Enercast — at the moment it matters
Home  /  Archive  /  April 2026

Pipeline Notices — April 2026

722 notices recorded this month

722 notices
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [FORCE MAJEURE] REDTAIL COMPRESSOR STATION FORCE MAJEURE

SEV 5/5
Force Majeure 0.030 Bcf/d Until Further Notice

Trailblazer Pipeline declared force majeure at Redtail Compressor Station effective Gas Day April 15, 2026, reducing operating capacity to only 30 MDth/d (0.030 Bcf/d) until further notice. Primary firm, secondary firm, and interruptible service are all at risk of curtailment. No restoration timeline has been provided; end date is listed as 12/31/9000, indicating an indefinite outage.

Trailblazer FM at Redtail CS cuts operating capacity to 0.030 Bcf/d with all service classes at risk; this effectively eliminates Trailblazer as a functional eastbound Rockies takeaway path, expect bearish pressure on CIG/Cheyenne Hub Rockies basis as gas backs up in the Rockies, with offsetting bullish pressure at Midcontinent and Northern Natural Gas downstream delivery points.
Reroute: None: Trailblazer leases capacity at Bertrand CS on REX, and REX Zone 1 is the primary correlated alternative -- when Trailblazer is constrained at a compressor station upstream of Bertrand, REX may face correlated pressure; Colorado Interstate Gas (CIG) provides a partial alternative for some Rockies volumes moving south, but cannot fully absorb Trailblazer's eastbound capacity.
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13664
Notice Type: Critical notice
Sub-Type: FORCE MAJEURE
Subject: REDTAIL COMPRESSOR STATION FORCE MAJEURE
Posted: 4/15/2026 7:39:13 PM
Effective: 4/15/2026 7:39:13 PM
End Date: 12/31/9000

REDTAIL COMPRESSOR STATION FORCE MAJEURE
On Gas Day Wednesday, April 15, 2026, Trailblazer Pipeline Company (“TPC”) experienced a Force
Majeure event (as defined in Section 22 of the GT&C of the Tariff) at its Redtail Compressor Station.
Effective ID3 cycle, Gas Day Wednesday, April 15, 2026, and Evening cycle, Gas Day Thursday, April 16,
2026, and until further notice, the operating capacity at the Redtail Location (Location 56111) will be
scheduled to 30 MDth/d.
At this capacity level, primary and secondary firm quantities as well as ITS/AOR may be at risk of not
being scheduled. REX will post updates as they are available.
For questions, please call your Account Director or Scheduling Representative at 303-763-2906.
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] FORCE MAJEURE-COMP STA 168

SEV 4/5
Force Majeure Until Further Notice 85 Days

NGPL has declared force majeure at Compressor Station 168, effective April 6, 2026, with an end date of June 30, 2026. CS 168 is a key compression point on NGPL's Gulf Coast-to-Chicago corridor, restricting northbound flow capacity for up to 85 days. No specific volume restriction is stated in the notice.

NGPL CS 168 force majeure constrains Gulf Coast-to-Chicago northbound capacity, creating bearish pressure at Henry Hub as gas backs up at Gulf Coast origin points and bullish pressure at Chicago Citygate and NGPL Midcontinent basis versus Henry Hub.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Gulf Coast-to-Chicago/Midwest corridors, but NGPL is one of the highest-throughput Midwest pipelines and partial reroute may not fully offset a significant compressor station outage.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE-COMP STA 168
Posted: 04/06/2026 9:21:29AM
Effective: 04/06/2026 9:21:29AM
End Date: 06/30/2026 9:00:00AM
Kinder Morgan (multi-pipeline)

[FORCE MAJEURE] FORCE MAJEURE-COMP STA 168 UPD1

SEV 4/5
Force Majeure Until Further Notice 67 Days

NGPL has declared force majeure at Compressor Station 168, effective April 24, 2026, with an end date of June 30, 2026. CS 168 is a key compression facility on the NGPL mainline moving Gulf Coast and Midcontinent gas northward into Chicago and Midwest markets. No specific capacity volume is stated in the notice.

NGPL CS 168 force majeure constrains northbound Gulf Coast-to-Midwest throughput for up to 67 days; expect bearish pressure at Henry Hub as Gulf Coast gas backs up, with bullish pressure at Chicago Citygate and NGPL Midcontinent basis vs Henry Hub.
Reroute: Moderate: ANR, PEPL, and REX Zone 3 serve overlapping Chicago and Midwest markets and may absorb some displaced NGPL volumes, though NGPL is very high capacity and a large constraint is difficult to fully offset on alternative pipes.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: FORCE MAJEURE
Subject: FORCE MAJEURE-COMP STA 168 UPD1
Posted: 04/24/2026 9:28:49AM
Effective: 04/24/2026 9:28:49AM
End Date: 06/30/2026 9:00:00AM
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Force Majeure] DELHI COMPRESSOR FMJ

SEV 4/5
Force Majeure Until Further Notice

Enable Gas Transmission has declared force majeure at its Delhi Compressor Station in Richland Parish, Louisiana, effective April 8, 2026, continuing until further notice. The unplanned outage prevents deliveries to Gulf Run Delhi Core Delivery Point (#291856) and is expected to impact primary firm transportation services in EGT's South Pooling Area. No restoration timeline has been provided.

EGT force majeure at Delhi CS eliminates deliveries to Gulf Run Delhi Core Del with no end date, curtailing primary firm service in the South Pooling Area; expect bearish pressure on Arkla Basin and Gulf Coast basis as stranded gas backs up, with watch on Gulf Run LNG feed gas supply chain if downstream volumes are affected.
Reroute: Moderate: Gulf South and Southern Natural (EGT/Energy Transfer) serve overlapping Gulf Coast and Haynesville-area corridors, providing partial alternatives; however, the specific Gulf Run Delhi Core delivery point has no direct bypass, and volumes destined for Gulf Run interconnects (including LNG feed gas paths) cannot be fully replaced via alternate routing.
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6372
Notice Type: Force Majeure
Subject: DELHI COMPRESSOR FMJ
Posted: Wed Apr 08 11:14:00 CDT 2026
Effective: Wed Apr 08 11:15:00 CDT 2026
End Date: 

EGT Critical Notices
TSP:                                     872670161
TSP Name:                                ENABLE GAS TRANSMISSION, LLC
Critical Notice Description:             Critical notice
Notice Effective Date:                   04/08/2026
Notice Effective Time:                   11:15
Notice End Date:                         00/00/0000
Notice End Time:                         00:00
Notice Identifier:                       6372
Notice Status Description:               Initiate
Notice Type:                             Force Majeure
Posting Date/Time:                       04/08/2026 11:13
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject:                                 DELHI COMPRESSOR FMJ
Notice Text:
This Operational Alert is being issued pursuant to Section 20, GT&C, of EGT s Tariff to notify shippers of
unplanned maintenance at EGT s Delhi Compressor Station located in Richland Parish, Louisiana and in
EGT s South Pooling Area. This unplanned maintenance will commence Immediately, and
continue until further notice. Based on current nominations, EGT expects impacts to both
Primary FT services.
During this time:
*	EGT will be unable to deliver to Gulf Run Delhi Core Del (#291856).
Based on current nominations, EGT does anticipate impacts to its primary firm services.  EGT
will evaluate nominations, on a case by case basis, based on daily operations to alleviate
impacts to the extent possible.  Should any of the details of this posting change, EGT will notify
its shippers and update this notice accordingly.
EGT will schedule nominations, if needed, on each impacted day in accordance with its tariff.
This alert will remain in effect until the completion of the maintenance.
If you have any questions concerning this alert, please contact your Scheduling Representative.
For a more readable version of this document click
Here
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Force Majeure] DELHI COMPRESSOR FMJ TERM

SEV 4/5
Force Majeure Until Further Notice

EGT declared force majeure at its Delhi Compressor Station in Richland Parish, Louisiana, effective April 12, 2026, with no end date (until further notice). The outage prevents EGT from delivering to Gulf Run Delhi Core Delivery Point (#291856), with primary firm transport service expected to be impacted. A separate balancing alert (6327) has been terminated as of April 12, indicating the operational situation may be stabilizing, but the FM itself remains active.

EGT force majeure at Delhi CS cuts primary firm deliveries to Gulf Run Delhi with no restoration timeline; expect localized tightness at the Gulf Run interconnect and potential knock-on effects for Haynesville production takeaway and LNG feed gas nominations at Gulf Coast export terminals supplied via Gulf Run.
Reroute: Moderate: Gulf South Pipeline and Kinder Morgan assets serve overlapping Haynesville corridor routes, and some volumes may be redirected away from the Gulf Run Delhi delivery point; however, the specific impact on LNG feed gas supply depends on whether downstream shippers can nominate alternate paths to Gulf Coast export terminals.
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6376
Notice Type: Force Majeure
Subject: DELHI COMPRESSOR FMJ TERM
Posted: Sun Apr 12 12:48:00 CDT 2026
Effective: 
End Date: 

EGT Critical Notices
TSP:                                     872670161
TSP Name:                                ENABLE GAS TRANSMISSION, LLC
Critical Notice Description:             Critical notice
Notice Effective Date:                   04/12/2026
Notice Effective Time:                   13:00
Notice End Date:                         00/00/0000
Notice End Time:                         00:00
Notice Identifier:                       6376
Notice Status Description:               Initiate
Notice Type:                             Force Majeure
Posting Date/Time:                       04/12/2026 12:47
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject:                                 DELHI COMPRESSOR FMJ TERM
Notice Text:
New Information Posted April 12th, 2026
EGT Balancing Alert #6327 is terminated effective immediately.
Previous Information Posted April 8th, 2026
This Operational Alert is being issued pursuant to Section 20, GT&C, of EGT s Tariff to notify
shippers of unplanned maintenance at EGT s Delhi Compressor Station located in Richland
Parish, Louisiana and in EGT s South Pooling Area. This unplanned maintenance will commence
Immediately and continue until further notice. Based on current nominations, EGT expects
impacts to Primary FT services.
During this time:
*	EGT will be unable to deliver to Gulf Run Delhi Core Del (#291856).
Based on current nominations, EGT does anticipate impacts to its primary firm services.  EGT
will evaluate nominations, on a case by case basis, based on daily operations to alleviate
impacts to the extent possible.  Should any of the details of this posting change, EGT will notify
its shippers and update this notice accordingly.
EGT will schedule nominations, if needed, on each impacted day in accordance with its tariff.
This alert will remain in effect until the completion of the maintenance.
If you have any questions concerning this alert, please contact your Scheduling Representative.
For a more readable version of this document click
Here
EGTS

OFO: Northern Area Conform Services

SEV 4/5
Operational Alert Until Further Notice

EGTS has issued an Operational Flow Order (OFO) for Conform Services on its Northern Area, effective January 23, 2026 at 15:00. This is a Critical-category notice indicating active system stress requiring shippers to conform nominations to actual usage. No specific capacity volume is stated, but OFO declarations on EGTS Northern Area signal tightness in Appalachian Mid-Atlantic supply flows. Duration is indeterminate from this notice.

EGTS Northern Area OFO signals active system stress on the Appalachian/Mid-Atlantic corridor; expect bullish pressure at Dominion South and TETCO M2 basis with potential tightening at Mid-Atlantic delivery points served by EGTS and Transco Zone 5.
Reroute: Moderate: TCO (Columbia Gas Transmission) and Equitrans serve overlapping Appalachian markets and may absorb some volumes, but EGTS Northern Area OFOs during winter typically reflect system-wide tightness that limits available reroute capacity on competing pipes.
View original notice text
Pipeline: EGTS
Notice ID: 1009868
Subject: OFO: Northern Area Conform Services
Notice Type: Notices
Posted: 2026-01-21T19:37:14.555
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
ANR Pipeline (TC Energy)

CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station

SEV 4/5
Maintenance 1.611 Bcf/d Until Further Notice 2 Days

ANR Pipeline has planned maintenance at Eunice Compressor Station in the Southeast Area on 3/18-3/19, resulting in curtailments across eight interconnect locations totaling approximately 1.611 Bcf/d of reduced capacity. Affected locations include major interconnects with TGP (443 MMcf/d reduced to 30 MMcf/d), Sonat/SNG (377 MMcf/d reduced to 110 MMcf/d), Weeks Island/LIG (270 MMcf/d reduced to 40 MMcf/d), and Col Gulf (143 MMcf/d reduced to 0 MMcf/d). ANR explicitly anticipates Firm Primary, Firm Secondary, and Interruptible curtailments, meaning all service classes are at risk.

ANR Eunice CS planned outage removes approximately 1.611 Bcf/d of Southeast Area capacity for 3/18-3/19, with firm primary curtailments explicitly anticipated; expect tightening at Transco Zone 4, SNG/Sonat, and TGP Southeast interconnects, with bullish basis pressure across Gulf Coast-to-Southeast delivery corridors.
Reroute: Limited: the Eunice CS constraint simultaneously affects ANR interconnects with both SNG/Sonat and TGP -- the two primary competing Southeast pipelines -- reducing the ability of shippers to reroute curtailed volumes; TETCO and CGT provide partial Gulf Coast northbound alternatives but are unlikely to absorb the full 1.6 Bcf/d reduction.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage

Notice Stat Desc: Initiate

Prior Notice: 

Critical: Y

Reqrd Rsp Desc: No Response Required
Post

Notice Effective

Notice End



Response
Post Date: 02/20/26

02/20/26

03/20/26
Subject: Subject: CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Author: Author: T0000106
Notice Text
ANR has planned maintenance at the Eunice compressor station in the Southeast Area. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:  

 

3/18 – 3/19:

 

Patterson/Trunkline (LOC #40317):  94 MMcf/d (leaving 0 MMcf/d)

Patterson to Col Gulf (LOC #43613):  143 MMcf/d (leaving 0 MMcf/d)

Riverway (To Bridgeline) (LOC #42593):  130 MMcf/d (leaving 40 MMcf/d)

Avalon (LOC #38295):  85 MMcf/d (leaving 25 MMcf/d)

Shadyside/Sonat (Del) (LOC #10369):  377 MMcf/d (leaving 110 MMcf/d)

Shadyside/TGP (Del) (LOC #467240):  443 MMcf/d (leaving 30 MMcf/d)

St. Landry/FL Int (LOC #322625):  69 MMcf/d (leaving 30 MMcf/d)

Weeks ISLA/LIG PL (LOC #233620):  270 MMcf/d (leaving 40 MMcf/d)

 

Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.

 

Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
El Paso (EPNG)

[FORCE MAJEURE] Force Majeure - El Paso C Station

SEV 4/5
Force Majeure Until Further Notice 1 Days

EPNG has declared force majeure at El Paso C Station effective 04/15/2026 at 10:30 AM, with restoration expected by 04/16/2026 at 9:00 AM. El Paso C Station is a compressor station on the EPNG mainline in the El Paso/West Texas corridor, a key segment for westbound Permian Basin takeaway toward SoCal and Arizona. Duration is approximately 22.5 hours. No capacity volume is specified in the notice.

EPNG force majeure at El Paso C Station reduces westbound Permian takeaway capacity; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points, though the short ~1-day duration limits sustained market impact.
Reroute: Moderate: Transwestern Pipeline (TW) serves overlapping SoCal Border and Arizona markets and is the primary reroute alternative; however, TW spare capacity at any given time may not fully absorb constrained EPNG volumes, particularly on short notice.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: FORCE MAJEURE
Subject: Force Majeure - El Paso C Station
Posted: 04/15/2026 10:30:41AM
Effective: 04/15/2026 10:30:41AM
End Date: 04/16/2026 9:00:00AM
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [OPERATIONAL ALERT] THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #12

SEV 4/5
Compressor Issue 0.813 Bcf/d Until Further Notice

Trailblazer Pipeline Segment 20 capacity is restricted to 0.813 Bcf/d effective evening cycle April 1, 2026, until further notice due to a third-party operational issue at Bertrand Compressor Station. This is Update #12, indicating an ongoing multi-revision unresolved outage. Primary firm, secondary firm, and interruptible service are all at risk of curtailment. No restoration timeline has been provided.

Trailblazer Segment 20 restricted to 0.813 Bcf/d with primary firm at risk and no restoration timeline; simultaneous REX/Trailblazer Bertrand CS constraint removes independent reroute options, bearish pressure on Rockies/CIG basis as eastbound Rockies gas remains stranded with no alternative takeaway.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both pipelines are simultaneously constrained by the same third-party facility, meaning REX cannot serve as an independent reroute for Trailblazer volumes affected at Bertrand CS.
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13621
Notice Type: Critical notice
Sub-Type: OPERATIONAL ALERT
Subject: THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #12
Posted: 3/31/2026 7:23:39 PM
Effective: 3/31/2026 7:23:39 PM
End Date: 12/31/9000

THIRD PARTY OPERATIONAL ISSUE – BERTRAND COMPRESSOR STATION – UPDATE #12
Effective Evening cycle, Gas Day Wednesday, April 1, 2026, until further notice, the capacity in
Segment 20 is being restricted to 813 MDth/d.
At this capacity level, primary and secondary firm quantities as well as ITS/AOR may be at risk of not
being scheduled.
REX is continuing to monitor progress across the system and will post updates as more information
becomes available. Any updates will also be posted under Trailblazer’s EBB. For questions, please call
your Account Director or Scheduling Hotline at 303-763-2906
Rockies Express

[OPERATIONAL ALERT] BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #12

SEV 4/5
Compressor Issue 1.174 Bcf/d Until Further Notice

Rockies Express Pipeline is restricting Segment 250 (Zone 1, West-to-East direction) to 1,174 MDth/d (1.174 Bcf/d) due to an ongoing operational issue at Bertrand Compressor Station, effective evening cycle April 1, 2026, until further notice. This is Update #12, indicating a prolonged unresolved event. Primary firm, secondary firm, and interruptible service are all at risk of curtailment at this capacity level.

Bertrand CS constraint caps REX Zone 1 eastbound at 1.174 Bcf/d until further notice, with all service classes at curtailment risk; Trailblazer shares this facility and is simultaneously constrained, leaving zero independent reroute -- expect bearish Rockies basis pressure and bullish Midcontinent/Chicago Citygate basis widening vs Henry Hub.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both are simultaneously constrained by the same facility, and no independent reroute exists for Rockies eastbound volumes affected by this outage.
View original notice text
Pipeline: Rockies Express Pipeline
Notice ID: 13620
Notice Type: Critical notice
Sub-Type: OPERATIONAL ALERT
Subject: BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #12
Posted: 3/31/2026 7:23:22 PM
Effective: 3/31/2026 7:23:22 PM
End Date: 12/31/9000

BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE – UPDATE #12
Effective Evening cycle, Gas Day Wednesday, April 1, 2026, until further notice, the capacity in
Segment 250 is being restricted to 1,174 MDth/d in the West to East direction.
At this capacity level, primary and secondary firm quantities as well as ITS/AOR may be at risk of not
being scheduled. REX will post updates as they are available.
For questions, please call your Account Director or Scheduling Representative at 303-763-2906.
Texas Gas Transmission

Capacity Impact: Mitchellville (Portland) Location #2764 and Goodnight (Glasgow)

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038053
Notice Type: Other/Pipeline Conditions
Status: Initiate
Posted: 2026-04-29T08:40:00+00:00
Effective: 2026-05-01T09:00:00+00:00
End: 
Subject: Capacity Impact: Mitchellville (Portland) Location #2764 and Goodnight (Glasgow)
Texas Eastern Transmission (TETCO)

04/29/2026- TE Pipeline Conditions for 4/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/30/2026
Notice End Date: 05/01/2026
Posting Date: 04/29/2026
Notice Identifier: 177246
Required Response Indicator Description: No response required

For Gas Day April 30, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
Planned Outage
Five Points South
N/A
100%
100%
64%
Lebanon
Yes
Batesville South
Yes
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
72%
White Castle South
Yes
West Monroe
Yes
Union Church
N/A
100%
53%
Longview
N/A
100%
48%
Deliveries to the Castor Line
N/A
100%
Hempstead
N/A
100%
100%
100%
Planned Outage
Speaks
N/A
100%
78%
Angleton West
N/A
100%
100%
100%
100%
29%
Planned Outage
Deliveries to BIG
N/A
100%
100%
100%
100%
42%
East Golden Pass
N/A
100%
Gillis
N/A
100%
43%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/29/2026- ETNG Pipeline Conditions for 4/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/30/2026
Notice End Date: 05/01/2026
Posting Date: 04/29/2026
Notice Identifier: 177219
Required Response Indicator Description: No response required

For Gas Day April 30, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Tracy City
96%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/28/2026- TE Pipeline Conditions for 4/29/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 04/30/2026
Posting Date: 04/28/2026
Notice Identifier: 177209
Required Response Indicator Description: No response required

For Gas Day April 29, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Athens
N/A
100%
100%
Unplanned Outage
Danville
N/A
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
Planned Outage
Five Points South
N/A
100%
75%
Lebanon
N/A
100%
10%
Batesville South
N/A
100%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
78%
White Castle South
Yes
West Monroe
Yes
Union Church
N/A
100%
50%
Longview
N/A
100%
59%
Deliveries to the Castor Line
N/A
100%
23%
Hempstead
N/A
100%
100%
100%
Planned Outage
Speaks
N/A
100%
78%
Angleton West
N/A
100%
100%
100%
100%
21%
Planned Outage
Deliveries to BIG
N/A
100%
100%
100%
100%
10%
East Golden Pass
N/A
100%
33%
Gillis
N/A
100%
26%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/28/2026- ETNG Pipeline Conditions for 4/29/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 04/30/2026
Posting Date: 04/28/2026
Notice Identifier: 177185
Required Response Indicator Description: No response required

For Gas Day April 29, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Tracy City
19%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/28/2026- AGT Operational Flow Order -- EFF 4/29 and 5/1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- EFF 4/29 and 5/1
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 07/27/2026
Posting Date: 04/28/2026
Notice Identifier: 177174
Required Response Indicator Description: No response required

Operational Area
Gas Day April 28
Gas Day April 29
Gas Day April 30
Gas Day May 1
Gas Day May 2 until further notice
System Wide - All Customers
No OFO*
OFO in Effect: No DP 8% / 500
No OFO*
OFO in Effect: No DP 8% / 500
No OFO*
Customer Specific
No OFO*
No OFO*
No OFO*
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
No OFO*
No OFO*
Texas Eastern Transmission (TETCO)

04/27/2026- TE Pipeline Conditions for 4/28/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/28/2026
Notice End Date: 04/29/2026
Posting Date: 04/27/2026
Notice Identifier: 177156
Required Response Indicator Description: No response required

For Gas Day April 28, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
86%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
Planned Outage
Five Points South
N/A
100%
68%
Lebanon
Yes
Batesville South
Yes
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
81%
White Castle South
Yes
West Monroe
Yes
Union Church
N/A
100%
54%
Longview
N/A
100%
48%
Deliveries to the Castor Line
N/A
100%
35%
Huntsville
N/A
96%
Speaks
N/A
100%
55%
Angleton West
N/A
100%
82%
Deliveries to BIG
Yes
East Golden Pass
N/A
100%
33%
Gillis
N/A
100%
17%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/27/2026- ETNG Pipeline Conditions for 4/28/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/28/2026
Notice End Date: 04/29/2026
Posting Date: 04/27/2026
Notice Identifier: 177139
Required Response Indicator Description: No response required

For Gas Day April 28, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
100%
19%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Kinder Morgan (multi-pipeline)

[MAINTENANCE] OUTAGE IMPACT REPORT - 4-23-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Midcontinent Express
Notice Type: MAINTENANCE
Subject: OUTAGE IMPACT REPORT - 4-23-26
Posted: 04/23/2026 12:47:58PM
Effective: 04/23/2026 12:47:58PM
End Date: 04/30/2026 9:00:00AM
Kinder Morgan (multi-pipeline)

[MAINTENANCE] OUTAGE IMPACT REPORT - 4-23-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: MAINTENANCE
Subject: OUTAGE IMPACT REPORT - 4-23-26
Posted: 04/23/2026 12:00:22PM
Effective: 04/23/2026 12:00:22PM
End Date: 04/30/2026 9:00:00AM
Kinder Morgan (multi-pipeline)

[OPERATIONAL ALERT] SEG 22 - GC#2 LINE (CS300/301) PIPE INTE

SEV 3/5
Operational Alert Until Further Notice 38 Days

NGPL has issued an operational alert for Segment 22 on the Gulf Coast #2 Line involving compressor stations CS300/CS301, effective April 23, 2026 through May 31, 2026. The notice involves a pipe integrity issue on a key Gulf Coast northbound segment. No specific capacity restriction volume is stated in the notice text.

NGPL Segment 22 GC#2 Line integrity constraint reduces northbound Gulf Coast takeaway capacity toward Chicago and the Midwest, creating bearish pressure at Henry Hub as gas backs up on the Gulf Coast and bullish pressure at Chicago Citygate and NGPL Midcontinent basis; no volume specified so magnitude of impact is unquantified pending further detail.
Reroute: Moderate: ANR, PEPL, and TETCO serve overlapping Gulf Coast-to-Midwest corridors and may absorb some displaced volumes, though NGPL is one of the highest-throughput Midwest pipelines and large constraints are difficult to fully offset.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: OPERATIONAL ALERT
Subject: SEG 22 - GC#2 LINE (CS300/301) PIPE INTE
Posted: 04/23/2026 2:47:55PM
Effective: 04/23/2026 2:47:55PM
End Date: 05/31/2026 9:00:00AM
Texas Eastern Transmission (TETCO)

04/26/2026- TE Pipeline Conditions for 04/27/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 04/28/2026
Posting Date: 04/26/2026
Notice Identifier: 177110
Required Response Indicator Description: No response required

For Gas Day April 27, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
16%
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
N/A
100%
36%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
79%
White Castle South
Yes
West Monroe
Yes
Union Church
N/A
100%
58%
Longview
N/A
100%
53%
Deliveries to the Castor Line
N/A
100%
42%
Huntsville
Yes
Speaks
N/A
100%
77%
Angleton West
N/A
100%
56%
East Golden Pass
Yes
Gillis
N/A
100%
41%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
No DS - M2-30 and M3, issued 04/25/2026. 6% / 500 Dth Tolerance
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30 and M2-24
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/26/2026- ETNG Pipeline Conditions for 04/27/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 04/28/2026
Posting Date: 04/26/2026
Notice Identifier: 177095
Required Response Indicator Description: No response required

For Gas Day April 27, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 23, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/25/2026- TE Pipeline Conditions for 04/26/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/26/2026
Notice End Date: 04/27/2026
Posting Date: 04/25/2026
Notice Identifier: 177089
Required Response Indicator Description: No response required

For Gas Day April 26, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
86%
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
16%
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
N/A
100%
36%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
79%
White Castle South
Yes
West Monroe
Yes
Union Church
N/A
100%
58%
Longview
N/A
100%
53%
Deliveries to the Castor Line
N/A
100%
42%
Huntsville
Yes
Speaks
N/A
100%
77%
Angleton West
N/A
100%
56%
East Golden Pass
Yes
Gillis
N/A
100%
41%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
No DS - M2-30 and M3, issued 04/25/2026. 6% / 500 Dth Tolerance
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30 and M2-24
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/25/2026- ETNG Pipeline Conditions for 04/26/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/26/2026
Notice End Date: 04/27/2026
Posting Date: 04/25/2026
Notice Identifier: 177062
Required Response Indicator Description: No response required

For Gas Day April 26, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 23, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-24-2026 ID1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/24/2026 11:00:55AM	Notice End Date/Time:  04/25/2026 9:00:00am
Post Date/Time:  4/24/2026 11:00:55 AM	Notice ID: 400861
Reqrd Rsp:  1	Rsp Date:  04/24/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-24-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Friday, April 24, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 72,079 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 14,786 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,843 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 325,886 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 202,864 Dths

·         STA 315 (Segment 315 BH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 184,769 Dths

·         STA 317 (Segment 317 BH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 71,713 Dths

·         STA 321 (Segment 321 FH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 241,517 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 228,517 Dths

·         STA 245 (Segment 245 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 235,973 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 142,423 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 158,966 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-24-2026 ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/24/2026 3:35:55PM	Notice End Date/Time:  04/25/2026 9:00:00am
Post Date/Time:  4/24/2026 3:35:55 PM	Notice ID: 400868
Reqrd Rsp:  1	Rsp Date:  04/24/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-24-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Friday, April 24, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 26,893 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 11,083 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 19,144 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 325,886 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 201,192 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 189,428 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 59,857 Dths

·         STA 321 (Segment 321 FH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 192,619 Dths

·         Z5hc North (Segment 299 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 183,534 Dths

·         STA 245 (Segment 245 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 186,317 Dths

·         STA 249 (Segment 249 FH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 101,841 Dths

·         MLV 273 (Segment 284 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 79,654 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Texas Eastern Transmission (TETCO)

04/24/2026- TE Action Alert -- EFF 4/25

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Action Alert -- EFF 4/25
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 04/28/2026
Posting Date: 04/24/2026
Notice Identifier: 176999
Required Response Indicator Description: No response required

Zone
Gas Day April 24
Gas Day April 25 - April 27
Gas Day April 28 and until further notice
M1-24"
OFO In Effect: No Due Pipe 2% / 250
OFO In Effect: No Due Pipe 2% / 250
OFO In Effect: No Due Pipe 2% / 250
M1-30"
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
M2-24"
OFO In Effect: No Due Pipe 2% / 250
OFO In Effect: No Due Pipe 2% / 250
OFO In Effect: No Due Pipe 2% / 250
M2-30"
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 6%/500
No Action Alert or OFO
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 6%/500
No Action Alert or OFO
ETX
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
STX
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
WLA
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
ELA
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
Texas Eastern Transmission (TETCO)

04/24/2026- TE Pipeline Conditions for 04/25/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 04/26/2026
Posting Date: 04/24/2026
Notice Identifier: 177026
Required Response Indicator Description: No response required

For Gas Day April 25, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
86%
Rec from AGT & Del West of Lambertville
100%
100%
100%
11%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
30%
Five Points South
Yes
Lebanon
N/A
100%
33%
Lebanon Lateral
Yes
Batesville South
N/A
100%
36%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
79%
White Castle South
Yes
West Monroe
Yes
Union Church
N/A
100%
58%
Longview
N/A
100%
53%
Deliveries to the Castor Line
N/A
100%
42%
Huntsville
Yes
Speaks
N/A
100%
77%
Angleton West
N/A
100%
55%
East Golden Pass
Yes
Gillis
N/A
100%
40%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
No DS - M2-30 and M3, issued 04/25/2026. 6% / 500 Dth Tolerance
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30 and M2-24
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/24/2026- ETNG Pipeline Conditions for 4/25/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 04/26/2026
Posting Date: 04/24/2026
Notice Identifier: 177022
Required Response Indicator Description: No response required

For Gas Day April 25, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 23, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-23-2026 ID1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/23/2026 11:42:06AM	Notice End Date/Time:  04/24/2026 9:00:00am
Post Date/Time:  4/23/2026 11:42:06 AM	Notice ID: 400836
Reqrd Rsp:  1	Rsp Date:  04/23/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-23-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Thursday, April 23, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

NONE

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 76,872 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 24,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 346,897 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 218,775 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 218,710 Dths

·         STA 317 (Segment 317 BH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 64,290 Dths

·         STA 321 (Segment 321 FH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 281,443 Dths

·         MLV 330 (Segment 324 FH) - through approx 60% of SOP increases due to nominations in excess of operational capacity; 74,256 Dths

·         Z5 HC North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 210,634 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 244,693 Dths

·         STA 249 (Segment 249 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 139,146 Dths

·         MLV 256 East (Segment 256 FH) - through approx 94% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,859 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 157,362 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Texas Eastern Transmission (TETCO)

04/23/2026- TE Pipeline Conditions for 04/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 04/25/2026
Posting Date: 04/23/2026
Notice Identifier: 176979
Required Response Indicator Description: No response required

For Gas Day April 24, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
87%
Rec from AGT & Del West of Lambertville
100%
100%
100%
17%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
100%
Planned Outage
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
Yes
Deliveries to Meter 74215 (1)
Yes
Meter 70215 Receipts
N/A
100%
100%
100%
Meter 71616 Receipts
Yes
Access Area
New Roads South
N/A
100%
82%
White Castle South
Yes
Union Church
N/A
100%
57%
Longview
N/A
100%
46%
Deliveries to the Castor Line
N/A
100%
46%
Huntsville
Yes
Speaks
N/A
100%
79%
Angleton West
N/A
100%
60%
East Golden Pass
N/A
100%
Gillis
N/A
100%
46%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, issued 04/20/2026. 2% / 250 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/23/2026- ETNG Pipeline Conditions for 4/24/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 04/25/2026
Posting Date: 04/23/2026
Notice Identifier: 176963
Required Response Indicator Description: No response required

For Gas Day April 24, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/23/2026- ETNG Action Alert -- EFF 4/25

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 4/25
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 07/22/2026
Posting Date: 04/23/2026
Notice Identifier: 176953
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 23 - April 24
Gas Day April 25 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-22-2026 ID1

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/22/2026 11:40:22AM	Notice End Date/Time:  04/23/2026 9:00:00am
Post Date/Time:  4/22/2026 11:40:22 AM	Notice ID: 400811
Reqrd Rsp:  1	Rsp Date:  04/22/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-22-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Wednesday, April 22, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 19,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,100 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 334,761 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 212,667 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 201,473 Dths

·         STA 317 (Segment 317 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 67,176 Dths

·         STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 256,579 Dths

·         STA 325 (Segment 324 FH) - through approx 38% of SOP increases due to nominations in excess of operational capacity; 52,076 Dths

·         MLV 330 (Segment 324 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 77,189 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 36,000 Dths

·         STA 224 (Segment 224 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 85,699 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to pipeline maintenance at delivery location; 207,395 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 272,996 Dths

·         STA 249 (Segment 249 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 179,427 Dths

·         MLV 256 East (Segment 256 FH) - through approx 99% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 62,013 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 10,753 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 158,871 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-22-2026 ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/22/2026 4:05:52PM	Notice End Date/Time:  04/23/2026 9:00:00am
Post Date/Time:  4/22/2026 4:05:52 PM	Notice ID: 400820
Reqrd Rsp:  1	Rsp Date:  04/22/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-22-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Wednesday, April 22, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 19,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,100 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 334,730 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 211,247 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 193,616 Dths

·         STA 317 (Segment 317 BH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 56,041 Dths

·         STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 182,811 Dths

·         MLV 330 (Segment 324 FH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 46,365 Dths

·         STA 224 (Segment 224 FH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 62,804 Dths

·         Z5hc North (Segment 299 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 203,214 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 267,327 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 179,403 Dths

·         MLV 256 East (Segment 256 FH) - through approx 86% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 53,114 Dths

·         MLV 273 (Segment 284 FH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 77,784 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Texas Eastern Transmission (TETCO)

04/22/2026- TE Pipeline Conditions for 04/23/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/23/2026
Notice End Date: 04/24/2026
Posting Date: 04/22/2026
Notice Identifier: 176951
Required Response Indicator Description: No response required

For Gas Day April 23, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
88%
Rec from AGT & Del West of Lambertville
100%
100%
100%
17%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
100%
Planned Outage
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
Yes
Deliveries to Meter 74215 (1)
Yes
Meter 70215 Receipts
N/A
100%
100%
100%
Meter 71616 Receipts
Yes
Access Area
New Roads South
N/A
100%
82%
White Castle South
Yes
Union Church
N/A
100%
47%
Longview
N/A
100%
42%
Deliveries to the Castor Line
N/A
100%
44%
Huntsville
Yes
Speaks
N/A
100%
79%
Angleton West
N/A
100%
60%
East Golden Pass
Yes
Gillis
N/A
100%
88%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, issued 04/20/2026. 2% / 250 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/22/2026- ETNG Pipeline Conditions for 04/23/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/23/2026
Notice End Date: 04/24/2026
Posting Date: 04/22/2026
Notice Identifier: 176922
Required Response Indicator Description: No response required

For Gas Day April 23, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf South Pipeline

Unplanned Bistineau Compressor & Storage Field Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037997
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-15T14:12:00+00:00
Effective: 2026-04-15T14:14:00+00:00
End: 2026-08-14T09:00:00+00:00
Subject: Unplanned Bistineau Compressor & Storage Field Maintenance
Trunkline Gas Company

[Trunkline Gas Company] [Maint] Trunkline South Texas Maintenance Update #2

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Trunkline Gas Company
Notice ID: 62618
Notice Type: Maint
Subject: Trunkline South Texas Maintenance Update #2
Posted: 2026-03-31 10:42:00.0
Effective: 2026-03-31 10:42:00.0
End Date: 

Notice ID: 62618
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-03-31 10:42:00.0
Subject: Trunkline South Texas Maintenance Update #2
Notice Effective Date/Time: 2026-03-31 10:42:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 03/31/2026 Trunkline South Texas Maintenance Update #2 Please Note: changes from the previous posting are shown in bold type. Trunkline will be performing integrity work on its South Texas Modified Transmission System (STX System) between the Jalapeno interconnection (Jim Wells County) and Mainline Valve 16 (Bee County) from March 23 through June 8, 2026. As a result of and for the duration of the integrity work, the STX System will be operating under lower pressure. This work will not enable deliveries effectively shutting in the segment unless or until a delivery point in the segment is able to accept gas. The Reservation Charge Crediting Mechanism of Section 29.1 (A) (2) shall apply to this outage. If you have any questions, please contact your Customer Service or Marketing Representative.
Trunkline Gas Company

[Trunkline Gas Company] [Maint] Trunkline South Texas Maintenance Update #3

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Trunkline Gas Company
Notice ID: 62815
Notice Type: Maint
Subject: Trunkline South Texas Maintenance Update #3
Posted: 2026-04-09 09:58:00.0
Effective: 2026-04-09 09:58:00.0
End Date: 

Notice ID: 62815
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-09 09:58:00.0
Subject: Trunkline South Texas Maintenance Update #3
Notice Effective Date/Time: 2026-04-09 09:58:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 04/09/2026 Trunkline South Texas Maintenance Update #3 Please Note: changes from the previous posting are shown in bold type. Trunkline will be performing integrity work on its South Texas Modified Transmission System (STX System) between the Jalapeno interconnection (Jim Wells County) and the Eagle Plant (Jackson County) interconnection from March 23 through June 8, 2026. As a result of and for the duration of the integrity work, the STX System will be operating under lower pressure. This work will not enable deliveries effectively shutting in the segment unless or until a delivery point in the segment is able to accept gas. The Reservation Charge Crediting Mechanism of Section 29.1 (A) (2) shall apply to this outage. If you have any questions, please contact your Customer Service or Marketing Representative.
EGTS

Hastings Extraction Plant Planned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1011277
Subject: Hastings Extraction Plant Planned Maintenance
Notice Type: Notices
Posted: 2026-04-21T14:34:03.257
Effective: 2026-04-28T12:00:00
subcategory: Critical
naesbNoticeTypeDescription: Maintenance
tspDefinedNoticeTypeDescription: Capacity Constraint
Texas Eastern Transmission (TETCO)

04/21/2026- TE Pipeline Conditions for 4/22/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/22/2026
Notice End Date: 04/23/2026
Posting Date: 04/21/2026
Notice Identifier: 176909
Required Response Indicator Description: No response required

For Gas Day April 22, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
85%
Rec from AGT & Del West of Lambertville
100%
100%
100%
15%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
89%
Planned Outage
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
Yes
Deliveries to Meter 74215 (1)
Yes
Meter 70215 Receipts
N/A
100%
100%
100%
Meter 71616 Receipts
Yes
Access Area
New Roads South
N/A
100%
83%
White Castle South
N/A
100%
22%
Union Church
N/A
100%
56%
Longview
N/A
100%
34%
Deliveries to the Castor Line
N/A
100%
44%
Speaks
N/A
100%
79%
Angleton West
N/A
100%
54%
East Golden Pass
Yes
Gillis
N/A
100%
76%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, issued 04/20/2026. 2% / 250 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/21/2026- ETNG Pipeline Conditions for 04/22/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/22/2026
Notice End Date: 04/23/2026
Posting Date: 04/21/2026
Notice Identifier: 176889
Required Response Indicator Description: No response required

For Gas Day April 22, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
CPL

Cove Point System Alert

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1007574
Subject: Cove Point System Alert
Notice Type: Notices
Posted: 2025-12-05T21:25:56.9
Effective: 2025-12-05T21:25:56.9
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
CPL

Pleasant Valley Station Unit #7 Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008084
Subject: Pleasant Valley Station Unit #7 Unplanned Maintenance
Notice Type: Notices
Posted: 2026-01-14T14:00:05.558
Effective: 2026-01-14T14:00:05.558
subcategory: Critical
naesbNoticeTypeDescription: Maintenance
CPL

Cove Point System Alert

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008087
Subject: Cove Point System Alert
Notice Type: Notices
Posted: 2026-01-14T14:38:20.145
Effective: 2026-01-14T14:38:20.145
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
CPL

Cove Point Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008091
Subject: Cove Point Restrictions
Notice Type: Notices
Posted: 2026-01-14T15:03:25.724
Effective: 2026-01-15T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
CPL

Cove Point OFO

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008203
Subject: Cove Point OFO
Notice Type: Notices
Posted: 2026-01-22T14:51:52.068
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
CPL

Cove Point Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008578
Subject: Cove Point Restrictions
Notice Type: Notices
Posted: 2026-02-19T12:41:48.285
Effective: 2026-02-22T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Maintenance
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1008485
Subject: TL-400 Restrictions Remain in Effect
Notice Type: Notices
Posted: 2025-10-24T12:31:08.459
Effective: 2025-10-24T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Maintenance
EGTS

Over-Injection and T-Pool Balancing Advisory

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009652
Subject: Over-Injection and T-Pool Balancing Advisory
Notice Type: Notices
Posted: 2026-01-08T18:43:04.026
Effective: 2026-01-08T18:43:04.026
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Capacity Constraint
EGTS

Oakford Area Restrictions

SEV 3/5
Capacity Constraint Until Further Notice

EGTS has issued a Critical capacity constraint notice for the Oakford area, effective January 12, 2026. Oakford is a major storage and transmission hub in western Pennsylvania serving Mid-Atlantic and Appalachian markets. No specific capacity volumes or restoration timeline are provided in the notice text.

EGTS Oakford area restriction tightens Appalachian Mid-Atlantic supply with no stated restoration date; expect bullish pressure on Dominion South and TETCO M2 basis vs Henry Hub.
Reroute: Moderate: TCO and Equitrans serve overlapping Appalachian markets, and Transco provides some Mid-Atlantic alternative capacity, but Oakford is a critical storage hub with limited full bypass options.
View original notice text
Pipeline: EGTS
Notice ID: 1009660
Subject: Oakford Area Restrictions
Notice Type: Notices
Posted: 2026-01-09T12:46:30.233
Effective: 2026-01-12T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

OFO – Under Performance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009717
Subject: OFO – Under Performance
Notice Type: Notices
Posted: 2026-01-13T13:55:25.017
Effective: 2026-01-15T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Over-Under Performance
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009718
Subject: PL-1 Restrictions
Notice Type: Notices
Posted: 2026-01-13T13:58:28.711
Effective: 2026-01-15T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO ADVISORY PL-1 FTNN Hourly

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009745
Subject: OFO ADVISORY PL-1 FTNN Hourly
Notice Type: Notices
Posted: 2026-01-14T16:04:04.419
Effective: 2026-01-19T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
EGTS

OFO Advisory Northern FTNN Hourly

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009746
Subject: OFO Advisory Northern FTNN Hourly
Notice Type: Notices
Posted: 2026-01-14T16:08:07.841
Effective: 2026-01-19T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
EGTS

Northern Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009749
Subject: Northern Restrictions
Notice Type: Notices
Posted: 2026-01-14T16:10:37.871
Effective: 2026-01-19T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

Limited Daily and Hourly Flexibility – Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009776
Subject: Limited Daily and Hourly Flexibility – Manage Receipts and Deliveries
Notice Type: Notices
Posted: 2026-01-15T18:46:22.982
Effective: 2026-01-15T18:46:22.982
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

System Alert – Limited Flexibility

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009777
Subject: System Alert – Limited Flexibility
Notice Type: Notices
Posted: 2026-01-15T19:11:06.457
Effective: 2026-01-15T20:00:00
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: Northern Area FTNN Hourly

SEV 3/5
Operational Alert Until Further Notice

EGTS has issued an Operational Flow Order (OFO) for the Northern Area requiring hourly FTNN (Firm Transportation No-Notice) compliance, effective January 23, 2026 at 15:00. This is a first-time notice (Revision 1) indicating system stress in the Northern Area of the Eastern Gas Transmission and Storage system. No capacity volume or restoration timeline is specified.

