1.45 Bcf/d scheduled against 1.78 Bcf/d operating capacity (81.5% utilized, 18.5% headroom), compared to a pre-event 7-day median of 1.43 Bcf/d (range 1.11-1.46 Bcf/d); no explicit volume cut is stated, but scheduling reductions are anticipated and the UFN language keeps the event open-ended.

Gulf South curtailment at Stratton Ridge (Loc 24329) again reduces Freeport LNG feed gas on Gas Day 10/20/2026 -- pre-event baseline was 1.43 Bcf/d median (range 1.11-1.46), live evening cycle shows 1.45 Bcf/d scheduled vs 1.78 Bcf/d operating capacity with no explicit cut volume stated; displaced gas stays in the domestic Gulf Coast pool, bearish Gulf Coast/Henry Hub basis; this is a repeat occurrence from 10/17 and remains UFN.
Reroute: None: Freeport LNG feed gas delivered via this specific lateral cannot be rerouted to the terminal through an alternative path; any curtailed volume remains in the domestic pipeline system.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] ATOKA 2 POINT GROUP

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure on the ATOKA 2 POINT GROUP, effective Oct 20 2026 9:00AM through Oct 21 2026 8:59AM -- a roughly 24-hour window. This posting (TW-121397) is an administrative repost of TW-121388 filed earlier the same day with no operational changes. Pre-event scheduled quantities at the two identified Atoka receipt meters (loc_id 9168 and 500305) were 0.00 Bcf/d throughout the prior seven gas days, so the immediate physical supply reduction appears negligible based on recent flow.

TW force majeure on ATOKA 2 POINT GROUP is a same-day administrative repost of TW-121388 with no new operational content; pre-event flow at both Atoka receipt meters was 0.00 Bcf/d, so the physical cut is currently unquantifiable but minimum severity 4 applies given force majeure declaration -- split-direction signal remains bearish Transwestern Permian/Waha basis and mildly bullish SoCal Border and Arizona delivery points.
Reroute: Moderate: EPNG serves overlapping SoCal border and Arizona delivery markets and can partially offset Transwestern constraints; however, if EPNG is simultaneously constrained, California reroute options are effectively eliminated.
View original notice text
Loading…
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the ATOKA 2 POINT GROUP, effective October 20 at 9:00 AM through October 21 at 8:59 AM -- approximately one gas day. No specific capacity volume is stated in the notice. Pre-event flow data for the two named Atoka-area receipt points (ATOKA PECOS DIAMOND PL 8 INCH, loc_id 9168; AGAVE ATOKA #3 STA, loc_id 500305) shows zero scheduled quantities over the prior seven days, suggesting this is a small receipt-point group with minimal throughput ahead of the event.

TW force majeure on ATOKA 2 POINT GROUP applies split-direction pressure: bearish Waha and Transwestern Permian basis as any constrained receipts back up at the basin, and mildly bullish SoCal Border and Arizona delivery points; pre-event flow at the two identified Atoka receipt meters was 0.00 Bcf/d across the prior week, so immediate market impact is likely negligible in volume terms despite the FM declaration.
Reroute: Moderate: EPNG serves overlapping Permian-to-California and Permian-to-Arizona corridors and can absorb marginal volumes if needed; however, given near-zero pre-event flows at the identified Atoka meters, reroute need appears minimal.
View original notice text
Loading…
Force Majeure 0.205 Bcf/d cut (capped at 0.180 Bcf/d) Until Further Notice 25 Days

Southern Star has declared a force majeure at the Saginaw Compressor Station (Jasper County, MO) due to a mechanical failure of the Saginaw Turbine, reducing capacity by 180,000 Dth/d (0.180 Bcf/d) at Saginaw CS and 25,000 Dth/d (0.025 Bcf/d) at Empire Energy Center, totaling 0.205 Bcf/d. This update (superseding #11240) pushes the in-service date back to November 2, 2026, extending the outage that began ID2 cycle October 9. Live capacity data for Saginaw CS Area Deliveries (loc_id 444550) shows operating capacity at 0.180 Bcf/d with 0.143 Bcf/d scheduled, corroborating the reduced operating cap stated in the notice.