EGTS Northern Area OFO signals Mid-Atlantic/Appalachian supply tightness -- watch for basis widening at Dominion South and TETCO M2 versus Henry Hub, with potential spillover into Transco Zone 5 if EGTS cannot balance flows.
Reroute: Moderate: TCO (Columbia Gas Transmission) and Equitrans serve overlapping Appalachian markets, and Transco provides partial Mid-Atlantic alternative; however, EGTS Northern Area OFOs during winter demand periods often reflect system-wide tightness that limits the effectiveness of reroutes.
View original notice text
Pipeline: EGTS
Notice ID: 1009869
Subject: OFO: Northern Area FTNN Hourly
Notice Type: Notices
Posted: 2026-01-21T19:43:52.441
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: PL-1 Conform Services

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009870
Subject: OFO: PL-1 Conform Services
Notice Type: Notices
Posted: 2026-01-21T19:58:34.487
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: PL-1 System FTNN Hourly

SEV 3/5
Operational Alert Until Further Notice

EGTS has issued an Operational Flow Order (OFO) on its PL-1 system requiring FTNN (Flowing Today, Nominated Nomination) hourly compliance, effective 2026-01-23 at 15:00. This is a first-revision notice posted in January 2026, indicating active system stress on the EGTS Mid-Atlantic/Appalachian network. No specific capacity volume is stated, and no restoration timeline is given.

EGTS PL-1 OFO with hourly FTNN requirements signals Mid-Atlantic/Appalachian pipeline stress; watch for basis widening at Dominion South and TETCO M2 vs Henry Hub, with potential tightening for downstream Southeast and Mid-Atlantic markets served by EGTS and interconnecting TCO and Transco.
Reroute: Moderate: TCO (monitored) and Equitrans serve overlapping Appalachian markets, and Transco provides partial Mid-Atlantic alternative; however, simultaneous winter demand pressure across the region may limit available spare capacity on alternative pipes.
View original notice text
Pipeline: EGTS
Notice ID: 1009871
Subject: OFO: PL-1 System FTNN Hourly
Notice Type: Notices
Posted: 2026-01-21T20:06:32.939
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

PL-1 Restrictions

SEV 3/5
Capacity Constraint Until Further Notice

EGTS has issued a Critical Pipeline Conditions notice for PL-1 Restrictions effective January 23, 2026. The notice indicates a capacity constraint on the EGTS system, which serves Mid-Atlantic and Appalachian markets including West Virginia, Virginia, Pennsylvania, Maryland, and New York. No specific volume or restoration timeline is provided in the notice text.

EGTS PL-1 capacity constraint tightens Appalachian and Mid-Atlantic supply; watch for basis widening at Dominion South and TETCO M2 versus Henry Hub with no stated restoration timeline.
Reroute: Moderate: TCO and Equitrans serve overlapping Appalachian markets, and Transco provides partial Mid-Atlantic alternative, but EGTS serves specific local distribution points that may have limited bypass options.
View original notice text
Pipeline: EGTS
Notice ID: 1009872
Subject: PL-1 Restrictions
Notice Type: Notices
Posted: 2026-01-21T21:23:59.385
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009901
Subject: TL-400 Restrictions Remain in Effect
Notice Type: Notices
Posted: 2026-01-23T13:02:45.875
Effective: 2026-01-23T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Leidy Area Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009967
Subject: Leidy Area Restrictions Revision
Notice Type: Notices
Posted: 2026-01-27T14:07:35.948
Effective: 2026-01-28T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Southern & Central City Gate Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009974
Subject: Southern & Central City Gate Restrictions
Notice Type: Notices
Posted: 2026-01-27T19:59:39.435
Effective: 2026-01-29T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

TL-360 Receipt Capacity Constraint Remains in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009991
Subject: TL-360 Receipt Capacity Constraint Remains in Effect
Notice Type: Notices
Posted: 2026-01-28T20:01:47.641
Effective: 2026-01-30T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Southern & Central City Gate Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009992
Subject: Southern & Central City Gate Restrictions Revision
Notice Type: Notices
Posted: 2026-01-28T21:14:44.302
Effective: 2026-01-29T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Southern & Central City Gate Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009993
Subject: Southern & Central City Gate Restrictions Revision
Notice Type: Notices
Posted: 2026-01-28T21:41:55.688
Effective: 2026-01-29T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010092
Subject: Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries
Notice Type: Notices
Posted: 2026-02-04T13:45:32.974
Effective: 2026-02-04T13:45:32.974
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

Groveport Compressor Station Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010093
Subject: Groveport Compressor Station Unplanned Maintenance
Notice Type: Notices
Posted: 2026-02-04T14:09:11.847
Effective: 2026-02-04T14:09:11.847
subcategory: Critical
naesbNoticeTypeDescription: Maintenance
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: PL-1 System FTNN Hourly Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010178
Subject: OFO: PL-1 System FTNN Hourly Termination
Notice Type: Notices
Posted: 2026-02-10T12:45:16.328
Effective: 2026-02-10T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: Northern Area Conform Services Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010179
Subject: OFO: Northern Area Conform Services Termination
Notice Type: Notices
Posted: 2026-02-10T12:47:00.826
Effective: 2026-02-10T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: Northern Area FTNN Hourly Terminated

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010180
Subject: OFO: Northern Area FTNN Hourly Terminated
Notice Type: Notices
Posted: 2026-02-10T12:49:31.129
Effective: 2026-02-10T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO: PL-1 Conform Services Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010181
Subject: OFO: PL-1 Conform Services Termination
Notice Type: Notices
Posted: 2026-02-10T12:51:18.267
Effective: 2026-02-10T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Leidy Area Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010189
Subject: Leidy Area Restrictions Revision
Notice Type: Notices
Posted: 2026-02-10T18:57:17.936
Effective: 2026-02-11T15:00:00
revision: 2
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Southern & Central City Gate Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010336
Subject: Southern & Central City Gate Restrictions
Notice Type: Notices
Posted: 2026-02-19T12:45:39.74
Effective: 2026-02-22T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Northern Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010337
Subject: Northern Restrictions
Notice Type: Notices
Posted: 2026-02-19T12:47:22.008
Effective: 2026-02-22T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO – Under Performance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010338
Subject: OFO – Under Performance
Notice Type: Notices
Posted: 2026-02-19T12:49:28.865
Effective: 2026-02-22T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Over-Under Performance
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010339
Subject: PL-1 Restrictions
Notice Type: Notices
Posted: 2026-02-19T12:51:34.456
Effective: 2026-02-22T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010447
Subject: PL-1 Restrictions
Notice Type: Notices
Posted: 2026-02-26T13:18:59.358
Effective: 2026-03-02T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010531
Subject: Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries
Notice Type: Notices
Posted: 2026-03-03T16:25:58.186
Effective: 2026-03-03T16:25:58.186
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

Valley Gate Restriction

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010639
Subject: Valley Gate Restriction
Notice Type: Notices
Posted: 2026-03-10T13:04:38.199
Effective: 2026-03-10T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Oakford Area Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010671
Subject: Oakford Area Restrictions
Notice Type: Notices
Posted: 2026-03-12T18:51:46.525
Effective: 2026-03-16T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010673
Subject: PL-1 Restrictions
Notice Type: Notices
Posted: 2026-03-12T20:59:01.854
Effective: 2026-03-17T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Northern Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010674
Subject: Northern Restrictions
Notice Type: Notices
Posted: 2026-03-12T21:01:56.979
Effective: 2026-03-17T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010730
Subject: Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries
Notice Type: Notices
Posted: 2026-03-16T18:08:31.984
Effective: 2026-03-16T18:08:31.984
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

TL-400 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010900
Subject: TL-400 Restrictions
Notice Type: Notices
Posted: 2026-03-27T14:48:59.093
Effective: 2026-04-06T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Maintenance
EGTS

OFO Advisory: PL-1 FTNN Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1011082
Subject: OFO Advisory: PL-1 FTNN Termination
Notice Type: Notices
Posted: 2026-04-07T12:59:23.815
Effective: 2026-04-07T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1011145
Subject: TL-400 Restrictions Remain in Effect
Notice Type: Notices
Posted: 2026-04-11T20:42:58.228
Effective: 2026-04-11T23:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
Northwest Pipeline

Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency
Notice ID: 32647

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-019

Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency

 posted on
 
Feb 5 2026 2:03PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 02/05/2026 1:56 PM MCT
Notice Eff D/T: 02/05/2026 1:56 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-019
Prior Notice: 
Subject: Chehalis - Unplanned Maintenance, Notice of Recall and OFO, Potential Deficiency

Notice Text:

Northwest is experiencing unplanned maintenance at Chehalis 
Unit 2 located at MP 1289.38 in Lewis County, Washington. New 
replacement parts have been ordered and are in route to 
complete the repairs as quickly as possible. To maintain the 
integrity of the pipeline, the available southbound capacity 
will be restricted beginning gas day Saturday, February 07, 
2026, with the anticipated return to service on gas day 
Tuesday, February 10, 2026. 
Effective gas day Saturday, February 07, 2026, the available 
capacity at the Chehalis Compressor Station will be limited to 
500,000 Dth/day southbound. 
Additionally, effective gas day Saturday, February 07, 2026, 
and until further notice, Northwest is issuing an OFO Recall 
Advisory and Operational Flow Order (OFO) southbound through 
the Chehalis compressor pursuant to Section 14.15(d) of its 
Tariff. 
Under the OFO Recall Advisory, Shippers are required to: (1) 
recall capacity that is subject to an OFO recall provision; or 
(2) take other action that is acceptable to Northwest, to 
satisfy its OFO obligation.
If the southbound scheduled quantities exceed Northwest’s 
design capacity of 672,000 Dth/d at Chehalis, Northwest will 
provide Shippers with their specific OFO obligations by 4:00 
p.m. MST. Shippers must comply with their OFO obligations no 
later than the Evening nomination deadline (5:00 p.m. MST).
If an OFO is necessary for a given Gas Day, Northwest will wait 
until the Evening scheduling process to provide notice of a 
Declared Deficiency period and will make deficiency cuts to 
bring the nomination requests at the Chehalis compressor from 
the design capacity of 672,000 Dth/d to the operationally 
available capacity of 500,000 Dth/d. If an OFO is not 
necessary, but a deficiency period is, Northwest will provide 
notice of a Declared Deficiency period and will make deficiency 
cuts in the Timely scheduling process to bring the nomination 
requests at the Chehalis compressor to the operationally 
available capacity of 500,000 Dth/d (or whatever NWP cannot 
mitigate during any day of the unplanned maintenance period), 
all pursuant to Sections 10.2 and 10.3 of Rate Schedule TF-1 in 
Northwest's Tariff. The deficiency period will continue until 
the work is completed. 
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Meacham Notice of Recall and OFO

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham Notice of Recall and OFO
Notice ID: 32657

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-026

Meacham Notice of Recall and OFO

 posted on
 
Feb 17 2026 3:46PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 02/17/2026 3:46 PM MCT
Notice Eff D/T: 02/17/2026 3:46 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-026
Prior Notice: 
Subject: Meacham Notice of Recall and OFO

Notice Text:

Effective Gas Day Thursday, February 19, 2026 and until further 
notice, Northwest is issuing an OFO Recall Advisory and 
Operational Flow Order (OFO) through the Meacham compressor 
pursuant to Section 14.15(d) of its Tariff. 
Under the OFO Recall Advisory, Shippers are required to: (1) 
recall capacity that is subject to an OFO recall provision; or 
(2) take other action that is acceptable to Northwest, to 
satisfy its OFO obligation.
If the southbound scheduled quantities exceed the greater of 
Northwest’s design capacity of 500,000 Dth/d at Meacham or the 
operationally available capacity at that location on that day, 
Northwest will provide Shippers with their specific OFO 
obligations by 4:00 p.m. MST. Shippers must comply with their 
OFO obligations no later than the Evening nomination deadline 
(5:00 p.m. MST).
Shippers can monitor throughput quantities and obtain a copy of 
Northwest’s OFO procedures on Northwest’s website at 
www.northwest.williams.com.  
If you have any questions, please contact your Commercial 
Services Representative or the hotline at 713-215-6301.
Northwest Pipeline

Unplanned maintenance at Jackston Prairie and declared Entitlement

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Unplanned maintenance at Jackston Prairie and declared Entitlement
Notice ID: 32689

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-038

Unplanned maintenance at Jackston Prairie and declared Entitlement

 posted on
 
Mar 12 2026 8:59AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 03/12/2026 8:54 AM MCT
Notice Eff D/T: 03/12/2026 8:54 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-038
Prior Notice: 
Subject: Unplanned maintenance at Jackston Prairie and declared Entitlement

Notice Text:

 
Puget Sound Energy (PSE), operator of Jackson Prairie (JP)
storage facility, has notified Northwest of a malfunctioning
component at JP Storage currently preventing injection
capability. PSE is actively working to source the part and
safely bring the facility back to full operational capacity.
Northwest will accept injection nominations at JP only to the
extent such injections can be netted against corresponding
withdrawal nominations.
 
Because system flexibility will be limited, Northwest is
declaring a Stage II (8%) Underrun Entitlement for all
receiving Parties north of the Kemmerer compressor station
beginning Gas Day Saturday, March 14, 2026. 
 
Please remain diligent in managing supply and demand and avoid
banking the system. On system balancing on Northwest’s
Electronic Bulletin Board is currently designated as “No” for
all areas.
 
Northwest would like to thank the customers in advance for
their cooperation. We will provide further updates as more
information becomes available.
  
 
 
 
If you have any questions, please contact your Commercial
Services representative or the Hotline at 713-215-6301.
Northwest Pipeline

Caldwell CS – Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Caldwell CS – Unplanned Maintenance
Notice ID: 32759

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-046

Caldwell CS – Unplanned Maintenance

 posted on
 
Apr 13 2026 8:49AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 04/13/2026 8:45 AM MCT
Notice Eff D/T: 04/13/2026 8:45 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-046
Prior Notice: 
Subject: Caldwell CS – Unplanned Maintenance

Notice Text:

Northwest is experiencing unplanned maintenance at Caldwell 
Unit 4, located at MP 849.8 in Gem County, Idaho. Initial 
assessments indicate this is expected to result in an extended 
outage, with an estimated duration of 60 to 90 days to 
complete the required repairs.
Northwest is doing everything possible to complete the work as 
quickly and safely as possible to bring in this timeline. We 
will provide updates on our EBB as additional information 
becomes available. 
Effective Gas Day Tuesday, April 14, 2026, the available 
capacity at the Caldwell Compressor Station will be limited to 
438,000 Dth/d northbound and 439,000 Dth/d southbound. 
If primary nomination requests through the Caldwell CS exceeds 
the available capacity of 438,000 Dth/d northbound or 439,000 
Dth/d southbound (or whatever NWP cannot mitigate during any 
day of the maintenance), pursuant to Sections 10.2 and 10.3 of 
Rate Schedule TF-1 in Northwest's Tariff, Northwest will give 
notice of a Declared Deficiency Period based on a design 
capacity of 452,000 Dth/d northbound or 475,000 Dth/d 
southbound. The deficiency period will continue until the work 
has been completed. 
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Texas Gas Transmission

Pipeline Incident Impacting Service Update

SEV 3/5
Operational Alert 0.285 Bcf/d Until Further Notice 37 Days

Texas Gas Transmission issued an operational alert following a pipeline incident in Panola County, Texas on March 16-24, 2026, isolating the North Louisiana Supply Lateral west of the Haughton Compressor Station. Capacity on the Sharon Carthage scheduling groups has been progressively restored from zero to current levels (SCW=135,000, SCE=100,000, CEW=235,000, SCP=285,000 MMBtu/d), with the notice end date now extended to April 30, 2026. The cause remains under investigation and capacity remains below pre-incident levels.

TGT North Louisiana Supply Lateral running at reduced throughput of up to 0.285 Bcf/d on the Sharon Carthage system through April 30; watch for tightening at Henry Hub and NGPL Texas basis as Gulf Coast northbound TGT receipts from Haynesville/North Louisiana remain constrained.
Reroute: Moderate: ANR, PEPL, and TETCO serve overlapping Gulf Coast-to-Midwest corridors and can absorb some displaced North Louisiana volumes, though TGT is a primary northbound conduit from this supply area and alternatives may not fully offset the constraint during high-demand periods.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037862
Notice Type: Operational Alert
Status: Supersede
Posted: 2026-03-24T10:16:00+00:00
Effective: 2026-03-24T10:17:00+00:00
End: 2026-04-30T17:00:00+00:00
Subject: Pipeline Incident Impacting Service  Update

Texas Gas Transmission Notice 5037862
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical
Notice Type Desc :
Operational Alert
Notice Stat Desc :
Supersede
Notice ID :
5037862
Prior Notice :
5037793
Reqrd Rsp Desc :
No response required
Subject :
Pipeline Incident Impacting Service Update
TSP :
115972101
Post Date/Time :
03/24/2026 10:16:00 AM
Notice Effective Date/Time :
03/24/2026 10:17:00 AM
Notice End Date/Time :
04/30/2026 05:00:00 PM
Response Date/Time :
Critical :
Notice Text :
Updating Notice End Date to April 30, 2026 @ 5PM.
***********************************************************
Effective 3/16/2026 @ 9:00AM the capacity on the Sharon Carthage System will be as follows:
Sharon Carthage West (SCW)=135,000
Sharon Carthage East (SCE) = 100,000
Sharon Carthage East + West (CEW) = 235,000
Sharon Carthage (SCP) = 285,000
*************************************************
Updating Notice End Date to April 3, 2026, as well as updating capacities for two of the impacted
scheduling groups (SCW and SCP).
*************************************************
Updating Notice End Date to February 27, 2026.
*************************************************
Updating and removing impacted locations were capacities were previously set to 0.
*************************************************
Updating capacities for the impacted scheduling groups and adding an additional location to the
zero-capacity list.
**************************************************
Adding additional impacted scheduling group, Sharon Carthage (SCP), to the notice below.
**************************************************
Adding additional impacted scheduling groups to the notice below.
*************************************************************************
Removing Spring Ridge #5 from impacted locations.
*************************************************************************
Texas Gas Transmission is responding to an incident on its pipeline in Panola County, Texas.  The
line was isolated and gas flow has been stopped impacting locations on the North Louisiana Supply
Lateral west of the Haughton Compressor Station. There was no fire and no injuries.
Notice
Page 1 of 2
03/24/2026 10:16:39 AM
As a result of the event, effective immediately, capacity will be reduced to the stated amounts
below for the following scheduling groups:
Sharon Carthage West (SCW)=100,000
Sharon Carthage East (SCE) = 50,000
Sharon Carthage East + West (CEW) = 150,000
Sharon Carthage (SCP) = 200,000
Our continued focus is on the safety of the public and our employees. We are working closely with
local officials as we assess the situation.
The cause of the incident is under investigation. We will provide updates as appropriate.
Please contact your customer service representative if you have any questions.
Page 2 of 2
03/24/2026 10:16:39 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical
Post Date/Time :
03/24/2026 10:16:00 AM
Notice Type Desc :
Operational Alert
Notice Effective Date/Time :
03/24/2026 10:17:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/30/2026 05:00:00 PM
Notice ID :
5037862
Response Date/Time :
Prior Notice :
5037793
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Pipeline Incident Impacting Service Update
Notice Text :
Updating Notice End Date to April 30, 2026 @ 5PM.
***********************************************************
Effective 3/16/2026 @ 9:00AM the capacity on the Sharon Carthage System will be as follows:
Sharon Carthage West (SCW)=135,000
Sharon Carthage East (SCE) = 100,000
Sharon Carthage East + West (CEW) = 235,000
Sharon Carthage (SCP) = 285,000
*************************************************
Updating Notice End Date to April 3, 2026, as well as updating capacities for two of the impacted
scheduling groups (SCW and SCP).
*************************************************
Updating Notice End Date to February 27, 2026.
*************************************************
Updating and removing impacted locations were capacities were previously set to 0.
*************************************************
Updating capacities for the impacted scheduling groups and adding an additional location to the
zero-capacity list.
**************************************************
Adding additional impacted scheduling group, Sharon Carthage (SCP), to the notice below.
**************************************************
Adding additional impacted scheduling groups to the notice below.
*************************************************************************
Removing Spring Ridge #5 from impacted locations.
*************************************************************************
Texas Gas Transmission is responding to an incident on its pipeline in Panola County, Texas.  The
line was isolated and gas flow has been stopped impacting locations on the North Louisiana Supply
Lateral west of the Haughton Compressor Station. There was no fire and no injuries.
03/24/2026 10:16:39 AM
Page 1 of 2
As a result of the event, effective immediately, capacity will be reduced to the stated amounts
below for the following scheduling groups:
Sharon Carthage West (SCW)=100,000
Sharon Carthage East (SCE) = 50,000
Sharon Carthage East + West (CEW) = 150,000
Sharon Carthage (SCP) = 200,000
Our continued focus is on the safety of the public and our employees. We are working closely with
local officials as we assess the situation.
The cause of the incident is under investigation. We will provide updates as appropriate.
Please contact your customer service representative if you have any questions.
03/24/2026 10:16:39 AM
Page 2 of 2
Texas Eastern Transmission (TETCO)

04/20/2026- TE Operational Flow Order -- EFF 4/22

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- EFF 4/22
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/22/2026
Notice End Date: 07/19/2026
Posting Date: 04/20/2026
Notice Identifier: 176833
Required Response Indicator Description: No response required

Zone
Gas Day April 19 - April 21
Gas Day April 22 and until further notice
M1-24"
No OFO*
No OFO*
M1-30"
No OFO*
No OFO*
M2-24"
No OFO*
OFO In Effect: No Due Pipe 2% / 250
M2-30"
No OFO*
No OFO*
No OFO*
No OFO*
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
Texas Eastern Transmission (TETCO)

04/20/2026- TE Operational Flow Order -- EFF 4/22 UPDATE (Adding M1-24)

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- EFF 4/22 UPDATE (Adding M1-24)
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/22/2026
Notice End Date: 07/19/2026
Posting Date: 04/20/2026
Notice Identifier: 176837
Prior Notice Identifier: 176833
Required Response Indicator Description: No response required

Zone
Gas Day April 19 - April 21
Gas Day April 22 and until further notice
M1-24"
No OFO*
OFO In Effect: No Due Pipe 2% / 250
M1-30"
No OFO*
No OFO*
M2-24"
No OFO*
OFO In Effect: No Due Pipe 2% / 250
M2-30"
No OFO*
No OFO*
No OFO*
No OFO*
ETX
No OFO*
No OFO*
STX
No OFO*
No OFO*
WLA
No OFO*
No OFO*
ELA
No OFO*
No OFO*
Customer Specific
No OFO*
No OFO*
Texas Eastern Transmission (TETCO)

04/20/2026- TE Pipeline Conditions for 04/21/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/21/2026
Notice End Date: 04/22/2026
Posting Date: 04/20/2026
Notice Identifier: 176856
Required Response Indicator Description: No response required

For Gas Day April 21, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
82%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
Planned Outage
Five Points South
N/A
100%
97%
Lebanon
N/A
100%
94%
Lebanon Lateral
N/A
100%
33%
Batesville South
N/A
100%
37%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
81%
White Castle South
N/A
100%
19%
Union Church
N/A
100%
61%
Longview
N/A
100%
35%
Deliveries to the Castor Line
N/A
100%
38%
Speaks
N/A
100%
78%
Angleton West
N/A
100%
58%
East Golden Pass
Yes
Gillis
N/A
100%
44%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/20/2026- ETNG Pipeline Conditions for 4/21/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/21/2026
Notice End Date: 04/22/2026
Posting Date: 04/20/2026
Notice Identifier: 176854
Required Response Indicator Description: No response required

For Gas Day April 21, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-18-2026 ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/18/2026 3:22:35PM	Notice End Date/Time:  04/19/2026 9:00:00am
Post Date/Time:  4/18/2026 3:22:35 PM	Notice ID: 400730
Reqrd Rsp:  1	Rsp Date:  04/18/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-18-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Saturday, April 18, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 17,378 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 206,352 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 186,987 Dths

·         STA 317 (Segment 317 BH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 69,502 Dths

·         MLV 330 (Segment 324 FH) - through approx 29% of SOP increases due to nominations in excess of operational capacity; 13,370 Dths

·         Z5hc North (Segment 299 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 178,637 Dths

·         STA 245 (Segment 245 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 158,693 Dths

·         STA 249 (Segment 249 FH) - through approx 90% of SOP increases due to nominations in excess of operational capacity; 90,296 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 174,184 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Texas Eastern Transmission (TETCO)

04/19/2026- TE Pipeline Conditions for 4/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/20/2026
Notice End Date: 04/21/2026
Posting Date: 04/19/2026
Notice Identifier: 176831
Required Response Indicator Description: No response required

For Gas Day April 20, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
73%
Five Points South
N/A
100%
63%
Lebanon
N/A
100%
54%
Lebanon Lateral
N/A
100%
91%
Batesville South
N/A
100%
47%
Deliveries to Meter 74215 (1)
N/A
100%
100%
17%
Access Area
New Roads South
N/A
100%
79%
White Castle South
N/A
100%
14%
Union Church
N/A
100%
56%
Longview
N/A
100%
30%
Deliveries to the Castor Line
N/A
100%
55%
Huntsville North
Yes
Speaks
N/A
100%
78%
Angleton West
N/A
100%
62%
East Golden Pass
Yes
Gillis
N/A
100%
81%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/19/2026- ETNG Pipeline Conditions for 4/20/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/20/2026
Notice End Date: 04/21/2026
Posting Date: 04/19/2026
Notice Identifier: 176810
Required Response Indicator Description: No response required

For Gas Day April 20, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
47%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
100%
62%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/18/2026- TE Pipeline Conditions for 4/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/19/2026
Notice End Date: 04/20/2026
Posting Date: 04/18/2026
Notice Identifier: 176785
Required Response Indicator Description: No response required

For Gas Day April 19, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
74%
Five Points South
N/A
100%
60%
Lebanon
N/A
100%
50%
Lebanon Lateral
N/A
100%
91%
Batesville South
N/A
100%
47%
Deliveries to Meter 74215 (1)
N/A
100%
100%
17%
Access Area
New Roads South
N/A
100%
79%
White Castle South
N/A
100%
14%
Union Church
N/A
100%
56%
Longview
N/A
100%
30%
Deliveries to the Castor Line
N/A
100%
55%
Huntsville North
Yes
Speaks
N/A
100%
78%
Angleton West
N/A
100%
62%
East Golden Pass
Yes
Gillis
N/A
100%
81%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/18/2026- ETNG Pipeline Conditions for 4/19/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/19/2026
Notice End Date: 04/20/2026
Posting Date: 04/18/2026
Notice Identifier: 176783
Required Response Indicator Description: No response required

For Gas Day April 19, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
23%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/17/2026- TE Action Alert -- EFF 4/18

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Action Alert -- EFF 4/18
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/19/2026
Posting Date: 04/17/2026
Notice Identifier: 176724
Required Response Indicator Description: No response required

Zone
Gas Day April 17
Gas Day April 18
Gas Day April 19 and until further notice
M1-24"
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
M1-30"
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
M2-24"
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 10%/500
No Action Alert or OFO
M2-30"
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 10%/500
No Action Alert or OFO
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 10%/500
No Action Alert or OFO
ETX
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
STX
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
WLA
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
ELA
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
Texas Eastern Transmission (TETCO)

04/17/2026- TE Pipeline Conditions for 4/18/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/19/2026
Posting Date: 04/17/2026
Notice Identifier: 176752
Required Response Indicator Description: No response required

For Gas Day April 18, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
73%
Five Points South
N/A
100%
44%
Lebanon
N/A
100%
35%
Lebanon Lateral
N/A
100%
92%
Batesville South
N/A
100%
46%
Deliveries to Meter 74215 (1)
N/A
100%
100%
17%
Access Area
New Roads South
N/A
100%
80%
White Castle South
N/A
100%
15%
Union Church
N/A
100%
56%
Longview
N/A
100%
30%
Deliveries to the Castor Line
N/A
100%
55%
Huntsville North
Yes
Speaks
N/A
100%
78%
Angleton West
N/A
100%
62%
East Golden Pass
Yes
Gillis
N/A
100%
81%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
No DS M2-24, M2-30 and M3 issued 4/17/26. 10% / 500 Dth Tolerance
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24 and M1-30
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/17/2026- ETNG Action Alert -- EFF 4/18

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- EFF 4/18
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 07/16/2026
Posting Date: 04/17/2026
Notice Identifier: 176722
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 16 - April 17
Gas Day April 18 and until further notice
System Wide
No OFO/No Action Alert
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
East Tennessee Natural Gas

04/17/2026- ETNG Pipeline Conditions for 04/18/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/19/2026
Posting Date: 04/17/2026
Notice Identifier: 176738
Required Response Indicator Description: No response required

For Gas Day April 18, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
No DS - System Wide issued April 18, 2026. 500 Dth / 5% Tolerance
Imbalances Warnings
---
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/16/2026- TE Pipeline Conditions for 04/17/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/17/2026
Notice End Date: 04/18/2026
Posting Date: 04/16/2026
Notice Identifier: 176704
Required Response Indicator Description: No response required

For Gas Day April 17, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
83%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
72%
Five Points South
N/A
100%
49%
Lebanon
N/A
100%
38%
Lebanon Lateral
N/A
100%
90%
Batesville South
N/A
100%
53%
Deliveries to Meter 74215 (1)
N/A
100%
100%
21%
Access Area
New Roads South
N/A
100%
78%
White Castle South
Yes
Union Church
N/A
100%
58%
Longview
N/A
100%
30%
Deliveries to the Castor Line
N/A
100%
63%
Huntsville North
Yes
Speaks
N/A
100%
78%
Angleton West
N/A
100%
52%
East Golden Pass
N/A
100%
33%
Gillis
N/A
100%
46%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)

04/16/2026- NEXUS Customer Specific Operational Flow Order -- EFF 4/17

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Customer Specific Operational Flow Order -- EFF 4/17
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/17/2026
Notice End Date: 07/15/2026
Posting Date: 04/16/2026
Notice Identifier: 176720
Required Response Indicator Description: No response required

Operational Area
Gas Day April 16
Gas Day April 17 and until further notice
Customer Specific
No OFO
OFO in Effect: No Due Pipe OFO 4% / 500
East Tennessee Natural Gas

04/16/2026- ETNG Pipeline Conditions for 4/17/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/17/2026
Notice End Date: 04/18/2026
Posting Date: 04/16/2026
Notice Identifier: 176692
Required Response Indicator Description: No response required

For Gas Day April 17, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
41%
Deliveries To Texas Eastern
100%
100%
100%
100%
100%
100%
Boyd's Creek
Yes
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/16/2026- AGT Customer Specific Operational Flow Order -- EFF 4/18

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Customer Specific Operational Flow Order -- EFF 4/18
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/20/2026
Posting Date: 04/16/2026
Notice Identifier: 176681
Required Response Indicator Description: No response required

Operational Area
Gas Day April 16
Gas Day April 17
Gas Day April 18 and April 19
Gas Day April 20 - April 21
Gas Day April 22 and until further notice
System Wide - All Customers
OFO in Effect: No DP 4% / 500
No OFO*
No OFO*
OFO in Effect: No DP 5% / 500
NO OFO*
Customer Specific
No OFO*
NO OFO*
OFO in Effect: No DS 5% / 250
No OFO*
NO OFO*
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
No OFO*
No OFO*
Algonquin Gas Transmission

04/16/2026- AGT Operational Flow Order -- EFF 4/20

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- EFF 4/20
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/20/2026
Notice End Date: 04/22/2026
Posting Date: 04/16/2026
Notice Identifier: 176682
Required Response Indicator Description: No response required

Operational Area
Gas Day April 16
Gas Day April 17
Gas Day April 18 - April 19
Gas Day April 20 - April 21
Gas Day April 22 until further notice
System Wide - All Customers
OFO in Effect: No DP 4% / 500
No OFO*
No OFO*
OFO in Effect: No DP 5% / 500
No OFO*
Customer Specific
No OFO*
No OFO*
OFO in Effect: No DS 5% / 250
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
No OFO*
No OFO*
ANR Pipeline (TC Energy)

CAPACITY REDUCTION - Southeast Mainline – Evangeline Southbound

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage

Notice Stat Desc: Initiate

Prior Notice: 

Critical: Y

Reqrd Rsp Desc: No Response Required
Post

Notice Effective

Notice End



Response
Post Date: 02/20/26

02/20/26

03/20/26
Subject: Subject: CAPACITY REDUCTION - Southeast Mainline – Evangeline Southbound
Author: Author: T0000106
Notice Text
ANR has planned maintenance at the Eunice compressor station on Southeast Mainline. As a result, capacity will be reduced as follows:  

 

3/18 – 3/19 Evangeline Southbound (LOC #FPEVNGSB): 350 MMcf/d (leaving 987 MMcf/d) 

 

ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:

                0% - Based on the Current Net Shipper Nominations

                22% - Based on the Current Contracted MDQ

 

Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper’s 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.

 

Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)

Notice of Phase 2 Cold Weather Operational Conditions & OFO Watch (Fuel Segment ML-7)

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Weather Alert

Notice Stat Desc: Initiate

Prior Notice: 

Critical: Y

Reqrd Rsp Desc: No Response Required
Post

Notice Effective

Notice End



Response
Post Date: 03/11/26

03/11/26

03/18/26
Subject: Subject: Notice of Phase 2 Cold Weather Operational Conditions & OFO Watch (Fuel Segment ML-7)
Author: Author: T0000106
Notice Text
Notice of Cold Weather Operational Conditions Phase 2, Effective 3/16/26 - 3/17/26

 

Effective for gas day 3/16/2026 through end of gas day 3/17/2026, in order to preserve system integrity and to ensure ANR is able to meet scheduled delivery commitments to all of fuel segment ML-7; ANR is, in accordance with the General Terms and Conditions, declaring an "Extreme Condition" as that term is defined in ANR's FERC Gas Tariff §6.1, lowering the Swing Percentage from 10% to 5%. 





ANR is requesting, in accordance with §6.6.4 of its FERC Gas Tariff, that all receipt and delivery services, excluding ETS and FTS-3 delivery services, to be at a uniform hourly flow rate over a twenty-four (24) hour period. Rate Schedule FTS-3 shippers are required to be at their contractually agreed upon hourly rate. 

 

All Rate Schedule ETS shippers with an aggregated ETS Delivery Point Group must comply with this posting at the ETS Delivery Point Group level. ETS shippers are restricted to the lower of 1/16th of the respective Delivery Point MDQ, or the contractually agreed upon hourly rate in their Service Agreement at the ETS Delivery Point Group level. 

 

Requests for interruptible and overrun services including ANR's hourly ITS-3 service will be evaluated on a case-by-case basis. Scheduled flows for these interruptible services must also be at a uniform hourly rate over a twenty-four (24) hour period or for ITS-3 service the hourly flow rate will be the rate of the nominated, approved, and scheduled quantity. ANR is also reminding all MBS shippers that volumes not within operating tolerances and not at a uniform hourly flow rate of 1/24th of scheduled nominations will not be permitted. 



In addition, ANR is closely monitoring "Unauthorized Overrun" under Rate Schedules FTS-1, FTS-2, FTS-3, FTS-4, FTS-4L, STS, and ETS. Please refer to ANR's FERC Gas Tariff under each rate schedule for further detail and elevated penalties in effect during an "Extreme Condition Situation". Shippers attempting to deliver gas via Unauthorized Overrun may be subject to an "express order to Shipper to cease and desist" and a shipper specific OFO.



ANR reserves the right to revoke any conditionally approved operational flexibility.



Customers requesting short-notice start-up are expected to provide corresponding supply into ANR later in the Gas Day. For customers without the short-notice startup provision in their transportation agreement, requests for a short-notice startup will be evaluated a case-by-case basis. 

 

ANR is NOT declaring an Operational Flow Order (OFO) at this time but is providing Advance Warning to shippers (per §6.8.7 of its FERC Gas Tariff) that this weather event could create the need for ANR to issue an OFO with no additional prior notice to protect system integrity. Actions that may be necessary include, but are not limited to, further curtailing interruptible services, declining to schedule firm secondary nominations, and issuing an offending Shipper specific OFO, or issuing a non-Shipper specific OFO. ANR will continue to monitor system integrity closely and will update the EBB as required.



As a reminder, The Projected Hourly Consumption Forecast (Burn Sheet) for the power plant operations is required to be submitted to ANR prior to any flow or flow changes. 



ANR will continue to monitor the system integrity closely and will update this posting as required.



Please direct any questions to your Account Coordinator, Customer Service Representative, the Nominations and Scheduling hotline @ 800-827-5267, or the Power Desk @ 832-570-9060.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-02-2026 ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/02/2026 3:41:28PM	Notice End Date/Time:  04/03/2026 9:00:00am
Post Date/Time:  4/2/2026 3:41:28 PM	Notice ID: 400378
Reqrd Rsp:  1	Rsp Date:  04/02/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-02-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Thursday, April 02, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4 FOR ALL AREAS SOUTH OF STA 219

 

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through 100% of SIPss increases due to nominations in excess of operational capacity; 20,797 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 317,696 Dths

·         MLV 314 East (Segment 314 BH) - through approx 90% of SOP increases due to nominations in excess of operational capacity; 198,338 Dths

·         STA 315 (Segment 315 BH) - through approx 73% of SOP increases due to nominations in excess of operational capacity; 198,784 Dths

·         STA 317 (Segment 317 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 69,926 Dths

·         STA 321 (Segment 321 FH) - through approx 37% of SOP increases due to nominations in excess of operational capacity; 22,642 Dths

·         MLV 330 (Segment 324 FH) - through approx 35% of SOP increases due to nominations in excess of operational capacity; 20,468 Dths

·         Z5hc North (Segment 299 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 161,561 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 362,958 Dths

·         STA 249 (Segment 249 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 162,700 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 172,278 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-02-2026 ID3

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/02/2026 7:50:41PM	Notice End Date/Time:  04/03/2026 9:00:00am
Post Date/Time:  4/2/2026 7:50:41 PM	Notice ID: 400385
Reqrd Rsp:  1	Rsp Date:  04/02/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-02-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Thursday, April 02, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4 FOR ALL AREAS SOUTH OF STA 219

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 74% of IT increases due to nominations in excess of operational capacity; 15,904 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 860 South 500 Line (Segment 548 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 7,239 Dths

·         MLV 314 East (Segment 314 BH) - through approx 28% of SOP increases due to nominations in excess of operational capacity; 9,061 Dths

·         STA 245 (Segment 245 FH) - through approx 89% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 97,413 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Texas Eastern Transmission (TETCO)

04/15/2026- TE Pipeline Conditions for 04/16/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/16/2026
Notice End Date: 04/17/2026
Posting Date: 04/15/2026
Notice Identifier: 176656
Required Response Indicator Description: No response required

For Gas Day April 16, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
83%
Rec from AGT & Del West of Lambertville
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
98%
Five Points South
N/A
100%
82%
Lebanon
N/A
100%
79%
Lebanon Lateral
N/A
100%
89%
Batesville South
N/A
100%
53%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
60%
White Castle South
Yes
Union Church
N/A
100%
57%
Longview
N/A
100%
48%
Deliveries to the Castor Line
N/A
100%
51%
Huntsville North
Yes
Speaks
N/A
100%
79%
Angleton West
N/A
100%
50%
East Golden Pass
N/A
100%
23%
Gillis
N/A
100%
43%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/15/2026- ETNG Pipeline Conditions for 4/16/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/16/2026
Notice End Date: 04/17/2026
Posting Date: 04/15/2026
Notice Identifier: 176673
Required Response Indicator Description: No response required

For Gas Day April 16, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
28%
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyd's Creek
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/14/2026- TE Pipeline Conditions for 04/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 04/16/2026
Posting Date: 04/14/2026
Notice Identifier: 176571
Required Response Indicator Description: No response required

For Gas Day April 15, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
83%
Rec from AGT & Del West of Lambertville
100%
100%
100%
21%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
72%
Five Points South
N/A
100%
48%
Lebanon
N/A
100%
38%
Lebanon Lateral
N/A
100%
89%
Batesville South
N/A
100%
53%
Deliveries to Meter 74215 (1)
N/A
100%
100%
25%
Access Area
New Roads South
N/A
100%
54%
White Castle South
Yes
Union Church
N/A
100%
60%
Longview
N/A
100%
43%
Deliveries to the Castor Line
N/A
100%
55%
Huntsville North
N/A
22%
Speaks
N/A
100%
79%
Angleton West
N/A
100%
42%
East Golden Pass
N/A
100%
21%
Gillis
N/A
100%
52%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/14/2026- ETNG Pipeline Conditions for 4/15/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 04/16/2026
Posting Date: 04/14/2026
Notice Identifier: 176574
Required Response Indicator Description: No response required

For Gas Day April 15, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
25%
Deliveries To Texas Eastern
100%
100%
100%
100%
Boyd's Creek
100%
12%
Tracy City
Yes
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/14/2026- AGT Operational Flow Order -- EFF 4/16

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- EFF 4/16
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/16/2026
Notice End Date: 04/17/2026
Posting Date: 04/14/2026
Notice Identifier: 176562
Required Response Indicator Description: No response required

Operational Area
Gas Day April 14 - 15
Gas Day April 16
Gas Day April 17 and until further Notice
System Wide - All Customers
OFO in Effect: No DS 6% / 250
OFO in Effect: No DP 4% / 500
No OFO*
Customer Specific
OFO in Effect: No DS 5% / 250
No OFO*
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
Texas Eastern Transmission (TETCO)

04/13/2026- TE Pipeline Conditions for 4/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 04/15/2026
Posting Date: 04/13/2026
Notice Identifier: 176537
Required Response Indicator Description: No response required

For Gas Day April 14, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
83%
Receipts 74200
Yes
Planned Outage
Rec from AGT & Del West of Lambertville
100%
100%
100%
100%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
87%
Five Points South
N/A
100%
57%
Lebanon
N/A
100%
47%
Lebanon Lateral
N/A
100%
92%
Batesville South
N/A
100%
53%
Deliveries to Meter 74215 (1)
N/A
100%
100%
42%
Access Area
New Roads South
N/A
100%
55%
White Castle South
Yes
Union Church
N/A
100%
57%
Longview
N/A
100%
43%
Deliveries to the Castor Line
N/A
100%
45%
Huntsville North
N/A
34%
Speaks
N/A
100%
78%
Angleton West
N/A
100%
43%
East Golden Pass
N/A
100%
21%
Gillis
N/A
100%
43%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/13/2026- ETNG Pipeline Conditions for 4/14/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 04/15/2026
Posting Date: 04/13/2026
Notice Identifier: 176514
Required Response Indicator Description: No response required

For Gas Day April 14, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
38%
Deliveries To Texas Eastern
100%
100%
100%
100%
Fordtown West
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf South Pipeline

Update: Index 129 Pipeline Maintenance

SEV 3/5
Maintenance 0.770 Bcf/d Until Further Notice 11 Days

Gulf South Pipeline is performing planned maintenance on the Index 129 Pipeline from May 10 to May 21, 2026. North-to-south capacity on the West 30 segment (Goodrich to South Texas deliveries) will be reduced by up to 0.770 Bcf/d, with south-to-north capacity through Goodrich compressor station impacted by up to 0.180 Bcf/d. The maintenance has the potential to affect all service classes including Primary Firm Service, with specific shut-ins at Loc 12780 (Teco Polk County - Enterprise) and 12 CenterPoint Farm Taps.

Gulf South planned maintenance removes up to 0.770 Bcf/d of north-to-south capacity on the West 30 segment for 11 days starting May 10; watch for basis widening at Transco Zone 4 and Henry Hub versus Southeast delivery points, with Primary Firm Service at risk creating potential for physical tightness in the South Texas corridor.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping Gulf Coast and Southeast markets and may absorb some displaced volumes, but the 0.770 Bcf/d magnitude of the north-to-south restriction and simultaneous southbound and northbound impacts may limit full offset, particularly for South Texas delivery points.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037987
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-13T17:40:00+00:00
Effective: 2026-05-10T09:00:00+00:00
End: 2026-05-21T09:00:00+00:00
Subject: Update: Index 129 Pipeline Maintenance

Gulf South Pipeline Notice 5037987
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037987
Prior Notice :
5037942
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 129 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
04/13/2026 05:40:00 PM
Notice Effective Date/Time :
05/10/2026 09:00:00 AM
Notice End Date/Time :
05/21/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised Description:
--------------------------------------------------------------------------------------------
Gulf South is performing maintenance at the Index 129 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 12780 (Teco Polk County - Enterprise)
- 12 Centerpoint Farm Taps
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
The following groups are subject to impact:
-West 30 From Goodrich to So Texas (Deliveries)
North to South Capacity will be impacted by up to 770,000 Dth/d for the duration of the
maintenance. This maintenance has the potential to impact all services, including Primary Firm
Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
-West 30 From So Texas to Goodrich Receipt
South to north capacity through Goodrich compressor station could be impacted by as much as
180,000 Dth/d for the duration of the maintenance.
No impact anticipated to net zero nominations between receipt and delivery points located south
of the Brazos compressor station. No impact anticipated to net zero nominations within Area 25
(Coastal Bend Header).
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/13/2026 5:40:20 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/13/2026 05:40:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/10/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
05/21/2026 09:00:00 AM
Notice ID :
5037987
Response Date/Time :
Prior Notice :
5037942
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 129 Pipeline Maintenance
Notice Text :
Revised Description:
--------------------------------------------------------------------------------------------
Gulf South is performing maintenance at the Index 129 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 12780 (Teco Polk County - Enterprise)
- 12 Centerpoint Farm Taps
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
The following groups are subject to impact:
-West 30 From Goodrich to So Texas (Deliveries)
North to South Capacity will be impacted by up to 770,000 Dth/d for the duration of the
maintenance. This maintenance has the potential to impact all services, including Primary Firm
Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
-West 30 From So Texas to Goodrich Receipt
South to north capacity through Goodrich compressor station could be impacted by as much as
180,000 Dth/d for the duration of the maintenance.
No impact anticipated to net zero nominations between receipt and delivery points located south
of the Brazos compressor station. No impact anticipated to net zero nominations within Area 25
(Coastal Bend Header).
If you have any questions, please contact your customer service representative.
04/13/2026 5:40:20 PM
Page 1 of 1
Texas Eastern Transmission (TETCO)

04/12/2026- TE Pipeline Conditions for 4/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/13/2026
Notice End Date: 04/14/2026
Posting Date: 04/12/2026
Notice Identifier: 176472
Required Response Indicator Description: No response required

For Gas Day April 13, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Receipts 74200
Yes
Planned Outage
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
67%
Five Points South
N/A
100%
43%
Lebanon
N/A
100%
31%
Lebanon Lateral
N/A
100%
97%
Batesville South
N/A
100%
54%
Deliveries to Meter 74215 (1)
N/A
100%
100%
30%
Access Area
New Roads South
N/A
100%
43%
White Castle South
Yes
Union Church
N/A
100%
48%
West Monroe Receipts
Yes
Longview
N/A
100%
34%
Deliveries to the Castor Line
N/A
100%
45%
Speaks
N/A
100%
77%
Angleton West
N/A
100%
37%
East Golden Pass
N/A
100%
Gillis
N/A
100%
68%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/12/2026- ETNG Pipeline Conditions for 4/13/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/13/2026
Notice End Date: 04/14/2026
Posting Date: 04/12/2026
Notice Identifier: 176473
Required Response Indicator Description: No response required

For Gas Day April 13, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
87%
Transco Receipts
100%
100%
100%
70%
Planned Outage
Tracy City
100%
70%
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/11/2026- TE Pipeline Conditions for 4/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/12/2026
Notice End Date: 04/13/2026
Posting Date: 04/11/2026
Notice Identifier: 176424
Required Response Indicator Description: No response required

For Gas Day April 12, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Receipts 74200
Yes
Planned Outage
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
67%
Five Points South
N/A
100%
42%
Lebanon
N/A
100%
31%
Lebanon Lateral
N/A
100%
97%
Batesville South
N/A
100%
54%
Deliveries to Meter 74215 (1)
N/A
100%
100%
28%
Access Area
New Roads South
N/A
100%
43%
White Castle South
Yes
Union Church
N/A
100%
48%
West Monroe Receipts
Yes
Longview
N/A
100%
34%
Deliveries to the Castor Line
N/A
100%
45%
Speaks
N/A
100%
77%
Angleton West
N/A
100%
37%
East Golden Pass
N/A
100%
Gillis
N/A
100%
43%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
No DS M2-24, M2-30 and M3 issued 4/11/26. 10% / 250 Dth Tolerance
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24 and M1-30
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/11/2026- ETNG Pipeline Conditions for 4/12/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/12/2026
Notice End Date: 04/13/2026
Posting Date: 04/11/2026
Notice Identifier: 176425
Required Response Indicator Description: No response required

For Gas Day April 12, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-08-2026 ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/08/2026 3:44:30PM	Notice End Date/Time:  04/09/2026 9:00:00am
Post Date/Time:  4/8/2026 3:44:30 PM	Notice ID: 400503
Reqrd Rsp:  1	Rsp Date:  04/08/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-08-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Wednesday, April 08, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 16,674 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,658 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 189,029 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 230,708 Dths

·         STA 317 (Segment 317 BH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 40,481 Dths

·         STA 321 (Segment 321 FH) - through approx 52% of SOP increases due to nominations in excess of operational capacity; 28,458 Dths

·         STA 325 (Segment 324 FH) - through approx 64% of SOP increases due to nominations in excess of operational capacity; 61,187 Dths

·         MLV 330 (Segment 324 FH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 27,354 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 109,938 Dths

·         Z5  HC North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 191,333 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 379,034 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 222,825 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 72,361 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 41,441 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 159,114 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-09-2026 ID2

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/09/2026 3:26:37PM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 3:26:37 PM	Notice ID: 400529
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-09-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Thursday, April 09, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 14,304 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 183,048 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 237,071 Dths

·         STA 317 (Segment 317 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 51,944 Dths

·         MLV 330 (Segment 324 FH) - through approx 90% of SOP increases due to nominations in excess of operational capacity; 109,757 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 110,239 Dths

·         Z5hc North (Segment 299 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 151,221 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 360,457 Dths

·         STA 249 (Segment 249 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 193,771 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 103,343 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

OFO CD1 EFF 4-11-2026 - EXPANDED 4-13-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER	Notice Type Desc (2):  OFO
Notice Eff Date/Time:  04/10/2026 7:05:01AM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 7:05:01 AM	Notice ID: 400542
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  OFO CD1 EFF 4-11-2026 - EXPANDED 4-13-26
Notice Text:

OFO DAILY CRITICAL DAY 1 EFFECTIVE 4-11-2026 AND EXPANDED 4-13-2026

 

Due to forecasted milder weather with associated lesser demand moving across more areas of the system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Saturday, April 11, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is implementing an OFO Daily Critical Day (“CD”) pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff for the following areas listed below.

 

Effective for the Gas Day of Monday, April 13, 2026 and until further notice, Tennessee is EXPANDING the OFO Daily Critical Day 1 to include all of Zones 4, 5 and 6.

 

This OFO will be effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.

 

Please refer to the table below for the affected areas and dates, and the actions required:

 

 

Zone

	

GD 4-10-26

	

4-11-2026

	

4-13-2026 and until further notice




Zone 0

	

NO OFO

	

Critical Day 1

All Areas Excluding South of STA 1

(Excluding Segments 406, 409, 410, 490, 491, 492)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas Excluding South of STA 1

(Excluding Segments 406, 409, 410, 490, 491, 492)

·         Receipts do not overdeliver

Deliveries do not undertake




Zone L

	

NO OFO

	

Critical Day 1

All Areas Excluding Muskrat and 500 Line

 (Excluding Segments 509, 515, 516, 523, 524,526)

(Excluding 500 Line Segments 527, 529, 530)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas Excluding Muskrat and 500 Line

 (Excluding Segments 509, 515, 516, 523, 524,526)

(Excluding 500 Line Segments 527, 529, 530)

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 1

	

NO OFO

	

Critical Day 1

All of Line 100

All of the 800 Line

All Areas Excluding 500 Line

(Excluding 500 Line Segments 534, 539, 542)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All of Line 100

All of the 800 Line

All Areas Excluding 500 Line

(Excluding 500 Line Segments 534, 539, 542)

·         Receipts do not overdeliver

Deliveries do not undertake




Zone 2

	

NO OFO

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 3

	

NO OFO

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 4

	

NO OFO

	

Critical Day 1

All Areas South of 219 Only

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 5

	

No OFO

	

No OFO

 

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 6

	

No OFO

	

No OFO

 

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE:  Greater of 2% of scheduled quantities or 500 Dth

 

Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.

 

In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.  

 

Please contact your Scheduling Representative if you have any questions.

 

 

 

..
Texas Eastern Transmission (TETCO)

04/10/2026- TE Action Alert -- EFF 4/11

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Action Alert -- EFF 4/11
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/11/2026
Notice End Date: 04/13/2026
Posting Date: 04/10/2026
Notice Identifier: 176344
Required Response Indicator Description: No response required

Zone
Gas Day April 10
Gas Day April 11 and April 12
Gas Day April 13 and until further notice
M1-24"
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
M1-30"
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
M2-24"
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 10%/250
No Action Alert or OFO
M2-30"
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 10%/250
No Action Alert or OFO
No Action Alert or OFO
Action Alert In Effect: No Due Shipper 10%/250
No Action Alert or OFO
ETX
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
STX
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
WLA
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
ELA
No Action Alert or OFO
No Action Alert or OFO
No Action Alert or OFO
Texas Eastern Transmission (TETCO)

04/10/2026- TE Pipeline Conditions for 4/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/11/2026
Notice End Date: 04/12/2026
Posting Date: 04/10/2026
Notice Identifier: 176362
Required Response Indicator Description: No response required

For Gas Day April 11, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Receipts 74200
Yes
Planned Outage
Rec from AGT & Del West of Lambertville
100%
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
73%
Five Points South
N/A
100%
52%
Lebanon
N/A
100%
46%
Lebanon Lateral
N/A
100%
94%
Batesville South
N/A
100%
54%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
43%
White Castle South
Yes
Union Church
N/A
100%
48%
West Monroe Receipts
Yes
Longview
N/A
100%
34%
Deliveries to the Castor Line
N/A
100%
45%
Speaks
N/A
100%
77%
Angleton West
N/A
100%
37%
East Golden Pass
N/A
100%
15%
Gillis
N/A
100%
33%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
No DS M2-24, M2-30 and M3 issued 4/11/26. 10% / 250 Dth Tolerance
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24 and M1-30
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/10/2026- ETNG Pipeline Conditions for 04/11/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 04/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/11/2026
Notice End Date: 04/12/2026
Posting Date: 04/10/2026
Notice Identifier: 176356
Required Response Indicator Description: No response required

For Gas Day April 11, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
Yes
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/06/2026- TE Pipeline Conditions for 4/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/07/2026
Notice End Date: 04/08/2026
Posting Date: 04/06/2026
Notice Identifier: 176205
Required Response Indicator Description: No response required

For Gas Day April 7, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
81%
Rec from AGT & Del West of Lambertville
100%
100%
ISS-1 Injections (2)
N/A
100%
FSS, SS-1 and SS Injections (2)
N/A
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
48%
Five Points South
N/A
100%
92%
Lebanon
N/A
100%
86%
Lebanon Lateral
N/A
100%
78%
Batesville South
N/A
100%
55%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
100%
White Castle South
Yes
Union Church
N/A
100%
33%
West Monroe Receipts
Yes
Longview
N/A
100%
21%
Deliveries to the Castor Line
N/A
100%
Speaks
N/A
100%
78%
Angleton West
N/A
100%
46%
East Golden Pass
Yes
Gillis
N/A
100%
71%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30 and M2-24
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
(2) Beginning 9:00 AM CCT April 3, 2026, through 9:00 AM CCT April 7, 2026, excess injections on all ISS-1, FSS-1, SS-1 and SS contracts will be restricted as well as TT16, TT17, TT24, no-notice balancing and no-notice pre-injection.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/07/2026- TE Pipeline Conditions for 04/08/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/08/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/08/2026
Notice End Date: 04/09/2026
Posting Date: 04/07/2026
Notice Identifier: 176240
Required Response Indicator Description: No response required

For Gas Day April 8, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
81%
Rec from AGT & Del West of Lambertville
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
70%
Five Points South
N/A
100%
35%
Lebanon
N/A
100%
79%
Lebanon Lateral
Yes
Batesville South
N/A
100%
40%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
33%
White Castle South
Yes
Union Church
N/A
100%
33%
West Monroe Receipts
Yes
Longview
N/A
100%
34%
Deliveries to the Castor Line
N/A
100%
18%
Speaks
N/A
100%
78%
Angleton West
N/A
100%
38%
East Golden Pass
N/A
100%
18%
Gillis
N/A
100%
22%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/08/2026- TE Pipeline Conditions for 04/09/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/09/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/09/2026
Notice End Date: 04/10/2026
Posting Date: 04/08/2026
Notice Identifier: 176272
Required Response Indicator Description: No response required

For Gas Day April 9, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
83%
Rec from AGT & Del West of Lambertville
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
96%
Five Points South
N/A
100%
11%
Lebanon
N/A
100%
74%
Lebanon Lateral
N/A
100%
16%
Batesville South
N/A
100%
39%
Deliveries to Meter 74215 (1)
Yes
Access Area
New Roads South
N/A
100%
11%
White Castle South
Yes
Union Church
N/A
100%
42%
West Monroe Receipts
Yes
Longview
N/A
100%
50%
Deliveries to the Castor Line
N/A
100%
33%
Speaks
N/A
100%
78%
Angleton West
N/A
100%
41%
East Golden Pass
Yes
Gillis
N/A
100%
39%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/09/2026- TE Pipeline Conditions for 4/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 4/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/10/2026
Notice End Date: 04/11/2026
Posting Date: 04/09/2026
Notice Identifier: 176314
Required Response Indicator Description: No response required

For Gas Day April 10, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
80%
Receipts 74200
Yes
Planned Outage
Rec from AGT & Del West of Lambertville
100%
100%
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
59%
Five Points South
N/A
100%
43%
Lebanon
N/A
100%
55%
Lebanon Lateral
N/A
100%
98%
Batesville South
N/A
100%
54%
Deliveries to Meter 74215 (1)
N/A
100%
100%
Access Area
New Roads South
N/A
100%
27%
White Castle South
Yes
Union Church
N/A
100%
49%
West Monroe Receipts
Yes
Longview
N/A
100%
35%
Deliveries to the Castor Line
N/A
100%
53%
Speaks
N/A
100%
77%
Angleton West
N/A
100%
36%
East Golden Pass
N/A
100%
Gillis
N/A
100%
44%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
---
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-24, M1-30, M2-24, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/06/2026- ETNG Pipeline Conditions for 4/7/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/07/2026
Notice End Date: 04/08/2026
Posting Date: 04/06/2026
Notice Identifier: 176180
Required Response Indicator Description: No response required

For Gas Day April 7, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
32%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/07/2026- ETNG Pipeline Conditions for 4/8/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/08/2026
Notice End Date: 04/09/2026
Posting Date: 04/07/2026
Notice Identifier: 176225
Required Response Indicator Description: No response required

For Gas Day April 8, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
38%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/08/2026- ETNG Pipeline Conditions for 4/9/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/9/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/09/2026
Notice End Date: 04/10/2026
Posting Date: 04/08/2026
Notice Identifier: 176265
Required Response Indicator Description: No response required

For Gas Day April 9, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
23%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
East Tennessee Natural Gas

04/09/2026- ETNG Pipeline Conditions for 4/10/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Pipeline Conditions for 4/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/10/2026
Notice End Date: 04/11/2026
Posting Date: 04/09/2026
Notice Identifier: 176311
Required Response Indicator Description: No response required

For Gas Day April 10, 2026, East Tennessee Natural Gas (ETNG) has approved and scheduled nominations at each pipeline segment and meter station up to ETNG's operational capacity. The following locations have been restricted due to requested nominations exceeding ETNG's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Topside
100%
Tracy City
Yes
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Hourly Customer Specific OFO
---
Action Alert
---
Imbalances Warnings
Stay Balanced
Systemwide Notes:
ETNG requires any imbalance payback be coordinated through your Operations Account Representative.
If necessary, ETNG will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Effective October 1, 2025, MR 59200 - SNG Whitfield will be restricted to 0 Dth / d until further notice due to SNG pressures being lower than ETNG's typical operating pressure. Also, effective October 1, 2025, MR 59311 - SNG Bradley will be limited to its meter capacity of 31,000 Dth/d.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/06/2026- AGT Operational Flow Order -- UPDATE

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- UPDATE
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/06/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176166
Prior Notice Identifier: 175951
Required Response Indicator Description: No response required

Operational Area
Gas Day April 5
Gas Day April 6
Gas Day April 7 - April 8
Gas Day April 9 and until further Notice
System Wide - All Customers
OFO in Effect: No DS 5% / 250
No OFO*
OFO in Effect: No DP 5% / 250
No OFO*
Customer Specific
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
No OFO*
Algonquin Gas Transmission

04/06/2026- AGT Operational Flow Order -- UPDATE

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- UPDATE
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/07/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176168
Prior Notice Identifier: 176166
Required Response Indicator Description: No response required

Operational Area
Gas Day April 5
Gas Day April 6
Gas Day April 7 - April 8
Gas Day April 9 and until further Notice
System Wide - All Customers
OFO in Effect: No DS 5% / 250
No OFO*
OFO in Effect: No DP 5% / 250
No OFO*
Customer Specific
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
No OFO*
Algonquin Gas Transmission

04/09/2026- AGT Operational Flow Order -- EFF 4/13

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Operational Flow Order -- EFF 4/13
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/13/2026
Notice End Date: 04/16/2026
Posting Date: 04/09/2026
Notice Identifier: 176303
Required Response Indicator Description: No response required

Operational Area
Gas day April 9 - April 12
Gas Day April 13 - 15
Gas Day April 16 and until further Notice
System Wide - All Customers
No OFO*
OFO in Effect: No DS 6% / 250
No OFO*
Customer Specific
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
OFO in Effect: No DS 5% / 250
Hourly Customer Specific
No OFO*
No OFO*
No OFO*
Energy Transfer

[Trunkline Gas Company] [Maint] Trunkline South Texas Maintenance Update #3

SEV 3/5
Maintenance 77 Days

Trunkline Gas Company (TGC) is performing integrity work on its South Texas Modified Transmission System (STX System) between the Jalapeno interconnection (Jim Wells County) and the Eagle Plant (Jackson County) interconnection from March 23 through June 8, 2026 -- approximately 77 days total. The segment is operating under reduced pressure and is effectively shut in for deliveries unless a downstream delivery point can accept gas. Reservation Charge Crediting under Section 29.1(A)(2) has been triggered, confirming firm service impact.

TGC South Texas segment is effectively shut in for the duration with no stated capacity volume, reducing Gulf Coast northbound throughput on Trunkline; watch for incremental bearish pressure at TETCO STX and Henry Hub if affected volumes are material, though no specific Bcf/d figure is disclosed.
Reroute: Moderate: Texas Eastern (TETCO), Southern Natural (EGT), and ANR serve overlapping Gulf Coast northbound corridors and can absorb some TGC South Texas volumes, though shipper nominations will need to be redirected and alternate capacity confirmed.
View original notice text
Pipeline: Trunkline Gas Company
Notice ID: 62815
Notice Type: Maint
Subject: Trunkline South Texas Maintenance Update #3
Posted: 2026-04-09 09:58:00.0
Effective: 2026-04-09 09:58:00.0
End Date: 

Notice ID: 62815
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-09 09:58:00.0
Subject: Trunkline South Texas Maintenance Update #3
Notice Effective Date/Time: 2026-04-09 09:58:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 04/09/2026 Trunkline South Texas Maintenance Update #3 Please Note: changes from the previous posting are shown in bold type. Trunkline will be performing integrity work on its South Texas Modified Transmission System (STX System) between the Jalapeno interconnection (Jim Wells County) and the Eagle Plant (Jackson County) interconnection from March 23 through June 8, 2026. As a result of and for the duration of the integrity work, the STX System will be operating under lower pressure. This work will not enable deliveries effectively shutting in the segment unless or until a delivery point in the segment is able to accept gas. The Reservation Charge Crediting Mechanism of Section 29.1 (A) (2) shall apply to this outage. If you have any questions, please contact your Customer Service or Marketing Representative.
Gulf South Pipeline

Unplanned Index 129 Pipeline Maintenane

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037947
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-04T14:58:00+00:00
Effective: 2026-04-04T15:00:00+00:00
End: 2026-04-11T09:00:00+00:00
Subject: Unplanned Index 129 Pipeline Maintenane

Gulf South Pipeline Notice 5037947
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5037947
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 129 Pipeline Maintenane
TSP :
078444247
Post Date/Time :
04/04/2026 02:58:00 PM
Notice Effective Date/Time :
04/04/2026 03:00:00 PM
Notice End Date/Time :
04/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Index 129 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 3364 (Mill Gansville/Tannehill Comm Cg)
- Loc 3385 (Calvin City Gate)
- 1 Atmos Farm Tap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/04/2026 2:58:49 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/04/2026 02:58:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/04/2026 03:00:00 PM
Notice Stat Desc :
Initiate
Notice End Date/Time :
04/11/2026 09:00:00 AM
Notice ID :
5037947
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 129 Pipeline Maintenane
Notice Text :
Gulf South will be performing maintenance at Index 129 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 3364 (Mill Gansville/Tannehill Comm Cg)
- Loc 3385 (Calvin City Gate)
- 1 Atmos Farm Tap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/04/2026 2:58:49 PM
Page 1 of 1
Gulf South Pipeline

Failure To Take Confirmed Quantities - Loc 24329 Stratton Ridge to Freeport LNG

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037946
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Over-Under Performance
Notice Stat Desc :
Initiate
Notice ID :
5037946
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Failure To Take Confirmed Quantities - Loc 24329 Stratton
Ridge to Freeport LNG
TSP :
078444247
Post Date/Time :
04/04/2026 08:07:00 AM
Notice Effective Date/Time :
04/04/2026 08:10:00 AM
Notice End Date/Time :
04/05/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 24329 – STRATTON RIDGE (TO
FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (“Gulf South”) is notifying
customers that it anticipates confirmation reductions for the remaining nomination cycles for Gas
Day 4/4/2026 and until further notice based upon Projected Daily Quantities* at this Location.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
If you have any questions, please contact your customer service representative.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day.  “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day.  The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
Notice
Page 1 of 1
04/04/2026 8:08:05 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/04/2026 08:07:00 AM
Notice Type Desc :
Over-Under Performance
Notice Effective Date/Time :
04/04/2026 08:10:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
04/05/2026 09:00:00 AM
Notice ID :
5037946
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Failure To Take Confirmed Quantities - Loc 24329 Stratton
Ridge to Freeport LNG
Notice Text :
Due to Customer’s failure to take confirmed quantities at Location SLN 24329 – STRATTON RIDGE (TO
FREEPORT LNG) located in Area 25, Gulf South Pipeline Company, LLC (“Gulf South”) is notifying
customers that it anticipates confirmation reductions for the remaining nomination cycles for Gas
Day 4/4/2026 and until further notice based upon Projected Daily Quantities* at this Location.
Gulf South continues to monitor this issue and will confirm and schedule nomination cycles
pursuant to the nomination timeline.
If you have any questions, please contact your customer service representative.
“Projected Daily Quantities” is the greater of the Elapsed Prorated Scheduled Quantity or the
Accumulated Measured Quantity plus the Estimated Measured Quantity for the balance of the Gas
Day.  “Accumulated Measured Quantity” is defined as the measured quantities through the location
since the beginning of the Gas Day.  The “Estimated Measured Quantity” is the number of hours
remaining in the Gas Day multiplied by the 30-minute average of the current flow rate divided by
24 hours.
04/04/2026 8:08:05 AM
Page 1 of 1
Gulf South Pipeline

Mccomb Compressor Station Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037905
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037905
Prior Notice :
5037720
Reqrd Rsp Desc :
No response required
Subject :
Mccomb Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/27/2026 03:40:00 PM
Notice Effective Date/Time :
04/27/2026 09:00:00 AM
Notice End Date/Time :
05/04/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at the McComb Compressor Station.
The following groups are subject to impact:
-McComb South Receipts Scheduling Group
Gas Day 4/27 - 5/3:
Capacity could be impacted by as much as 150,000 Dth/d for the duration of the maintenance.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/27/2026 3:41:08 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/27/2026 03:40:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/27/2026 09:00:00 AM
Notice Stat Desc :
Terminate
Notice End Date/Time :
05/04/2026 09:00:00 AM
Notice ID :
5037905
Response Date/Time :
Prior Notice :
5037720
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Mccomb Compressor Station Maintenance
Notice Text :
Gulf South is performing maintenance at the McComb Compressor Station.
The following groups are subject to impact:
-McComb South Receipts Scheduling Group
Gas Day 4/27 - 5/3:
Capacity could be impacted by as much as 150,000 Dth/d for the duration of the maintenance.
If you have any questions, please contact your customer service representative.
03/27/2026 3:41:08 PM
Page 1 of 1
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Mojave Pipeline
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Colorado Interstate Gas
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPGD)
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Southern Natural Gas
Notice ID: 400369
Notice Type: OPERATIONAL FLOW ORDER
Subtype: OFO
Subject: OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
Posted: 04/02/2026 7:25:09AM
Effective: 04/02/2026 7:25:09AM
End Date: 04/03/2026 9:00:00AM
Texas Gas Transmission

2026 Projected Outages Overview

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037420
Notice Type: Planned Service Outage
Status: Initiate
Posted: 2025-12-29T15:43:00+00:00
Effective: 2025-12-29T15:45:00+00:00
End: 2027-01-01T09:00:00+00:00
Subject: 2026 Projected Outages Overview
Texas Gas Transmission

Maintenance - Sharon Carthage West (SCW)

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037691
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-12T15:26:00+00:00
Effective: 2026-06-15T08:00:00+00:00
End: 2026-06-19T17:00:00+00:00
Subject: Maintenance - Sharon Carthage West (SCW)
Texas Gas Transmission

Maintenance - Jeffersontown Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037745
Notice Type: Maintenance
Status: Terminate
Posted: 2026-02-26T09:23:00+00:00
Effective: 2026-05-13T08:00:00+00:00
End: 2026-07-03T17:00:00+00:00
Subject: Maintenance - Jeffersontown Compressor Station
Texas Gas Transmission

Maintenance - Jeffersontown Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037746
Notice Type: Maintenance
Status: Terminate
Posted: 2026-02-26T09:25:00+00:00
Effective: 2026-07-07T17:00:00+00:00
End: 2026-07-18T17:00:00+00:00
Subject: Maintenance - Jeffersontown Compressor Station
Texas Gas Transmission

Maintenance - Location 8040 Florida

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037765
Notice Type: Maintenance/Planned Service Outage
Status: Supersede
Posted: 2026-03-05T11:59:00+00:00
Effective: 2026-07-13T08:00:00+00:00
End: 2026-07-20T16:00:00+00:00
Subject: Maintenance - Location 8040 Florida
Texas Gas Transmission

Maintenance - Pineville Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037895
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T08:54:00+00:00
Effective: 2026-07-27T08:00:00+00:00
End: 2026-08-21T17:00:00+00:00
Subject: Maintenance - Pineville Compressor Station
Texas Gas Transmission

Maintenance - Harrison Compressor (South) Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037897
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T09:01:00+00:00
Effective: 2026-09-29T09:00:00+00:00
End: 2026-10-02T09:00:00+00:00
Subject: Maintenance - Harrison Compressor (South) Station
Texas Gas Transmission

Maintenance - Location 9494 Gulf South Bosco Delivery

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037898
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T09:16:00+00:00
Effective: 2026-11-09T09:00:00+00:00
End: 2026-11-13T09:00:00+00:00
Subject: Maintenance - Location 9494 Gulf South Bosco Delivery
Texas Gas Transmission

Maintenance- Youngsville Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037949
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-06T12:00:00+00:00
Effective: 2026-07-13T08:00:00+00:00
End: 2026-08-07T17:00:00+00:00
Subject: Maintenance- Youngsville Compressor Station
Texas Gas Transmission

Maintenance- Youngsville Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037951
Notice Type: Maintenance/Planned Service Outage
Status: Supersede
Posted: 2026-04-06T12:03:00+00:00
Effective: 2026-06-01T09:00:00+00:00
End: 2026-06-30T17:00:00+00:00
Subject: Maintenance- Youngsville Compressor Station
Texas Gas Transmission

Maintenance- Youngsville Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037952
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-06T12:05:00+00:00
Effective: 2026-08-21T08:00:00+00:00
End: 2026-09-18T05:00:00+00:00
Subject: Maintenance- Youngsville Compressor Station
Texas Gas Transmission

Maintenance - Youngsville Compressor Station (GCSR-37818)

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037953
Notice Type: Maintenance/Planned Service Outage
Status: Supersede
Posted: 2026-04-06T12:06:00+00:00
Effective: 2026-09-01T09:00:00+00:00
End: 2026-10-23T09:00:00+00:00
Subject: Maintenance - Youngsville Compressor Station (GCSR-37818)
Texas Gas Transmission

Maintenance - Youngsville Compressor Station (GCSR-37818)

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037954
Notice Type: Maintenance/Planned Service Outage
Status: Supersede
Posted: 2026-04-06T12:08:00+00:00
Effective: 2027-03-01T09:00:00+00:00
End: 2027-04-09T09:00:00+00:00
Subject: Maintenance - Youngsville Compressor Station (GCSR-37818)
Texas Gas Transmission

Maintenance - Midland Inventory Verification Test

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037978
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-10T14:06:00+00:00
Effective: 2026-10-20T07:00:00+00:00
End: 2026-10-30T17:00:00+00:00
Subject: Maintenance - Midland Inventory Verification Test
Texas Gas Transmission

Maintenance - Location 8085 (Midwest Bicknell Del)

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037980
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-10T14:14:00+00:00
Effective: 2026-07-20T08:00:00+00:00
End: 2026-08-07T05:00:00+00:00
Subject: Maintenance - Location 8085 (Midwest Bicknell Del)
Texas Gas Transmission

Maintenance - Location 9474 Gulf South - Iowa Delivery

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038006
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-17T11:39:00+00:00
Effective: 2026-07-06T07:00:00+00:00
End: 2026-07-12T08:00:00+00:00
Subject: Maintenance - Location 9474 Gulf South - Iowa Delivery
Texas Gas Transmission

Pipeline Incident Impacting Service Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038052
Notice Type: Operational Alert
Status: Supersede
Posted: 2026-04-28T14:57:00+00:00
Effective: 2026-04-28T15:00:00+00:00
End: 2026-07-31T17:00:00+00:00
Subject: Pipeline Incident Impacting Service  Update
Gulf South Pipeline

2026 Projected Outages Overview

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037418
Notice Type: Planned Service Outage
Status: Initiate
Posted: 2025-12-29T14:32:00+00:00
Effective: 2025-12-29T14:34:00+00:00
End: 2027-01-01T09:00:00+00:00
Subject: 2026 Projected Outages Overview
Gulf South Pipeline

Bistineau Compressor & Storage Field Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037562
Notice Type: Maintenance
Status: Supersede
Posted: 2026-01-27T11:37:00+00:00
Effective: 2026-09-29T09:00:00+00:00
End: 2026-10-16T09:00:00+00:00
Subject: Bistineau Compressor & Storage Field Maintenance
Gulf South Pipeline

Hall Summit Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037852
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-20T15:01:00+00:00
Effective: 2026-07-06T09:00:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: Hall Summit Compressor Station Maintenance
Gulf South Pipeline

Vixen Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037853
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-20T15:03:00+00:00
Effective: 2026-07-13T09:00:00+00:00
End: 2026-07-18T09:00:00+00:00
Subject: Vixen Compressor Station Maintenance
Gulf South Pipeline

Delhi Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037914
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T15:59:00+00:00
Effective: 2026-06-14T09:00:00+00:00
End: 2026-06-20T09:00:00+00:00
Subject: Delhi Compressor Station Maintenance
Gulf South Pipeline

Index 46 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037963
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-08T09:39:00+00:00
Effective: 2026-06-09T09:00:00+00:00
End: 2026-09-20T09:00:00+00:00
Subject: Index 46 Pipeline Maintenance
Gulf South Pipeline

Delhi Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037964
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-08T09:41:00+00:00
Effective: 2026-06-14T09:00:00+00:00
End: 2026-06-20T09:00:00+00:00
Subject: Delhi Compressor Station Maintenance
Gulf South Pipeline

Delhi Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037965
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-08T09:43:00+00:00
Effective: 2026-07-05T09:00:00+00:00
End: 2026-08-01T09:00:00+00:00
Subject: Delhi Compressor Station Maintenance
Gulf South Pipeline

Update: Wilson Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038024
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-21T09:51:00+00:00
Effective: 2026-08-03T09:00:00+00:00
End: 2026-08-06T09:00:00+00:00
Subject: Update: Wilson Compressor Station Maintenance
Gulf South Pipeline

Update: Wilson Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038025
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-21T09:55:00+00:00
Effective: 2026-07-27T09:00:00+00:00
End: 2026-08-01T09:00:00+00:00
Subject: Update: Wilson Compressor Station Maintenance
Gulf South Pipeline

Update: Carthage #2 Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038032
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-21T10:11:00+00:00
Effective: 2026-07-06T09:00:00+00:00
End: 2026-08-08T09:00:00+00:00
Subject: Update: Carthage #2 Compressor Station Maintenance
Gulf South Pipeline

Index 387 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038041
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-23T10:22:00+00:00
Effective: 2026-06-11T09:00:00+00:00
End: 2026-06-23T09:00:00+00:00
Subject: Index 387 Pipeline Maintenance
Gulf South Pipeline

Update: Tallulah Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038042
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-23T10:26:00+00:00
Effective: 2026-06-08T09:00:00+00:00
End: 2026-06-13T09:00:00+00:00
Subject: Update: Tallulah Compressor Station Maintenance
Gulf South Pipeline

Update: Index 131 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038049
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-24T16:27:00+00:00
Effective: 2026-10-20T09:00:00+00:00
End: 2026-11-01T09:00:00+00:00
Subject: Update: Index 131 Pipeline Maintenance
Gulf South Pipeline

Update: Index 301-18 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038040
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-23T10:20:00+00:00
Effective: 2026-05-18T09:00:00+00:00
End: 2026-06-17T09:00:00+00:00
Subject: Update: Index 301-18 Pipeline Maintenance
Gulf South Pipeline

Update: Index 330 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038043
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-23T11:45:00+00:00
Effective: 2026-05-19T09:00:00+00:00
End: 2026-07-01T09:00:00+00:00
Subject: Update: Index 330 Pipeline Maintenance
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-28-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/28/2026 3:24:45PM	Notice End Date/Time:  04/29/2026 9:00:00am
Post Date/Time:  4/28/2026 3:24:45 PM	Notice ID: 400954
Reqrd Rsp:  1	Rsp Date:  04/28/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-28-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Tuesday, April 28, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         NMP/TGP Gillrina Road Nueces Delivery Meter (Pin 47799) - through 100% of SIPps increases due to operational concerns; 50,138 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 5,922 Dths

·         STA 1 (Segment 101 BH) - through 100% of PS IT due to operational concerns ; 63,811 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 2,968 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 319,870 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 195,295 Dths

·         STA 315 (Segment 315 BH) - through approx 71% of SOP increases due to nominations in excess of operational capacity; 182,730 Dths

·         STA 317 (Segment 317 BH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 62,719 Dths

·         STA 321 (Segment 321 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 273,681 Dths

·         Z5hc North (Segment 299 FH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 130,042 Dths

·         STA 245 (Segment 245 FH) - through approx 77% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 196,158 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 82,138 Dths

·         MLV 273 (Segment 284 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 82,168 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-28-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/28/2026 7:34:30PM	Notice End Date/Time:  04/29/2026 9:00:00am
Post Date/Time:  4/28/2026 7:34:30 PM	Notice ID: 400962
Reqrd Rsp:  1	Rsp Date:  04/28/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-28-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Tuesday, April 28, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         NMP/TGP Gillrina Road Nueces Delivery Meter (Pin 47799) - through 100% of IT increases due to operational concerns; 10,000 Dths

SEGMENT RESTRICTIONS

·         STA 1 (Segment 101 BH) - through 100% of SOP increases due to operational concerns; 8,844 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 2,968 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 1,243 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

MONTHLY STORAGE TRANSFERS REMINDER

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  STORAGE	Notice Type Desc (2):  RESTRICTIONS
Notice Eff Date/Time:  04/29/2026 6:43:29AM	Notice End Date/Time:  04/30/2026 9:00:00am
Post Date/Time:  4/29/2026 6:43:29 AM	Notice ID: 400968
Reqrd Rsp:  1	Rsp Date:  04/29/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  MONTHLY STORAGE TRANSFERS REMINDER
Notice Text:

MONTHLY STORAGE TRANSFERS FOR MAY 1, 2026

DART provides the ability for storage customers to enter their own storage transfers online.  The transfers must be confirmed on or before the effective date.  If you have a terminated or recalled contract that needs the balance transferred to the base storage contract holder or a new contract, these transfers need to be completed on or before the first of the month.  

For terminated storage contracts per the firm storage rate schedule of the Tennessee Gas Pipeline tariff on First Revised Sheet No. 217, Section 11: “Shippers must withdraw or transfer its Storage Balance on or before the date of the expiration of its FS Service Agreement.  To the extent that a Shipper fails to dispose of or transfer its entire Storage Balance, Transporter shall retain and take title to Shipper's remaining Storage Balance at no cost to Transporter.”   

PLEASE NOTE:  When the first of the month falls on a weekend or holiday, any small volume left on a terminated or recalled storage contract will be moved for the customers by TGP to the new valid contract if requested by the customer on the first business day following the weekend or holiday provided that efforts have been made prior to the first and/or holiday to transfer allocated balances prior to the weekend and/or holiday before requesting TGP to move the remaining balance.

TENNESSEE GAS PIPELINE WILL CONFISCATE ANY REMAINING BALANCE NOT TRANSFERRED OR REQUESTED BY THE CUSTOMER TO BE TRANSFERRED ON TERMINATED FIRM STORAGE CONTRACTS.