Southern Star force majeure at Saginaw CS removes 0.205 Bcf/d of Midcontinent/Missouri delivery capacity through Nov 2; timeline extension is bearish for update direction but the sustained capacity loss is bullish for Southern Star basis -- watch for tightening in Kansas/Missouri LDC markets with limited reroute via ANR, PEPL, or Southern Star alternatives.
Reroute: Moderate: ANR and Panhandle Eastern (PEPL) serve overlapping Midcontinent and Midwest corridors and may absorb some volumes, but Southern Star serves specific Kansas/Missouri local markets that have limited direct bypass options.
View original notice text
Loading…
Force Majeure 0.040 Bcf/d cut (capped at 0.035 Bcf/d) 1 Days

Transwestern Pipeline has declared a force majeure at Atoka 2 Compressor Station (Artesia area, NM) due to mechanical failure, effective Gas Day October 20, 2026. Total station capacity will be reduced from 75,000 MMBtu/d (0.075 Bcf/d) to approximately 35,000 MMBtu/d (0.035 Bcf/d), a reduction of ~0.040 Bcf/d, affecting receipt volumes from DCP Artesia Plant (POI 10703) and Dagger Draw Plant (POI 56339). Transwestern states capacity will return to 75,000 MMBtu/d on Gas Day October 21, making this a single-day event.

TW force majeure removes ~0.040 Bcf/d of Artesia-area Permian receipt capacity for Gas Day Oct 20 only; pre-event DCP Artesia (loc 10703) was scheduling ~0.031 Bcf/d against 0.038 Bcf/d operating capacity and Dagger Draw (loc 56339) was scheduling ~0.050 Bcf/d, so the combined receipts at risk broadly align with the stated cut -- expect modest bearish pressure at Waha/Permian basis with negligible downstream SoCal Border impact given the small aggregate volume and single-day duration.
Reroute: Limited: Transwestern and EPNG both serve the SoCal border from Permian receipt points; EPNG could absorb marginal volumes from Artesia-area producers, but at 0.040 Bcf/d the cut is small enough that system-wide reroute impact is minimal. The one-day duration further limits market significance.
View original notice text
Loading…
Operational Alert Until Further Notice 1 Days

Gulf South Pipeline issued a Critical Over-Under Performance notice for Gas Day 10/17/2026, citing the customer's failure to take confirmed quantities at Loc 24329 Stratton Ridge to Freeport LNG. Gulf South is implementing scheduling reductions for remaining nomination cycles on 10/17 and until further notice. Live capacity data shows Stratton Ridge (Loc 24329) running at 1.46 Bcf/d scheduled against 1.78 Bcf/d operating capacity (82.2% utilization, 0.317 Bcf/d headroom) as of the evening cycle; the pre-event baseline median was 1.43 Bcf/d over the prior seven gas days, so the posted evening reading is consistent with a partial reduction already in progress with no stated volume for the cut.

Gulf South curtailment at Stratton Ridge (Loc 24329) reduces Freeport LNG feed gas on Gas Day 10/17/2026 -- pre-event baseline was 1.43 Bcf/d (flat over the prior week), live evening cycle shows 1.46 Bcf/d scheduled against 1.78 Bcf/d operating capacity with no explicit cut volume stated; gas displaced from LNG export remains in the domestic Gulf Coast market, bearish for Henry Hub-area pricing.
Reroute: None: this notice directly curtails feed gas deliveries to Freeport LNG at the terminal delivery meter; there is no alternative pipeline pathway that replaces LNG offtake once the customer fails to take at the terminal.
View original notice text
Loading…
Force Majeure 0.395 Bcf/d cut (capped at 0.930 Bcf/d) Until Further Notice 29 Days

ANR Pipeline has extended its Force Majeure at St. John Eastbound (LOC #FPSTJNEB) on the Michigan Leg South through October 31, 2026, pushed back from the prior end date of October 19. The FM was originally declared on October 3 due to an anomaly between MLV 56 and MLV 57, reducing eastbound capacity by 395 MMcf/d (0.395 Bcf/d), leaving 930 MMcf/d available. Firm Primary curtailments of approximately 34% of contracted MDQ remain in effect, with RCC eligibility active under ANR Tariff Section 6.36.