 

Please contact your Primary Gas Scheduler or Veronica Esparza (713-420-5213), Storage Coordinator, if you need procedures and/or help with your storage transfer.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-29-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/29/2026 11:07:20AM	Notice End Date/Time:  04/30/2026 9:00:00am
Post Date/Time:  4/29/2026 11:07:20 AM	Notice ID: 400969
Reqrd Rsp:  1	Rsp Date:  04/29/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-29-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Wednesday, April 29, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         REX/TGP Big Muskie Guernsey Receipt Meter (Pin 44423) - through approx 99% of SOP delivery increases due to displacement gas unavailable for backhaul; 31,986 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,868 Dths

·         STA 860 (Segment 860 BH) - through SIPsp increases due to scheduled maintenance and nominations in excess of operational capacity

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 334,046 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 222,825 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 197,814 Dths

·         STA 317 (Segment 317 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 84,612 Dths

·         STA 321 (Segment 321 FH) - through approx 63% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 129,910 Dths

·         Z5hc North (Segment 299 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 219,962 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 297,985 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 166,008 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 80,138 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 159,853 Dths

·         MLV 273 (Segment 284 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 135,129 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Gulf South Pipeline

Posted Maintenance Events for 04/24/2026 - 04/30/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038037
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-22T13:46:00+00:00
Effective: 2026-04-24T09:00:00+00:00
End: 2026-05-01T09:00:00+00:00
Subject: Posted Maintenance Events for 04/24/2026 - 04/30/2026
Gulf South Pipeline

Index 205 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5035531
Notice Type: Maintenance
Status: Initiate
Posted: 2024-10-22T11:02:33+00:00
Effective: 2024-10-23T09:00:00+00:00
End: 
Subject: Index 205 Pipeline Maintenance
Gulf South Pipeline

Update: Index 249-1 Pipeline Maintanence

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037656
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-10T14:03:00+00:00
Effective: 2026-05-05T09:00:00+00:00
End: 2026-05-09T09:00:00+00:00
Subject: Update: Index 249-1 Pipeline Maintanence
Gulf South Pipeline

Wilson Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038015
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-21T09:21:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-12T09:00:00+00:00
Subject: Wilson Compressor Station Maintenance
Gulf South Pipeline

Posted Maintenance Events for 05/01/2026- 05/07/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038054
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-29T11:35:00+00:00
Effective: 2026-05-01T09:00:00+00:00
End: 2026-05-08T09:00:00+00:00
Subject: Posted Maintenance Events for 05/01/2026- 05/07/2026

Gulf South Pipeline Notice 5038054
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038054
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Posted Maintenance Events for 05/01/2026- 05/07/2026
TSP :
078444247
Post Date/Time :
04/29/2026 11:35:00 AM
Notice Effective Date/Time :
05/01/2026 09:00:00 AM
Notice End Date/Time :
05/08/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
https://reporting.prod.bwpmlp.org/infopost/postings?postingsDocumentId=815422
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/29/2026 11:36:01 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical/Planned Service Outage
Post Date/Time :
04/29/2026 11:35:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/01/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
05/08/2026 09:00:00 AM
Notice ID :
5038054
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Posted Maintenance Events for 05/01/2026- 05/07/2026
Notice Text :
https://reporting.prod.bwpmlp.org/infopost/postings?postingsDocumentId=815422
If you have any questions, please contact your customer service representative.
04/29/2026 11:36:01 AM
Page 1 of 1
Texas Gas Transmission

Maintenance - Location 1526 Doe Run KY

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037673
Notice Type: Maintenance/Planned Service Outage
Status: Initiate
Posted: 2026-02-12T10:45:00+00:00
Effective: 2026-06-23T09:00:00+00:00
End: 2026-06-27T17:00:00+00:00
Subject: Maintenance -  Location 1526 Doe Run KY
Texas Gas Transmission

Maintenance - Jeffersontown Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037735
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-25T10:21:00+00:00
Effective: 2026-06-05T06:00:00+00:00
End: 2026-07-02T14:30:00+00:00
Subject: Maintenance - Jeffersontown Compressor Station
Texas Gas Transmission

Maintenance - Columbia Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037894
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T08:49:00+00:00
Effective: 2026-05-25T08:00:00+00:00
End: 2026-06-30T08:00:00+00:00
Subject: Maintenance - Columbia Compressor Station
Texas Gas Transmission

Maintenance- Youngsville Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037950
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-06T12:01:00+00:00
Effective: 2026-08-17T08:00:00+00:00
End: 2026-08-21T08:00:00+00:00
Subject: Maintenance- Youngsville Compressor Station
Texas Gas Transmission

Maintenance - Location 9560 TETCO - Kosciusko Del

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037958
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-07T16:12:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-14T17:00:00+00:00
Subject: Maintenance - Location 9560 TETCO - Kosciusko Del
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037979
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-10T14:11:00+00:00
Effective: 2026-07-14T09:00:00+00:00
End: 2026-08-14T17:00:00+00:00
Subject: Pipeline Maintainence-Oaktown
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038007
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-17T11:43:00+00:00
Effective: 2026-07-20T09:00:00+00:00
End: 2026-08-07T09:00:00+00:00
Subject: Pipeline Maintainence-Oaktown
Texas Gas Transmission

Maintenance - Pineville Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038011
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-20T08:16:00+00:00
Effective: 2026-05-11T08:00:00+00:00
End: 2026-06-10T14:30:00+00:00
Subject:  Maintenance - Pineville Compressor Station
East Tennessee Natural Gas

04/27/2026- ETNG Action Alert -- LIFTED EFF 4/27

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- LIFTED EFF 4/27
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/27/2026
Notice End Date: 07/26/2026
Posting Date: 04/27/2026
Notice Identifier: 177126
Prior Notice Identifier: 176953
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 26
Gas Day April 27 and until further notice
System Wide
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO or Action Alert*
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO*
Kinder Morgan (multi-pipeline)

[MAINTENANCE] SEGMENT 200-ILI TOOL RUN

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Midcontinent Express
Notice Type: MAINTENANCE
Subject: SEGMENT 200-ILI TOOL RUN
Posted: 04/23/2026 1:12:31PM
Effective: 04/23/2026 1:12:31PM
End Date: 06/30/2026 9:00:00AM
Kinder Morgan (multi-pipeline)

[MAINTENANCE] PHMSA MEGA-SEG 13 AM#3 107/108-ILI UPD1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: MAINTENANCE
Subject: PHMSA MEGA-SEG 13 AM#3 107/108-ILI UPD1
Posted: 04/10/2026 8:08:52AM
Effective: 04/10/2026 8:08:52AM
End Date: 05/31/2026 9:00:00AM
Kinder Morgan (multi-pipeline)

[MAINTENANCE] PHMSA MEGA RULE-CS 184 TO CS 154

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: MAINTENANCE
Subject: PHMSA MEGA RULE-CS 184 TO CS 154
Posted: 04/16/2026 2:59:44PM
Effective: 04/16/2026 2:59:44PM
End Date: 06/30/2026 9:00:00AM
Kinder Morgan (multi-pipeline)

[MAINTENANCE] OUTAGE IMPACT REPORT - 4-24-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: MAINTENANCE
Subject: OUTAGE IMPACT REPORT - 4-24-26
Posted: 04/24/2026 11:51:44AM
Effective: 04/24/2026 11:51:44AM
End Date: 04/30/2026 9:00:00AM
Gulf South Pipeline

White Oak Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038010
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-18T16:59:00+00:00
Effective: 2026-05-18T09:00:00+00:00
End: 2026-05-23T09:00:00+00:00
Subject: White Oak Compressor Station Maintenance
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-25-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/25/2026 7:40:25PM	Notice End Date/Time:  04/26/2026 9:00:00am
Post Date/Time:  4/25/2026 7:40:25 PM	Notice ID: 400896
Reqrd Rsp:  1	Rsp Date:  04/25/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-25-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Saturday, April 25, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

METER RESTRICTIONS

·         NONE

 

SEGMENT RESTRICTIONS

·         NONE

 

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Gulf South Pipeline

Update: Rodrigue Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038050
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-25T14:58:00+00:00
Effective: 2026-04-25T15:00:00+00:00
End: 2026-04-27T09:00:00+00:00
Subject: Update: Rodrigue Compressor Station Maintenance

Gulf South Pipeline Notice 5038050
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038050
Prior Notice :
5038031
Reqrd Rsp Desc :
No response required
Subject :
Update: Rodrigue Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
04/25/2026 02:58:00 PM
Notice Effective Date/Time :
04/25/2026 03:00:00 PM
Notice End Date/Time :
04/27/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South is performing maintenance at the Rodrigue Compressor Station.
The following groups are subject to impact:
-Bayou Sale to Napoleonville Scheduling Group
Gas Day 4/5:
Capacity could be impacted by as much as 35,000 Dth/d for the duration of the maintenance.
Gas Day 4/6-4/26:
Capacity could be impacted by as much as 100,000 Dth/d for the duration of the maintenance.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/25/2026 2:58:59 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/25/2026 02:58:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/25/2026 03:00:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/27/2026 09:00:00 AM
Notice ID :
5038050
Response Date/Time :
Prior Notice :
5038031
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Rodrigue Compressor Station Maintenance
Notice Text :
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South is performing maintenance at the Rodrigue Compressor Station.
The following groups are subject to impact:
-Bayou Sale to Napoleonville Scheduling Group
Gas Day 4/5:
Capacity could be impacted by as much as 35,000 Dth/d for the duration of the maintenance.
Gas Day 4/6-4/26:
Capacity could be impacted by as much as 100,000 Dth/d for the duration of the maintenance.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/25/2026 2:58:59 PM
Page 1 of 1
Tennessee Gas Pipeline (TGP)

OFO CD1 EFF 4-25-2026 LIFTED 4-27-2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER	Notice Type Desc (2):  OFO
Notice Eff Date/Time:  04/24/2026 7:19:54AM	Notice End Date/Time:  04/25/2026 9:00:00am
Post Date/Time:  4/24/2026 7:19:54 AM	Notice ID: 400859
Reqrd Rsp:  1	Rsp Date:  04/24/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  OFO CD1 EFF 4-25-2026 LIFTED 4-27-2026
Notice Text:

OFO DAILY CRITICAL DAY 1 EFFECTIVE 4-25-2026 AND LIFTED 4-27-2026

 

Due to forecasted milder weather with associated lesser demand moving across various areas of the system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Saturday, April 25, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is implementing an OFO Daily Critical Day (“CD”) 1 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff. 

 

Tennessee is lifting the OFO Daily Critical Day 1 for ALL AREAS effective for the Gas Day of Monday, April 27, 2026 and until further notice. 

 

This OFO will be effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.

 

Please refer to the table below for the affected areas and dates, and the actions required:

 

 

Zone

	

GD 4-24-26

	

4-25-2026

	

4-27-2026 and until further notice




Zone 0

	

No OFO

	

Critical Day 1

100 Line Excluding South of STA 1

(Excluding Segments 406, 409, 410, 490, 491, 492)

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO




Zone L

	

No OFO

	

Critical Day 1

500 Line Excluding Muskrat

 (Excluding Segments 509, 515, 516, 523, 524,526)

(Excluding 500 Line Segments 527, 529, 530)

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO




Zone 1

	

No OFO

	

Critical Day 1

500 Line

(Excluding 500 Line Segments 534, 539, 542)

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO




Zone 2

	

No OFO

	

Critical Day 1

All Areas

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO




Zone 3

	

No OFO

	

Critical Day 1

All Areas

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO




Zone 4

	

No OFO

	

Critical Day 1

All Areas South of STA 219 Only

·        Receipts do not overdeliver

·        Deliveries do not undertake

·         

	

NO OFO




Zone 5

	

No OFO

	

No OFO

 

	

No OFO

 




Zone 6

	

No OFO

	

No OFO

 

	

No OFO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE:  Greater of 2% of scheduled quantities or 500 Dth

 

Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.

 

In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.  

 

Please contact your Scheduling Representative if you have any questions.

 

 

 

...
Texas Eastern Transmission (TETCO)

04/24/2026- TE Pipeline Conditions for 04/24/2026 -- INTRADAY

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Pipeline Conditions for 04/24/2026 -- INTRADAY
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/24/2026
Notice End Date: 04/25/2026
Posting Date: 04/24/2026
Notice Identifier: 177013
Prior Notice Identifier: 176979
Required Response Indicator Description: No response required

For Gas Day April 24, 2026, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
North of Berne
Meter 75919 Deliveries
N/A
100%
100%
87%
Rec from AGT & Del West of Lambertville
100%
100%
100%
17%
Planned Outage
TE/AGT Lease
Yes
To Lease Capacity
Nexus/TE Leased Meters
Yes
To Lease Capacity
30" South of Berne
Berne South
N/A
100%
100%
Danville
N/A
100%
100%
100%
100%
Planned Outage
Tompkinsville
N/A
100%
100%
Barton
Yes
24"
Sarahsville South
N/A
100%
100%
100%
100%
100%
100%
Planned Outage
Five Points South
Yes
Lebanon
Yes
Lebanon Lateral
Yes
Batesville South
Yes
Deliveries to Meter 74215 (1)
Yes
Meter 70215 Receipts
N/A
100%
100%
100%
Meter 71616 Receipts
Yes
Access Area
New Roads South
N/A
100%
82%
White Castle South
Yes
Union Church
N/A
100%
57%
Longview
N/A
100%
46%
Deliveries to the Castor Line
N/A
100%
46%
West Monroe Receipts (2)
Yes
Huntsville
Yes
Speaks
N/A
100%
79%
Angleton West
N/A
100%
60%
East Golden Pass
N/A
100%
Gillis
N/A
100%
46%
TABS Pool Restrictions - Tolerances
ETX
STX
WLA
ELA
M1-24"
M1-30"
M2-24"
M2-30"
TABS Pool - Length
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
TABS Pool - Short
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
1% or 1,000
No-Notice Restrictions
OFO / Imbalance Notice
OFO
No DP - M1-24, M2-24, issued 04/20/2026. 2% / 250 Dth Tolerance
Action Alert
---
Customer Specific OFO
---
Imbalance Warnings
Stay Balanced - Access Area, M1-30, M2-30 and M3
FERC Order 698
M2-24, M2-30 and M3
Systemwide Notes:
(2) Due to intraday nomination changes.
Shippers in Texas Eastern's Access Area Zones and Market Area Zones are required to coordinate any imbalance payback through TE's account representative and actual payback quantities may be limited depending on system operations and conditions. If customers do not adhere to imbalance requirements stated above, TE will utilize any provision of its tariff to ensure system integrity including the issuance of customer specific or system wide OFOs.
Beginning Gas Day March 18, 2026, TE anticipates restrictions of approximately 0-10% of P1 nominations at Danville. For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.
Operational advisory for shippers nominating from 79503: TETLP will upper limit to -0- certain activities if shippers (1) have initial nominations originating from 79503 (WLA TABS Pool) for delivery west of EGP at the Timely Cycle and (2) these shippers are consistently reducing these quantities intraday. TE will be reviewing these activities at the Timely Cycle beginning Gas Day January 30, 2026 until further notice.
(1) Beginning Gas Day December 4, 2025 TETCO will begin restricting delivery nominations at MR 74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH to the designed meter capacity of 250,000 Dth/d.
Due to gas quality issues, meter 76609 has been shut in and physical receipts at the meter will be unavailable until further notice. Beginning during the Timely cycle for Gas Day December 6, 2025, and until further notice, TE will restrict receipt nominations at Meter 76609 to -0- Dth/d.
If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.
TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.
Please contact your Operations Account Representative should you have any questions.
Texas Eastern Transmission (TETCO)

04/24/2026- TE Operational Flow Order -- LIFTED

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- LIFTED
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/24/2026
Notice End Date: 07/23/2026
Posting Date: 04/24/2026
Notice Identifier: 177015
Prior Notice Identifier: 176837
Required Response Indicator Description: No response required

Zone
Gas Day April 24
Gas Day April 25 - April 27
Gas Day April 28 and until further notice
M1-24"
No Action Alert or OFO *
No Action Alert or OFO *
No Action Alert or OFO*
M1-30"
No Action Alert or OFO*
No Action Alert or OFO*
No Action Alert or OFO*
M2-24"
No Action Alert or OFO *
No Action Alert or OFO *
No Action Alert or OFO *
M2-30"
No Action Alert or OFO*
Action Alert In Effect: No Due Shipper 6%/500
No Action Alert or OFO*
No Action Alert or OFO*
Action Alert In Effect: No Due Shipper 6%/500
No Action Alert or OFO*
ETX
No Action Alert or OFO*
No Action Alert or OFO*
No Action Alert or OFO*
STX
No Action Alert or OFO*
No Action Alert or OFO*
No Action Alert or OFO*
WLA
No Action Alert or OFO*
No Action Alert or OFO*
No Action Alert or OFO*
ELA
No Action Alert or OFO*
No Action Alert or OFO*
No Action Alert or OFO*
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/23/2026 2:41:46PM	Notice End Date/Time:  04/24/2026 9:00:00am
Post Date/Time:  4/23/2026 2:41:46 PM	Notice ID: 400842
Reqrd Rsp:  1	Rsp Date:  04/23/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

 

 

	

 

	

 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

Seven Day Forecast (updated 04/23/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station / Seg

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Monday

(4/27)

	

Tuesday

(4/28)

	

Wednesday

(4/29)

	

Thursday

(4/30)

	

Friday

(5/1)

	

Saturday

(5/2)

	

Sunday

(5/3)

	

 

Primary Outage(s) that may Impact Throughput




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490

FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

 

1,122

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/28/2026 - 6/9/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter (4/24/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

920

(355)

	

920

(355)

	

920

(355)

	

920

(355)

	

920

(355)

	

920

(355)

	

920

(355)

	

MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026) Sta 40: Unit 1D - Emergent Repair (4/21/2026 - 5/8/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

 

1,343

	

 

1,343

	

 

1,343

	

 

1,343

	

 

1,343

	

 

1,343

	

 

1,343

	

 




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




Station 834

(segment 834 BH)

	

 

683

	

674

(9)

	

674

(9)

	

674

(9)

	

674

(9)

	

674

(9)

	

674

(9)

	

674

(9)

	

Sta 834: Unit 6A - Overhaul (3/3/2025 - 5/15/2026)




Station 847

(segment 847 FH)

	

 

626

	

 

626

	

490

(136)

	

 

626

	

490

(136)

	

 

626

	

 

626

	

 

626

	

MLV 847-1 to MLV 851-1: Pig Runs - Cal / IMU & MFL-A 4/30/26 (4/30/2026)

MLV 847-1 to MLV 851-1: Pig Runs - Cleaning / Gauge 4/28/26 (4/28/2026)




Station 527

(segment 527 BH)

	

 

2,395

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

Sta 527: Unit 1C - High Vibration (2/4/2026 - 5/15/2026)




Station 534 South of Pool (segment 530 BH)

	

 

 

1,550

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/29/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

Station 860

(segment 548 BH)

	

 

 

1,593

	

 

1450

(143)

	

 

1230

(363)

	

 

1230

(363)

	

 

1230

(363)

	

 

1230

(363)

	

 

1580

(13)

	

 

1580

(13)

	

MLV 554-2R to MLV 554-2: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 555-1L to MLV 556-1: Anomaly Remediation (4/28/2026 - 5/1/2026) MLV 556-1 to MLV 557-1: Anomaly Remediation (4/23/2026 - 4/27/2026) Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




 

 

Station 860 North

(Segment 860 BH)

	

 

 

 

1,874

	

 

 

1550

(324)

	

 

 

1550

(324)

	

 

 

1535

(339)

	

 

 

1550

(324)

	

 

 

1550

(324)

	

 

 

1846

(28)

	

 

 

1846

(28)

	

Sta 563 Joelton: Annual ESD Test (4/29/2026)

Sta 563 Joelton: Unit 1A - Lube Oil Varnish System Installation (4/29/2026 - 5/1/2026)

Sta 563 Joelton: Unit 2A - Lube Oil Varnish System Installation (4/27/2026 - 4/29/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




Station 110

(segment 187 BH)

(south thru

Kentucky)

	

 

 

2,685

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 87: Unit 2E Overhaul (2/20/2026 - 4/30/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

578

(329)

	

578

(329)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

Sta 114 Catlettsburg: Annual ESD Test (4/27/2026 - 4/28/2026) Sta 119A Rocky Fork: Annual ESD Test (4/27/2026 - 4/28/2026)




Station 204

(Segment 204 BH)

	

 

1,828

	

 

1550

(278)

	

 

1515

(313)

	

 

1520

(308)

	

 

1515

(313)

	

 

1520

(308)

	

 

1,828

	

 

1,828

	

MLV 204-3 to MLV 205-3: Span Maintenance (4/28/2026 - 5/1/2026) MLV 214-2 to MLV 219-2: Pig Run - Cal/IMU (M) (4/30/2026)

MLV 214-2 to MLV 219-2: Pig Run - Gauge/Cleaning (M) (4/28/2026)

Sta 209 Cambridge: Annual ESD Test & Maintenance (4/20/2026 - 5/1/2026)




Station 245

(segment 245 FH)

	

 

986

	

 

830

(156)

	

 

830

(156)

	

 

830

(156)

	

 

650

(336)

	

 

650

(336)

	

 

750

(236)

	

 

750

(236)

	

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)

Sta 249: Unit 1A - Crankcase Inspection (4/27/2026 - 5/1/2026)




MLV 256 West

(segment 249 FH)

	

 

1,203

	

 

1,203

	

535

(668)

	

535

(668)

	

535

(668)

	

 

1,203

	

 

1,203

	

 

1,203

	

MLV 249-2 to MLV 254-2: Cal/IMU (4/29/2026)

MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (4/28/2026) MLV 249-2 to MLV 254-2: MFL-C (4/30/2026)




Station 254

(segment 256 FH)

	

 

1,203

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

MLV 258-1 to MLV 259-1: Anomaly Remediation (4/20/2026 - 5/4/2026) MLV 259-1 to MLV 260-1: Anomaly Remediation (4/20/2026 - 5/4/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

550

(338)

	

 

888

	

 

888

	

 

888

	

 

888

	

Sta 264: Filter Scrubber (4/29/2026)




Station 307

(segment 307 BH)

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




 

 

	

 

	

 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

Seven Day Forecast (updated 04/23/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station / Seg

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Monday

(4/27)

	

Tuesday

(4/28)

	

Wednesday

(4/29)

	

Thursday

(4/30)

	

Friday

(5/1)

	

Saturday

(5/2)

	

Sunday

(5/3)

	

 

Primary Outage(s) that may Impact Throughput




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 321

(segment 321 FH)

	

 

2,102

	

1852

(250)

	

1852

(250)

	

1852

(250)

	

1852

(250)

	

1852

(250)

	

1852

(250)

	

1852

(250)

	

Sta 321: Unit 1C - Emergent Repair (4/20/2026 - 5/8/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

 

153

	

MLV 339-1 to MLV 340-1: Anomaly Remediation (4/20/2026 - 5/2/2026)




Station 405 HC Line (segment 299

FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

May 2026 (updated 04/23/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490 FH)

	

 

564

	

 

564

	

 

564

	

 

325

(239)

	

 

564

	

Sta 409: Annual ESD Test & Maintenance (5/19/2026 - 5/21/2026)




MLV 406

(segment 406 BH)

	

 

456

	

 

456

	

200

(256)

	

 

456

	

 

456

	

MLV 400-1 to MLV 409-1: Pig Run - Maintenance Cleaning (M) (5/12/2026)

MLV 400-2 to MLV 409-2: Pig Run - Maintenance Cleaning (M) (5/14/2026)




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

760

(362)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/28/2026 - 6/9/2026)

MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

1060

(18)

	

1055

(23)

	

1055

(23)

	

1055

(23)

	

MLV 26-1 Relocation: Highway 59 Widening (5/16/2026 - 6/2/2026)

MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter (4/24/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

 

920

(355)

	

 

950

(325)

	

 

1,275

	

 

1,275

	

MLV 32-2 to MLV 40-2S: Pig Run - Maintenance (5/12/2026)

MLV 32-3 to MLV 40-3S: Pig Run - Maintenance (5/13/2026) MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026)

Sta 40: Unit 1D - Emergent Repair (4/21/2026 - 5/8/2026)




Carthage Lateral (segment 700

FH)

	

 

296

	

180

(116)

	

180

(116)

	

 

296

	

 

296

	

MLV 706-1 to MLV 700-1: Pig Run - Caliper 5/14/26 (M) (5/14/2026)

MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/12/26 (M) (5/12/2026) MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/7/26 (M) (5/7/2026)




 

 

 

Station 47

(segment 143 FH)

	

 

 

 

 

1,343

	

 

 

 

1020

(323)

	

 

 

 

1050

(293)

	

 

 

 

1050

(293)

	

 

 

 

1025

(318)

	

MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (5/15/2026)

MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (5/18/2026)

MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/11/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/12/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/13/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Sta. 47: Scrubber/Filter/Separator Cleaning/Inspection/Changeout (5/25/2026 - 5/29/2026)

Sta. 47: Station Transformer Maintenance (5/4/2026 - 5/5/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




MLV 822 West

(segment 820 FH)

	

 

724

	

150

(574)

	

 

724

	

 

724

	

 

724

	

MLV 820-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/6/2026)




MLV 822 East

(segment 822 BH)

	

 

972

	

150

(822)

	

 

972

	

 

972

	

 

972

	

MLV 823-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/5/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

640

(94)

	

 

734

	

Sta 823 (Kinder): Annual ESD Test (5/19/2026 - 5/21/2026)




 

 

Station 834

(segment 834 BH)

	

 

 

 

683

	

 

 

 

674

(9)

	

 

 

 

650

(33)

	

 

 

 

150

(533)

	

 

 

 

674

(9)

	

Sta 834 to Sta 827: Maintenance Pig (5/21/2026)

Sta 834: Unit 1A - Replace Insulation Blanket (5/5/2026 - 5/6/2026) Sta 834: Unit 1A - Turbocharger (5/11/2026 - 5/22/2026)

Sta 834: Unit 2A - Replace Insulation Blanket (5/7/2026 - 5/8/2026) Sta 834: Unit 3A - Replace Insulation Blanket (5/12/2026 - 5/13/2026) Sta 834: Unit 4A - Replace Insulation Blanket (5/14/2026 - 5/15/2026) Sta 834: Unit 6A - Overhaul (3/3/2025 - 5/15/2026)

Sta 834: Unit 7A - Turbocharger/Overhaul (5/25/2026 - 6/4/2026)




Station 527

(segment 527 BH)

	

 

2,395

	

1750

(645)

	

2340

(55)

	

 

2,395

	

 

2,395

	

Sta 527: Unit 1C - High Vibration (2/4/2026 - 5/15/2026)

Sta. 527 Port Sulphur: Annual ESD Test (5/7/2026)




 

Station 534 South of Pool (segment 530 BH)

	

 

 

 

1,550

	

 

 

1365

(185)

	

 

 

1528

(22)

	

 

 

1528

(22)

	

 

 

1370

(180)

	

Sta 530: Annual ESD Test (5/7/2026)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Annual ESD Test (5/26/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/29/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

 

1435

(212)

	

 

1435

(212)

	

 

1635

(12)

	

 

1635

(12)

	

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026)

Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

May 2026 (updated 04/23/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




 

Station 860

(segment 548 BH)

	

 

 

1,593

	

 

1580

(13)

	

 

1580

(13)

	

 

800

(793)

	

 

800

(793)

	

MLV 551-2 to MLV 552-2: Anomaly Remediation (5/18/2026 - 5/29/2026) MLV 552-2 to MLV 553-2: Anomaly Remediation (5/4/2026 - 5/15/2026) Sta 546: Unit 1A - Unit Maintenance (5/4/2026 - 5/5/2026)

Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




 

Station 860 North (Segment 860 BH)

	

 

 

 

1,874

	

 

 

1846

(28)

	

 

 

1100

(774)

	

 

 

1530

(344)

	

 

 

1846

(28)

	

Sta 563 Joelton: Scrubber Filter Changeout (5/18/2026 - 5/20/2026)

Sta 563 Joelton: Unit 2A - Solar Turbine Exchange (5/11/2026 - 5/22/2026) Sta 860: Annual ESD Test & Maintenance (5/11/2026 - 5/12/2026)

Sta 860: Scrubber/Filter/Separator Clean, Inspect & Filter Change (5/11/2026 - 5/15/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

 

2,685

	

 

 

 

 

 

2392

(293)

	

 

 

 

 

 

1895

(790)

	

 

 

 

 

 

1697

(988)

	

 

 

 

 

 

1697

(988)

	

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026)

MLV 109-3: Crossover to Ln 4 Valve Replacements (5/18/2026 - 5/26/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - AFD (5/19/2026)

MLV 87-3 to MLV 96-3: Pig Run - Cleaning/Gauge (5/14/2026) MLV 87-3 to MLV 96-3: Pig Run - EMAT (5/21/2026) MLV 87-3 to MLV 96-3: Pig Run - MDS (5/26/2026)

MLV 874-2A to MLV 874-2B: Anomaly Remediation (5/18/2026 - 5/30/2026) MLV 874-2B to MLV 874-2: Anomaly Remediation (5/18/2026 - 5/30/2026) Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 




 

 

Station 204

(Segment 204 BH)

	

 

 

 

1,828

	

 

 

1720

(108)

	

 

 

 

1,828

	

 

 

1815

(13)

	

 

 

1270

(558)

	

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026)

MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026) MLV 207-4 to MLV 209-4: Replace MLV 208-4 (M) (5/27/2026 - 6/10/2026) MLV 214-2 to MLV 219-2: Pig Run - EMAT (M) (5/7/2026)

MLV 214-2 to MLV 219-2: Pig Run - MFL-C (M) (5/5/2026)

MLV 214-3 to MLV 215-3: Anomaly Remediation (5/18/2026 - 5/23/2026)




 

 

Station 245

(segment 245 FH)

	

 

 

 

986

	

 

 

 

730

(256)

	

 

 

 

490

(496)

	

 

 

 

490

(496)

	

 

 

 

720

(266)

	

MLV 237-2 to MLV 245-2: Pig Run - CAL/IMU (M) (5/19/2026)

MLV 237-2 to MLV 245-2: Pig Run - Gauge/Cleaning Tool (M) (5/12/2026) MLV 237-2 to MLV 245-2: Pig Run - MFL-A (M) (5/21/2026)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)

Sta 249: Annual ESD Test & Maintenance (5/19/2026 - 5/25/2026) Sta 249: Unit 2A - Crankcase Inspection (5/4/2026 - 5/8/2026)




 

Station 254

(segment 256 FH)

	

 

 

1,203

	

 

 

940

(263)

	

 

 

925

(278)

	

 

 

1,203

	

 

 

630

(573)

	

MLV 254-2 to MLV 261-2: Pig Run - Cal/IMU/MFL-A Combo (5/28/2026)

MLV 254-2 to MLV 261-2: Pig Run - Gauge/Cleaning tool (5/27/2026) MLV 258-1 to MLV 259-1: Anomaly Remediation (4/20/2026 - 5/4/2026) MLV 259-1 to MLV 260-1: Anomaly Remediation (4/20/2026 - 5/4/2026) Sta 254 Nassau: Annual ESD Test (5/12/2026)

Sta 254: Unit 2B - 4k / 8k Service Inspection (5/13/2026 - 5/14/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

1400

(423)

	

Sta 315 Wellsboro: Annual ESD Test (5/26/2026)




Station 321

(segment 321 FH)

	

 

2,102

	

 

1820

(282)

	

 

1820

(282)

	

 

1820

(282)

	

 

2,102

	

Sta 321: Unit 1C - Emergent Repair (4/20/2026 - 5/8/2026)

Sta 323A Lackawaxen: Annual ESD Testing & Valve Replacement (5/4/2026 - 5/7/2026)

Sta. 323A: Unit 1A - ABB Drive Modernization (5/4/2026 - 5/22/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

150

(3)

	

150

(3)

	

150

(3)

	

 

153

	

MLV 342-1 to MLV 343-1: Anomaly Remediation (5/6/2026 - 5/10/2026)

MLV 344-1 to MLV 345-1: Anomaly Remediation (5/16/2026 - 5/20/2026)




 

 

TGP - Outage Impact Report May 2026 (updated 04/23/26)

	

-Primary impact restrictions may be necessary




-Major impact restrictions may be necessary




-Minor impact restrictions may be necessary depending on flow conditions




-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 405 HC Line (segment 299 FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

June 2026 (updated 04/23/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(6/1 - 6/7)

	

Week 2

(6/8 - 6/14)

	

Week 3

(6/15 - 6/21)

	

Week 4

(6/22 - 6/28)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490 FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

760

(362)

	

760

(362)

	

1000

(122)

	

1000

(122)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/28/2026 - 6/9/2026)

MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

930

(148)

	

930

(148)

	

930

(148)

	

925

(153)

	

MLV 26-1 Relocation: Highway 59 Widening (5/16/2026 - 6/2/2026)

MLV 26-2 Relocation: Highway 59 Widening (6/4/2026 - 6/22/2026) MLV 26-3 Relocation: Highway 59 Widening (M) (6/23/2026 - 7/10/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

1330

(13)

	

1300

(43)

	

1330

(13)

	

1330

(13)

	

MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (6/9/2026)

MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




 

 

Station 834

(segment 834 BH)

	

 

 

 

683

	

 

 

 

674

(9)

	

 

 

 

220

(463)

	

 

 

 

220

(463)

	

 

 

 

590

(93)

	

Sta 827 (Alexandria): Annual ESD and Maintenance (6/8/2026 - 6/11/2026)

Sta 827 to Sta 823: Pig Run - Maintenance (M) (6/8/2026) Sta 834 to Sta 827: Pig Run - BH Combo 6/11/26 (M) (6/11/2026)

Sta 834 to Sta 827: Pig Run - BH Hard Spot 6/15/26 (M) (6/15/2026)

Sta 834 to Sta 827: Pig Run - Cleaning / Gauge 6/8/26 to 6/10/26 (M) (6/8/2026 - 6/10/2026)

Sta 834: Scrubber Filter Changeout (6/24/2026 - 6/26/2026) Sta 834: Unit 7A - Turbocharger/Overhaul (5/25/2026 - 6/4/2026)




Station 534 South of Pool (segment 530 BH)

	

 

1,550

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

1635

(12)

	

1635

(12)

	

1635

(12)

	

1635

(12)

	

Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026)

Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)




Station 860

(segment 548 BH)

	

 

1,593

	

1550

(43)

	

 

1,593

	

 

1,593

	

 

1,593

	

MLV 557-3 to MLV 559-3: Pig Runs - Cal / IMU & MFL-A 6/4/26 (6/4/2026)

MLV 557-3 to MLV 559-3: Pig Runs - Cleaning / Gauge 6/2/26 (6/2/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




Station 860 North (Segment 860 BH)

	

 

1,874

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

2,685

	

 

 

 

 

2002

(683)

	

 

 

 

 

1667

(1018)

	

 

 

 

 

2386

(299)

	

 

 

 

 

2393

(292)

	

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026)

MLV 109-3: Crossover to Ln 5 Valve Replacements (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 106 Clay City: Annual ESD Test & Maintenance (6/2/2026 - 6/5/2026) Sta 110 Morehead: Annual ESD Test & Substation Inspection (6/8/2026 - 6/12/2026)

Sta 87: Unit 3D - Power side Overhaul (6/1/2026 - 9/30/2026) Sta 871 Campbellsville: Annual ESD Test (6/23/2026)

Sta 875 Richmond: Annual ESD Test & Maintenance (6/16/2026 - 6/19/2026) Sta. 106: C Building - Install Water Trech System (6/8/2026 - 6/12/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 




Station 200

(segment 200 BH)

	

 

1,766

	

 

1,766

	

 

1,766

	

1485

(281)

	

 

1,766

	

Sta 200 Greenup: Annual ESD Test (6/16/2026 - 6/19/2026)




Station 204

(Segment 204 BH)

	

 

1,828

	

 

1270

(558)

	

 

1270

(558)

	

 

1,828

	

 

1,828

	

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026)

MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026) MLV 207-4 to MLV 209-4: Replace MLV 208-4 (M) (5/27/2026 - 6/10/2026)




 

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

June 2026 (updated 04/23/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(6/1 - 6/7)

	

Week 2

(6/8 - 6/14)

	

Week 3

(6/15 - 6/21)

	

Week 4

(6/22 - 6/28)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 219 to

Station 224

(Segment 219 FH)

	

 

539

	

 

539

	

 

539

	

 

140

(399)

	

 

539

	

MLV 219-1D to MLV 224-1: Pig Run - Maintenance (6/16/2026)




 

Station 245

(segment 245 FH)

	

 

 

986

	

 

830

(156)

	

 

830

(156)

	

 

735

(251)

	

 

830

(156)

	

Sta 241: Annual ESD Test (6/16/2026)

Sta 241: Unit 1B - Oil System (6/2/2026 - 6/4/2026) Sta 241: Unit 2B - Oil System (6/9/2026 - 6/11/2026)

Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026) Sta 249: Unit 2B - 25k Overhaul (6/1/2026 - 6/26/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

965

(188)

	

1110

(43)

	

 

1,153

	

 

1,153

	

Sta 219: Unit 1B - Protective Device Checks & GHG (6/8/2026 - 6/12/2026)

Sta 303A: Annual ESD Test & Maintenance (6/1/2026 - 6/5/2026) Sta 307: Unit 3A - Turbocharger swap (6/8/2026 - 6/12/2026)




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




Station 317

(segment 317 BH)

	

 

1,548

	

900

(648)

	

 

1,548

	

 

1,548

	

 

1,548

	

MLV 317-2 to MLV 315-2: Pig run - Cleaning (6/2/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 329

(segment 324 FH)

	

 

846

	

 

846

	

155

(691)

	

 

846

	

 

846

	

MLV 325-1 to MLV 329-1: Pig runs - Cal/IMU (M) (6/10/2026)

MLV 325-1 to MLV 329-1: Pig runs - Cleaning/Gauge 6/9/26 (M) (6/9/2026) MLV 325-1 to MLV 329-1: Pig runs - MFL-C 6/11/26 (M) (6/11/2026)




Cranston Lateral South

(segment 281

FH)

	

 

187

	

 

187

	

 

187

	

 

187

	

 

150

(37)

	

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Cal/IMU (M) (6/23/2026) ; MLV

265E-101.1 to MLV 265E-104: PIG RUNS - Gauge/Cleaning tool (M) (6/22/2026)

; MLV 265E-101.1 to MLV 265E-104: PIG RUNS - MFL-A (M) (6/24/2026)




Station 405 HC Line (segment 299 FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

July 2026 (updated 04/23/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(6/29 - 7/5)

	

Week 2

(7/6 - 7/12)

	

Week 3

(7/13 - 7/19)

	

Week 4

(7/20 - 7/26)

	

Week 5

(7/27 - 8/2)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490 FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

710

(259)

	

MLV 11-1A to MLV 11-1: Anomaly Remediation (7/27/2026 - 8/14/2026)

MLV 13-1 to MLV 12-1: Anomaly Remediation (7/27/2026 - 8/13/2026) MLV 9-1D to MLV 10-1: Anomaly Remediation (7/27/2026 - 8/14/2026)




Station 17

(segment 117 FH)

	

 

1,122

	

1000

(122)

	

1000

(122)

	

1000

(122)

	

1000

(122)

	

1000

(122)

	

MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

925

(153)

	

925

(153)

	

 

1,078

	

970

(108)

	

 

1,078

	

MLV 26-3 Relocation: Highway 59 Widening (M) (6/23/2026 - 7/10/2026) Sta 25: Annual ESD Test (7/21/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

 

1295

(48)

	

 

1085

(258)

	

 

1105

(238)

	

 

1,343

	

 

1,343

	

MLV 40-1D to MLV 47-1S: Pig Run - Maintenance (7/14/2026) MLV 40-4D to MLV 47-4S: Pig Run - Maintenance (7/9/2026)

MLV 59-3A to MLV 63-3S: Pipe Replacements (7/13/2026 - 7/27/2026) Sta. 47: Unit 1D - 16K hour Overhaul (6/29/2026 - 7/10/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




Station 823 Muskrat Line (segment 509 BH)

	

 

231

	

 

130

(101)

	

 

231

	

 

231

	

 

231

	

 

231

	

Sta 823 to MLV 516: Pig Run - Maintenance (M) (6/30/2026)




MLV 516

Muskrat Line (segment 516 FH)

	

 

241

	

 

241

	

 

100

(141)

	

 

241

	

 

241

	

 

241

	

Sta 523 to MLV 516: Pig Run - Chemical Cleaning / Gauge 7/6/26 to 7/10/26 (M) (7/6/2026 - 7/10/2026)

Sta 523 to MLV 516: Pig Run - MFL-A 7/11/26 (M) (7/11/2026)




Station 534 South of Pool (segment 530 BH)

	

 

1,550

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

1640

(7)

	

1640

(7)

	

1640

(7)

	

1640

(7)

	

1640

(7)

	

Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026)




Station 860

(segment 548 BH)

	

 

1,593

	

 

1,593

	

 

1,593

	

 

1,593

	

1430

(163)

	

 

1,593

	

Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (7/21/2026 - 7/22/2026)




Station 860 North

(Segment 860 BH)

	

 

1,874

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

2,685

	

 

 

 

 

 

2534

(151)

	

 

 

 

 

 

1735

(950)

	

 

 

 

 

 

1735

(950)

	

 

 

 

 

 

1735

(950)

	

 

 

 

 

 

1735

(950)

	

MLV 107-7 to 110-7: Valve Installation & Crossover Work (7/6/2026 - 7/27/2026) MLV 109-4 to 110-4: Valve Installation & Crossover Work (7/28/2026 - 8/11/2026)

MLV 109-4 to MLV 110-4: Pipe Replacement (7/7/2026 - 7/21/2026) MLV 109-7 to MLV 110-7: Pipe Replacement (7/28/2026 - 8/4/2026)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 87: Unit 3D - Power side Overhaul (6/1/2026 - 9/30/2026)

Sta 96 Campbellsville: Annual ESD Test (7/21/2026 - 7/22/2026)

Sta 96 Campbellsville: Annual Substation Inspection (7/21/2026 - 7/24/2026) Sta 96: Unit 2D Replace Compressor Valves (7/5/2026 - 7/9/2026)




Station 114

(segment 114 BH)

	

 

907

	

600

(307)

	

 

907

	

 

907

	

 

907

	

 

907

	

Sta 114: Unit 1D - Solar Turbine Inspection (6/29/2026 - 7/1/2026)




Station 204

(Segment 204 BH)

	

 

1,828

	

 

1,828

	

 

1,828

	

 

1,828

	

 

1,828

	

 

1,828

	

 




Station 230C (segment 296

FH)

	

 

743

	

 

743

	

 

743

	

370

(373)

	

 

743

	

 

743

	

Sta 230C: Annual ESD (M) (7/13/2026 - 7/14/2026)




Station 237

(segment 237 FH)

	

 

1,006

	

 

1,006

	

 

1,006

	

 

1,006

	

780

(226)

	

 

1,006

	

MLV 237-1 to MLV 245-1: Pig Run - Cleaning/Gauge (7/20/2026) MLV 237-1 to MLV 245-1: Pig Run - MFL-C (7/22/2026)




Station 245

(segment 245 FH)

	

 

986

	

 

970

(16)

	

 

970

(16)

	

 

760

(226)

	

 

970

(16)

	

 

970

(16)

	

Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026) Sta 245-1 to MLV 249-1: Pig Run - Cal/IMU (7/15/2026)

Sta 245-1 to MLV 249-1: Pig Run - Gauge/Cleaning tool (7/14/2026) Sta 245-1 to MLV 249-1: Pig Run - MFL-C (7/16/2026)




MLV 256 West

(segment 249 FH)

	

 

1,203

	

 

1,203

	

 

1,203

	

 

1,203

	

1080

(123)

	

 

1,203

	

MLV 249-3A to MLV 251-3: Pig Run - Cal/IMU/MFL-A Combo (7/21/2026)

MLV 249-3A to MLV 251-3: Pig Run - Gauge/Cleaning tool (7/20/2026)




 

 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

July 2026 (updated 04/23/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(6/29 - 7/5)

	

Week 2

(7/6 - 7/12)

	

Week 3

(7/13 - 7/19)

	

Week 4

(7/20 - 7/26)

	

Week 5

(7/27 - 8/2)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




 

Station 307

(segment 307 BH)

	

 

 

1,153

	

 

 

1,153

	

 

 

1,153

	

 

 

1,153

	

 

1115

(38)

	

 

1115

(38)

	

Sta 219: Unit 1B - Save Air System (7/20/2026 - 7/31/2026)

Sta 307: Unit 1A - Protective Device Checks (7/20/2026 - 7/24/2026) Sta 307: Unit 2A - Protective Device Checks (7/20/2026 - 7/24/2026) Sta 307: Unit 3A - Protective Device Checks (7/20/2026 - 7/24/2026) Sta 307: Unit 4A - Protective Device Checks (7/20/2026 - 7/24/2026)




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




Station 321

(segment 321 FH)

	

 

2,102

	

 

2,102

	

 

2,102

	

 

2,102

	

1715

(387)

	

 

2,102

	

Sta 321: Station Valves for ESD System (7/21/2026 - 7/23/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

1735

(32)

	

 

1,767

	

 

1,767

	

 

1,767

	

Sta 325: Units 4A - Water Wash & Borescope (7/6/2026 - 7/7/2026)




Station 405 HC Line (segment 299 FH)

	

 

794

	

 

794

	

 

680

(114)

	

 

794

	

 

794

	

 

794

	

Sta 405A: Annual ESD Test / Filter Scrubber (7/7/2026 - 7/9/2026)




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-23-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/23/2026 3:53:50PM	Notice End Date/Time:  04/24/2026 9:00:00am
Post Date/Time:  4/23/2026 3:53:50 PM	Notice ID: 400844
Reqrd Rsp:  1	Rsp Date:  04/23/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-23-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Thursday, April 23, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

NONE

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 42,172 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 26,809 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 346,897 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 210,660 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 211,224 Dths

·         STA 317 (Segment 317 BH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 59,374 Dths

·         STA 321 (Segment 321 FH) - through approx 54% of SOP increases due to nominations in excess of operational capacity; 83,046 Dths

·         Z5 HC North (Segment 299 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 183,357 Dths

·         STA 245 (Segment 245 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 203,250 Dths

·         STA 249 (Segment 249 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 125,782 Dths

·         MLV 273 (Segment 284 FH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 80,730 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Gulf South Pipeline

Update: Index 131 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038039
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-23T10:13:00+00:00
Effective: 2026-05-05T09:00:00+00:00
End: 2026-05-15T09:00:00+00:00
Subject: Update: Index 131 Pipeline Maintenance

Gulf South Pipeline Notice 5038039
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038039
Prior Notice :
5037842
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 131 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
04/23/2026 10:13:00 AM
Notice Effective Date/Time :
05/05/2026 09:00:00 AM
Notice End Date/Time :
05/15/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Revised beginning and end date.
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South will be performing maintenance at Index 131.
The following scheduling groups will be subject to impact:
Abbeville Deliveries Scheduling Group
Capacity could be impacted by as much as 7,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
No impact anticipated to net zero nominations between receipt and delivery points located south
of Lafayette Yard that are fed by Index 205-7.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/23/2026 10:13:22 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/23/2026 10:13:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/05/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
05/15/2026 09:00:00 AM
Notice ID :
5038039
Response Date/Time :
Prior Notice :
5037842
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 131 Pipeline Maintenance
Notice Text :
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Revised beginning and end date.
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South will be performing maintenance at Index 131.
The following scheduling groups will be subject to impact:
Abbeville Deliveries Scheduling Group
Capacity could be impacted by as much as 7,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
No impact anticipated to net zero nominations between receipt and delivery points located south
of Lafayette Yard that are fed by Index 205-7.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/23/2026 10:13:22 AM
Page 1 of 1
Gulf South Pipeline

Update: Black Creek Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038045
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-23T15:48:00+00:00
Effective: 2026-04-27T09:00:00+00:00
End: 2026-04-29T09:00:00+00:00
Subject: Update: Black Creek Compressor Station Maintenance 

Gulf South Pipeline Notice 5038045
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038045
Prior Notice :
5037489
Reqrd Rsp Desc :
No response required
Subject :
Update: Black Creek Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
04/23/2026 03:48:00 PM
Notice Effective Date/Time :
04/27/2026 09:00:00 AM
Notice End Date/Time :
04/29/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised End Date:
-------------------------------------------------------------------------------------------------
-----
Revised End Date:
-------------------------------------------------------------------------------------------------
-----
Gulf South will be performing maintenance at Black Creek Compressor Station.
The work is to be completed during a third party outage.
No impact is expected for the following location:
- Loc 24529 (Plant Morrow - Cooperative Energy)
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/23/2026 3:49:06 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/23/2026 03:48:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/27/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/29/2026 09:00:00 AM
Notice ID :
5038045
Response Date/Time :
Prior Notice :
5037489
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Black Creek Compressor Station Maintenance
Notice Text :
Revised End Date:
-------------------------------------------------------------------------------------------------
-----
Revised End Date:
-------------------------------------------------------------------------------------------------
-----
Gulf South will be performing maintenance at Black Creek Compressor Station.
The work is to be completed during a third party outage.
No impact is expected for the following location:
- Loc 24529 (Plant Morrow - Cooperative Energy)
If you have any questions, please contact your customer service representative.
04/23/2026 3:49:06 PM
Page 1 of 1
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 40 1D EFF 4-22-26

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/22/2026 9:02:15AM	Notice End Date/Time:  04/23/2026 9:00:00am
Post Date/Time:  4/22/2026 9:02:15 AM	Notice ID: 400810
Reqrd Rsp:  1	Rsp Date:  04/22/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  EMERGENT REPAIR AT STA 40 1D EFF 4-22-26
Notice Text:

 

EMERGENT REPAIR AT STA 40 UNIT 1D EFFECTIVE 4-22-2026

 

Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of an emergent repair issue at Station 40 near Natchitoches, LA.  Tennessee has discovered an issue with Unit 1D which necessitates repairs.   Tennessee estimates the current impact to be up to 350,000 Dths. Based upon current demand and nominations, Secondary Out of the Path nominations pathed through Segment 132 FH may be at risk as early as Timely Cycle for the gas day of Thursday, April 23, 2026 and until further notice.  Previously scheduled volumes will not be curtailed for the current gas day of April 22, 2026; however, increases pathed through STA 40 South of Carthage (Segment 132 FH) for the remainder of the gas day are at risk. 