ANR FM at St. John Eastbound removes 0.395 Bcf/d of Michigan Leg South eastbound capacity through Oct 31 (extended from Oct 19); live data shows 0.977 Bcf/d operating capacity with 0.642 Bcf/d scheduled on TD1 against the 0.930 Bcf/d post-FM ceiling, consistent with the stated constraint, and pre-event flow averaged ~0.67 Bcf/d (0.60-0.77 range) on TD1 -- the 0.930 Bcf/d cap sits above recent scheduled flow but well below normal operating capacity, with firm primary shippers taking a ~34% MDQ curtailment signaling real tightness at ANR ML 7 Michigan delivery points.
Reroute: Limited: TETCO, TGT, and PEPL serve overlapping Midwest/Michigan markets but ANR Michigan Leg South is a specific geographic corridor; partial reroute may be possible via TETCO or PEPL for some Michigan deliveries but full offset is unlikely given the firm primary curtailment level.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

UPDATE: Force Majeure – MXP Line

SEV 4/5
Force Majeure 1.900 Bcf/d Until Further Notice

TCO has issued a revision to its October 14, 2026 force majeure on MXP Line-100 in West Virginia, originally triggered by a detected leak near the Saunders Creek Regulator Station (a separate event from the September 24 force majeure on the same line). As of this update, MXPSEG remains at zero total capacity, with firm service impact estimated at 1.9 MMDth/day; TCO is estimating a return to service for Gas Day Saturday October 17, 2026, though the timeline is subject to change and Timely/Evening Cycle nominations for October 17 are likely to be impacted. The force majeure and capacity elimination remain fully in effect, and RCC eligibility requires 10 or more consecutive days of firm curtailment.

TCO force majeure on MXPSEG remains at zero total capacity with 1.9 Bcf/d of estimated firm service impact; targeted return is October 17 but is not guaranteed, keeping bearish pressure on Columbia Appalachia basis and mildly bearish pressure on Dominion South and TETCO M2 through at least the weekend gas days.
Reroute: Limited to moderate: TETCO (monitored) and Equitrans serve overlapping Appalachian markets, but TCO MXPSEG is very high capacity and 1.9 Bcf/d of stranded firm volumes cannot be fully absorbed by competing pipes without significant basis pressure at Columbia Appalachia pool.
View original notice text
Loading…
Force Majeure 0.205 Bcf/d Until Further Notice 14 Days

Southern Star declared force majeure on Line Segment 455 due to a mechanical turbine failure at Saginaw Compressor Station in Jasper County, Missouri, effective October 9, 2026 (ID2 cycle). Capacity reductions total 205,000 Dth/d (0.205 Bcf/d): 180,000 Dth/d at Saginaw CS (Location ID 444550) and 25,000 Dth/d at Empire Energy Center (Location ID 378502). This notice (11240) supersedes 11238 and adds a repair timeline -- contractors are scheduled to complete turbine repairs by October 26, 2026, approximately two weeks from the notice date.

Southern Star force majeure removes 0.205 Bcf/d of Midcontinent/Kansas-Missouri capacity through approximately October 26; expect mild bullish pressure on Southern Star basis and Kansas-Missouri delivery markets, with tightening most acute at points downstream of Saginaw CS -- live data shows Saginaw CS Area Deliveries (loc 444550) running at 83.9% utilization with only 16.1% headroom, consistent with the stated constraint.
Reroute: Moderate: ANR, PEPL, and Southern Natural (EGT) serve overlapping Midcontinent and Kansas-Missouri markets, though Southern Star serves specific local delivery points in Missouri that may have limited bypass. PEPL Princeton Receipt (loc 17131) is posting 74.5% utilization with 25.5% headroom, suggesting some alternative capacity exists.
View original notice text
Loading…
Force Majeure 0.205 Bcf/d Until Further Notice

Southern Star declared force majeure effective October 9, 2026 due to a mechanical failure at Saginaw Compressor Station in Jasper County, Missouri. The event reduces capacity by 180,000 Dth/d (0.180 Bcf/d) at Saginaw CS (Location ID 444550) and 25,000 Dth/d (0.025 Bcf/d) at Empire Energy Center (Location ID 378502), for a combined 0.205 Bcf/d reduction on Line Segment 455. No restoration timeline has been given; Southern Star will post updates as available.

Southern Star force majeure removes 0.205 Bcf/d of Midcontinent throughput capacity on Line Segment 455 with no restoration timeline; expect bullish pressure on Southern Star / Midcontinent Kansas-Missouri basis with tightening likely to spill into Oneok Oklahoma pricing and modest supportive signal at Henry Hub if Midwest pull-back reduces southbound displacement.
Reroute: Moderate: ANR, PEPL, and TIGT serve overlapping Midcontinent and Kansas/Missouri markets and could absorb a portion of the displaced volumes, but Southern Star Line Segment 455 serves specific local and downstream Missouri delivery points that may have limited bypass options.
View original notice text
Loading…
Force Majeure 0.395 Bcf/d cut (capped at 0.930 Bcf/d) Until Further Notice 17 Days

ANR Pipeline has declared a force majeure on the Michigan Leg South at St. John Eastbound (LOC #FPSTJNEB) due to an anomaly discovered between MLV 56 and MLV 57, restricting capacity by 395 MMcf/d (0.395 Bcf/d) and leaving only 930 MMcf/d available. The constraint, originally set to run from 10/3 through 10/12, has now been extended through 10/19, a total of 17 days. ANR anticipates firm primary curtailments of approximately 34% of contracted MDQ, with firm secondary and interruptible services also affected.

ANR force majeure removes 0.395 Bcf/d of Michigan Leg South eastbound capacity through 10/19; pre-event flow at St. John Eastbound (FPSTJNEB TD1) was running at a median 0.67 Bcf/d (range 0.59-0.75) against the now-constrained 0.977 Bcf/d operating capacity, with the new 0.930 Bcf/d cap implying a modest physical cut relative to recent scheduled flows of ~0.593 Bcf/d currently posted, but firm primary curtailments at 34% of MDQ signal tightening at ANR ML 7 Michigan/Wisconsin delivery markets.
Reroute: Limited: ANR is one of the primary pipelines serving Michigan and Wisconsin markets; NGPL, PEPL, and ANR's own alternative segments provide partial relief but cannot fully replace constrained Michigan Leg South eastbound capacity, particularly for firm primary shippers already facing 34% MDQ curtailments.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

FORCE MAJEURE ON MUSKRAT EFF 10-9-26

SEV 4/5
Force Majeure Until Further Notice

Tennessee Gas Pipeline has declared a force majeure on its Muskrat Line (Segments 509, 515, 516, 523, and 524) effective Gas Day October 9, 2026 and until further notice, due to evacuations in the Cocodrie, Louisiana area driven by the projected path and landfall of Hurricane Isaias. Primary In the Path capacity at Segment 524 FH may be impacted as early as the Timely Cycle for October 9. No specific capacity volume is stated; duration is indeterminate (UFN).

TGP Muskrat Line force majeure effective 10-9-26 UFN removes Gulf Coast zone supply with no stated capacity figure but hurricane-driven evacuations at Cocodrie create immediate risk to primary firm service on Segments 509-524; expect bullish pressure on Tennessee Zone 0/1 downstream basis and potential widening at Transco Zone 4 as Gulf Coast TGP supply is at risk.
Reroute: Limited: Gulf South (monitored) and Columbia Gulf Transmission serve overlapping Gulf Coast corridors, but hurricane evacuation conditions affecting the Cocodrie area may simultaneously constrain other Gulf Coast infrastructure; reroute cannot be assumed reliable while Isaias threatens landfall.
View original notice text
Loading…
Force Majeure 2.274 Bcf/d

REX declared a force majeure at Hamilton Compressor Station effective ID1 cycle Gas Day October 7, 2026, and until further notice. Segment 360 eastbound capacity is restricted to 2.274 Bcf/d, with upstream segments 370 and 380 also curtailed to 2.657 and 2.692 Bcf/d respectively. Primary firm, secondary firm, and AOR/ITS quantities are all at risk of not being scheduled.

REX Hamilton FM caps Seg 360 E-to-W flow at 2.274 Bcf/d with firm and secondary firm service at risk; expect bullish pressure at Lebanon Hub and Midwest delivery points as westbound throughput tightens, with no clear HH directional signal given REX's Midwest-facing flow path.
Reroute: Limited: Trailblazer Pipeline (TPC) is the primary Rockies eastbound alternative, but REX and Trailblazer share Bertrand Compressor Station -- they are not independent reroutes for one another, limiting offset capacity. Zone 3 Appalachian westbound reversals on REX may partially compensate for Midwest demand, but firm service curtailment risk leaves limited near-term relief.
View original notice text
Loading…
Restoration Until Further Notice

Cove Point LNG is terminating a previously active capacity restriction (PPO) effective 2026-10-07 at 03:00. This restoration notice signals that prior feedgas delivery constraints at Cove Point are being lifted, restoring normal LNG export operations. No specific capacity figure is stated in the notice.