 

Updates will be posted as more information becomes available.

 

Please contact your Scheduler if you have any questions.

 

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-22-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/22/2026 7:44:15PM	Notice End Date/Time:  04/23/2026 9:00:00am
Post Date/Time:  4/22/2026 7:44:15 PM	Notice ID: 400828
Reqrd Rsp:  1	Rsp Date:  04/22/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-22-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Wednesday, April 22, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 19,746 Dths

·         STA 245 (Segment 245 FH) - through approx 51% of SOP increases due to nominations in excess of operational capacity; 14,361 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Gulf South Pipeline

Posted Maintenance Events for 04/17/2026 - 04/23/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037995
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-15T11:47:00+00:00
Effective: 2026-04-17T09:00:00+00:00
End: 2026-04-24T09:00:00+00:00
Subject: Posted Maintenance Events for 04/17/2026 - 04/23/2026
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 321 1C EFF 4-21

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/21/2026 3:19:27PM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 3:19:27 PM	Notice ID: 400797
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  EMERGENT REPAIR AT STA 321 1C EFF 4-21
Notice Text:

 

EMERGENT REPAIR AT STA 321 UNIT 1C EFFECTIVE 4- 21-2026

 

Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of an emergent repair issue at Station 321 near West Clifford, PA.  Tennessee has discovered an issue with Unit 1C which necessitates repairs.   Tennessee estimates the current impact to be up to 250,000 Dths. Based upon current demand and nominations, Secondary Out of the Path nominations pathed through Segment 321 FH may be at risk as early as Timely Cycle for the gas day of Thursday, April 23, 2026 and until further notice.  Previously scheduled volumes will not be curtailed for the current gas days of April 21, 2026 or April 22, 2026; however, increases pathed through STA 321 (Segment 321 FH) for the remainder of these gas days are at risk. 

 

Updates will be posted as more information becomes available.

 

Please contact your Scheduler if you have any questions.

 

 

...
East Tennessee Natural Gas

04/21/2026- ETNG Action Alert -- LIFTED EFF 4/21

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- LIFTED EFF 4/21
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/21/2026
Notice End Date: 07/20/2026
Posting Date: 04/21/2026
Notice Identifier: 176873
Prior Notice Identifier: 176722
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 20
Gas Day April 21 and until further notice
System Wide
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO or Action Alert*
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO*
Gulf South Pipeline

Update: Black Creek Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037489
Notice Type: Maintenance
Status: Supersede
Posted: 2026-01-19T21:48:00+00:00
Effective: 2026-04-27T09:00:00+00:00
End: 2026-04-28T09:00:00+00:00
Subject: Update: Black Creek Compressor Station Maintenance 

Gulf South Pipeline Notice 5037489
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037489
Prior Notice :
5037454
Reqrd Rsp Desc :
No response required
Subject :
Update: Black Creek Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
01/19/2026 09:48:00 PM
Notice Effective Date/Time :
04/27/2026 09:00:00 AM
Notice End Date/Time :
04/28/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised End Date:
-------------------------------------------------------------------------------------------------
-----
Gulf South will be performing maintenance at Black Creek Compressor Station.
The work is to be completed during a third party outage.
No impact is expected for the following location:
- Loc 24529 (Plant Morrow - Cooperative Energy)
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
01/19/2026 9:48:26 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
01/19/2026 09:48:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/27/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/28/2026 09:00:00 AM
Notice ID :
5037489
Response Date/Time :
Prior Notice :
5037454
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Black Creek Compressor Station Maintenance
Notice Text :
Revised End Date:
-------------------------------------------------------------------------------------------------
-----
Gulf South will be performing maintenance at Black Creek Compressor Station.
The work is to be completed during a third party outage.
No impact is expected for the following location:
- Loc 24529 (Plant Morrow - Cooperative Energy)
If you have any questions, please contact your customer service representative.
01/19/2026 9:48:26 PM
Page 1 of 1
Gulf South Pipeline

Carthage #2 Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037655
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-10T14:03:00+00:00
Effective: 2026-03-30T09:00:00+00:00
End: 2026-05-01T09:00:00+00:00
Subject: Carthage #2 Compressor Station Maintenance
Gulf South Pipeline

Update: Index 129 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037986
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-13T17:35:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-10T09:00:00+00:00
Subject: Update: Index 129 Pipeline Maintenance
Gulf South Pipeline

Petal Compressor and Storage Field Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037988
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-13T17:44:00+00:00
Effective: 2026-04-13T17:45:00+00:00
End: 2026-05-05T09:00:00+00:00
Subject: Petal Compressor and Storage Field Maintenance
Gulf South Pipeline

Update: Westlake Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037989
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-13T17:56:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-23T09:00:00+00:00
Subject: Update: Westlake Compressor Station Maintenance
Gulf South Pipeline

Update: Index 129 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037991
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-14T08:59:00+00:00
Effective: 2026-05-10T09:00:00+00:00
End: 2026-05-21T09:00:00+00:00
Subject: Update: Index 129 Pipeline Maintenance
Gulf South Pipeline

Montz Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037993
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-14T13:42:00+00:00
Effective: 2026-04-21T09:00:00+00:00
End: 2026-04-22T09:00:00+00:00
Subject: Montz Compressor Station Maintenance
Gulf South Pipeline

Index 330 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037994
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-14T15:17:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-07-01T09:00:00+00:00
Subject: Index 330 Pipeline Maintenance
Gulf South Pipeline

Index 819-2 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038014
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-21T09:13:00+00:00
Effective: 2026-04-22T09:00:00+00:00
End: 2026-04-23T09:00:00+00:00
Subject: Index 819-2 Meter Maintenance 

Gulf South Pipeline Notice 5038014
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5038014
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Index 819-2 Meter Maintenance
TSP :
078444247
Post Date/Time :
04/21/2026 09:13:00 AM
Notice Effective Date/Time :
04/22/2026 09:00:00 AM
Notice End Date/Time :
04/23/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Index 819-2 Meter.
The following point will be shut-in for the duration of the maintenance:
- Loc 24421 (Bennington (From Midship))
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please reach out to your customer service representative.
Notice
Page 1 of 1
04/21/2026 9:13:23 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/21/2026 09:13:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/22/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
04/23/2026 09:00:00 AM
Notice ID :
5038014
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 819-2 Meter Maintenance
Notice Text :
Gulf South will be performing maintenance at Index 819-2 Meter.
The following point will be shut-in for the duration of the maintenance:
- Loc 24421 (Bennington (From Midship))
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please reach out to your customer service representative.
04/21/2026 9:13:23 AM
Page 1 of 1
Gulf South Pipeline

Update: Rodrigue Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5038031
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-21T10:08:00+00:00
Effective: 2026-04-21T10:10:00+00:00
End: 2026-04-26T09:00:00+00:00
Subject: Update: Rodrigue Compressor Station Maintenance

Gulf South Pipeline Notice 5038031
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5038031
Prior Notice :
5038030
Reqrd Rsp Desc :
No response required
Subject :
Update: Rodrigue Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
04/21/2026 10:08:00 AM
Notice Effective Date/Time :
04/21/2026 10:10:00 AM
Notice End Date/Time :
04/26/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South is performing maintenance at the Rodrigue Compressor Station.
The following groups are subject to impact:
-Bayou Sale to Napoleonville Scheduling Group
Gas Day 4/5:
Capacity could be impacted by as much as 35,000 Dth/d for the duration of the maintenance.
Gas Day 4/6-4/25:
Capacity could be impacted by as much as 100,000 Dth/d for the duration of the maintenance.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/21/2026 10:08:48 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/21/2026 10:08:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/21/2026 10:10:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/26/2026 09:00:00 AM
Notice ID :
5038031
Response Date/Time :
Prior Notice :
5038030
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Rodrigue Compressor Station Maintenance
Notice Text :
Updated Date Range:
-------------------------------------------------------------------------------------------------
----------------------------------
Updated Description:
-------------------------------------------------------------------------------------------------
----------------------------------
Gulf South is performing maintenance at the Rodrigue Compressor Station.
The following groups are subject to impact:
-Bayou Sale to Napoleonville Scheduling Group
Gas Day 4/5:
Capacity could be impacted by as much as 35,000 Dth/d for the duration of the maintenance.
Gas Day 4/6-4/25:
Capacity could be impacted by as much as 100,000 Dth/d for the duration of the maintenance.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/21/2026 10:08:48 AM
Page 1 of 1
CPL

Cove Point Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008121
Subject: Cove Point Restrictions Revision
Notice Type: Notices
Posted: 2026-01-16T12:48:49.111
Effective: 2026-01-17T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
CPL

Cove Point System Alert

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008173
Subject: Cove Point System Alert
Notice Type: Notices
Posted: 2026-01-20T14:07:01.724
Effective: 2026-01-20T14:07:01.724
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Maintenance
CPL

LTS Unavailability

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008218
Subject: LTS Unavailability
Notice Type: Notices
Posted: 2026-01-23T14:40:38.854
Effective: 2026-01-24T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Other
tspDefinedNoticeTypeDescription: Pipeline Conditions
CPL

Pleasant Valley Station Unit #7 Returned to Service

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008256
Subject: Pleasant Valley Station Unit #7 Returned to Service
Notice Type: Notices
Posted: 2026-01-26T13:31:33.857
Effective: 2026-01-26T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Maintenance
tspDefinedNoticeTypeDescription: Pipeline Conditions
CPL

Cove Point OFO Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008457
Subject: Cove Point OFO Termination
Notice Type: Notices
Posted: 2026-02-10T12:40:28.169
Effective: 2026-02-10T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
CPL

Cove Point Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008460
Subject: Cove Point Restrictions Termination
Notice Type: Notices
Posted: 2026-02-10T13:39:57.675
Effective: 2026-02-10T20:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Maintenance
CPL

Cove Point Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008466
Subject: Cove Point Restrictions Termination
Notice Type: Notices
Posted: 2026-02-10T19:34:39.872
Effective: 2026-02-10T19:34:39.872
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
CPL

Cove Point System Alerts Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008485
Subject: Cove Point System Alerts Termination
Notice Type: Notices
Posted: 2026-02-12T12:53:27.206
Effective: 2026-02-13T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
CPL

Cove Point System Alerts Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008487
Subject: Cove Point System Alerts Termination
Notice Type: Notices
Posted: 2026-02-12T12:56:07.132
Effective: 2026-02-13T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
CPL

Cove Point Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008713
Subject: Cove Point Restrictions Revision
Notice Type: Notices
Posted: 2026-03-01T16:07:43.385
Effective: 2026-03-02T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Maintenance
CPL

Cove Point Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008750
Subject: Cove Point Restrictions Termination
Notice Type: Notices
Posted: 2026-03-04T12:14:47.655
Effective: 2026-03-04T20:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Maintenance
CPL

Cove Point Restrictions Termination - Revised

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008770
Subject: Cove Point Restrictions Termination - Revised
Notice Type: Notices
Posted: 2026-03-05T20:00:06.599
Effective: 2026-03-05T20:00:06.599
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

Leidy Area Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009780
Subject: Leidy Area Restrictions Revision
Notice Type: Notices
Posted: 2026-01-15T22:27:19.739
Effective: 2026-01-19T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Cornwell and Clarington Restrictions

SEV 2/5
Capacity Constraint

EGTS issued a critical notice on January 26, 2026, effective January 28, 2026, citing capacity constraints at Cornwell and Clarington locations on the Eastern Gas Transmission and Storage system. No specific capacity volumes, curtailment levels, or restoration timeline are provided in the notice text. Insufficient detail to assess market impact beyond a localized Appalachian constraint.

No capacity volume or curtailment detail provided; monitor for follow-on revisions, but this notice alone offers no actionable basis signal at Dominion South or TETCO M2.
Reroute: Moderate: TCO and Equitrans serve overlapping Appalachian markets in the WV/PA/OH corridor, providing partial reroute options if volumes are specified in a subsequent revision.
View original notice text
Pipeline: EGTS
Notice ID: 1009950
Subject: Cornwell and Clarington Restrictions
Notice Type: Notices
Posted: 2026-01-26T16:58:24.034
Effective: 2026-01-28T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

January 2026 Balancing Services

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009951
Subject: January 2026 Balancing Services
Notice Type: Notices
Posted: 2026-01-26T17:27:55.752
Effective: 2026-01-26T17:27:55.752
subcategory: Critical
naesbNoticeTypeDescription: Storage
tspDefinedNoticeTypeDescription: Imbalance Resolution
EGTS

OFO – Under Performance Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010062
Subject: OFO – Under Performance Revision
Notice Type: Notices
Posted: 2026-02-02T18:02:39.855
Effective: 2026-02-03T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Over-Under Performance
EGTS

System Alert – Inventory Transfers

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1009990
Subject: System Alert – Inventory Transfers
Notice Type: Notices
Posted: 2026-02-03T16:59:34.548
Effective: 2026-02-03T16:59:34.548
revision: 5
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

System Alert – Inventory Transfers

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010079
Subject: System Alert – Inventory Transfers
Notice Type: Notices
Posted: 2026-02-03T17:25:23.473
Effective: 2026-02-03T17:25:23.473
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO – Under Performance Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010177
Subject: OFO – Under Performance Termination
Notice Type: Notices
Posted: 2026-02-10T12:43:18.305
Effective: 2026-02-10T18:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Over-Under Performance
EGTS

February 2026 Balancing Services

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010185
Subject: February 2026 Balancing Services
Notice Type: Notices
Posted: 2026-02-10T15:16:12.5
Effective: 2026-02-10T15:16:12.5
subcategory: Critical
naesbNoticeTypeDescription: Storage
tspDefinedNoticeTypeDescription: Imbalance Resolution
EGTS

Leidy Area Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010193
Subject: Leidy Area Restrictions Revision
Notice Type: Notices
Posted: 2026-02-10T19:24:27.21
Effective: 2026-02-11T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Southern and Central City Gate Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010194
Subject: Southern and Central City Gate Restrictions Termination
Notice Type: Notices
Posted: 2026-02-10T19:32:28.897
Effective: 2026-02-11T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

PL-1 Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010206
Subject: PL-1 Restrictions Revision
Notice Type: Notices
Posted: 2026-02-11T13:49:19.754
Effective: 2026-02-11T20:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010223
Subject: PL-1 Restrictions Termination
Notice Type: Notices
Posted: 2026-02-12T12:21:12.069
Effective: 2026-02-13T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Northern Area Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010224
Subject: Northern Area Restrictions Termination
Notice Type: Notices
Posted: 2026-02-12T12:47:15.357
Effective: 2026-02-14T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO ADVISORY Northern FTNN Hourly Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010225
Subject: OFO ADVISORY Northern FTNN Hourly Terminated
Notice Type: Notices
Posted: 2026-02-12T13:01:14.46
Effective: 2026-02-13T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO ADVISORY PL-1 FTNN Hourly Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010226
Subject: OFO ADVISORY PL-1 FTNN Hourly Terminated
Notice Type: Notices
Posted: 2026-02-12T13:04:17.842
Effective: 2026-02-13T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Southern and Central City Gate Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010414
Subject: Southern and Central City Gate Restrictions Termination
Notice Type: Notices
Posted: 2026-02-24T12:55:36.503
Effective: 2026-02-25T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

OFO – Under Performance Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010428
Subject: OFO – Under Performance Termination
Notice Type: Notices
Posted: 2026-02-25T13:02:03.281
Effective: 2026-02-25T18:00:00
subcategory: Critical
naesbNoticeTypeDescription: OFO
tspDefinedNoticeTypeDescription: Over-Under Performance
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010429
Subject: PL-1 Restrictions Termination
Notice Type: Notices
Posted: 2026-02-25T13:04:05.635
Effective: 2026-02-26T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010545
Subject: PL-1 Restrictions Termination
Notice Type: Notices
Posted: 2026-03-04T12:18:52.547
Effective: 2026-03-04T20:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Northern Area Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010546
Subject: Northern Area Restrictions Termination
Notice Type: Notices
Posted: 2026-03-04T12:21:06.607
Effective: 2026-03-04T20:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Leidy Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010619
Subject: Leidy Area Restrictions Terminated
Notice Type: Notices
Posted: 2026-03-09T13:14:44.289
Effective: 2026-03-09T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

Oakford Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010620
Subject: Oakford Area Restrictions Terminated
Notice Type: Notices
Posted: 2026-03-09T13:16:40.53
Effective: 2026-03-09T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

Valley Gate and PL-1 Restriction Guidance Reminder

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010640
Subject: Valley Gate and PL-1 Restriction Guidance Reminder
Notice Type: Notices
Posted: 2026-03-10T13:06:17.01
Effective: 2026-03-10T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Leidy Area Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010672
Subject: Leidy Area Restrictions Revision
Notice Type: Notices
Posted: 2026-03-12T19:00:23.87
Effective: 2026-03-16T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

TL-360 Receipt Capacity Restriction Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010683
Subject: TL-360 Receipt Capacity Restriction Termination
Notice Type: Notices
Posted: 2026-03-13T13:01:37.709
Effective: 2026-03-13T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
EGTS

System Alert Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010741
Subject: System Alert Termination
Notice Type: Notices
Posted: 2026-03-17T12:57:50.731
Effective: 2026-03-17T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

System Alert Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010764
Subject: System Alert Termination
Notice Type: Notices
Posted: 2026-03-18T15:37:35.688
Effective: 2026-03-18T15:37:35.688
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Northern Area Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010774
Subject: Northern Area Restrictions Termination
Notice Type: Notices
Posted: 2026-03-19T12:16:52.977
Effective: 2026-03-20T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010777
Subject: PL-1 Restrictions Termination
Notice Type: Notices
Posted: 2026-03-19T12:45:26.364
Effective: 2026-03-20T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Oakford Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010791
Subject: Oakford Area Restrictions Terminated
Notice Type: Notices
Posted: 2026-03-20T12:00:17.769
Effective: 2026-03-21T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Leidy Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010792
Subject: Leidy Area Restrictions Terminated
Notice Type: Notices
Posted: 2026-03-20T12:02:54.831
Effective: 2026-03-21T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Return to One Operational Impact Area

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010795
Subject: Return to One Operational Impact Area
Notice Type: Notices
Posted: 2026-03-20T12:37:07.272
Effective: 2026-04-01T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Pipeline Conditions
EGTS

Valley Gate Restriction Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010865
Subject: Valley Gate Restriction Termination
Notice Type: Notices
Posted: 2026-03-25T12:49:44.639
Effective: 2026-03-30T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Cornwell and Clarington Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010876
Subject: Cornwell and Clarington Restrictions Termination
Notice Type: Notices
Posted: 2026-03-26T11:43:23.476
Effective: 2026-03-30T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Valley Gate and PL-1 Restriction Guidance Reminder Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010943
Subject: Valley Gate and PL-1 Restriction Guidance Reminder Terminated
Notice Type: Notices
Posted: 2026-03-30T14:02:29.902
Effective: 2026-03-30T14:02:29.902
subcategory: Critical
naesbNoticeTypeDescription: Capacity Constraint
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Over-Injection and T-pool Balancing Advisory Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010944
Subject: Over-Injection and T-pool Balancing Advisory Terminated
Notice Type: Notices
Posted: 2026-03-30T14:08:45.725
Effective: 2026-03-30T14:08:45.725
revision: 1
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Capacity Constraint
EGTS

System Alert – Limited Flexibility Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010942
Subject: System Alert – Limited Flexibility Terminated
Notice Type: Notices
Posted: 2026-03-30T14:09:24.252
Effective: 2026-03-30T14:09:24.252
revision: 1
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
tspDefinedNoticeTypeDescription: Pipeline Conditions
EGTS

Tennessee Gas Pipeline EDI Issue

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1011117
Subject: Tennessee Gas Pipeline EDI Issue
Notice Type: Notices
Posted: 2026-04-09T18:19:23.748
Effective: 2026-04-09T18:19:23.748
subcategory: Critical
naesbNoticeTypeDescription: Scheduling Alert
Northwest Pipeline

Stage III (13%) Overrun Entitlement Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Stage III (13%) Overrun Entitlement Lifted
Notice ID: 32630

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-013

Stage III (13%) Overrun Entitlement Lifted

 posted on
 
Jan 26 2026 10:07AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 01/26/2026 10:04 AM MCT
Notice Eff D/T: 01/26/2026 10:04 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-013
Prior Notice: 26-007
Subject: Stage III (13%) Overrun Entitlement Lifted

Notice Text:

Effective Gas Day January 28, 2026, Northwest is lifting the 
Stage III (13%) Overrun Entitlement for all Receiving Parties 
north of the Kemmerer compressor station that was originally 
issued in All Shipper’s Notice 26-007.
Northwest requests that shippers continue to be diligent in 
managing their supply and demand needs.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Chehalis Compressor Station Deficiency Period

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis Compressor Station Deficiency Period
Notice ID: 32648

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-020

Chehalis Compressor Station Deficiency Period

 posted on
 
Feb 6 2026 3:37PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 02/06/2026 3:33 PM MCT
Notice Eff D/T: 02/06/2026 3:33 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-020
Prior Notice: 
Subject: Chehalis Compressor Station Deficiency Period

Notice Text:

As indicated in All Shippers Notice #26-019, Northwest is 
currently experiencing unplanned maintenance at the Chehalis 
compressor station. 
Primary southbound nomination requests at the Chehalis 
compressor have exceeded the available capacity of 500,000 
Dth/d southbound (or whatever Northwest cannot mitigate). 
Therefore, pursuant to Sections 10.2 and 10.3 of Rate Schedule 
TF-1 in Northwest's Tariff, Northwest hereby gives notice of a 
Deficiency Period for Gas Day February 07, 2026. The Deficiency 
will be calculated based on a design capacity of 672,000 Dth/d 
southbound. The Deficiency Period will continue until the work 
is completed. Northwest will post on its EBB if unable to 
mitigate volumes each day until the work is completed.
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per
Notice ID: 32651

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-021

Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per

 posted on
 
Feb 9 2026 8:03AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: MAINTENANCE
Post D/T: 02/09/2026 7:51 AM MCT
Notice Eff D/T: 02/09/2026 7:51 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-021
Prior Notice: 26-020
Subject: Chehalis Unplanned Maintenance Complete, Chehalis OFO Lifted, and Deficiency Per

Notice Text:

Northwest is pleased to inform customers that repairs on
Chehalis Unit 2, as referenced in Notice #26-019, will be
complete today. Effective Gas Day 10 the Recall Advisory and
Operational Flow Order at the Chehalis CS will be lifted. 
Northwest will accept nominations up to 800,000 Dth/d
southbound through Chehalis CS starting Timely cycle on Gas
Day February 10, 2026. This will also end the current
Deficiency Period.
If you have any questions, please contact your Commercial 
Services Representative or the hotline at 713-215-6301.
Northwest Pipeline

Meacham OFO Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32655

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-024

Meacham OFO Lifted

 posted on
 
Feb 16 2026 9:07AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 02/16/2026 9:07 AM MCT
Notice Eff D/T: 02/16/2026 9:07 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-024
Prior Notice: 26-002
Subject: Meacham OFO Lifted

Notice Text:

Effective Gas Day February 16, 2026, the Recall Advisory and 
Operational Flow Order at the Meacham compressor (Notice 26-
0002) will be lifted.
If you have any questions, please contact your Commercial 
Services Representative or the Hotline at 713-215-6301.
Northwest Pipeline

Meacham OFO Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Meacham OFO Lifted
Notice ID: 32672

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-030

Meacham OFO Lifted

 posted on
 
Mar 1 2026 1:34PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: OPERATIONAL FLOW ORDER
Post D/T: 03/01/2026 1:34 PM MCT
Notice Eff D/T: 03/01/2026 1:34 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-030
Prior Notice: 26-026
Subject: Meacham OFO Lifted

Notice Text:

Effective Gas Day March 1, 2026, the Recall Advisory 
and Operational Flow Order at the Meacham compressor 
(Notice 26-026) will be lifted.
 
If you have any questions, please contact your Commercial 
Services Representative or the Hotline at 713-215-6301.
Northwest Pipeline

Jackson Prairie Maintenance complete and Entitlement Lifted

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Jackson Prairie Maintenance complete and Entitlement Lifted
Notice ID: 32690

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-039

Jackson Prairie Maintenance complete and Entitlement Lifted

 posted on
 
Mar 14 2026 5:03PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: MAINTENANCE
Post D/T: 03/14/2026 5:03 PM MCT
Notice Eff D/T: 03/14/2026 5:03 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-039
Prior Notice: 26-038
Subject: Jackson Prairie Maintenance complete and Entitlement Lifted

Notice Text:

Puget Sound Energy (PSE), operator of the Jackson Prairie (JP)
storage facility, has notified Northwest that the maintenance to repair 
a malfunctioning component has been completed. 
Normal withdrawal and injection nominations can commence. 
 
Because of the increased flexibility with the full return of JP, Northwest is
lifting the Stage II (8%) Underrun Entitlement for all
receiving Parties north of the Kemmerer compressor station effective immediately.
 
Please remain diligent in managing supply and demand. 
 
If you have any questions, please contact your Commercial
Services representative or the Hotline at 713-215-6301.
Texas Gas Transmission

Maintenance Location Acadian Rapides 9194

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037840
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-20T11:20:00+00:00
Effective: 2026-03-20T11:21:00+00:00
End: 
Subject: Maintenance Location Acadian Rapides 9194

Texas Gas Transmission Notice 5037840
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Texas Gas Transmission, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037840
Prior Notice :
5037839
Reqrd Rsp Desc :
No response required
Subject :
Maintenance Location Acadian Rapides 9194
TSP :
115972101
Post Date/Time :
03/20/2026 11:20:00 AM
Notice Effective Date/Time :
03/20/2026 11:21:00 AM
Notice End Date/Time :
Response Date/Time :
Critical :
Notice Text :
Texas Gas Transmission, LLC will be performing maintenance near Location Name: Acadian Rapides,
Location Number: 9194, which will result in an outage beginning March 20, 2026. During this
maintenance period, capacity will be reduced to 0 MMBtu/d at this meter location.
Notice
Page 1 of 1
03/20/2026 11:20:32 AM
Notice
TSP Name :
Texas Gas Transmission, LLC
TSP :
115972101
Category :
Critical
Post Date/Time :
03/20/2026 11:20:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/20/2026 11:21:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
Notice ID :
5037840
Response Date/Time :
Prior Notice :
5037839
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Maintenance Location Acadian Rapides 9194
Notice Text :
Texas Gas Transmission, LLC will be performing maintenance near Location Name: Acadian Rapides,
Location Number: 9194, which will result in an outage beginning March 20, 2026. During this
maintenance period, capacity will be reduced to 0 MMBtu/d at this meter location.
03/20/2026 11:20:32 AM
Page 1 of 1
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-16-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/16/2026 11:06:07AM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 11:06:07 AM	Notice ID: 400677
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-16-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Thursday, April 16, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 12,939 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 12,823 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 212,939 Dths

·         STA 315 (Segment 315 BH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 338,776 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 72,536 Dths

·         MLV 330 (Segment 324 FH) - through approx 56% of SOP increases due to nominations in excess of operational capacity; 29,873 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 191,279 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 271,328 Dths

·         STA 249 (Segment 249 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 136,106 Dths

·         MLV 256 East (Segment 256 FH) - through approx 89% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 11,815 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 44,077 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 226,493 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/16/2026 2:29:05PM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 2:29:05 PM	Notice ID: 400684
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

 

	

 

	

 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

Seven Day Forecast (updated 04/16/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station / Seg

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Monday

(4/20)

	

Tuesday

(4/21)

	

Wednesday

(4/22)

	

Thursday

(4/23)

	

Friday

(4/24)

	

Saturday

(4/25)

	

Sunday

(4/26)

	

 

Primary Outage(s) that may Impact Throughput




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490

FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 25

(segment 125 FH)

	

 

1,078

	

 

1,078

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

1060

(18)

	

MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter (4/21/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

1040

(235)

	

1040

(235)

	

1040

(235)

	

1040

(235)

	

1040

(235)

	

1040

(235)

	

1040

(235)

	

MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

1275

(68)

	

1275

(68)

	

1275

(68)

	

1275

(68)

	

1275

(68)

	

 

1,343

	

 

1,343

	

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta 47: Unit 1E - Annual Turbine Maintenance (4/20/2026 - 4/24/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

963

(279)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-4 to MLV 71-4D: Pig Runs - EMAT 4/23/26 (4/23/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




Station 834

(segment 834 BH)

	

 

683

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

Sta 834: Unit 1A - Turbocharger (3/30/2026 - 5/8/2026) Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/24/2026)




Station 534 South of Pool (segment 530 BH)

	

 

 

1,550

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 -

5/29/2026)




 

MLV 548

(segment 542 BH)

	

 

 

1,647

	

 

1435

(212)

	

 

1385

(262)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

Sta 538 Heidelberg: Station ESD Test (4/21/2026)

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

 

Station 860

(segment 548 BH)

	

 

 

 

 

1,593

	

 

 

 

1260

(333)

	

 

 

 

1260

(333)

	

 

 

 

1260

(333)

	

 

 

 

1260

(333)

	

 

 

 

1260

(333)

	

 

 

 

1385

(208)

	

 

 

 

1385

(208)

	

MLV 556-1 to MLV 557-1: Anomaly Remediation (4/20/2026 - 4/24/2026) Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555 Collinwood: Annual ESD Test & Maintenance (4/21/2026 - 4/24/2026) Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (4/21/2026 - 4/24/2026)

Sta 555: Unit 1B - Emergent Repair (4/9/2026 - 4/30/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




Station 860 North (Segment 860 BH)

	

 

1,874

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

MLV 562-2 to MLV 563-2: Anomaly Remediation (4/13/2026 - 4/25/2026) Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




Station 110

(segment 187 BH)

(south thru

Kentucky)

	

 

 

2,685

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 87: Unit 2E Overhaul (2/20/2026 - 4/30/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 




Station 204

(Segment 204 BH)

	

 

1,828

	

1550

(278)

	

1480

(348)

	

1550

(278)

	

1480

(348)

	

1550

(278)

	

1550

(278)

	

1550

(278)

	

MLV 204-3 to MLV 209-3: Pig Run - EMAT (4/23/2026) MLV 204-3 to MLV 209-3: Pig Run - MFL-C (4/21/2026)

Sta 209 Cambridge: Annual ESD Test & Maintenance (4/20/2026 - 5/1/2026)




Station 245

(segment 245 FH)

	

 

986

	

 

986

	

 

986

	

 

986

	

 

986

	

 

986

	

 

986

	

 

986

	

 




Station 254

(segment 256 FH)

	

 

1,203

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

940

(263)

	

MLV 258-1 to MLV 259-1: Anomaly Remediation (4/20/2026 - 5/4/2026) MLV 259-1 to MLV 260-1: Anomaly Remediation (4/20/2026 - 5/4/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

MLV 339-1 to MLV 340-1: Anomaly Remediation (4/20/2026 - 5/2/2026)




Station 405 HC Line (segment 299

FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

April 2026 (updated 04/16/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(3/30 - 4/5)

	

Week 2

(4/6 - 4/12)

	

Week 3

(4/13 - 4/19)

	

Week 4

(4/20 - 4/26)

	

Week 5

(4/27 - 5/3)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490 FH)

	

 

564

	

 

	

 

	

 

	

 

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

	

 

	

 

	

 

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

	

 

	

 

	

 

	

 

969

	

 




Station 25

(segment 125 FH)

	

 

1,078

	

 

	

 

	

 

	

 

	

1060

(18)

	

MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter (4/21/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

 

	

 

	

 

	

 

	

1040

(235)

	

MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

 

	

 

	

 

	

 

	

 

1,343

	

 




Station 63

(segment 163 FH)

	

 

1,242

	

 

	

 

	

 

	

 

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

	

 

	

 

	

 

	

 

734

	

 




Station 834

(segment 834 BH)

	

 

683

	

 

	

 

	

 

	

 

	

670

(13)

	

Sta 834: Unit 1A - Turbocharger (3/30/2026 - 5/8/2026)

Sta 834: Unit 7A - Turbocharger/Overhaul (4/27/2026 - 5/8/2026)




Station 847

(segment 847 FH)

	

 

626

	

 

	

 

	

 

	

 

	

490

(136)

	

MLV 847-1 to MLV 851-1: Pig Runs - Cal / IMU & MFL-A 4/30/26 (4/30/2026)

MLV 847-1 to MLV 851-1: Pig Runs - Cleaning / Gauge 4/28/26 (4/28/2026)




Station 534 South of Pool (segment 530 BH)

	

 

 

1,550

	

 

	

 

	

 

	

 

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/29/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

 

	

 

	

 

	

 

	

 

1435

(212)

	

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)

Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

Station 860

(segment 548 BH)

	

 

 

1,593

	

 

	

 

	

 

	

 

	

 

1230

(363)

	

MLV 554-2R to MLV 554-2: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 555-1L to MLV 556-1: Anomaly Remediation (4/27/2026 - 5/1/2026) Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555: Unit 1B - Emergent Repair (4/9/2026 - 4/30/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




 

Station 860 North (Segment 860 BH)

	

 

 

 

1,874

	

 

	

 

	

 

	

 

	

 

 

1535

(339)

	

Sta 563 Joelton: Annual ESD Test (4/29/2026)

Sta 563 Joelton: Unit 1A - Lube Oil Varnish System Installation (4/29/2026 - 5/1/2026)

Sta 563 Joelton: Unit 2A - Lube Oil Varnish System Installation (4/27/2026 - 4/29/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

2,685

	

 

	

 

	

 

	

 

	

 

 

2222

(463)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 874-2A to MLV 874-2B: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 874-2B to MLV 874-2: Anomaly Remediation (4/27/2026 - 5/2/2026) Sta 87: Unit 2E Overhaul (2/20/2026 - 4/30/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

	

 

	

 

	

 

	

578

(329)

	

Sta 114 Catlettsburg: Annual ESD Test (4/27/2026 - 4/28/2026) Sta 119A Rocky Fork: Annual ESD Test (4/27/2026 - 4/28/2026)




Station 204

(Segment 204 BH)

	

 

1,828

	

 

	

 

	

 

	

 

	

1550

(278)

	

MLV 214-2 to MLV 219-2: Pig Run - Cal/IMU (M) (4/30/2026)

MLV 214-2 to MLV 219-2: Pig Run - Gauge/Cleaning (M) (4/28/2026)

Sta 209 Cambridge: Annual ESD Test & Maintenance (4/20/2026 - 5/1/2026)




Station 245

(segment 245 FH)

	

 

986

	

 

	

 

	

 

	

 

	

650

(336)

	

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 249: Unit 1A - Crankcase Inspection (4/27/2026 - 5/1/2026)




MLV 256 West

(segment 249 FH)

	

 

1,203

	

 

	

 

	

 

	

 

	

535

(668)

	

MLV 249-2 to MLV 254-2: Cal/IMU (4/29/2026)

MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (4/28/2026) MLV 249-2 to MLV 254-2: MFL-C (4/30/2026)




Station 254

(segment 256 FH)

	

 

1,203

	

 

	

 

	

 

	

 

	

940

(263)

	

MLV 258-1 to MLV 259-1: Anomaly Remediation (4/20/2026 - 5/4/2026) MLV 259-1 to MLV 260-1: Anomaly Remediation (4/20/2026 - 5/4/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

	

 

	

 

	

 

	

 

888

	

 




 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

April 2026 (updated 04/16/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(3/30 - 4/5)

	

Week 2

(4/6 - 4/12)

	

Week 3

(4/13 - 4/19)

	

Week 4

(4/20 - 4/26)

	

Week 5

(4/27 - 5/3)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 307

(segment 307 BH)

	

 

1,153

	

 

	

 

	

 

	

 

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

	

 

	

 

	

 

	

 

1,823

	

 




MLV 324

(segment 324 FH)

	

 

1,767

	

 

	

 

	

 

	

 

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

 

	

 

	

 

	

 

	

145

(8)

	

MLV 339-1 to MLV 340-1: Anomaly Remediation (4/20/2026 - 5/2/2026)




Station 405 HC Line (segment 299 FH)

	

 

794

	

 

	

 

	

 

	

 

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

May 2026 (updated 04/16/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490 FH)

	

 

564

	

 

564

	

 

564

	

 

325

(239)

	

 

564

	

Sta 409: Annual ESD Test & Maintenance (5/19/2026 - 5/21/2026)




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

760

(362)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (5/5/2026 - 6/9/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

1060

(18)

	

1055

(23)

	

1055

(23)

	

1055

(23)

	

MLV 26-1 Relocation: Highway 59 Widening (5/16/2026 - 6/2/2026) MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter

(4/21/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

1040

(235)

	

950

(325)

	

 

1,275

	

 

1,275

	

MLV 32-2 to MLV 40-2S: Pig Run - Maintenance (5/12/2026) MLV 32-3 to MLV 40-3S: Pig Run - Maintenance (5/13/2026)

MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026)




Carthage Lateral (segment 700 FH)

	

 

296

	

180

(116)

	

180

(116)

	

 

296

	

 

296

	

MLV 706-1 to MLV 700-1: Pig Run - Caliper 5/14/26 (M) (5/14/2026)

MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/12/26 (M) (5/12/2026) MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/7/26 (M) (5/7/2026)




 

 

 

Station 47

(segment 143 FH)

	

 

 

 

 

1,343

	

 

 

 

 

1020

(323)

	

 

 

 

 

1050

(293)

	

 

 

 

 

1050

(293)

	

 

 

 

 

1025

(318)

	

MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (5/15/2026) MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (5/18/2026)

MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/11/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/12/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/13/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Sta. 47: Scrubber/Filter/Separator Cleaning/Inspection/Changeout (5/25/2026 - 5/29/2026)

Sta. 47: Station Transformer Maintenance (5/4/2026 - 5/5/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




MLV 822 West

(segment 820 FH)

	

 

724

	

150

(574)

	

 

724

	

 

724

	

 

724

	

MLV 820-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/6/2026)




MLV 822 East

(segment 822 BH)

	

 

972

	

150

(822)

	

 

972

	

 

972

	

 

972

	

MLV 823-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/5/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

640

(94)

	

 

734

	

Sta 823 (Kinder): Annual ESD Test (5/19/2026 - 5/21/2026)




 

 

Station 834

(segment 834 BH)

	

 

 

 

683

	

 

 

645

(38)

	

 

 

670

(13)

	

 

 

504

(179)

	

 

 

 

683

	

Sta 834 to Sta 827: Maintenance Pig (5/21/2026)

Sta 834: Unit 1A - Replace Insulation Blanket (5/5/2026 - 5/6/2026) Sta 834: Unit 1A - Turbocharger (3/30/2026 - 5/8/2026)

Sta 834: Unit 2A - Replace Insulation Blanket (5/7/2026 - 5/8/2026) Sta 834: Unit 3A - Replace Insulation Blanket (5/12/2026 - 5/13/2026) Sta 834: Unit 4A - Replace Insulation Blanket (5/14/2026 - 5/15/2026) Sta 834: Unit 7A - Turbocharger/Overhaul (4/27/2026 - 5/8/2026)




Station 527

(segment 527 BH)

	

 

2,395

	

1920

(475)

	

 

2,395

	

 

2,395

	

 

2,395

	

Sta. 527 Port Sulphur: Annual ESD Test (5/7/2026)




 

Station 534 South of Pool (segment 530 BH)

	

 

 

 

1,550

	

 

 

1365

(185)

	

 

 

1528

(22)

	

 

 

1528

(22)

	

 

 

1370

(180)

	

Sta 530: Annual ESD Test (5/7/2026)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Annual ESD Test (5/26/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/29/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

 

1435

(212)

	

 

1435

(212)

	

 

1635

(12)

	

 

1635

(12)

	

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)

Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

Station 860

(segment 548 BH)

	

 

 

1,593

	

 

1545

(48)

	

 

1580

(13)

	

 

800

(793)

	

 

800

(793)

	

MLV 551-2 to MLV 552-2: Anomaly Remediation (5/18/2026 - 5/29/2026) MLV 552-2 to MLV 553-2: Anomaly Remediation (5/4/2026 - 5/15/2026) MLV 557-1 to MLV 558-1R: Anomaly Remediation (5/4/2026 - 5/8/2026) Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

May 2026 (updated 04/16/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




 

Station 860 North (Segment 860 BH)

	

 

 

 

1,874

	

 

 

1846

(28)

	

 

 

1100

(774)

	

 

 

1530

(344)

	

 

 

1846

(28)

	

Sta 563 Joelton: Scrubber Filter Changeout (5/18/2026 - 5/20/2026)

Sta 563 Joelton: Unit 2A - Solar Turbine Exchange (5/11/2026 - 5/22/2026) Sta 860: Annual ESD Test & Maintenance (5/11/2026 - 5/12/2026)

Sta 860: Scrubber/Filter/Separator Clean, Inspect & Filter Change (5/11/2026 - 5/15/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

2,685

	

 

 

 

 

 

2392

(293)

	

 

 

 

 

 

1895

(790)

	

 

 

 

 

 

1891

(794)

	

 

 

 

 

 

1891

(794)

	

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 109-3: Crossover to Ln 4 Valve Replacements (5/18/2026 - 5/26/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - AFD (5/19/2026)

MLV 87-3 to MLV 96-3: Pig Run - Cleaning/Gauge (5/14/2026) MLV 87-3 to MLV 96-3: Pig Run - EMAT (5/21/2026) MLV 87-3 to MLV 96-3: Pig Run - MDS (5/26/2026)

MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 




 

 

Station 204

(Segment 204 BH)

	

 

 

 