Restoration of Cove Point LNG feedgas capacity removes a prior bearish domestic supply overhang; resumption of LNG exports is bullish for Henry Hub and tightens Appalachian/Mid-Atlantic basis (Eastern Gas South and Transco Zone 5), as gas previously retained onshore will now flow to the export terminal -- live capacity at COVE POINT PLANT (loc 10001, SI:SIQ) shows 0.013 Bcf/d currently scheduled against 1.80 Bcf/d operating capacity, confirming the terminal was running near zero under the prior restriction.
Reroute: Not applicable -- this is a restoration event lifting a prior restriction at Cove Point LNG; no reroute assessment required.
View original notice text
Loading…
Maintenance 0.400 Bcf/d Until Further Notice 1 Days

This is a bundled CTPL 2026 Planned Outage and Maintenance Summary covering two independent jobs. The most impactful single job is Job 2026114 (Q4): a 15-hour compressor maintenance window at Gillis Compressor Station on 11/17/2026 (3:00 a.m. to 6:00 p.m.), with a transport impact of 400,000 Dths (0.400 Bcf/d) and available capacity reduced to 1,130,000 Dths. Job 2026112 (Q3, 9/29-10/2, 4 days) is a LEAP Meter Station upgrade with zero transport impact and should not be treated as a capacity-affecting event.

Job 2026114 removes 0.400 Bcf/d of Sabine Pass LNG feedgas capacity for ~15 hours on 11/17/2026, reducing available CTPL throughput to 1.130 Bcf/d; LNG feedgas curtailment keeps that volume in the domestic market, bearish Henry Hub for that gas day, with the Gillis-LEAP interconnect (CT109461) currently scheduled at 0.735 Bcf/d against 1.00 Bcf/d operating capacity providing partial buffer.
Reroute: Limited: CTPL is the dedicated feed gas pipeline for Sabine Pass LNG; no alternative pipeline directly replaces CTPL feedgas supply to the terminal, though Cheniere may partially offset the 15-hour window through storage or scheduling adjustments.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

FORCE MAJEURE MLV 313 (HC LINE) 10-6 REM

SEV 4/5
Force Majeure 0.580 Bcf/d Until Further Notice

Tennessee Gas Pipeline declared a force majeure on October 2, 2026 between valve sections 313A-403 to 313A-404 on the HC Line just south of Avoca, New York, following discovery of an anomaly requiring immediate repair. This is Revision 3, issued as a reminder that repair work is scheduled to begin on October 6, 2026, with primary firm capacity at MLV 313 HC Zone 4 End (Segment 399 FH) at risk for up to 0.580 Bcf/d; meters 412803 (TGP Gravel Run) and 421068 (TGP Wyckoff Storage) are being physically shut in for the duration of work, with all secondary receipts and deliveries restricted. No restoration timeline has been provided.

TGP HC Line force majeure threatens up to 0.580 Bcf/d of primary firm capacity at MLV 313 Zone 4 End with no restoration timeline; expect bullish pressure on Tennessee Zone 4-300 and Zone 6 New England basis as Appalachian corridor flows through this segment are curtailed, with Wyckoff Storage shut in compounding supply tightness for downstream Northeast markets.
Reroute: Limited: Transco is the primary competing pipeline for Northeast deliveries, and while it serves overlapping markets, TGP's HC Line serves specific Appalachian Zone 4 segments with limited bypass; partial reroute via Transco and TETCO is possible but unlikely to fully offset 0.580 Bcf/d of primary firm curtailment given current system loadings.
View original notice text
Loading…
Force Majeure 2.096 Bcf/d 10 Days

GTN has declared a Force Majeure following an unexpected equipment failure at Sandpoint Compressor Station Unit A, restricting capacity at Flow Past Kingsgate (LOC #3500) to 2.096 Bcf/d from October 6 through October 15, 2026. No incremental volumes will be scheduled on the intraday of October 5. GTN anticipates Firm Primary, Firm Secondary, and Interruptible curtailments, including previously scheduled volumes for the October 6 Evening Cycle, with the Reservation Charge Crediting Mechanism activated.

GTN force majeure at Sandpoint CS Unit A restricts Flow Past Kingsgate to 2.096 Bcf/d through Oct 15, tightening Western Canada/WCSB import flow into the Pacific Northwest and California; expect bullish pressure at Sumas, PG&E Malin, and Stanfield basis points -- the GTN Kingsgate basis had already averaged -1.609 vs HH over the five trading days ended Sep 25 (most recently -1.755 on Sep 25), but those figures predate this FM declaration and do not reflect the now-constrained flow environment.
Reroute: Limited: GTN is the primary Western Canada-to-Pacific Northwest import corridor; Northwest Pipeline (NWP) provides some Pacific Northwest alternative capacity, but cannot fully replace WCSB volumes moving through Kingsgate, and Ruby Pipeline serves a different upstream basin (Rockies/Opal) with no direct Canadian supply substitution.
View original notice text
Loading…
Force Majeure 0.395 Bcf/d Until Further Notice 10 Days

ANR Pipeline declared force majeure on its Michigan Leg South system effective October 3, 2026, due to an anomaly discovered between MLV 56 and MLV 57. Eastbound capacity at St. John (LOC #FPSTJNEB) is reduced by 395 MMcf/d (0.395 Bcf/d), leaving 930 MMcf/d available, with the constraint expected to run through October 12. ANR warns of firm primary (estimated 34% of contracted MDQ), firm secondary, and interruptible curtailments, with RCCs to be issued per Tariff Section 6.36 if primary firm scheduled quantities cannot be met.

ANR force majeure removes 0.395 Bcf/d of eastbound Michigan Leg South capacity through Oct 12, with 34% of contracted firm primary MDQ at risk; expect bullish pressure on ANR ML 7 and Michigan/Wisconsin basis versus Henry Hub as Midwest supply tightens.
Reroute: Limited: TETCO (monitored), TGT (monitored), and PEPL (monitored) serve overlapping Gulf Coast-to-Midwest corridors but cannot fully replace Michigan-specific ANR Michigan Leg South deliveries; downstream Michigan LDC customers in particular have few practical bypass options.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

FORCE MAJEURE MLV 313(HC LINE) EFF 10-6

SEV 4/5
Force Majeure 0.580 Bcf/d Until Further Notice

Tennessee Gas Pipeline has declared a Force Majeure between valve sections 313A-403 and 313A-404 on the HC Line just south of Avoca, New York, effective October 6, 2026 starting with the Timely Cycle. An anomaly requiring immediate repair was discovered; repair work begins October 6 with no stated end date. Up to 0.580 Bcf/d of Primary In the Path capacity at MLV 313 HC Zone 4 End (Segment 399 FH) is at risk, and meters 412803 (TGP Gravel Run) and 421068 (TGP Wyckoff Storage) will be physically shut in for the duration.

TGP HC Line force majeure removes up to 0.580 Bcf/d of Zone 4 primary firm capacity effective Oct 6 with no restoration timeline; expect bullish pressure on Tennessee Zone 4 and Zone 6 Northeast/New England basis with Wyckoff Storage shut in compounding supply tightness into the region.
Reroute: Limited: Transco is the primary competing Northeast pipeline and serves overlapping Zone 4/6 markets, but TGP and Transco together are the two dominant Northeast corridors, so a TGP constraint of this size cannot be fully offset without knowing Transco's available capacity; no same-corridor single alternative exists for direct HC Line Zone 4 deliveries north of the constraint point.
View original notice text
Loading…
Compressor Issue 0.504 Bcf/d

Great Lakes Gas Transmission declared unplanned maintenance at Rapid River Compressor Station 9 effective October 1, 2026, with a critical capacity reduction taking effect October 2 until further notice. Eastbound capacity at Crystal Falls CS (LOC #3911656) will be reduced by 504 MMcf/d (0.504 Bcf/d), leaving only 1,210 MMcf/d (1.210 Bcf/d) of eastbound capacity. GLGT explicitly warns this may result in Firm Primary curtailments, estimating 22% impact to Firm Primary service, with Reservation Charge Crediting triggered under Section 6.10.3(d).

Unplanned GLGT compressor outage removes 0.504 Bcf/d of eastbound capacity until further notice with confirmed 22% Firm Primary impact; expect bullish pressure at Chicago Citygate, Emerson/Viking GL, and Dawn Ontario basis as Western Canadian supply routed through GLGT is curtailed, with the no-restoration-timeline and firm service curtailment language supporting a sustained tightness signal in Upper Midwest markets.
Reroute: Limited: GLGT is a primary Western Canadian import path into the Upper Midwest and Michigan; while ANR and TransCanada Mainline interconnect with the system, the constraint is on GLGT's own mainline eastbound segment and volumes scheduled on this path have limited immediate alternatives at comparable cost or capacity.
View original notice text
Loading…
November 2026
555 notices
October 2026
1,083 notices
September 2026
782 notices
August 2026
2,480 notices
July 2026
703 notices
June 2026
586 notices
May 2026
506 notices
April 2026
722 notices
March 2026
467 notices