 

1,828

	

 

 

 

1720

(108)

	

 

 

 

 

1,828

	

 

 

 

1815

(13)

	

 

 

 

1270

(558)

	

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026) MLV 214-2 to MLV 219-2: Pig Run - EMAT (M) (5/6/2026)

MLV 214-2 to MLV 219-2: Pig Run - MFL-C (M) (5/4/2026)

MLV 214-3 to MLV 215-3: Anomaly Remediation (5/18/2026 - 5/23/2026)




 

 

Station 245

(segment 245 FH)

	

 

 

 

986

	

 

 

735

(251)

	

 

 

490

(496)

	

 

 

490

(496)

	

 

 

720

(266)

	

MLV 237-2 to MLV 245-2: Pig Run - CAL/IMU (M) (5/19/2026)

MLV 237-2 to MLV 245-2: Pig Run - Gauge/Cleaning Tool (M) (5/12/2026) MLV 237-2 to MLV 245-2: Pig Run - MFL-A (M) (5/21/2026)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 249: Annual ESD Test & Maintenance (5/19/2026 - 5/25/2026)

Sta 249: Unit 2A - Crankcase Inspection (5/4/2026 - 5/8/2026)




 

Station 254

(segment 256 FH)

	

 

 

1,203

	

 

 

940

(263)

	

 

 

925

(278)

	

 

 

1,203

	

 

 

630

(573)

	

MLV 254-2 to MLV 261-2: Pig Run - Cal/IMU/MFL-A Combo (5/28/2026)

MLV 254-2 to MLV 261-2: Pig Run - Gauge/Cleaning tool (5/27/2026) MLV 258-1 to MLV 259-1: Anomaly Remediation (4/20/2026 - 5/4/2026) MLV 259-1 to MLV 260-1: Anomaly Remediation (4/20/2026 - 5/4/2026) Sta 254 Nassau: Annual ESD Test (5/12/2026)

Sta 254: Unit 2B - 4k / 8k Service Inspection (5/13/2026 - 5/14/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

1400

(423)

	

Sta 315 Wellsboro: Annual ESD Test (5/26/2026)




Station 321

(segment 321 FH)

	

 

2,102

	

1820

(282)

	

1820

(282)

	

1820

(282)

	

 

2,102

	

Sta 323A Lackawaxen: Annual ESD Testing & Valve Replacement (5/4/2026 - 5/7/2026)

Sta. 323A: Unit 1A - ABB Drive Modernization (5/4/2026 - 5/22/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

150

(3)

	

150

(3)

	

150

(3)

	

 

153

	

MLV 342-1 to MLV 343-1: Anomaly Remediation (5/6/2026 - 5/10/2026) MLV 344-1 to MLV 345-1: Anomaly Remediation (5/16/2026 - 5/20/2026)




Station 405 HC Line (segment 299 FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

June 2026 (updated 04/16/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(6/1 - 6/7)

	

Week 2

(6/8 - 6/14)

	

Week 3

(6/15 - 6/21)

	

Week 4

(6/22 - 6/28)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490 FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

760

(362)

	

760

(362)

	

1000

(122)

	

1000

(122)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (5/5/2026 - 6/9/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

930

(148)

	

930

(148)

	

930

(148)

	

925

(153)

	

MLV 26-1 Relocation: Highway 59 Widening (5/16/2026 - 6/2/2026) MLV 26-2 Relocation: Highway 59 Widening (6/4/2026 - 6/22/2026)

MLV 26-3 Relocation: Highway 59 Widening (M) (6/23/2026 - 7/10/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

1330

(13)

	

1300

(43)

	

1330

(13)

	

1330

(13)

	

MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (6/9/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




 

 

Station 834

(segment 834 BH)

	

 

 

 

683

	

 

 

 

683

	

 

 

220

(463)

	

 

 

220

(463)

	

 

 

590

(93)

	

Sta 827 (Alexandria): Annual ESD and Maintenance (6/8/2026 - 6/11/2026) Sta 827 to Sta 823: Pig Run - Maintenance (M) (6/8/2026)

Sta 834 to Sta 827: Pig Run - BH Combo 6/11/26 (M) (6/11/2026) Sta 834 to Sta 827: Pig Run - BH Hard Spot 6/15/26 (M) (6/15/2026)

Sta 834 to Sta 827: Pig Run - Cleaning / Gauge 6/8/26 to 6/10/26 (M) (6/8/2026 - 6/10/2026)

Sta 834: Scrubber Filter Changeout (6/24/2026 - 6/26/2026)




Station 534 South of Pool (segment 530 BH)

	

 

1,550

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

1635

(12)

	

1635

(12)

	

1635

(12)

	

1635

(12)

	

Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)




Station 860

(segment 548 BH)

	

 

1,593

	

1550

(43)

	

 

1,593

	

 

1,593

	

 

1,593

	

MLV 557-3 to MLV 559-3: Pig Runs - Cal / IMU & MFL-A 6/4/26 (6/4/2026)

MLV 557-3 to MLV 559-3: Pig Runs - Cleaning / Gauge 6/2/26 (6/2/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




Station 860 North (Segment 860 BH)

	

 

1,874

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

 

 

2,685

	

 

 

 

 

 

 

1915

(770)

	

 

 

 

 

 

 

1780

(905)

	

 

 

 

 

 

 

2292

(393)

	

 

 

 

 

 

 

2393

(292)

	

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

MLV 96-4D to MLV 96-4BL: Spike Test (6/11/2026 - 6/20/2026)

Sta 106 Clay City: Annual ESD Test & Maintenance (6/2/2026 - 6/5/2026) Sta 110 Morehead: Annual ESD Test & Substation Inspection (6/8/2026 - 6/12/2026)

Sta 87: Unit 3D - Power side Overhaul (6/1/2026 - 9/30/2026) Sta 871 Campbellsville: Annual ESD Test (6/23/2026)

Sta 875 Richmond: Annual ESD Test & Maintenance (6/16/2026 - 6/19/2026) Sta 96 Campbellsville: Annual ESD Test (6/9/2026 - 6/10/2026)

Sta 96 Campbellsville: Annual Substation Inspection (6/9/2026 - 6/12/2026) Sta. 106: C Building - Install Water Trech System (6/8/2026 - 6/12/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 




Station 200

(segment 200 BH)

	

 

1,766

	

 

1,766

	

 

1,766

	

1485

(281)

	

 

1,766

	

Sta 200 Greenup: Annual ESD Test (6/16/2026 - 6/19/2026)




 

Station 204

(Segment 204 BH)

	

 

 

1,828

	

 

1270

(558)

	

 

1270

(558)

	

 

 

1,828

	

 

 

1,828

	

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026)




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

June 2026 (updated 04/16/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station # / Lateral

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Week 1

(6/1 - 6/7)

	

Week 2

(6/8 - 6/14)

	

Week 3

(6/15 - 6/21)

	

Week 4

(6/22 - 6/28)

	

 

Primary Outage(s)




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 219 to

Station 224

(Segment 219 FH)

	

 

539

	

 

539

	

 

539

	

 

140

(399)

	

 

539

	

MLV 219-1D to MLV 224-1: Pig Run - Maintenance (6/16/2026)




Station 245

(segment 245 FH)

	

 

986

	

 

830

(156)

	

 

830

(156)

	

 

740

(246)

	

 

830

(156)

	

Sta 241: Annual ESD Test (6/16/2026)

Sta 241: Unit 1B - Oil System (6/2/2026 - 6/4/2026) Sta 241: Unit 2B - Oil System (6/9/2026 - 6/11/2026) Sta 249: Unit 2B - 25k Overhaul (6/1/2026 - 6/26/2026)




Station 261 Discharge East (segment 261 FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

965

(188)

	

1110

(43)

	

 

1,153

	

 

1,153

	

Sta 219: Unit 1B - Protective Device Checks & GHG (6/8/2026 - 6/12/2026) Sta 303A: Annual ESD Test & Maintenance (6/1/2026 - 6/5/2026)

Sta 307: Unit 3A - Turbocharger swap (6/8/2026 - 6/12/2026)




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




Station 317

(segment 317 BH)

	

 

1,548

	

900

(648)

	

 

1,548

	

 

1,548

	

 

1,548

	

MLV 317-2 to MLV 315-2: Pig run - Cleaning (6/2/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 329

(segment 324 FH)

	

 

846

	

 

846

	

155

(691)

	

 

846

	

 

846

	

MLV 325-1 to MLV 329-1: Pig runs - Cal/IMU (M) (6/10/2026)

MLV 325-1 to MLV 329-1: Pig runs - Cleaning/Gauge 6/9/26 (M) (6/9/2026) MLV 325-1 to MLV 329-1: Pig runs - MFL-C 6/11/26 (M) (6/11/2026)




Cranston Lateral South

(segment 281

FH)

	

 

187

	

 

187

	

 

187

	

 

187

	

 

150

(37)

	

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Cal/IMU (M) (6/23/2026) ; MLV

265E-101.1 to MLV 265E-104: PIG RUNS - Gauge/Cleaning tool (M) (6/22/2026)

; MLV 265E-101.1 to MLV 265E-104: PIG RUNS - MFL-A (M) (6/24/2026)




Station 405 HC Line (segment 299 FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

...
Tennessee Gas Pipeline (TGP)

OFO CD1 LIFTED EFFECTIE 4-20-2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER	Notice Type Desc (2):  OFO
Notice Eff Date/Time:  04/17/2026 6:40:57AM	Notice End Date/Time:  04/18/2026 9:00:00am
Post Date/Time:  4/17/2026 6:40:57 AM	Notice ID: 400701
Reqrd Rsp:  1	Rsp Date:  04/17/2026
Notice Stat Desc:  TERMINATE	Prior Notice:  400542
Subject:  OFO CD1 LIFTED EFFECTIE 4-20-2026
Notice Text:

OFO DAILY CRITICAL DAY 1 LIFTED EFFECTIVE 4-20-2026

 

Due to forecasted seasonal weather moving across the system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Monday, April 20, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is LIFTING the current OFO Daily Critical Day (“CD”) pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff for the following areas listed below.

 

This OFO is currently effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.

 

Please refer to the table below for the affected areas and dates, and the actions required:

 

 

Zone

	

4-19-2026

	

4-20-2026 and until further notice




Zone 0

	

NO OFO

	

NO OFO




Zone L

	

NO OFO

	

NO OFO




Zone 1

	

NO OFO

	

NO OFO




Zone 2

	

NO OFO

	

NO OFO




Zone 3

	

NO OFO

	

NO OFO




Zone 4

	

Critical Day 1

All Areas North and East of STA 219

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO

 




Zone 5

	

Critical Day 1

All Areas

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO

 




Zone 6

	

Critical Day 1

All Areas

·        Receipts do not overdeliver

·        Deliveries do not undertake

	

NO OFO

 

 

CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE:  Greater of 2% of scheduled quantities or 500 Dth

 

Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.

 

In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.  

 

Please contact your Scheduling Representative if you have any questions.

 

 

 

 

 

 

 

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-18-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/18/2026 11:16:54AM	Notice End Date/Time:  04/19/2026 9:00:00am
Post Date/Time:  4/18/2026 11:16:54 AM	Notice ID: 400722
Reqrd Rsp:  1	Rsp Date:  04/18/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-18-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Saturday, April 18, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 44,768 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 209,096 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 192,812 Dths

·         STA 317 (Segment 317 BH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 69,036 Dths

·         STA 321 (Segment 321 FH) - through approx 10% of SOP increases due to nominations in excess of operational capacity; 14,181 Dths

·         MLV 330 (Segment 324 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 43,313 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 188,000 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 168,056 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 100,152 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 209,184 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-18-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/18/2026 7:31:45PM	Notice End Date/Time:  04/19/2026 9:00:00am
Post Date/Time:  4/18/2026 7:31:45 PM	Notice ID: 400737
Reqrd Rsp:  1	Rsp Date:  04/18/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-18-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Saturday, April 18, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 15,666 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-04-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/04/2026 7:24:21PM	Notice End Date/Time:  04/05/2026 9:00:00am
Post Date/Time:  4/4/2026 7:24:21 PM	Notice ID: 400425
Reqrd Rsp:  1	Rsp Date:  04/04/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-04-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Saturday, April 04, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-05-2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/05/2026 3:25:52PM	Notice End Date/Time:  04/06/2026 9:00:00am
Post Date/Time:  4/5/2026 3:25:52 PM	Notice ID: 400437
Reqrd Rsp:  1	Rsp Date:  04/05/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-05-2026
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Sunday, April 05, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 96% of SIPps increases due to nominations in excess of operational capacity; 30,507 Dths

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 33,938 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 344,620 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 203,134 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 191,798 Dths

·         STA 317 (Segment 317 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 84,917 Dths

·         MLV 330 (Segment 324 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 87,035 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 166,611 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 170,255 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 77,554 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 170,654 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-05-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/05/2026 3:58:00PM	Notice End Date/Time:  04/06/2026 9:00:00am
Post Date/Time:  4/5/2026 3:58:00 PM	Notice ID: 400438
Reqrd Rsp:  1	Rsp Date:  04/05/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-05-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Sunday, April 05, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 33,938 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 332,599 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 203,019 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 187,765 Dths

·         STA 317 (Segment 317 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 80,487 Dths

·         MLV 330 (Segment 324 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 79,660 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 166,611 Dths

·         STA 245 (Segment 245 FH) - through approx 83% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 141,606 Dths

·         STA 249 (Segment 249 FH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 51,482 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 170,654 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-05-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/05/2026 7:40:23PM	Notice End Date/Time:  04/06/2026 9:00:00am
Post Date/Time:  4/5/2026 7:40:23 PM	Notice ID: 400445
Reqrd Rsp:  1	Rsp Date:  04/05/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-05-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Sunday, April 05, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 15,183 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 317 (Segment 317 BH) - through approx 46% of SOP increases due to nominations in excess of operational capacity; 13,232 Dths

·         STA 313Hcg - Z4 Hc (Segment 399 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 51,579 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-06-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/06/2026 7:41:06PM	Notice End Date/Time:  04/07/2026 9:00:00am
Post Date/Time:  4/6/2026 7:41:06 PM	Notice ID: 400466
Reqrd Rsp:  1	Rsp Date:  04/06/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-06-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Monday, April 06, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         NONE

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 317 (Segment 317 BH) - through approx 69% of SOP increases due to nominations in excess of operational capacity; 26,840 Dths

·         STA 233 (Segment 233 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 2,371 Dths

·         STA 313Hcg - Z4 Hc (Segment 399 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 29,267 Dths

·         Z5hc North (Segment 299 FH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 62,215 Dths

·         STA 245 (Segment 245 FH) - through approx 10% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 6,975 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-07-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/07/2026 4:00:30PM	Notice End Date/Time:  04/08/2026 9:00:00am
Post Date/Time:  4/7/2026 4:00:30 PM	Notice ID: 400480
Reqrd Rsp:  1	Rsp Date:  04/07/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-07-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Tuesday, April 07, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 15,149 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 179,486 Dths

·         STA 315 (Segment 315 BH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 153,179 Dths

·         STA 317 (Segment 317 BH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 74,992 Dths

·         STA 325 (Segment 324 FH) - through approx 52% of SOP increases due to nominations in excess of operational capacity; 54,495 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 202,205 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 309,107 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 213,629 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 101,701 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 51,665 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 169,582 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-07-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/07/2026 7:41:48PM	Notice End Date/Time:  04/08/2026 9:00:00am
Post Date/Time:  4/7/2026 7:41:48 PM	Notice ID: 400488
Reqrd Rsp:  1	Rsp Date:  04/07/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-07-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Tuesday, April 07, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 96,446 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 16,360 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-15-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/15/2026 10:58:31AM	Notice End Date/Time:  04/16/2026 9:00:00am
Post Date/Time:  4/15/2026 10:58:31 AM	Notice ID: 400651
Reqrd Rsp:  1	Rsp Date:  04/15/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-15-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Wednesday, April 15, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 16,967 Dths

·         STA 9 (Segment 109 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 25,064 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 210,012 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 188,145 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 123,049 Dths

·         MLV 330 (Segment 324 FH) - through approx 38% of SOP increases due to nominations in excess of operational capacity; 18,328 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 192,799 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 234,988 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 98,817 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 241,044 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Gulf South Pipeline

Update: Index 70-4 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037680
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-12T15:05:00+00:00
Effective: 2026-05-18T09:00:00+00:00
End: 2026-05-23T09:00:00+00:00
Subject: Update: Index 70-4 Meter Maintenance
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-03-2026 ID3

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/03/2026 7:43:04PM	Notice End Date/Time:  04/04/2026 9:00:00am
Post Date/Time:  4/3/2026 7:43:04 PM	Notice ID: 400405
Reqrd Rsp:  1	Rsp Date:  04/03/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-03-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Friday, April 03, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4 FOR ALL AREAS SOUTH OF STA 219

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         MLV 314 East (Segment 314 BH) - through approx 27% of SOP increases due to nominations in excess of operational capacity; 6,621 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-04-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/04/2026 11:01:46AM	Notice End Date/Time:  04/05/2026 9:00:00am
Post Date/Time:  4/4/2026 11:01:46 AM	Notice ID: 400411
Reqrd Rsp:  1	Rsp Date:  04/04/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-04-2026 ID2
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Saturday, April 04, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 53% of SIPss increases due to nominations in excess of operational capacity; 17,370 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,786 Dths

·         STA 823 (Segment 823 BH) - through approx 60% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 8,956 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 350,399 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 204,245 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 186,150 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 86,175 Dths

·         STA 321 (Segment 321 FH) - through approx 32% of SOP increases due to nominations in excess of operational capacity; 15,081 Dths

·         MLV 330 (Segment 324 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 41,292 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 159,799 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 180,252 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 90,771 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 169,064 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

OFO CD1 DOWNGRADED EFFECTIVE 4-14-2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER	Notice Type Desc (2):  OFO
Notice Eff Date/Time:  04/13/2026 8:12:51AM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 8:12:51 AM	Notice ID: 400605
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  SUPERSEDE	Prior Notice:  400542
Subject:  OFO CD1 DOWNGRADED EFFECTIVE 4-14-2026
Notice Text:

OFO DAILY CRITICAL DAY 1 DOWNGRADED EFFECTIVE 4-14-2026 TO ONLY COVER ALL AREAS EAST OF STA 219

 

Due to forecasted seasonal weather moving across various areas of the system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Tuesday, April 14, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is DOWNGRADING the current OFO Daily Critical Day (“CD”) to only cover all areas North and East of STA 219 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff for the following areas listed below.

 

This OFO will be effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.

 

Please refer to the table below for the affected areas and dates, and the actions required:

 

 

Zone

	

4-13-2026

	

4-14-2026 and until further notice




Zone 0

	

Critical Day 1

All Areas Excluding South of STA 1

(Excluding Segments 406, 409, 410, 490, 491, 492)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone L

	

Critical Day 1

All Areas Excluding Muskrat and 500 Line

 (Excluding Segments 509, 515, 516, 523, 524,526)

(Excluding 500 Line Segments 527, 529, 530)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 1

	

Critical Day 1

All of Line 100

All of the 800 Line

All Areas Excluding 500 Line

(Excluding 500 Line Segments 534, 539, 542)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 2

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 3

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 4

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas North and East of STA 219 only

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 5

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 6

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

 

CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE:  Greater of 2% of scheduled quantities or 500 Dth

 

Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.

 

In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.  

 

Please contact your Scheduling Representative if you have any questions.

 

 

 

 

 

 

 

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-13-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/13/2026 11:09:14AM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 11:09:14 AM	Notice ID: 400607
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-13-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Monday, April 13, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through 100% of SIPps increases due to nominations in excess of operational capacity; 12,501 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 221,339 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 214,895 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 89,495 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 161,464 Dths

·         STA 245 (Segment 245 FH) - through approx 98% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 127,870 Dths

·         STA 249 (Segment 249 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 41,022 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 167,749 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-13-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/13/2026 3:30:53PM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 3:30:53 PM	Notice ID: 400614
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-13-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Monday, April 13, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through PIP increases due to nominations in excess of operational capacity

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 216,834 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 211,291 Dths

·         STA 317 (Segment 317 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 80,965 Dths

·         Z5hc North (Segment 299 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 149,084 Dths

·         STA 245 (Segment 245 FH) - through approx 79% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 114,316 Dths

·         STA 249 (Segment 249 FH) - through approx 37% of SOP increases due to nominations in excess of operational capacity; 15,597 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 167,668 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-14-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/14/2026 3:38:17PM	Notice End Date/Time:  04/15/2026 9:00:00am
Post Date/Time:  4/14/2026 3:38:17 PM	Notice ID: 400636
Reqrd Rsp:  1	Rsp Date:  04/14/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-14-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Tuesday, April 14, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 9 (Segment 109 FH) - through approx 68% of SA increases due to scheduled maintenance and nominations in excess of operational capacity; 11,202 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,685 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 185,868 Dths

·         STA 315 (Segment 315 BH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 197,927 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 54,798 Dths

·         Z5hc North (Segment 299 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 141,084 Dths

·         STA 245 (Segment 245 FH) - through approx 94% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 127,898 Dths

·         STA 249 (Segment 249 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 20,265 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 110,195 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
ANR Pipeline (TC Energy)

UPDATED CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage

Notice Stat Desc: Supersede

Prior Notice: 25980318

Critical: Y

Reqrd Rsp Desc: No Response Required
Post

Notice Effective

Notice End



Response
Post Date: 03/18/26

03/18/26

03/19/26
Subject: Subject: UPDATED CAPACITY REDUCTION - Southeast Area – Eunice Compressor Station
Author: Author: T0000106
Notice Text
Effective 3/18/26 ID3 cycle, ANR has completed the Eunice compressor station maintenance and is reinstating capacities as follows:

 

Riverway (To Bridgeline) (LOC #42593): 110 MMcf/d (previously 40 MMcf/d)

St. Landry/FL Int (LOC #322625): 44 MMcf/d (previously 30 MMcf/d)

Weeks ISLA/LIG PL (LOC #233620): 140 MMcf/d (previously 40 MMcf/d)

 

 

Please refer to Notice #25986110 on the EBB for additional maintenance.

 

Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. 

 

Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
ANR Pipeline (TC Energy)

UPDATED CAPACITY REDUCTION - Southeast Mainline – Evangeline Southbound

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name ANR Pipeline Company
TSP 006958581
Notice Type Description: Planned Service Outage

Notice Stat Desc: Supersede

Prior Notice: 25980321

Critical: Y

Reqrd Rsp Desc: No Response Required
Post

Notice Effective

Notice End



Response
Post Date: 03/18/26

03/18/26

03/19/26
Subject: Subject: UPDATED CAPACITY REDUCTION - Southeast Mainline – Evangeline Southbound
Author: Author: T0000106
Notice Text
Effective 3/18/26 ID3 cycle, ANR has completed the Eunice compressor station maintenance and is reinstating capacity at Evangeline Southbound (LOC #FPEVNGSB) to 1,087 MMcf/d (previously 987 MMcf/d).

 

Please refer to Notice #25986109 on the EBB for additional maintenance.

 

 

Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR’s FERC Gas Tariff (“Tariff”). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR’s Tariff, less any scheduled quantities on the contract. 

 

Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-03-2026 EC

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/02/2026 7:13:00PM	Notice End Date/Time:  04/03/2026 9:00:00am
Post Date/Time:  4/2/2026 7:13:00 PM	Notice ID: 400384
Reqrd Rsp:  1	Rsp Date:  04/02/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-03-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Friday, April 03, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4 FOR ALL AREAS SOUTH OF STA 219

METER RESTRICTIONS

·         TET/TGP Dry Creek Sales Casey Delivery Meter (Pin 420886) - through 100% of SIPps increases due to operational concerns; 4,053 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 33% of SIPss increases due to nominations in excess of operational capacity; 34,275 Dths

·         Ocean ST/TGP Pro Delivery Meter (Pin 420707) - through 100% of SOP receipt increases due to displacement gas unavailable for backhaul; 668 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 23,920 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 346,647 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 206,950 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 189,053 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 90,589 Dths

·         STA 321 (Segment 321 FH) - through approx 73% of SOP increases due to nominations in excess of operational capacity; 184,457 Dths

·         MLV 330 (Segment 324 FH) - through approx 52% of SOP increases due to nominations in excess of operational capacity; 47,808 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 163,337 Dths

·         STA 245 (Segment 245 FH) - through approx 79% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 173,767 Dths

·         STA 249 (Segment 249 FH) - through approx 57% of SOP increases due to nominations in excess of operational capacity; 86,953 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 245,383 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-03-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/03/2026 11:14:14AM	Notice End Date/Time:  04/04/2026 9:00:00am
Post Date/Time:  4/3/2026 11:14:14 AM	Notice ID: 400390
Reqrd Rsp:  1	Rsp Date:  04/03/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-03-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Friday, April 03, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4 FOR ALL AREAS SOUTH OF STA 219

METER RESTRICTIONS

·         TET/TGP Dry Creek Sales Casey Delivery Meter (Pin 420886) - through 100% of SIPps increases due to operational concerns; 4,053 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 16% of SIPss increases due to nominations in excess of operational capacity; 11,694 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,786 Dths

·         STA 823 (Segment 823 BH) - through approx 85% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 23,920 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 346,647 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 206,623 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 189,057 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 84,926 Dths

·         MLV 330 (Segment 324 FH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 29,636 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 168,324 Dths

·         STA 245 (Segment 245 FH) - through approx 81% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 171,412 Dths

·         STA 249 (Segment 249 FH) - through approx 58% of SOP increases due to nominations in excess of operational capacity; 54,492 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 194,471 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-03-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/03/2026 3:23:48PM	Notice End Date/Time:  04/04/2026 9:00:00am
Post Date/Time:  4/3/2026 3:23:48 PM	Notice ID: 400398
Reqrd Rsp:  1	Rsp Date:  04/03/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-03-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Friday, April 03, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4 FOR ALL AREAS SOUTH OF STA 219

METER RESTRICTIONS

·         TET/TGP Dry Creek Sales Casey Delivery Meter (Pin 420886) - through 100% of SIPps increases due to operational concerns; 4,053 Dths

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through approx 60% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 8,956 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 329,151 Dths

·         MLV 314 East (Segment 314 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 202,299 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 180,943 Dths

·         STA 317 (Segment 317 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 79,677 Dths

·         MLV 330 (Segment 324 FH) - through approx 7% of SOP increases due to nominations in excess of operational capacity; 2,036 Dths

·         Z5hc North (Segment 299 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 147,374 Dths

·         STA 245 (Segment 245 FH) - through approx 45% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 64,965 Dths

·         MLV 273 (Segment 284 FH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 78,660 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-12-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/12/2026 11:07:19AM	Notice End Date/Time:  04/13/2026 9:00:00am
Post Date/Time:  4/12/2026 11:07:19 AM	Notice ID: 400585
Reqrd Rsp:  1	Rsp Date:  04/12/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-12-2026 ID2
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Sunday, April 12, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,654 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 177,262 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 169,930 Dths

·         STA 317 (Segment 317 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 52,195 Dths

·         MLV 330 (Segment 324 FH) - through approx 16% of SOP increases due to nominations in excess of operational capacity; 4,802 Dths

·         Z5hc North (Segment 299 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 156,841 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 186,355 Dths

·         STA 249 (Segment 249 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 94,004 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 175,954 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-12-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/12/2026 3:27:09PM	Notice End Date/Time:  04/13/2026 9:00:00am
Post Date/Time:  4/12/2026 3:27:09 PM	Notice ID: 400593
Reqrd Rsp:  1	Rsp Date:  04/12/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-12-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Sunday, April 12, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,668 Dths

·         MLV 314 East (Segment 314 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 173,576 Dths

·         STA 315 (Segment 315 BH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 165,989 Dths

·         STA 317 (Segment 317 BH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 50,943 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 190,085 Dths

·         STA 245 (Segment 245 FH) - through approx 92% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 171,970 Dths

·         STA 249 (Segment 249 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 80,182 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 175,629 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Gulf South Pipeline

Index 301-18 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037962
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-08T09:36:00+00:00
Effective: 2026-06-08T09:00:00+00:00
End: 2026-07-01T09:00:00+00:00
Subject: Index 301-18 Pipeline Maintenance
Gulf South Pipeline

Posted Maintenance Events for 04/10/2026 - 04/16/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037968
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-08T15:57:00+00:00
Effective: 2026-04-10T09:00:00+00:00
End: 2026-04-16T09:00:00+00:00
Subject: Posted Maintenance Events for 04/10/2026 - 04/16/2026
El Paso (EPNG)

[MAINTENANCE] Updated April 2026 Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPNG)
Notice Type: MAINTENANCE
Subject: Updated April 2026 Maintenance
Posted: 04/15/2026 10:34:41AM
Effective: 04/15/2026 10:34:41AM
End Date: 04/16/2026 9:00:00AM
Gulf South Pipeline

Update:Index 70-7 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037681
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-12T15:06:00+00:00
Effective: 2026-06-01T09:00:00+00:00
End: 2026-06-06T09:00:00+00:00
Subject: Update:Index 70-7 Meter Maintenance
Gulf South Pipeline

Update:Index 70-6 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037683
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-12T15:07:00+00:00
Effective: 2026-06-01T09:00:00+00:00
End: 2026-06-06T09:00:00+00:00
Subject: Update:Index 70-6 Meter Maintenance
Gulf South Pipeline

Index 129-20 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037685
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-12T15:08:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-09T09:00:00+00:00
Subject: Index 129-20 Meter Maintenance
Gulf South Pipeline

Olla Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037689
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-12T15:13:00+00:00
Effective: 2026-04-20T09:00:00+00:00
End: 2026-04-24T09:00:00+00:00
Subject: Olla Compressor Station Maintenance
Gulf South Pipeline

Tallulah Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037690
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-12T15:16:00+00:00
Effective: 2026-04-27T09:00:00+00:00
End: 2026-05-02T09:00:00+00:00
Subject: Tallulah Compressor Station Maintenance
Gulf South Pipeline

Index 270-L Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037693
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-13T15:04:00+00:00
Effective: 2026-04-10T09:00:00+00:00
End: 2026-04-26T09:00:00+00:00
Subject: Index 270-L Pipeline Maintenance
Gulf South Pipeline

Kiln Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037717
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-20T12:59:00+00:00
Effective: 2026-04-21T09:00:00+00:00
End: 2026-04-22T09:00:00+00:00
Subject: Kiln Compressor Station Maintenance
Gulf South Pipeline

Update: Index 70-8 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037727
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-24T08:58:00+00:00
Effective: 2026-06-15T09:00:00+00:00
End: 2026-06-20T09:00:00+00:00
Subject: Update: Index 70-8 Meter Maintenance
Gulf South Pipeline

Update: Index 70-5 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037728
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-24T08:59:00+00:00
Effective: 2026-05-18T09:00:00+00:00
End: 2026-05-23T09:00:00+00:00
Subject: Update: Index 70-5 Meter Maintenance
Gulf South Pipeline

Update: Index 70 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037729
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-24T09:00:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-09T09:00:00+00:00
Subject: Update: Index 70 Meter Maintenance
Gulf South Pipeline

Update: Index 59-8 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037730
Notice Type: Maintenance
Status: Supersede
Posted: 2026-02-24T09:01:00+00:00
Effective: 2026-04-20T09:00:00+00:00
End: 2026-04-25T09:00:00+00:00
Subject: Update: Index 59-8 Meter Maintenance
Gulf South Pipeline

Index 131 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037742
Notice Type: Maintenance
Status: Initiate
Posted: 2026-02-25T13:09:00+00:00
Effective: 2026-04-14T09:00:00+00:00
End: 2026-04-17T09:00:00+00:00
Subject: Index 131 Pipeline Maintenance
Gulf South Pipeline

Marksville Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037759
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-04T14:53:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-08T09:00:00+00:00
Subject: Marksville Compressor Station Maintenance
Gulf South Pipeline

Update: Wilson Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037761
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-05T10:25:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-09T09:00:00+00:00
Subject: Update: Wilson Compressor Station Maintenance
Gulf South Pipeline

Rodrigue Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037772
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-06T11:57:00+00:00
Effective: 2026-04-05T09:00:00+00:00
End: 2026-04-25T09:00:00+00:00
Subject: Rodrigue Compressor Station Maintenance
Gulf South Pipeline

Rodrigue Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037782
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-10T09:59:00+00:00
Effective: 2026-05-03T09:00:00+00:00
End: 2026-05-23T09:00:00+00:00
Subject: Rodrigue Compressor Station Maintenance
Gulf South Pipeline

Carthage #2 Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037786
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-10T13:47:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-06-06T09:00:00+00:00
Subject: Carthage #2 Compressor Station Maintenance
Gulf South Pipeline

Index 133 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037813
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-16T15:53:00+00:00
Effective: 2026-05-23T09:00:00+00:00
End: 2026-05-29T09:00:00+00:00
Subject: Index 133 Pipeline Maintenance
Gulf South Pipeline

Update: Index 192 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037816
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-17T11:17:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-06T09:00:00+00:00
Subject: Update: Index 192 Pipeline Maintenance
Gulf South Pipeline

Revised: Index 270-65 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037837
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-20T09:25:00+00:00
Effective: 2026-06-05T09:00:00+00:00
End: 2026-06-17T09:00:00+00:00
Subject: Revised: Index 270-65 Pipeline Maintenance
Gulf South Pipeline

Index 131 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037842
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-20T11:28:00+00:00
Effective: 2026-05-05T09:00:00+00:00
End: 2026-05-15T09:00:00+00:00
Subject: Index 131 Pipeline Maintenance
Gulf South Pipeline

Carthage Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037844
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-20T12:43:00+00:00
Effective: 2026-06-15T09:00:00+00:00
End: 2026-06-20T09:00:00+00:00
Subject: Carthage Compressor Station Maintenance
Gulf South Pipeline

Kiln Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037845
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-20T12:49:00+00:00
Effective: 2026-07-06T09:00:00+00:00
End: 2026-07-11T09:00:00+00:00
Subject: Kiln Compressor Station Maintenance
Gulf South Pipeline

Tallulah Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037848
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-20T13:23:00+00:00
Effective: 2026-07-26T09:00:00+00:00
End: 2026-08-01T09:00:00+00:00
Subject: Tallulah Compressor Station Maintenance
Gulf South Pipeline

Hall Summit Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037851
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-20T14:57:00+00:00
Effective: 2026-05-26T09:00:00+00:00
End: 2026-05-30T09:00:00+00:00
Subject: Hall Summit Compressor Station Maintenance
Gulf South Pipeline

Heidelberg Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037957
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-06T17:07:00+00:00
Effective: 2026-04-15T09:00:00+00:00
End: 2026-04-16T09:00:00+00:00
Subject: Heidelberg Compressor Station Maintenance
Gulf South Pipeline

Update: Index 330 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037985
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-13T17:30:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-07-01T09:00:00+00:00
Subject: Update: Index 330 Pipeline Maintenance

Gulf South Pipeline Notice 5037985
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037985
Prior Notice :
5037941
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 330 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
04/13/2026 05:30:00 PM
Notice Effective Date/Time :
05/11/2026 09:00:00 AM
Notice End Date/Time :
07/01/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised Description:
------------------------------------------------------------------------------------
Gulf South will be performing maintenance at Index 330 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 6880 (Henderson - Cecilia)
- Loc 3021 (St Martinville City Gate #3)
- Loc 7950 (St Martinville Rurals - Sola Nola)
- Loc 7956 (Mayo Romero (Loreauville))
- Loc 7954 (Opelousas Rural Sola Nola 30)
- 4 Delta Farmtaps
- 1 ATMOS Farmtap
The following scheduling groups will be subject to impact:
Gas Day 5/11-6/30:
-Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 175,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/13/2026 5:30:57 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/13/2026 05:30:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/11/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
07/01/2026 09:00:00 AM
Notice ID :
5037985
Response Date/Time :
Prior Notice :
5037941
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Index 330 Pipeline Maintenance
Notice Text :
Revised Description:
------------------------------------------------------------------------------------
Gulf South will be performing maintenance at Index 330 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 6880 (Henderson - Cecilia)
- Loc 3021 (St Martinville City Gate #3)
- Loc 7950 (St Martinville Rurals - Sola Nola)
- Loc 7956 (Mayo Romero (Loreauville))
- Loc 7954 (Opelousas Rural Sola Nola 30)
- 4 Delta Farmtaps
- 1 ATMOS Farmtap
The following scheduling groups will be subject to impact:
Gas Day 5/11-6/30:
-Arnaudville to Bayou Sale Scheduling Group
Capacity could be impacted by as much as 175,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/13/2026 5:30:57 PM
Page 1 of 1
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-10-2026 ID2

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/10/2026 3:19:48PM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 3:19:48 PM	Notice ID: 400553
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-10-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Friday, April 10, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 5,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 204,676 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 180,020 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 81,338 Dths

·         MLV 330 (Segment 324 FH) - through approx 57% of SOP increases due to nominations in excess of operational capacity; 32,409 Dths

·         Z5hc North (Segment 299 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 129,729 Dths

·         STA 245 (Segment 245 FH) - through approx 79% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 175,368 Dths

·         STA 249 (Segment 249 FH) - through approx 65% of SOP increases due to nominations in excess of operational capacity; 79,353 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 103,879 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-11-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/11/2026 11:21:55AM	Notice End Date/Time:  04/12/2026 9:00:00am
Post Date/Time:  4/11/2026 11:21:55 AM	Notice ID: 400565
Reqrd Rsp:  1	Rsp Date:  04/11/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-11-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Saturday, April 11, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 361,152 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 159,898 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 169,026 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 38,727 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 157,959 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 180,185 Dths

·         STA 249 (Segment 249 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 89,855 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 216,774 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

OFO CD1 DOWNGRADED EFFECTIVE 4-14-2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER	Notice Type Desc (2):  OFO
Notice Eff Date/Time:  04/13/2026 7:00:41AM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 7:00:41 AM	Notice ID: 400604
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  SUPERSEDE	Prior Notice:  400542
Subject:  OFO CD1 DOWNGRADED EFFECTIVE 4-14-2026
Notice Text:

OFO DAILY CRITICAL DAY 1 DOWNGRADED EFFECTIVE 4-14-2026 TO ONLY COVER ALL AREAS EAST OF STA 219

 

Due to forecasted seasonal weather moving across various areas of the system, in order to protect the operational integrity of its system, effective for the Gas Day (“GD”) of Tuesday, April 14, 2026, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) is DOWNGRADING the current OFO Daily Critical Day (“CD”) to only cover all areas North and East of STA 219 pursuant to Article X of the General Terms and Conditions of Tennessee's FERC NGA Gas Tariff for the following areas listed below.

 

This OFO will be effective for all LMS-PA, SA contracts acting as balancing parties and LMS-MA Balancing Parties only.

 

Please refer to the table below for the affected areas and dates, and the actions required:

 

 

Zone

	

4-13-2026

	

4-14-2026 and until further notice




Zone 0

	

Critical Day 1

All Areas Excluding South of STA 1

(Excluding Segments 406, 409, 410, 490, 491, 492)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone L

	

Critical Day 1

All Areas Excluding Muskrat and 500 Line

 (Excluding Segments 509, 515, 516, 523, 524,526)

(Excluding 500 Line Segments 527, 529, 530)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 1

	

Critical Day 1

All of Line 100

All of the 800 Line

All Areas Excluding 500 Line

(Excluding 500 Line Segments 534, 539, 542)

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 2

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 3

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

NO OFO




Zone 4

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas North and East of STA 219 only

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 5

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake




Zone 6

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

	

Critical Day 1

All Areas

·         Receipts do not overdeliver

·         Deliveries do not undertake

 

CD 1 PENALTY: $5.00 + applicable Regional Daily Spot Price per Dth for quantities in excess of the tolerance
CD 1 TOLERANCE:  Greater of 2% of scheduled quantities or 500 Dth

 

Balancing between OBA points in separate pipeline regions or across meters not located in the OFO area will not be permitted.

 

In the event this OFO is not sufficient to maintain the operational integrity of its system, Tennessee may escalate to calling a Critical Day II, a Balancing Alert, Meter Specific OFO(s) or Hourly OFO(s), or taking any other actions that may be permitted or required by Tennessee's Tariff.  

 

Please contact your Scheduling Representative if you have any questions.

 

 

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-09-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/09/2026 11:20:02AM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 11:20:02 AM	Notice ID: 400519
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-09-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Thursday, April 09, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         ANR/TGP TGP Anr Greenville Delivery Meter (Pin 420941) - through 100% of SOP increases due to operational concerns; 1,000 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 14,304 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 167,970 Dths

·         STA 315 (Segment 315 BH) - through approx 69% of SOP increases due to nominations in excess of operational capacity; 146,947 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 76,632 Dths

·         STA 325 (Segment 324 FH) - through approx 52% of SOP increases due to nominations in excess of operational capacity; 67,957 Dths

·         MLV 330 (Segment 324 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 59,391 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 109,739 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 172,456 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 355,456 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 204,768 Dths

·         MLV 256 East (Segment 256 FH) - through approx 95% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 32,904 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 174,491 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/09/2026 2:51:37PM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 2:51:37 PM	Notice ID: 400528
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

 

	

 

	

 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

Seven Day Forecast (updated 04/09/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




Station / Seg

	

Est Nominal

Operating Capacity (Thousand Dth)

	

Monday

(4/13)

	

Tuesday

(4/14)

	

Wednesday

(4/15)

	

Thursday

(4/16)

	

Friday

(4/17)

	

Saturday

(4/18)

	

Sunday

(4/19)

	

 

Primary Outage(s) that may Impact Throughput




Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409A

(Alamo) (segment 492 FH)

	

 

274

	

 

274

	

 

90

(184)

	

 

90

(184)

	

 

90

(184)

	

 

274

	

 

274

	

 

274

	

Sta. 409A Alamo: Annual ESD Test (4/14/2026 - 4/16/2026)




Station 409 (Donna Line) (segment 490

FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

900

(69)

	

900

(69)

	

940

(29)

	

 

969

	

 

969

	

 

969

	

MLV 9-3D to MLV 11-3: Pig Run - Chem Cleaning (4/14/2026 - 4/15/2026) MLV 9-3D to MLV 11-3: Pig Run - Gauge (4/16/2026)

MLV 9-3D to MLV 11-3: Pig Run - MFL-A (4/16/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

 

1,078

	

 

1,078

	

 

1,078

	

 

1,078

	

 

1,078

	

 

1,078

	

 

1,078

	

 




Station 32 South

(segment 132 FH)

	

 

1,275

	

 

1215

(60)

	

 

1215

(60)

	

 

1215

(60)

	

 

1215

(60)

	

 

1215

(60)

	

 

1,275

	

 

1,275

	

MLV 31-2 to MLV 32-2S: Anomaly Remediation (4/6/2026 - 4/17/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

1265

(78)

	

1265

(78)

	

1265

(78)

	

1265

(78)

	

1265

(78)

	

1285

(58)

	

1285

(58)

	

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta 47: Unit 1C thru 6C - Installing Unloaders (3/30/2026 - 4/17/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

963

(279)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)

MLV 79-4 to MLV 71-4D: Pig Runs - Cleaning / Gauge 4/14/26 (4/14/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




Station 834

(segment 834 BH)

	

 

683

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

670

(13)

	

Sta 834: Unit 1A - Turbocharger (3/30/2026 - 5/8/2026) Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/24/2026)




Station 527

(segment 527 BH)

	

 

2,395

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

2340

(55)

	

 

2,395

	

 

2,395

	

Sta 527: Unit 1C - High Vibration (2/4/2026 - 4/17/2026)




 

Station 534 South of Pool (segment 530 BH)

	

 

 

1,550

	

 

 

1390

(160)

	

 

 

1390

(160)

	

 

 

1390

(160)

	

 

 

1390

(160)

	

 

 

1390

(160)

	

 

 

1528

(22)

	

 

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 1B - Engine Maintenance (4/13/2026 - 4/17/2026) Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026)

Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/29/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

 

1435

(212)

	

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)

Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




Station 860

(segment 548 BH)

	

 

1,593

	

1580

(13)

	

1580

(13)

	

1580

(13)

	

1580

(13)

	

1580

(13)

	

1580

(13)

	

1580

(13)

	

Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




Station 860 North (Segment 860

BH)

	

 

1,874

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

 

1846

(28)

	

MLV 562-2 to MLV 563-2: Anomaly Remediation (4/13/2026 - 4/25/2026) Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




Station 110

(segment 187 BH)

(south thru

Kentucky)

	

 

 

2,685

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

 

2392

(293)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 87: Unit 2E Overhaul (2/20/2026 - 4/24/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

771

(136)

	

771

(136)

	

771

(136)

	

771

(136)

	

771

(136)

	

771

(136)

	

771

(136)

	

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026)




Station 204

(Segment 204 BH)

	

 

1,828

	

1595

(233)

	

1565

(263)

	

1595

(233)

	

1565

(263)

	

1595

(233)

	

 

1,828

	

 

1,828

	

MLV 204-3 to MLV 209-3: Pig Run - Cal/IMU (4/16/2026)

MLV 204-3 to MLV 209-3: Pig Run - Gauge/Cleaning (4/14/2026) Sta 214: Annual ESD Test & Maintenance (3/23/2026 - 4/17/2026)




Station 245

(segment 245 FH)

	

 

986

	

970

(16)

	

970

(16)

	

970

(16)

	

970

(16)

	

970

(16)

	

 

986

	

 

986

	

Sta 245: Unit 1A & 2A - Automation Upgrade (3/23/2026 - 4/17/2026)




Station 254

(segment 256 FH)

	

 

1,203

	

 

1,203

	

 

1,203

	

 

1,203

	

 

1040

(163)

	

 

1040

(163)

	

 

1,203

	

 

1,203

	

MLV 254-3 to MLV 258-3A: Pig Runs - Cal/IMU/MFL-A Combo - 4/17/26 (4/17/2026)

MLV 254-3 to MLV 258-3A: Pig Runs - Gauge/Cleaning tool - 4/16/26

(4/16/2026)




Station 261 Discharge East (segment 261

FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

1100

(53)

	

1100

(53)

	

1100

(53)

	

1100

(53)

	

1100

(53)

	

 

1,153

	

 

1,153

	

Sta 307: Unit 5A - Exhaust Bellows Change Out (4/13/2026 - 4/17/2026) Sta 307: Unit 5A - Liner (3/29/2026 - 4/17/2026)




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

140

(13)

	

140

(13)

	

140

(13)

	

145

(8)

	

145

(8)

	

145

(8)

	

145

(8)

	

MLV 337-1 to MLV 338-1: Anomaly Remediation (4/11/2026 - 4/15/2026) MLV 338-1 to MLV 339-1: Anomaly Remediation (4/16/2026 - 4/20/2026)




Station 405 HC Line (segment 299

FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

April 2026 (updated 04/09/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




 

Station # / Lateral

	

Est Nominal Operating Capacity (Thousand Dth)

	

Week 1

(3/30 - 4/5)

	

Week 2

(4/6 - 4/12)

	

Week 3

(4/13 - 4/19)

	

Week 4

(4/20 - 4/26)

	

Week 5

(4/27 - 5/3)

	

 

Primary Outage(s)




 

Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490

FH)

	

 

564

	

 

	

 

	

 

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

	

 

	

 

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

	

 

	

 

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

 

	

 

	

 

	

1104

(18)

	

1104

(18)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/21/2026 - 6/9/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

 

	

 

	

 

	

1060

(18)

	

1060

(18)

	

MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter (4/21/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

 

	

 

	

 

	

 

1040

(235)

	

 

1040

(235)

	

MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

 

	

 

	

 

	

1275

(68)

	

 

1,343

	

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta 47: Unit 1E - Annual Turbine Maintenance (4/20/2026 - 4/24/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

 

	

 

	

 

	

963

(279)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-4 to MLV 71-4D: Pig Runs - EMAT 4/23/26 (4/23/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

	

 

	

 

	

 

734

	

 

734

	

 




Station 834

(segment 834 BH)

	

 

683

	

 

	

 

	

 

	

670

(13)

	

670

(13)

	

Sta 834: Unit 1A - Turbocharger (3/30/2026 - 5/8/2026) Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/24/2026)

Sta 834: Unit 7A - Turbocharger/Overhaul (4/27/2026 - 5/8/2026)




Station 847

(segment 847 FH)

	

 

626

	

 

	

 

	

 

	

 

626

	

490

(136)

	

MLV 847-1 to MLV 851-1: Pig Runs - Cal / IMU & MFL-A 4/30/26 (4/30/2026)

MLV 847-1 to MLV 851-1: Pig Runs - Cleaning / Gauge 4/28/26 (4/28/2026)




Station 534 South of Pool (segment 530 BH)

	

 

 

1,550

	

 

	

 

	

 

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 -

5/29/2026)




 

MLV 548

(segment 542 BH)

	

 

 

1,647

	

 

	

 

	

 

	

 

1385

(262)

	

 

1435

(212)

	

Sta 538 Heidelberg: Station ESD Test (4/21/2026)

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

 

 

 

Station 860

(segment 548 BH)

	

 

 

 

 

 

1,593

	

 

	

 

	

 

	

 

 

 

 

1270

(323)

	

 

 

 

 

1230

(363)

	

MLV 554-2R to MLV 554-2: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 555-1L to MLV 556-1: Anomaly Remediation (4/27/2026 - 5/1/2026) MLV 556-1 to MLV 557-1: Anomaly Remediation (4/20/2026 - 4/24/2026) Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555 Collinwood: Annual ESD Test & Maintenance (4/21/2026 - 4/24/2026) Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (4/21/2026 - 4/24/2026)

Sta 555: Unit 1B - Protective Device Inspection (4/28/2026 - 4/29/2026) Sta 555: Unit 1B - Replace Recycle Valve Seal (4/28/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




 

 

Station 860 North (Segment 860 BH)

	

 

 

 

1,874

	

 

	

 

	

 

	

 

 

 

1846

(28)

	

 

 

 

1535

(339)

	

MLV 562-2 to MLV 563-2: Anomaly Remediation (4/13/2026 - 4/25/2026) Sta 563 Joelton: Annual ESD Test (4/29/2026)

Sta 563 Joelton: Unit 1A - Lube Oil Varnish System Installation (4/29/2026 - 5/1/2026)

Sta 563 Joelton: Unit 2A - Lube Oil Varnish System Installation (4/27/2026 - 4/29/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

2,685

	

 

	

 

	

 

	

 

 

2392

(293)

	

 

 

2222

(463)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 874-2A to MLV 874-2B: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 874-2B to MLV 874-2: Anomaly Remediation (4/27/2026 - 5/2/2026) Sta 87: Unit 2E Overhaul (2/20/2026 - 4/24/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026)

Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

	

 

	

 

	

771

(136)

	

469

(438)

	

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026) Sta 114 Catlettsburg: Annual ESD Test (4/28/2026 - 4/29/2026)

Sta 119A Rocky Fork: Annual ESD Test (4/28/2026 - 4/29/2026)




 

Station 204

(Segment 204 BH)

	

 

 

1,828

	

 

	

 

	

 

	

 

 

1480

(348)

	

 

 

1550

(278)

	

MLV 204-3 to MLV 209-3: Pig Run - EMAT (4/23/2026) MLV 204-3 to MLV 209-3: Pig Run - MFL-C (4/21/2026) MLV 214-2 to MLV 219-2: Pig Run - Cal/IMU (M) (4/30/2026)

MLV 214-2 to MLV 219-2: Pig Run - Gauge/Cleaning (M) (4/28/2026)

Sta 209 Cambridge: Annual ESD Test & Maintenance (4/20/2026 - 5/1/2026)




 

	

 

	

 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

 

	

TGP - Outage Impact Report

	

 

	

 

	

-Major impact restrictions may be necessary




 

	

 

	

April 2026 (updated 04/09/26)

	

 

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




 

Station # / Lateral

	

Est Nominal Operating Capacity (Thousand Dth)

	

Week 1

(3/30 - 4/5)

	

Week 2

(4/6 - 4/12)

	

Week 3

(4/13 - 4/19)

	

Week 4

(4/20 - 4/26)

	

Week 5

(4/27 - 5/3)

	

 

Primary Outage(s)




 

Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 245

(segment 245 FH)

	

 

986

	

 

	

 

	

 

	

 

986

	

650

(336)

	

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026)

Sta 249: Unit 1A - Crankcase Inspection (4/27/2026 - 5/1/2026)




MLV 256 West

(segment 249 FH)

	

 

1,203

	

 

	

 

	

 

	

 

1,203

	

535

(668)

	

MLV 249-2 to MLV 254-2: Cal/IMU (4/29/2026)

MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (4/28/2026) MLV 249-2 to MLV 254-2: MFL-C (4/30/2026)




Station 254

(segment 256 FH)

	

 

1,203

	

 

	

 

	

 

	

1005

(198)

	

 

1,203

	

MLV 259-1 to MLV 260-1: Anomaly Remediation (4/20/2026 - 4/25/2026)




Station 261 Discharge East (segment 261

FH)

	

 

888

	

 

	

 

	

 

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

 

	

 

	

 

	

 

1,153

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

	

 

	

 

	

 

1,823

	

 

1,823

	

 




MLV 324

(segment 324 FH)

	

 

1,767

	

 

	

 

	

 

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

 

	

 

	

 

	

 

145

(8)

	

 

145

(8)

	

MLV 338-1 to MLV 339-1: Anomaly Remediation (4/16/2026 - 4/20/2026) MLV 339-1 to MLV 340-1: Anomaly Remediation (4/21/2026 - 4/25/2026) MLV 340-1 to MLV 341-1: Anomaly Remediation (4/26/2026 - 4/30/2026)

MLV 341-1 to MLV 342-1: Anomaly Remediation (5/1/2026 - 5/5/2026)




Station 405 HC Line (segment 299

FH)

	

 

794

	

 

	

 

	

 

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

May 2026 (updated 04/09/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




 

Station # / Lateral

	

Est Nominal Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




 

Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490

FH)

	

 

564

	

 

564

	

 

564

	

 

325

(239)

	

 

564

	

Sta 409: Annual ESD Test & Maintenance (5/19/2026 - 5/21/2026)




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

1104

(18)

	

1104

(18)

	

1104

(18)

	

760

(362)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/21/2026 - 6/9/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

1060

(18)

	

1055

(23)

	

1055

(23)

	

1055

(23)

	

MLV 26-1 Relocation: Highway 59 Widening (5/16/2026 - 6/2/2026) MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter

(4/21/2026 - 5/4/2026)




Station 32 South

(segment 132 FH)

	

 

1,275

	

 

1040

(235)

	

 

950

(325)

	

 

1,275

	

 

1,275

	

MLV 32-2 to MLV 40-2S: Pig Run - Maintenance (5/12/2026) MLV 32-3 to MLV 40-3S: Pig Run - Maintenance (5/13/2026)

MLV 37-2 to MLV 38-2: Anomaly Remediation (4/20/2026 - 5/8/2026)




Carthage Lateral (segment 700

FH)

	

 

296

	

180

(116)

	

180

(116)

	

 

296

	

 

296

	

MLV 706-1 to MLV 700-1: Pig Run - Caliper 5/14/26 (M) (5/14/2026)

MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/12/26 (M) (5/12/2026) MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/7/26 (M) (5/7/2026)




 

 

 

Station 47

(segment 143 FH)

	

 

 

 

 

1,343

	

 

 

 

1020

(323)

	

 

 

 

1050

(293)

	

 

 

 

815

(528)

	

 

 

 

1330

(13)

	

MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (5/15/2026) MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (5/18/2026)

MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/11/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/12/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/13/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Sta. 47: Scrubber/Filter/Separator Cleaning/Inspection/Changeout (5/18/2026 - 5/22/2026)

Sta. 47: Station Transformer Maintenance (5/4/2026 - 5/5/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




MLV 822 West

(segment 820 FH)

	

 

724

	

150

(574)

	

 

724

	

 

724

	

 

724

	

MLV 820-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/6/2026)




MLV 822 East

(segment 822 BH)

	

 

972

	

150

(822)

	

 

972

	

 

972

	

 

972

	

MLV 823-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/5/2026)




Station 823

(segment 823 BH)

	

 

734

	

640

(94)

	

 

734

	

 

734

	

 

734

	

Sta 823 (Kinder): Annual ESD Test (5/5/2026 - 5/7/2026)




 

 

Station 834

(segment 834 BH)

	

 

 

 

683

	

 

 

645

(38)

	

 

 

670

(13)

	

 

 

504

(179)

	

 

 

 

683

	

Sta 834 to Sta 827: Maintenance Pig (5/21/2026)

Sta 834: Unit 1A - Replace Insulation Blanket (5/5/2026 - 5/6/2026) Sta 834: Unit 1A - Turbocharger (3/30/2026 - 5/8/2026)

Sta 834: Unit 2A - Replace Insulation Blanket (5/7/2026 - 5/8/2026) Sta 834: Unit 3A - Replace Insulation Blanket (5/12/2026 - 5/13/2026) Sta 834: Unit 4A - Replace Insulation Blanket (5/14/2026 - 5/15/2026)

Sta 834: Unit 7A - Turbocharger/Overhaul (4/27/2026 - 5/8/2026)




Station 527

(segment 527 BH)

	

 

2,395

	

1920

(475)

	

 

2,395

	

 

2,395

	

 

2,395

	

Sta. 527 Port Sulphur: Annual ESD Test (5/7/2026)




 

Station 534 South of Pool (segment 530 BH)

	

 

 

 

1,550

	

 

 

1365

(185)

	

 

 

1528

(22)

	

 

 

1528

(22)

	

 

 

1370

(180)

	

Sta 530: Annual ESD Test (5/7/2026)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Annual ESD Test (5/26/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/29/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

 

1435

(212)

	

 

1435

(212)

	

 

1635

(12)

	

 

1635

(12)

	

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 5/15/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)

Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 5/15/2026)




 

Station 860

(segment 548 BH)

	

 

 

1,593

	

 

1545

(48)

	

 

1580

(13)

	

 

800

(793)

	

 

800

(793)

	

MLV 551-2 to MLV 552-2: Anomaly Remediation (5/18/2026 - 5/29/2026) MLV 552-2 to MLV 553-2: Anomaly Remediation (5/4/2026 - 5/15/2026) MLV 557-1 to MLV 558-1R: Anomaly Remediation (5/4/2026 - 5/8/2026) Sta 550: Unit 3A - Overhaul (4/6/2026 - 5/18/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

May 2026 (updated 04/09/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




 

Station # / Lateral

	

Est Nominal Operating Capacity (Thousand Dth)

	

Week 1

(5/4 - 5/10)

	

Week 2

(5/11 - 5/17)

	

Week 3

(5/18 - 5/24)

	

Week 4

(5/25 - 5/31)

	

 

Primary Outage(s)




 

Est. Operational Capacity (Operational Impact) - Thousand Dth




 

Station 860 North (Segment 860 BH)

	

 

 

1,874

	

 

 

1846

(28)

	

 

 

1100

(774)

	

 

 

1540

(334)

	

 

 

1846

(28)

	

Sta 563 Joelton: Unit 2A - Solar Turbine Exchange (5/11/2026 - 5/22/2026)

Sta 860: Annual ESD Test & Maintenance (5/11/2026 - 5/12/2026)

Sta 860: Scrubber/Filter/Separator Clean, Inspect & Filter Change (5/11/2026 - 5/15/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

2,685

	

 

 

 

 

2392

(293)

	

 

 

 

 

1895

(790)

	

 

 

 

 

1891

(794)

	

 

 

 

 

1891

(794)

	

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 109-3: Crossover to Ln 4 Valve Replacements (5/18/2026 - 5/26/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - AFD (5/19/2026)

MLV 87-3 to MLV 96-3: Pig Run - Cleaning/Gauge (5/14/2026) MLV 87-3 to MLV 96-3: Pig Run - EMAT (5/21/2026) MLV 87-3 to MLV 96-3: Pig Run - MDS (5/26/2026)

MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)




Station 114

(segment 114 BH)

	

 

907

	

771

(136)

	

771

(136)

	

771

(136)

	

 

907

	

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026)




 

 

Station 204

(Segment 204 BH)

	

 

 

 

1,828

	

 

 

 

1720

(108)

	

 

 

 

1,828

	

 

 

 

1815

(13)

	

 

 

 

1270

(558)

	

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026) MLV 214-2 to MLV 219-2: Pig Run - EMAT (M) (5/6/2026)

MLV 214-2 to MLV 219-2: Pig Run - MFL-C (M) (5/4/2026)

MLV 214-3 to MLV 215-3: Anomaly Remediation (5/18/2026 - 5/23/2026)




 

 

Station 245

(segment 245 FH)

	

 

 

 

986

	

 

 

735

(251)

	

 

 

490

(496)

	

 

 

490

(496)

	

 

 

720

(266)

	

MLV 237-2 to MLV 245-2: Pig Run - CAL/IMU (M) (5/19/2026)

MLV 237-2 to MLV 245-2: Pig Run - Gauge/Cleaning Tool (M) (5/12/2026) MLV 237-2 to MLV 245-2: Pig Run - MFL-A (M) (5/21/2026)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 249: Annual ESD Test & Maintenance (5/19/2026 - 5/25/2026)

Sta 249: Unit 2A - Crankcase Inspection (5/4/2026 - 5/8/2026)




Station 254

(segment 256 FH)

	

 

1,203

	

 

1,203

	

 

925

(278)

	

 

1,203

	

 

630

(573)

	

MLV 254-2 to MLV 261-2: Pig Run - Cal/IMU/MFL-A Combo (5/28/2026)

MLV 254-2 to MLV 261-2: Pig Run - Gauge/Cleaning tool (5/27/2026) Sta 254 Nassau: Annual ESD Test (5/12/2026)

Sta 254: Unit 2B - 4k / 8k Service Inspection (5/13/2026 - 5/14/2026)




Station 261 Discharge East (segment 261

FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 

1,153

	

 




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

1400

(423)

	

Sta 315 Wellsboro: Annual ESD Test (5/26/2026)




Station 321

(segment 321 FH)

	

 

2,102

	

1820

(282)

	

1820

(282)

	

1820

(282)

	

 

2,102

	

Sta 323A Lackawaxen: Annual ESD Testing & Valve Replacement (5/4/2026 - 5/7/2026)

Sta. 323A: Unit 1A - ABB Drive Modernization (5/4/2026 - 5/22/2026)




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 336 East

(segment 336 FH)

	

 

153

	

 

145

(8)

	

 

150

(3)

	

 

150

(3)

	

 

153

	

MLV 341-1 to MLV 342-1: Anomaly Remediation (5/1/2026 - 5/5/2026) MLV 342-1 to MLV 343-1: Anomaly Remediation (5/6/2026 - 5/10/2026) MLV 343-1 to MLV 344-1: Anomaly Remediation (5/11/2026 - 5/15/2026)

MLV 344-1 to MLV 345-1: Anomaly Remediation (5/16/2026 - 5/20/2026)




MLV 345 North of Derby Lateral (segment 355

BH)

	

 

147

	

 

147

	

 

147

	

 

47

(100)

	

 

47

(100)

	

MLV 345-1 to MLV 346-1: Anomaly Remediation (M) (5/21/2026 - 5/25/2026) MLV 346-1 to MLV 347-1: Anomaly Remediation (5/26/2026 - 5/30/2026) MLV 347-1 to MLV 348-1: Anomaly Remediation (5/31/2026 - 6/4/2026)




Station 405 HC Line (segment 299

FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

June 2026 (updated 04/09/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




 

Station # / Lateral

	

Est Nominal Operating Capacity (Thousand Dth)

	

Week 1

(6/1 - 6/7)

	

Week 2

(6/8 - 6/14)

	

Week 3

(6/15 - 6/21)

	

Week 4

(6/22 - 6/28)

	

 

Primary Outage(s)




 

Est. Operational Capacity (Operational Impact) - Thousand Dth




Station 409 (Donna Line) (segment 490

FH)

	

 

564

	

 

564

	

 

564

	

 

564

	

 

564

	

 




Station 1

(segment 101 BH)

	

 

399

	

 

399

	

 

399

	

 

399

	

 

399

	

 




Station 9

(segment 109 FH)

	

 

969

	

 

969

	

 

969

	

 

969

	

 

969

	

 




Station 17

(segment 117 FH)

	

 

1,122

	

760

(362)

	

760

(362)

	

1000

(122)

	

1000

(122)

	

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/21/2026 - 6/9/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)




Station 25

(segment 125 FH)

	

 

1,078

	

930

(148)

	

930

(148)

	

930

(148)

	

925

(153)

	

MLV 26-1 Relocation: Highway 59 Widening (5/16/2026 - 6/2/2026) MLV 26-2 Relocation: Highway 59 Widening (6/4/2026 - 6/22/2026)

MLV 26-3 Relocation: Highway 59 Widening (M) (6/23/2026 - 7/10/2026)




Station 47

(segment 143 FH)

	

 

1,343

	

1330

(13)

	

1300

(43)

	

1330

(13)

	

1330

(13)

	

MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (6/9/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)




Station 63

(segment 163 FH)

	

 

1,242

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

1117

(125)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)




Station 823

(segment 823 BH)

	

 

734

	

 

734

	

 

734

	

 

734

	

 

734

	

 




 

 

Station 834

(segment 834 BH)

	

 

 

 

683

	

 

 

220

(463)

	

 

 

220

(463)

	

 

 

220

(463)

	

 

 

590

(93)

	

Sta 827 (Alexandria): Annual ESD and Maintenance (6/8/2026 - 6/11/2026) Sta 827 to Sta 823: Pig Run - Maintenance (M) (6/3/2026)

Sta 834 to Sta 827: Pig Run - BH Combo 6/11/26 (M) (6/11/2026) Sta 834 to Sta 827: Pig Run - BH Hard Spot 6/15/26 (M) (6/15/2026)

Sta 834 to Sta 827: Pig Run - Cleaning / Gauge 6/8/26 to 6/10/26 (M) (6/8/2026 - 6/10/2026)

Sta 834: Scrubber Filter Changeout (6/26/2026)




Station 534 South of Pool (segment 530

BH)

	

 

1,550

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

 

1528

(22)

	

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)




MLV 548

(segment 542 BH)

	

 

1,647

	

1635

(12)

	

1635

(12)

	

1635

(12)

	

1635

(12)

	

Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 8/14/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 6/28/2026)




Station 860

(segment 548 BH)

	

 

1,593

	

1550

(43)

	

 

1,593

	

 

1,593

	

 

1,593

	

MLV 557-3 to MLV 559-3: Pig Runs - Cal / IMU & MFL-A 6/4/26 (6/4/2026)

MLV 557-3 to MLV 559-3: Pig Runs - Cleaning / Gauge 6/2/26 (6/2/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 6/5/2026)




Station 860 North (Segment 860

BH)

	

 

1,874

	

 

1846

(28)

	

 

1846

(28)

	

 

1530

(344)

	

 

1846

(28)

	

Sta 563 Joelton: Scrubber Filter Changeout (6/15/2026 - 6/18/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)




 

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

	

 

 

 

 

 

 

 

 

2,685

	

 

 

 

 

 

 

 

 

1915

(770)

	

 

 

 

 

 

 

 

 

1780

(905)

	

 

 

 

 

 

 

 

 

2291

(394)

	

 

 

 

 

 

 

 

 

2394

(291)

	

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (5/27/2026 - 6/10/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

Sta 87: Unit 3D - Power side Overhaul (6/1/2026 - 9/30/2026)

Sta 106 Clay City: Annual ESD Test & Maintenance (6/2/2026 - 6/5/2026) Sta. 106: C Building - Install Water Trech System (6/8/2026 - 6/12/2026) Sta 110 Morehead: Annual ESD Test & Substation Inspection (6/8/2026 - 6/12/2026)

Sta 96 Campbellsville: Annual ESD Test (6/9/2026 - 6/10/2026)

Sta 96 Campbellsville: Annual Substation Inspection (6/9/2026 - 6/12/2026) MLV 96-4D to MLV 96-4BL: Spike Test (6/11/2026 - 6/20/2026)

Sta 875 Richmond: Annual ESD Test & Maintenance (6/16/2026 - 6/19/2026) MLV 109-4 to MLV 110-4: Pipe Replacement (6/17/2026 - 7/2/2026)

Sta 871 Campbellsville: Annual ESD Test (6/23/2026)




Station 114

(segment 114 BH)

	

 

907

	

 

907

	

 

907

	

 

907

	

 

907

	

 




Station 200

(segment 200 BH)

	

 

1,766

	

 

1,766

	

 

1,766

	

1485

(281)

	

 

1,766

	

Sta 200 Greenup: Annual ESD Test (6/16/2026 - 6/19/2026)




 

	

 

	

 

	

-Primary impact restrictions may be necessary




 

	

TGP - Outage Impact Report

	

 

	

-Major impact restrictions may be necessary




 

	

June 2026 (updated 04/09/26)

	

 

	

-Minor impact restrictions may be necessary depending on flow conditions




 

	

 

	

 

	

-Little to no impact, though minor outages may cause incremental reductions




 

Station # / Lateral

	

Est Nominal Operating Capacity (Thousand Dth)

	

Week 1

(6/1 - 6/7)

	

Week 2

(6/8 - 6/14)

	

Week 3

(6/15 - 6/21)

	

Week 4

(6/22 - 6/28)

	

 

Primary Outage(s)




 

Est. Operational Capacity (Operational Impact) - Thousand Dth




 

Station 204

(Segment 204 BH)

	

 

 

1,828

	

 

1270

(558)

	

 

1270

(558)

	

 

 

1,828

	

 

 

1,828

	

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026)




Station 219 to

Station 224

(Segment 219 FH)

	

 

539

	

 

539

	

 

539

	

 

140

(399)

	

 

539

	

MLV 219-1D to MLV 224-1: Pig Run - Maintenance (6/16/2026)




Station 245

(segment 245 FH)

	

 

986

	

 

830

(156)

	

 

830

(156)

	

 

740

(246)

	

 

830

(156)

	

Sta 241: Annual ESD Test (6/16/2026)

Sta 241: Unit 1B - Oil System (6/2/2026 - 6/4/2026) Sta 241: Unit 2B - Oil System (6/9/2026 - 6/11/2026) Sta 249: Unit 2B - 25k Overhaul (6/1/2026 - 6/26/2026)




Station 261 Discharge East (segment 261

FH)

	

 

888

	

 

888

	

 

888

	

 

888

	

 

888

	

 




Station 307

(segment 307 BH)

	

 

1,153

	

965

(188)

	

1110

(43)

	

 

1,153

	

 

1,153

	

Sta 219: Unit 1B - Protective Device Checks & GHG (6/8/2026 - 6/12/2026) Sta 303A: Annual ESD Test & Maintenance (6/1/2026 - 6/5/2026)

Sta 307: Unit 3A - Turbocharger swap (6/8/2026 - 6/12/2026)




Station 315

(segment 315 BH)

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 

1,823

	

 




MLV 324

(segment 324 FH)

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 

1,767

	

 




MLV 329

(segment 324 FH)

	

 

846

	

 

846

	

155

(691)

	

 

846

	

 

846

	

MLV 325-1 to MLV 329-1: Pig runs - Cal/IMU (M) (6/10/2026)

MLV 325-1 to MLV 329-1: Pig runs - Cleaning/Gauge 6/9/26 (M) (6/9/2026) MLV 325-1 to MLV 329-1: Pig runs - MFL-C 6/11/26 (M) (6/11/2026)




MLV 345 North of Derby Lateral (segment 355 BH)

	

 

 

147

	

 

47

(100)

	

 

47

(100)

	

 

47

(100)

	

 

47

(100)

	

MLV 347-1 to MLV 348-1: Anomaly Remediation (5/31/2026 - 6/4/2026) MLV 349-1 to MLV 350-1: Anomaly Remediation (6/5/2026 - 6/9/2026) MLV 350-1 to MLV 351-1: Anomaly Remediation (6/10/2026 - 6/14/2026) MLV 351-1 to MLV 352-1: Anomaly Remediation (6/15/2026 - 6/19/2026)

MLV 353-1 to MLV 354-1: Anomaly Remediation (6/20/2026 - 6/23/2026)




Cranston Lateral South

(segment 281

FH)

	

 

187

	

 

187

	

 

187

	

 

187

	

 

150

(37)

	

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Cal/IMU (M) (6/23/2026) ; MLV

265E-101.1 to MLV 265E-104: PIG RUNS - Gauge/Cleaning tool (M) (6/22/2026)

; MLV 265E-101.1 to MLV 265E-104: PIG RUNS - MFL-A (M) (6/24/2026)




Station 405 HC Line (segment 299

FH)

	

 

794

	

 

794

	

 

794

	

 

794

	

 

794

	

 




This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-10-2026 ID1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/10/2026 11:16:39AM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 11:16:39 AM	Notice ID: 400545
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-10-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Friday, April 10, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 16,553 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 5,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 210,104 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 203,062 Dths

·         STA 317 (Segment 317 BH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 80,423 Dths

·         STA 321 (Segment 321 FH) - through approx 15% of SOP increases due to nominations in excess of operational capacity; 20,601 Dths

·         STA 325 (Segment 324 FH) - through approx 12% of SOP increases due to nominations in excess of operational capacity; 7,594 Dths

·         MLV 330 (Segment 324 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 47,133 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 148,013 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 219,441 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 121,483 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 209,150 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Gulf South Pipeline

Paris Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037939
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-03T11:42:00+00:00
Effective: 2026-05-05T09:00:00+00:00
End: 2026-05-06T09:00:00+00:00
Subject: Paris Compressor Station Maintenance
Gulf South Pipeline

Index 330 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037941
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-03T11:46:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-07-01T09:00:00+00:00
Subject: Index 330 Pipeline Maintenance
Gulf South Pipeline

Index 129 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037940
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-03T11:46:00+00:00
Effective: 2026-05-05T09:00:00+00:00
End: 2026-05-10T09:00:00+00:00
Subject: Index 129 Pipeline Maintenance
Gulf South Pipeline

Index 129 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037942
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-03T11:51:00+00:00
Effective: 2026-05-10T09:00:00+00:00
End: 2026-05-21T09:00:00+00:00
Subject: Index 129 Pipeline Maintenance
Gulf South Pipeline

Unplanned Index 129 Pipeline Maintenane

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037977
Notice Type: Maintenance
Status: Terminate
Posted: 2026-04-10T11:05:00+00:00
Effective: 2026-04-10T11:07:00+00:00
End: 2026-04-11T09:00:00+00:00
Subject: Unplanned Index 129 Pipeline Maintenane

Gulf South Pipeline Notice 5037977
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037977
Prior Notice :
5037947
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 129 Pipeline Maintenane
TSP :
078444247
Post Date/Time :
04/10/2026 11:05:00 AM
Notice Effective Date/Time :
04/10/2026 11:07:00 AM
Notice End Date/Time :
04/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Index 129 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 3364 (Mill Gansville/Tannehill Comm Cg)
- Loc 3385 (Calvin City Gate)
- 1 Atmos Farm Tap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/10/2026 11:05:43 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/10/2026 11:05:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/10/2026 11:07:00 AM
Notice Stat Desc :
Terminate
Notice End Date/Time :
04/11/2026 09:00:00 AM
Notice ID :
5037977
Response Date/Time :
Prior Notice :
5037947
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 129 Pipeline Maintenane
Notice Text :
Gulf South will be performing maintenance at Index 129 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- Loc 3364 (Mill Gansville/Tannehill Comm Cg)
- Loc 3385 (Calvin City Gate)
- 1 Atmos Farm Tap
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/10/2026 11:05:43 AM
Page 1 of 1
East Tennessee Natural Gas

04/06/2026- ETNG Action Alert -- LIFTED EFF 4/6

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: East Tennessee Natural Gas, LLC
Subject: ETNG Action Alert -- LIFTED EFF 4/6
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/06/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176163
Prior Notice Identifier: 175998
Required Response Indicator Description: No response required

Operational Areas
Gas Day April 5
Gas Day April 6 and until further notice
System Wide
Action Alert in Effect: No Due Shipper Action Alert 5% / 500
No OFO*
Hourly Customer Specific Operational Flow Order
No Hourly Customer Specific OFO
No Hourly Customer Specific OFO*
MAD
No MAD
No MAD*
Gulf South Pipeline

Hall Summit Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037867
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-24T14:05:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-16T09:00:00+00:00
Subject: Hall Summit Compressor Station Maintenance
Gulf South Pipeline

Revised: Index 301-8-11-L Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037881
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-25T15:54:00+00:00
Effective: 2026-04-11T09:00:00+00:00
End: 2026-04-24T09:00:00+00:00
Subject: Revised: Index 301-8-11-L Pipeline Maintenance
Gulf South Pipeline

Mccomb Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037906
Notice Type: Maintenance
Status: Terminate
Posted: 2026-03-27T15:42:00+00:00
Effective: 2026-03-27T15:45:00+00:00
End: 2026-05-04T09:00:00+00:00
Subject: Mccomb Compressor Station Maintenance
Gulf South Pipeline

Revised: Harrisville Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037908
Notice Type: Maintenance
Status: Terminate
Posted: 2026-03-27T15:46:00+00:00
Effective: 2026-03-27T15:50:00+00:00
End: 2026-04-18T09:00:00+00:00
Subject: Revised: Harrisville Compressor Station Maintenance
Gulf South Pipeline

Index 130 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037910
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T15:50:00+00:00
Effective: 2026-05-04T09:00:00+00:00
End: 2026-05-05T09:00:00+00:00
Subject: Index 130 Meter Maintenance
Gulf South Pipeline

Arnaudville Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037911
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-27T15:51:00+00:00
Effective: 2026-04-27T09:00:00+00:00
End: 2026-05-02T09:00:00+00:00
Subject: Arnaudville Compressor Station Maintenance
Gulf South Pipeline

Index 818 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037913
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-27T15:54:00+00:00
Effective: 2026-05-05T09:00:00+00:00
End: 2026-05-06T09:00:00+00:00
Subject: Index 818 Meter Maintenance
Gulf South Pipeline

Revised: Index 330 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037915
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-27T16:03:00+00:00
Effective: 2026-04-27T09:00:00+00:00
End: 2026-05-01T09:00:00+00:00
Subject: Revised: Index 330 Pipeline Maintenance
Gulf South Pipeline

Posted Maintenance Events for 04/03/2026 - 04/09/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037934
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-02T11:11:00+00:00
Effective: 2026-04-03T09:00:00+00:00
End: 2026-04-10T09:00:00+00:00
Subject: Posted Maintenance Events for 04/03/2026 - 04/09/2026
Gulf South Pipeline

Index 819-2 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037961
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-08T09:30:00+00:00
Effective: 2026-05-13T09:00:00+00:00
End: 2026-05-14T09:00:00+00:00
Subject: Index 819-2 Meter Maintenance 

Gulf South Pipeline Notice 5037961
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5037961
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Index 819-2 Meter Maintenance
TSP :
078444247
Post Date/Time :
04/08/2026 09:30:00 AM
Notice Effective Date/Time :
05/13/2026 09:00:00 AM
Notice End Date/Time :
05/14/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at Index 819-2 Meter.
The following point will be shut-in for the duration of the maintenance:
- Loc 24421 (Bennington (From Midship))
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/08/2026 9:30:25 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/08/2026 09:30:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/13/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
05/14/2026 09:00:00 AM
Notice ID :
5037961
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 819-2 Meter Maintenance
Notice Text :
Gulf South is performing maintenance at Index 819-2 Meter.
The following point will be shut-in for the duration of the maintenance:
- Loc 24421 (Bennington (From Midship))
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/08/2026 9:30:25 AM
Page 1 of 1
Gulf South Pipeline

Index 301-6 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037787
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-11T08:34:00+00:00
Effective: 2026-04-09T09:00:00+00:00
End: 2026-04-11T09:00:00+00:00
Subject: Index 301-6 Pipeline Maintenance

Gulf South Pipeline Notice 5037787
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5037787
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Index 301-6 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
03/11/2026 08:34:00 AM
Notice Effective Date/Time :
04/09/2026 09:00:00 AM
Notice End Date/Time :
04/11/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at the Index 301-6 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- 17 Delta Gas Utilities Farm Taps
- 1 Ovett Field Farm Tap"
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/11/2026 8:34:19 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/11/2026 08:34:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/09/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
04/11/2026 09:00:00 AM
Notice ID :
5037787
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 301-6 Pipeline Maintenance
Notice Text :
Gulf South is performing maintenance at the Index 301-6 Pipeline.
The following points will be shut-in for the duration of the maintenance:
- 17 Delta Gas Utilities Farm Taps
- 1 Ovett Field Farm Tap"
If you have any questions, please contact your customer service representative.
03/11/2026 8:34:19 AM
Page 1 of 1
Gulf South Pipeline

Westlake Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037817
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-17T11:19:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-16T09:00:00+00:00
Subject: Westlake Compressor Station Maintenance

Gulf South Pipeline Notice 5037817
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5037817
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Westlake Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/17/2026 11:19:00 AM
Notice Effective Date/Time :
05/11/2026 09:00:00 AM
Notice End Date/Time :
05/16/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Westlake Compressor Station.
Based on current operating conditions, no capacity impact is expected.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/17/2026 11:19:45 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/17/2026 11:19:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/11/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
05/16/2026 09:00:00 AM
Notice ID :
5037817
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Westlake Compressor Station Maintenance
Notice Text :
Gulf South will be performing maintenance at Westlake Compressor Station.
Based on current operating conditions, no capacity impact is expected.
If you have any questions, please contact your customer service representative.
03/17/2026 11:19:45 AM
Page 1 of 1
Gulf South Pipeline

Index 287-5 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037824
Notice Type: Maintenance
Status: Supersede
Posted: 2026-03-18T08:36:00+00:00
Effective: 2026-04-07T09:00:00+00:00
End: 2026-04-09T09:00:00+00:00
Subject: Index 287-5 Meter Maintenance

Gulf South Pipeline Notice 5037824
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037824
Prior Notice :
5037762
Reqrd Rsp Desc :
No response required
Subject :
Index 287-5 Meter Maintenance
TSP :
078444247
Post Date/Time :
03/18/2026 08:36:00 AM
Notice Effective Date/Time :
04/07/2026 09:00:00 AM
Notice End Date/Time :
04/09/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised Description:
------------------------------------------------------------------------------------------
Gulf South will be performing maintenance at Index 287-5.
The following points will be shut-in for the duration of the maintenance:
- Loc 30 (Nopsi #3 City Gate)
This maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/18/2026 8:37:00 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/18/2026 08:36:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/07/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/09/2026 09:00:00 AM
Notice ID :
5037824
Response Date/Time :
Prior Notice :
5037762
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 287-5 Meter Maintenance
Notice Text :
Revised Description:
------------------------------------------------------------------------------------------
Gulf South will be performing maintenance at Index 287-5.
The following points will be shut-in for the duration of the maintenance:
- Loc 30 (Nopsi #3 City Gate)
This maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
03/18/2026 8:37:00 AM
Page 1 of 1
Gulf South Pipeline

Index 302 Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037938
Notice Type: Maintenance
Status: Initiate
Posted: 2026-04-03T11:40:00+00:00
Effective: 2026-04-08T09:00:00+00:00
End: 2026-04-09T09:00:00+00:00
Subject: Index 302 Pipeline Maintenance

Gulf South Pipeline Notice 5037938
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5037938
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Index 302 Pipeline Maintenance
TSP :
078444247
Post Date/Time :
04/03/2026 11:40:00 AM
Notice Effective Date/Time :
04/08/2026 09:00:00 AM
Notice End Date/Time :
04/09/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Index 302 Pipeline.
The following meters will need to be shut in for the duration of the maintenance:
- 13 Delta Farm Taps
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/03/2026 11:40:52 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/03/2026 11:40:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
04/08/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
04/09/2026 09:00:00 AM
Notice ID :
5037938
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 302 Pipeline Maintenance
Notice Text :
Gulf South will be performing maintenance at Index 302 Pipeline.
The following meters will need to be shut in for the duration of the maintenance:
- 13 Delta Farm Taps
If you have any questions, please contact your customer service representative.
04/03/2026 11:40:52 AM
Page 1 of 1
Gulf South Pipeline

Revised: Montz Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037861
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037861
Prior Notice :
5037582
Reqrd Rsp Desc :
No response required
Subject :
Revised: Montz Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/24/2026 09:55:00 AM
Notice Effective Date/Time :
03/24/2026 10:00:00 AM
Notice End Date/Time :
03/28/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Notice Text
----------------------------------
Updated Notice Effective Date
----------------------------------
Gulf South will be performing maintenance at the Montz Compressor Station.
The work is to be completed during a third party outage.
Gas Day 2/3-3/9:
The following location will be shut in for the duration of the maintenance:
- Loc 24352 (St. Charles Power Station)
Gas Day 3/10-3/23:
No impact is expected for the following location:
- Loc 24352 (St. Charles Power Station)
Gas Day 3/24-3/27:
Gulf South will work with the following point operators to mitigate impact:
- Loc 24352 (St. Charles Power Station)
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/24/2026 9:55:29 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/24/2026 09:55:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/24/2026 10:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
03/28/2026 09:00:00 AM
Notice ID :
5037861
Response Date/Time :
Prior Notice :
5037582
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Montz Compressor Station Maintenance
Notice Text :
Updated Notice Text
----------------------------------
Updated Notice Effective Date
----------------------------------
Gulf South will be performing maintenance at the Montz Compressor Station.
The work is to be completed during a third party outage.
Gas Day 2/3-3/9:
The following location will be shut in for the duration of the maintenance:
- Loc 24352 (St. Charles Power Station)
Gas Day 3/10-3/23:
No impact is expected for the following location:
- Loc 24352 (St. Charles Power Station)
Gas Day 3/24-3/27:
Gulf South will work with the following point operators to mitigate impact:
- Loc 24352 (St. Charles Power Station)
If you have any questions, please contact your customer service representative.
03/24/2026 9:55:29 AM
Page 1 of 1
Gulf South Pipeline

Unplanned Index 391-1-L Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037868
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037868
Prior Notice :
5037814
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 391-1-L Pipeline Maintenance
TSP :
078444247
Post Date/Time :
03/24/2026 02:22:00 PM
Notice Effective Date/Time :
03/24/2026 09:23:00 PM
Notice End Date/Time :
03/29/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised Description.
------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Index 391-1-L Pipeline.
The following points will have reduced flow for the duration of the maintenance:
- Loc 24494 (Tristate Longview (From Tristate))
- Loc 24520 (Tristate Longview (To Tristate))
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/24/2026 2:22:19 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/24/2026 02:22:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/24/2026 09:23:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
03/29/2026 09:00:00 AM
Notice ID :
5037868
Response Date/Time :
Prior Notice :
5037814
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 391-1-L Pipeline Maintenance
Notice Text :
Revised Description.
------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Index 391-1-L Pipeline.
The following points will have reduced flow for the duration of the maintenance:
- Loc 24494 (Tristate Longview (From Tristate))
- Loc 24520 (Tristate Longview (To Tristate))
If you have any questions, please contact your customer service representative.
03/24/2026 2:22:19 PM
Page 1 of 1
Gulf South Pipeline

Revised: Montz Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037869
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037869
Prior Notice :
5037861
Reqrd Rsp Desc :
No response required
Subject :
Revised: Montz Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/24/2026 02:24:00 PM
Notice Effective Date/Time :
03/24/2026 02:26:00 PM
Notice End Date/Time :
04/04/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Updated Notice Text
----------------------------------
Updated Notice Effective Date
----------------------------------
Gulf South will be performing maintenance at the Montz Compressor Station.
The work is to be completed during a third-party outage.
Gas Day 2/3-3/9:
The following location will be shut in for the duration of the maintenance:
- Loc 24352 (St. Charles Power Station)
Gas Day 3/10-4/3:
No impact is expected for the following location:
- Loc 24352 (St. Charles Power Station)
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/24/2026 2:24:52 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/24/2026 02:24:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/24/2026 02:26:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/04/2026 09:00:00 AM
Notice ID :
5037869
Response Date/Time :
Prior Notice :
5037861
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Montz Compressor Station Maintenance
Notice Text :
Updated Notice Text
----------------------------------
Updated Notice Effective Date
----------------------------------
Gulf South will be performing maintenance at the Montz Compressor Station.
The work is to be completed during a third-party outage.
Gas Day 2/3-3/9:
The following location will be shut in for the duration of the maintenance:
- Loc 24352 (St. Charles Power Station)
Gas Day 3/10-4/3:
No impact is expected for the following location:
- Loc 24352 (St. Charles Power Station)
If you have any questions, please contact your customer service representative.
03/24/2026 2:24:52 PM
Page 1 of 1
Gulf South Pipeline

Revised: Airport Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037880
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037880
Prior Notice :
5037724
Reqrd Rsp Desc :
No response required
Subject :
Revised: Airport Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/25/2026 03:52:00 PM
Notice Effective Date/Time :
03/25/2026 04:00:00 PM
Notice End Date/Time :
03/31/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised end date
---------------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Airport compressor station.
The following scheduling group is subject to impact:
Mobile Bay Delivery Scheduling Group
Gas Day 3/22:
Capacity could be impacted by as much as 45,000 dth/d for the duration of the maintenance.
Gas Day 3/23-3/30:
Capacity could be impacted by as much as 125,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/25/2026 3:52:21 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/25/2026 03:52:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/25/2026 04:00:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
03/31/2026 09:00:00 AM
Notice ID :
5037880
Response Date/Time :
Prior Notice :
5037724
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Airport Compressor Station Maintenance
Notice Text :
Revised end date
---------------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Airport compressor station.
The following scheduling group is subject to impact:
Mobile Bay Delivery Scheduling Group
Gas Day 3/22:
Capacity could be impacted by as much as 45,000 dth/d for the duration of the maintenance.
Gas Day 3/23-3/30:
Capacity could be impacted by as much as 125,000 dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
03/25/2026 3:52:21 PM
Page 1 of 1
Gulf South Pipeline

Revised: Harrisville Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037882
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037882
Prior Notice :
5037827
Reqrd Rsp Desc :
No response required
Subject :
Revised: Harrisville Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/25/2026 03:55:00 PM
Notice Effective Date/Time :
03/25/2026 04:00:00 PM
Notice End Date/Time :
03/25/2026 05:00:00 PM
Response Date/Time :
Critical :
Notice Text :
Revised notice text
--------------------------------------------------
Expansion Area 19 Delivery Scheduling Group
Capacity could be impacted by as much as 100,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/25/2026 3:55:48 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/25/2026 03:55:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/25/2026 04:00:00 PM
Notice Stat Desc :
Terminate
Notice End Date/Time :
03/25/2026 05:00:00 PM
Notice ID :
5037882
Response Date/Time :
Prior Notice :
5037827
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Harrisville Compressor Station Maintenance
Notice Text :
Revised notice text
--------------------------------------------------
Expansion Area 19 Delivery Scheduling Group
Capacity could be impacted by as much as 100,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
03/25/2026 3:55:48 PM
Page 1 of 1
Gulf South Pipeline

Revised: Heidelberg Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037883
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037883
Prior Notice :
5037658
Reqrd Rsp Desc :
No response required
Subject :
Revised: Heidelberg Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/25/2026 03:58:00 PM
Notice Effective Date/Time :
03/31/2026 09:00:00 AM
Notice End Date/Time :
04/01/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised notice text
--------------------------------------------------------------------------------
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
Loc 23373 (Transco (Petal Pipeline))
Loc 23370 (Transco Hattiesburg)
Combined receipt capacity between Location 23373 and Location 23370 will be limited to 85,000
dth. There will be no impact to withdrawal capacity.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/25/2026 3:58:03 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/25/2026 03:58:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/31/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/01/2026 09:00:00 AM
Notice ID :
5037883
Response Date/Time :
Prior Notice :
5037658
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Heidelberg Compressor Station Maintenance
Notice Text :
Revised notice text
--------------------------------------------------------------------------------
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
Loc 23373 (Transco (Petal Pipeline))
Loc 23370 (Transco Hattiesburg)
Combined receipt capacity between Location 23373 and Location 23370 will be limited to 85,000
dth. There will be no impact to withdrawal capacity.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff
If you have any questions, please contact your customer service representative.
03/25/2026 3:58:03 PM
Page 1 of 1
Gulf South Pipeline

Posted Maintenance Events for 03/27/2026 - 04/02/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037884
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical/Planned Service Outage
Notice Type Desc :
Maintenance
Notice Stat Desc :
Initiate
Notice ID :
5037884
Prior Notice :
Reqrd Rsp Desc :
No response required
Subject :
Posted Maintenance Events for 03/27/2026 - 04/02/2026
TSP :
078444247
Post Date/Time :
03/25/2026 04:55:00 PM
Notice Effective Date/Time :
03/27/2026 09:00:00 AM
Notice End Date/Time :
04/03/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
https://reporting.prod.bwpmlp.org/infopost/postings?postingsDocumentId=808409
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/25/2026 4:55:39 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical/Planned Service Outage
Post Date/Time :
03/25/2026 04:55:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/27/2026 09:00:00 AM
Notice Stat Desc :
Initiate
Notice End Date/Time :
04/03/2026 09:00:00 AM
Notice ID :
5037884
Response Date/Time :
Prior Notice :
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Posted Maintenance Events for 03/27/2026 - 04/02/2026
Notice Text :
https://reporting.prod.bwpmlp.org/infopost/postings?postingsDocumentId=808409
If you have any questions, please contact your customer service representative.
03/25/2026 4:55:39 PM
Page 1 of 1
Gulf South Pipeline

Revised: Harrisville Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037907
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037907
Prior Notice :
5037826
Reqrd Rsp Desc :
No response required
Subject :
Revised: Harrisville Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/27/2026 03:45:00 PM
Notice Effective Date/Time :
03/27/2026 03:50:00 PM
Notice End Date/Time :
03/28/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised notice text
---------------------------------------------------
Expansion Area 19 Delivery Scheduling Group
Gas Day 3/23:
Capacity could be impacted by as much as 85,000 dth/d for the duration of the maintenance.
Gas Day 3/24 - 3/27:
Capacity could be impacted by as much as 250,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/27/2026 3:45:02 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/27/2026 03:45:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/27/2026 03:50:00 PM
Notice Stat Desc :
Terminate
Notice End Date/Time :
03/28/2026 09:00:00 AM
Notice ID :
5037907
Response Date/Time :
Prior Notice :
5037826
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Harrisville Compressor Station Maintenance
Notice Text :
Revised notice text
---------------------------------------------------
Expansion Area 19 Delivery Scheduling Group
Gas Day 3/23:
Capacity could be impacted by as much as 85,000 dth/d for the duration of the maintenance.
Gas Day 3/24 - 3/27:
Capacity could be impacted by as much as 250,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Serivce.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
03/27/2026 3:45:02 PM
Page 1 of 1
Gulf South Pipeline

Revised: Heidelberg Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037909
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037909
Prior Notice :
5037883
Reqrd Rsp Desc :
No response required
Subject :
Revised: Heidelberg Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/27/2026 03:49:00 PM
Notice Effective Date/Time :
03/31/2026 03:50:00 PM
Notice End Date/Time :
04/01/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised notice text
--------------------------------------------------------------------------------
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
Loc 23373 (Transco (Petal Pipeline))
The receipt capacity for Location 23373 will be limited to 85,000 dth. There will be no impact to
withdrawal capacity.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff
Notice
Page 1 of 1
03/27/2026 3:49:06 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/27/2026 03:49:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/31/2026 03:50:00 PM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/01/2026 09:00:00 AM
Notice ID :
5037909
Response Date/Time :
Prior Notice :
5037883
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Heidelberg Compressor Station Maintenance
Notice Text :
Revised notice text
--------------------------------------------------------------------------------
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
Loc 23373 (Transco (Petal Pipeline))
The receipt capacity for Location 23373 will be limited to 85,000 dth. There will be no impact to
withdrawal capacity.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff
03/27/2026 3:49:06 PM
Page 1 of 1
Gulf South Pipeline

Revised: Heidelberg Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037912
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037912
Prior Notice :
5037909
Reqrd Rsp Desc :
No response required
Subject :
Revised: Heidelberg Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/27/2026 03:52:00 PM
Notice Effective Date/Time :
03/31/2026 09:00:00 AM
Notice End Date/Time :
04/01/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised notice text
--------------------------------------------------------------------------------
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
Loc 23373 (Transco (Petal Pipeline))
The receipt capacity for Location 23373 will be limited to 85,000 dth. There will be no impact to
withdrawal capacity.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff
Notice
Page 1 of 1
03/27/2026 3:53:01 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/27/2026 03:52:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/31/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
04/01/2026 09:00:00 AM
Notice ID :
5037912
Response Date/Time :
Prior Notice :
5037909
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Revised: Heidelberg Compressor Station Maintenance
Notice Text :
Revised notice text
--------------------------------------------------------------------------------
Gulf South is performing maintenance at Heidelberg Compressor Station.
The following locations are subject to impact:
Loc 23373 (Transco (Petal Pipeline))
The receipt capacity for Location 23373 will be limited to 85,000 dth. There will be no impact to
withdrawal capacity.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff
03/27/2026 3:53:01 PM
Page 1 of 1
Gulf South Pipeline

Unplanned Index 391-1-L Pipeline Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037916
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037916
Prior Notice :
5037868
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 391-1-L Pipeline Maintenance
TSP :
078444247
Post Date/Time :
03/27/2026 05:38:00 PM
Notice Effective Date/Time :
03/27/2026 05:40:00 PM
Notice End Date/Time :
03/29/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised Description.
------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Index 391-1-L Pipeline.
The following points will have reduced flow for the duration of the maintenance:
- Loc 24494 (Tristate Longview (From Tristate))
- Loc 24520 (Tristate Longview (To Tristate))
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/27/2026 5:38:31 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/27/2026 05:38:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/27/2026 05:40:00 PM
Notice Stat Desc :
Terminate
Notice End Date/Time :
03/29/2026 09:00:00 AM
Notice ID :
5037916
Response Date/Time :
Prior Notice :
5037868
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Unplanned Index 391-1-L Pipeline Maintenance
Notice Text :
Revised Description.
------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Index 391-1-L Pipeline.
The following points will have reduced flow for the duration of the maintenance:
- Loc 24494 (Tristate Longview (From Tristate))
- Loc 24520 (Tristate Longview (To Tristate))
If you have any questions, please contact your customer service representative.
03/27/2026 5:38:31 PM
Page 1 of 1
Gulf South Pipeline

Index 59-22 Meter Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037923
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037923
Prior Notice :
5037834
Reqrd Rsp Desc :
No response required
Subject :
Index 59-22 Meter Maintenance
TSP :
078444247
Post Date/Time :
03/31/2026 11:48:00 AM
Notice Effective Date/Time :
03/31/2026 11:50:00 AM
Notice End Date/Time :
03/31/2026 01:00:00 PM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at Index 59-22.
The following point will be shut-in for the duration of the maintenance:
- Loc 8544 (Lufkin Creosote Plant)
Based on current operating conditions, no capacity impact is expected at this time.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/31/2026 11:49:05 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/31/2026 11:48:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/31/2026 11:50:00 AM
Notice Stat Desc :
Terminate
Notice End Date/Time :
03/31/2026 01:00:00 PM
Notice ID :
5037923
Response Date/Time :
Prior Notice :
5037834
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Index 59-22 Meter Maintenance
Notice Text :
Gulf South will be performing maintenance at Index 59-22.
The following point will be shut-in for the duration of the maintenance:
- Loc 8544 (Lufkin Creosote Plant)
Based on current operating conditions, no capacity impact is expected at this time.
This maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
03/31/2026 11:49:05 AM
Page 1 of 1
Gulf South Pipeline

Delhi Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037924
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037924
Prior Notice :
5037789
Reqrd Rsp Desc :
No response required
Subject :
Delhi Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/31/2026 11:50:00 AM
Notice Effective Date/Time :
03/31/2026 12:00:00 PM
Notice End Date/Time :
03/31/2026 01:00:00 PM
Response Date/Time :
Critical :
Notice Text :
Gulf South is performing maintenance at the Delhi Compressor Station.
The following groups are subject to impact:
-Delhi Expansion Compressor Scheduling Group
Capacity could be impacted by as much as 70,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/31/2026 11:50:32 AM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/31/2026 11:50:00 AM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/31/2026 12:00:00 PM
Notice Stat Desc :
Terminate
Notice End Date/Time :
03/31/2026 01:00:00 PM
Notice ID :
5037924
Response Date/Time :
Prior Notice :
5037789
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Delhi Compressor Station Maintenance
Notice Text :
Gulf South is performing maintenance at the Delhi Compressor Station.
The following groups are subject to impact:
-Delhi Expansion Compressor Scheduling Group
Capacity could be impacted by as much as 70,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
03/31/2026 11:50:32 AM
Page 1 of 1
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Wyoming Interstate
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Mojave Pipeline
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Colorado Interstate Gas
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: El Paso Natural Gas (EPGD)
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
El Paso (EPNG)

[MAINTENANCE] TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Southern Natural Gas
Notice ID: 400377
Notice Type: MAINTENANCE
Subtype: MAINTENANCE
Subject: TGP Outage Impact Report
Posted: 04/02/2026 3:35:52PM
Effective: 04/02/2026 3:35:52PM
End Date: 04/03/2026 9:00:00AM
Texas Gas Transmission

GasQuest and Informational Postings - URL Updates

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5036568
Notice Type: Customer Services Update
Status: Initiate
Posted: 2025-05-15T15:11:18+00:00
Effective: 2025-05-21T05:00:00+00:00
End: 
Subject: GasQuest and Informational Postings - URL Updates
Texas Gas Transmission

Timely Cycle for 1/30/2026 Nomination Deadline Extended to 2:30 PM

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5037588
Notice Type: Customer Services Update/Nomination Deadlines
Status: Supersede
Posted: 2026-01-29T13:18:00+00:00
Effective: 2026-01-29T13:19:00+00:00
End: 
Subject: Timely Cycle for 1/30/2026 Nomination Deadline Extended to 2:30 PM
Texas Gas Transmission

Over-Under Performance- 26023 Cokinos Square Mile Cp-Rec

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Texas Gas Transmission
Notice ID: 5038036
Notice Type: Over-Under Performance
Status: Supersede
Posted: 2026-04-22T11:13:00+00:00
Effective: 2026-04-22T11:14:00+00:00
End: 
Subject: Over-Under Performance- 26023 Cokinos Square Mile Cp-Rec
Gulf South Pipeline

GasQuest and Informational Postings – URL Updates

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5036567
Notice Type: Customer Services Update
Status: Initiate
Posted: 2025-05-15T15:10:33+00:00
Effective: 2025-05-21T05:00:00+00:00
End: 
Subject: GasQuest and Informational Postings – URL Updates
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-27-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/27/2026 11:06:38AM	Notice End Date/Time:  04/28/2026 9:00:00am
Post Date/Time:  4/27/2026 11:06:38 AM	Notice ID: 400925
Reqrd Rsp:  1	Rsp Date:  04/27/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-27-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Monday, April 27, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 343,687 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 218,736 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 209,174 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 72,207 Dths

·         STA 321 (Segment 321 FH) - through approx 83% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 354,091 Dths

·         MLV 330 (Segment 324 FH) - through approx 62% of SOP increases due to nominations in excess of operational capacity; 62,998 Dths

·         Z5hc North (Segment 299 FH) - through approx 90% of SOP increases due to nominations in excess of operational capacity; 189,750 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 302,468 Dths

·         STA 249 (Segment 249 FH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 84,696 Dths

·         MLV 273 (Segment 284 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 147,273 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-28-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/27/2026 2:33:57PM	Notice End Date/Time:  04/28/2026 9:00:00am
Post Date/Time:  4/27/2026 2:33:57 PM	Notice ID: 400932
Reqrd Rsp:  1	Rsp Date:  04/27/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-28-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Tuesday, April 28, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         HICKORYR/TGP Mohawk Road Power Plt Delivery Meter (Pin 50789) - through approx 2% of SIPss due to nominations in excess of operational capacity; 5,133 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through approx 7% of IT due to nominations in excess of operational capacity; 5,922 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP due to nominations in excess of operational capacity; 13,100 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP due to nominations in excess of operational capacity; 12,470 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 90% of SOP due to nominations in excess of operational capacity; 321,337 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 482,947 Dths

·         STA 315 (Segment 315 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 563,544 Dths

·         STA 317 (Segment 317 BH) - through approx 65% of SOP due to nominations in excess of operational capacity; 91,836 Dths

·         STA 321 (Segment 321 FH) - through approx 77% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 867,807 Dths

·         MLV 330 (Segment 324 FH) - through approx 27% of SOP due to nominations in excess of operational capacity; 161,818 Dths

·         MLV 336 East (Segment 336 FH) - through approx 32% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 15,333 Dths

·         STA 224 (Segment 224 FH) - through approx 4% of SOP due to nominations in excess of operational capacity; 5,371 Dths

·         Z5hc North (Segment 299 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 526,666 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 746,287 Dths

·         STA 249 (Segment 249 FH) - through approx 68% of SOP due to nominations in excess of operational capacity; 360,709 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 141,337 Dths

·         MLV 273 (Segment 284 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 211,040 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-27-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/27/2026 3:54:26PM	Notice End Date/Time:  04/28/2026 9:00:00am
Post Date/Time:  4/27/2026 3:54:26 PM	Notice ID: 400933
Reqrd Rsp:  1	Rsp Date:  04/27/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-27-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Monday, April 27, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 343,687 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 218,009 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 209,085 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 66,055 Dths

·         STA 321 (Segment 321 FH) - through approx 95% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 197,458 Dths

·         Z5hc North (Segment 299 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 154,100 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 271,638 Dths

·         STA 249 (Segment 249 FH) - through approx 71% of SOP increases due to nominations in excess of operational capacity; 53,267 Dths

·         MLV 273 (Segment 284 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 73,534 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-28-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/27/2026 7:05:43PM	Notice End Date/Time:  04/28/2026 9:00:00am
Post Date/Time:  4/27/2026 7:05:43 PM	Notice ID: 400939
Reqrd Rsp:  1	Rsp Date:  04/27/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-28-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Tuesday, April 28, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 5,922 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 13,100 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 12,470 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 321,865 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 317,227 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 319,051 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 90,670 Dths

·         STA 321 (Segment 321 FH) - through approx 95% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 556,890 Dths

·         MLV 330 (Segment 324 FH) - through approx 43% of SOP increases due to nominations in excess of operational capacity; 55,074 Dths

·         Z5hc North (Segment 299 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 214,381 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 297,914 Dths

·         STA 249 (Segment 249 FH) - through approx 36% of SOP increases due to nominations in excess of operational capacity; 69,775 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 130,138 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 211,040 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-27-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/27/2026 7:44:54PM	Notice End Date/Time:  04/28/2026 9:00:00am
Post Date/Time:  4/27/2026 7:44:54 PM	Notice ID: 400940
Reqrd Rsp:  1	Rsp Date:  04/27/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-27-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Monday, April 27, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-28-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/28/2026 11:09:00AM	Notice End Date/Time:  04/29/2026 9:00:00am
Post Date/Time:  4/28/2026 11:09:00 AM	Notice ID: 400945
Reqrd Rsp:  1	Rsp Date:  04/28/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-28-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Tuesday, April 28, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 5,922 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 3,100 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 10,352 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 322,386 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 215,466 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 214,687 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 78,776 Dths

·         STA 321 (Segment 321 FH) - through approx 83% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 346,244 Dths

·         MLV 330 (Segment 324 FH) - through approx 59% of SOP increases due to nominations in excess of operational capacity; 61,530 Dths

·         Z5hc North (Segment 299 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 173,597 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 255,761 Dths

·         STA 249 (Segment 249 FH) - through approx 49% of SOP increases due to nominations in excess of operational capacity; 30,029 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 80,528 Dths

·         MLV 273 (Segment 284 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 147,039 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-29-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/28/2026 2:31:31PM	Notice End Date/Time:  04/29/2026 9:00:00am
Post Date/Time:  4/28/2026 2:31:31 PM	Notice ID: 400952
Reqrd Rsp:  1	Rsp Date:  04/28/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-29-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Wednesday, April 29, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         REX/TGP Big Muskie Guernsey Receipt Meter (Pin 44423) - through 100% of SOP deliveries due to displacement gas unavailable for backhaul; 32,000 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through approx 9% of IT due to nominations in excess of operational capacity; 8,014 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 98% of SOP due to nominations in excess of operational capacity; 4,868 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 10,352 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 94% of SOP due to nominations in excess of operational capacity; 334,046 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 481,202 Dths

·         STA 315 (Segment 315 BH) - through approx 89% of SOP due to nominations in excess of operational capacity; 668,007 Dths

·         STA 317 (Segment 317 BH) - through approx 67% of SOP due to nominations in excess of operational capacity; 88,727 Dths

·         STA 321 (Segment 321 FH) - through approx 75% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 841,757 Dths

·         MLV 330 (Segment 324 FH) - through approx 25% of SOP due to nominations in excess of operational capacity; 152,469 Dths

·         STA 224 (Segment 224 FH) - through approx 58% of SOP due to nominations in excess of operational capacity; 94,900 Dths

·         Z5hc North (Segment 299 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 541,922 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 747,443 Dths

·         STA 249 (Segment 249 FH) - through approx 77% of SOP due to nominations in excess of operational capacity; 408,006 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 141,803 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 174,955 Dths

·         MLV 273 (Segment 284 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 219,533 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-29-2026 TIMELY REV

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/28/2026 3:13:16PM	Notice End Date/Time:  04/29/2026 9:00:00am
Post Date/Time:  4/28/2026 3:13:16 PM	Notice ID: 400953
Reqrd Rsp:  1	Rsp Date:  04/28/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-29-2026 TIMELY REV
Notice Text:

REVISED

Effective Timely Cycle (9:00) for the gas day of Wednesday, April 29, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         REX/TGP Big Muskie Guernsey Receipt Meter (Pin 44423) - through 100% of SOP deliveries due to displacement gas unavailable for backhaul; 32,000 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through approx 9% of IT due to nominations in excess of operational capacity; 8,014 Dths

·         STA 1 (Segment 101 BH) - through 100% of SA due to operational concerns; 82,376 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 98% of SOP due to nominations in excess of operational capacity; 4,868 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 10,352 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 94% of SOP due to nominations in excess of operational capacity; 334,046 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 481,202 Dths

·         STA 315 (Segment 315 BH) - through approx 89% of SOP due to nominations in excess of operational capacity; 668,007 Dths

·         STA 317 (Segment 317 BH) - through approx 67% of SOP due to nominations in excess of operational capacity; 88,727 Dths

·         STA 321 (Segment 321 FH) - through approx 75% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 841,757 Dths

·         MLV 330 (Segment 324 FH) - through approx 25% of SOP due to nominations in excess of operational capacity; 152,469 Dths

·         STA 224 (Segment 224 FH) - through approx 58% of SOP due to nominations in excess of operational capacity; 94,900 Dths

·         Z5hc North (Segment 299 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 541,922 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 747,443 Dths

·         STA 249 (Segment 249 FH) - through approx 77% of SOP due to nominations in excess of operational capacity; 408,006 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 141,803 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 174,955 Dths

·         MLV 273 (Segment 284 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 219,533 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-29-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/28/2026 6:54:16PM	Notice End Date/Time:  04/29/2026 9:00:00am
Post Date/Time:  4/28/2026 6:54:16 PM	Notice ID: 400961
Reqrd Rsp:  1	Rsp Date:  04/28/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-29-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Wednesday, April 29, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         REX/TGP Big Muskie Guernsey Receipt Meter (Pin 44423) - through 100% of SOP delivery increases due to displacement gas unavailable for backhaul; 32,000 Dths

SEGMENT RESTRICTIONS

·         STA 1 (Segment 101 BH) - through 100% of SA increases due to operational concerns; 59,376 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,868 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 10,352 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 334,046 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 318,056 Dths

·         STA 315 (Segment 315 BH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 303,397 Dths

·         STA 317 (Segment 317 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 85,272 Dths

·         STA 321 (Segment 321 FH) - through approx 95% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 544,790 Dths

·         MLV 330 (Segment 324 FH) - through approx 46% of SOP increases due to nominations in excess of operational capacity; 56,555 Dths

·         STA 224 (Segment 224 FH) - through approx 42% of SOP increases due to nominations in excess of operational capacity; 26,321 Dths

·         Z5hc North (Segment 299 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 230,759 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 309,283 Dths

·         STA 249 (Segment 249 FH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 166,008 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 130,138 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 161,387 Dths

·         MLV 273 (Segment 284 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 206,593 Dths

·         STA 268 North(Segment 268 FH) - through approx 17% of SOP increases due to nominations in excess of operational capacity; 6,989 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-30-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/29/2026 2:49:53PM	Notice End Date/Time:  04/30/2026 9:00:00am
Post Date/Time:  4/29/2026 2:49:53 PM	Notice ID: 400977
Reqrd Rsp:  1	Rsp Date:  04/29/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-30-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Thursday, April 30, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         REX/TGP Big Muskie Guernsey Receipt Meter (Pin 44423) - through 100% of SOP deliveries due to displacement gas unavailable for backhaul; 32,000 Dths

·         NRGBM/TGP Beirne Hill Sales Bradfor Delivery Meter (Pin 48061) - through approx 62% of IT due to nominations in excess of operational capacity; 34,341 Dths

SEGMENT RESTRICTIONS

·         STA 1 (Segment 101 BH) - through approx 40% of SOP due to operational concerns; 46,370 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP due to nominations in excess of operational capacity; 2,500 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 10,352 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 313,724 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 482,036 Dths

·         STA 315 (Segment 315 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 583,161 Dths

·         STA 317 (Segment 317 BH) - through approx 64% of SOP due to nominations in excess of operational capacity; 86,582 Dths

·         STA 321 (Segment 321 FH) - through approx 78% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 864,270 Dths

·         MLV 330 (Segment 324 FH) - through approx 26% of SOP due to nominations in excess of operational capacity; 155,291 Dths

·         MLV 336 East (Segment 336 FH) - through approx 54% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 27,061 Dths

·         Z5hc North (Segment 299 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 623,184 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 754,488 Dths

·         STA 249 (Segment 249 FH) - through approx 59% of SOP due to nominations in excess of operational capacity; 312,097 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 141,803 Dths

·         MLV 273 (Segment 284 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 210,910 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-29-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/29/2026 3:20:29PM	Notice End Date/Time:  04/30/2026 9:00:00am
Post Date/Time:  4/29/2026 3:20:29 PM	Notice ID: 400978
Reqrd Rsp:  1	Rsp Date:  04/29/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-29-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Wednesday, April 29, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,868 Dths

·         STA 860 (Segment 860 BH) - through SIPsp increases due to scheduled maintenance and nominations in excess of operational capacity

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 334,046 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 225,735 Dths

·         STA 315 (Segment 315 BH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 299,305 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 70,006 Dths

·         STA 321 (Segment 321 FH) - through approx 96% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 122,347 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 189,547 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 266,209 Dths

·         STA 249 (Segment 249 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 124,926 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 80,138 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 155,402 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 135,103 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-30-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/29/2026 7:08:38PM	Notice End Date/Time:  04/30/2026 9:00:00am
Post Date/Time:  4/29/2026 7:08:38 PM	Notice ID: 400986
Reqrd Rsp:  1	Rsp Date:  04/29/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-30-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Thursday, April 30, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         REX/TGP Big Muskie Guernsey Receipt Meter (Pin 44423) - through 100% of SOP delivery increases due to displacement gas unavailable for backhaul; 32,000 Dths

SEGMENT RESTRICTIONS

·         STA 1 (Segment 101 BH) - through approx 91% of SOP increases due to operational concerns; 46,370 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 2,500 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,352 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 313,724 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 317,916 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 297,210 Dths

·         STA 317 (Segment 317 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 81,537 Dths

·         STA 321 (Segment 321 FH) - through approx 94% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 531,741 Dths

·         MLV 330 (Segment 324 FH) - through approx 39% of SOP increases due to nominations in excess of operational capacity; 48,760 Dths

·         Z5hc North (Segment 299 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 219,864 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 306,115 Dths

·         STA 249 (Segment 249 FH) - through approx 37% of SOP increases due to nominations in excess of operational capacity; 66,496 Dths

·         STA 254 (Segment 249 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 130,138 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 210,910 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-29-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/29/2026 7:34:26PM	Notice End Date/Time:  04/30/2026 9:00:00am
Post Date/Time:  4/29/2026 7:34:26 PM	Notice ID: 400987
Reqrd Rsp:  1	Rsp Date:  04/29/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-29-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Wednesday, April 29, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 1 (Segment 101 BH) - through 100% of SOP increases due to operational concerns; 3,483 Dths

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,868 Dths

·         MLV 314 East (Segment 314 BH) - through approx 70% of SOP increases due to nominations in excess of operational capacity; 48,889 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

.
NEXUS Gas Transmission (U.S.)

04/29/2026- Nexus Pipeline Conditions for 4/30/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/30/2026
Notice End Date: 05/01/2026
Posting Date: 04/29/2026
Notice Identifier: 177217
Required Response Indicator Description: No response required

For Gas Day April 30, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
33%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
46%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
43%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/29/2026- AGT Pipeline Conditions for 4/30/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/30/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/30/2026
Notice End Date: 05/01/2026
Posting Date: 04/29/2026
Notice Identifier: 177245
Required Response Indicator Description: No response required

For Gas Day April 30, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
99%
Cromwell
100%
100%
83%
Burrillville
100%
100%
40%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
55%
Iroquois Receipts
100%
100%
45%
Hanover West
100%
100%
69%
Mendon Receipts
100%
100%
100%
100%
20%
G System
100%
100%
42%
C System
Yes
Centerville-Transco Receipts (1)
86%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)

04/28/2026- Nexus Pipeline Conditions for 4/29/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 04/30/2026
Posting Date: 04/28/2026
Notice Identifier: 177180
Required Response Indicator Description: No response required

For Gas Day April 29, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
33%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
46%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
44%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/28/2026- AGT Pipeline Conditions for 4/29/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/29/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 04/30/2026
Posting Date: 04/28/2026
Notice Identifier: 177208
Required Response Indicator Description: No response required

For Gas Day April 29, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point (1)
100%
100%
100%
100%
100%
100%
100%
36%
Planned Outage
Cromwell
100%
100%
100%
Burrillville
100%
100%
99%
Weymouth
100%
100%
72%
Iroquois Deliveries
100%
100%
Iroquois Receipts
100%
100%
62%
Hanover West
100%
100%
92%
Mendon Receipts
100%
100%
100%
100%
100%
G System
100%
100%
51%
C System
Yes
Lincoln Receipts
100%
100%
72%
Centerville-Transco Receipts (2)
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - issued 4/29/26. 8% / 500 Dth Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has declared a limited no notice day through the Stony Point compressor station. For Gas Day April 29, 2026, customers are limited to approximately 62% of their no-notice nominations.
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(2) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Southern Star

Planned Service Outage - April 27, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11123
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-27 09:31 UTC
Effective Date: 4/27/2026 09:31 AM
Expiration Date: None
Subject: Planned Service Outage - April 27, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. The Station maintenance at the Mutual Station will begin April 29th, 2026, and Return to service May 5th,
2026. The following customers will be affected: 0 dth/d OGT Mutual Net Delivery (location:449209).
Revised (1)
1. The Station Maintenance at the Blackwell CS has been updated with new dates. The maintenance will
now begin September 28th, 2026, and Return to service October 3rd, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Texas Eastern Transmission (TETCO)

04/27/2026- REMINDER - AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: REMINDER - AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 07/26/2026
Posting Date: 04/27/2026
Notice Identifier: 177129
Required Response Indicator Description: No response required
Texas Eastern Transmission (TETCO)

04/27/2026- Athens Compressor Station Unplanned Outage

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Athens Compressor Station Unplanned Outage
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/29/2026
Notice End Date: 07/26/2026
Posting Date: 04/27/2026
Notice Identifier: 177133
Required Response Indicator Description: No response required
Texas Eastern Transmission (TETCO)

04/27/2026- Athens Compressor Station Force Majeure

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Athens Compressor Station Force Majeure
Notice Type: Force Majeure
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 07/26/2026
Posting Date: 04/27/2026
Notice Identifier: 177134
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/27/2026- Nexus Pipeline Conditions for 4/28/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/28/2026
Notice End Date: 04/29/2026
Posting Date: 04/27/2026
Notice Identifier: 177138
Required Response Indicator Description: No response required

For Gas Day April 28, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
32%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
45%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
43%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/27/2026- REMINDER - AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: REMINDER - AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 07/26/2026
Posting Date: 04/27/2026
Notice Identifier: 177128
Required Response Indicator Description: No response required
Algonquin Gas Transmission

04/27/2026- AGT Pipeline Conditions for 4/28/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/28/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/28/2026
Notice End Date: 04/29/2026
Posting Date: 04/27/2026
Notice Identifier: 177157
Required Response Indicator Description: No response required

For Gas Day April 28, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
61%
Cromwell
100%
100%
76%
Burrillville
100%
100%
60%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
86%
Iroquois Receipts
100%
100%
54%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
41%
G System
100%
100%
41%
C System
Yes
Centerville-Transco Receipts (1)
77%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Florida Gas Transmission

[Florida Gas Transmission] [Planned Service Outage] MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE - 2ND UPDATE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 63235
Notice Type: Planned Service Outage
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE - 2ND UPDATE
Posted: Apr 27 2026 9:06 AM
Effective: May 1 2026 9:00 AM
End Date: May 16 2026 9:00 AM

Notice ID: 63235
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 27 2026 9:06 AM
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE - 2ND UPDATE
Notice Effective Date/Time: May 1 2026 9:00 AM
Notice End Date/Time: May 16 2026 9:00 AM
Notice Text: FGT will be performing horsepower and pipeline maintenance between FGT Compressor Stations 8 and 9. This maintenance will begin May 1, 2026, and is to be completed by end of gas day May 15, 2026. During this maintenance FGT may schedule up to 1,150,000 MMBtu/day through Station 9. During normal operations, FGT schedules up to 1,250,000 MMBtu/day through Station 9.
Kinder Morgan (multi-pipeline)

[MAINTENANCE] SEG 26-GC#3 ML-ILI TOOL RUNS-COMPLETED

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Natural Gas Pipeline (NGPL)
Notice Type: MAINTENANCE
Subject: SEG 26-GC#3 ML-ILI TOOL RUNS-COMPLETED
Posted: 04/24/2026 12:11:52PM
Effective: 04/24/2026 12:11:52PM
End Date: 04/30/2026 9:00:00AM
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-26-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/26/2026 10:56:58AM	Notice End Date/Time:  04/27/2026 9:00:00am
Post Date/Time:  4/26/2026 10:56:58 AM	Notice ID: 400904
Reqrd Rsp:  1	Rsp Date:  04/26/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-26-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Sunday, April 26, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 344,014 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 219,877 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 209,793 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 72,352 Dths

·         STA 321 (Segment 321 FH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 398,006 Dths

·         MLV 330 (Segment 324 FH) - through approx 63% of SOP increases due to nominations in excess of operational capacity; 70,508 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 223,670 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 237,133 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 161,135 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 8,641 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 155,656 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR STA 40 1D RESOLVED

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/26/2026 1:19:17PM	Notice End Date/Time:  04/27/2026 9:00:00am
Post Date/Time:  4/26/2026 1:19:17 PM	Notice ID: 400909
Reqrd Rsp:  1	Rsp Date:  04/26/2026
Notice Stat Desc:  TERMINATE	Prior Notice:  400810
Subject:  EMERGENT REPAIR STA 40 1D RESOLVED
Notice Text:

 

EMERGENT REPAIR AT STA 40 UNIT 1D EFFECTIVE 4-22-2026 RESOLVED

 

Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee posted notice of an emergent repair issue at Station 40 near Natchitoches, LA on April 22, 2026 (Notice Identifier #400810).  Tennessee discovered an issue with Unit 1D which necessitated repairs.   The issue has now been resolved and the area is in the process of returning to normal operations. As such, nomination increases pathed through STA 40 South of Carthage (Segment 132 FH) will be accepted effective Timely Cycle for the Gas Day of Monday, April 27, 2026 up to segment capacity as posted on TGP's EBB.

 

This will be the final notice for this emergent repair.

 

Please contact your Scheduler if you have any questions.

 

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 4-27-26 TIMELY REVISED

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/26/2026 3:17:07PM	Notice End Date/Time:  04/27/2026 9:00:00am
Post Date/Time:  4/26/2026 3:17:07 PM	Notice ID: 400912
Reqrd Rsp:  1	Rsp Date:  04/26/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 4-27-26 TIMELY REVISED
Notice Text:

REVISED

Effective Timely Cycle (9:00) for the gas day of Monday, April 27, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 22% of SIPss due to nominations in excess of operational capacity; 17,164 Dths

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 96% of SOP due to nominations in excess of operational capacity; 344,014 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 480,537 Dths

·         STA 315 (Segment 315 BH) - through approx 85% of SOP due to nominations in excess of operational capacity; 546,729 Dths

·         STA 317 (Segment 317 BH) - through approx 66% of SOP due to nominations in excess of operational capacity; 92,888 Dths

·         STA 321 (Segment 321 FH) - through approx 74% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 807,261 Dths

·         STA 325 (Segment 324 FH) - through approx 9% of SOP due to nominations in excess of operational capacity; 40,990 Dths

·         MLV 330 (Segment 324 FH) - through approx 21% of SOP due to nominations in excess of operational capacity; 121,281 Dths

·         MLV 336 East (Segment 336 FH) - through approx 63% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 31,883 Dths

·         STA 224 (Segment 224 FH) - through approx 17% of SOP due to nominations in excess of operational capacity; 26,046 Dths

·         Z5 HC North (Segment 299 FH) - through approx 82% of SOP due to nominations in excess of operational capacity; 524,112 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 750,841 Dths

·         STA 249 (Segment 249 FH) - through approx 66% of SOP due to nominations in excess of operational capacity; 349,392 Dths

·         MLV 256 East (Segment 256 FH) - through approx 12% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 14,853 Dths

·         MLV 273 (Segment 284 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 208,517 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-26-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/26/2026 3:21:28PM	Notice End Date/Time:  04/27/2026 9:00:00am
Post Date/Time:  4/26/2026 3:21:28 PM	Notice ID: 400913
Reqrd Rsp:  1	Rsp Date:  04/26/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-26-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Sunday, April 26, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 344,014 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 217,539 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 209,498 Dths

·         STA 317 (Segment 317 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 68,810 Dths

·         STA 321 (Segment 321 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 303,264 Dths

·         Z5hc North (Segment 299 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 184,104 Dths

·         STA 245 (Segment 245 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 203,413 Dths

·         STA 249 (Segment 249 FH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 123,675 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 155,656 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-27-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/26/2026 7:04:35PM	Notice End Date/Time:  04/27/2026 9:00:00am
Post Date/Time:  4/26/2026 7:04:35 PM	Notice ID: 400919
Reqrd Rsp:  1	Rsp Date:  04/26/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-27-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Monday, April 27, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 114 East (Segment 114 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,400 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 343,687 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 219,933 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 209,147 Dths

·         STA 317 (Segment 317 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 77,442 Dths

·         STA 321 (Segment 321 FH) - through approx 95% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 527,314 Dths

·         MLV 330 (Segment 324 FH) - through approx 46% of SOP increases due to nominations in excess of operational capacity; 57,043 Dths

·         MLV 336 East (Segment 336 FH) - through approx 72% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 24,313 Dths

·         STA 224 (Segment 224 FH) - through approx 8% of SOP increases due to nominations in excess of operational capacity; 1,690 Dths

·         Z5 HC North (Segment 299 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 210,330 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 317,914 Dths

·         STA 249 (Segment 249 FH) - through approx 56% of SOP increases due to nominations in excess of operational capacity; 104,892 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 208,517 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-26-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/26/2026 7:53:13PM	Notice End Date/Time:  04/27/2026 9:00:00am
Post Date/Time:  4/26/2026 7:53:13 PM	Notice ID: 400920
Reqrd Rsp:  1	Rsp Date:  04/26/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-26-2026 ID3
Notice Text:

Effective ITRD3 for the gas day of Sunday, April 26, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

METER RESTRICTIONS

 

·         NONE

 

 

SEGMENT RESTRICTIONS

 

·         NONE

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/26/2026- NEXUS Pipeline Conditions for 04/27/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 04/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 04/28/2026
Posting Date: 04/26/2026
Notice Identifier: 177093
Required Response Indicator Description: No response required

For Gas Day April 27, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
30%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
43%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
40%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/26/2026- AGT Pipeline Conditions for 04/27/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 04/27/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/27/2026
Notice End Date: 04/28/2026
Posting Date: 04/26/2026
Notice Identifier: 177109
Required Response Indicator Description: No response required

For Gas Day April 27, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
83%
Cromwell
100%
100%
55%
Burrillville
100%
100%
51%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
64%
Iroquois Receipts
100%
100%
49%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
42%
G System
100%
100%
45%
C System
Yes
Centerville-Transco Receipts (1)
100%
100%
10%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-25-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/25/2026 11:28:29AM	Notice End Date/Time:  04/26/2026 9:00:00am
Post Date/Time:  4/25/2026 11:28:29 AM	Notice ID: 400881
Reqrd Rsp:  1	Rsp Date:  04/25/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-25-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Saturday, April 25, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

METER RESTRICTIONS

·         Greenbrier TN 2 (Dual) Receipt Meter (Pin 420289) - through approx 79% of SIPss increases receipts due to displacement gas unavailable for backhaul; 7,736 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 33,302 Dths

·         STA 523 West (Segment 516 FH) - through approx 36% of SOP increases due to nominations in excess of operational capacity; 376 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 338,369 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 221,113 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 212,287 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 69,585 Dths

·         STA 321 (Segment 321 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 334,789 Dths

·         MLV 330 (Segment 324 FH) - through approx 4% of SOP increases due to nominations in excess of operational capacity; 1,558 Dths

·         Z5 HC North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 221,729 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 251,593 Dths

·         STA 249 (Segment 249 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 162,743 Dths

·         MLV 256 East (Segment 256 FH) - through approx 23% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 2,234 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 153,888 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-26-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/25/2026 2:25:41PM	Notice End Date/Time:  04/26/2026 9:00:00am
Post Date/Time:  4/25/2026 2:25:41 PM	Notice ID: 400887
Reqrd Rsp:  1	Rsp Date:  04/25/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-26-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Sunday, April 26, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 28% of SIPss due to nominations in excess of operational capacity; 22,816 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through approx 52% of SOP due to operational concerns; 83,103 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 96% of SOP due to nominations in excess of operational capacity; 344,014 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 480,860 Dths

·         STA 315 (Segment 315 BH) - through approx 85% of SOP due to nominations in excess of operational capacity; 547,177 Dths

·         STA 317 (Segment 317 BH) - through approx 66% of SOP due to nominations in excess of operational capacity; 92,922 Dths

·         STA 321 (Segment 321 FH) - through approx 78% of SOP due to nominations in excess of operational capacity; 860,682 Dths

·         MLV 330 (Segment 324 FH) - through approx 30% of SOP due to nominations in excess of operational capacity; 173,299 Dths

·         MLV 336 East (Segment 336 FH) - through approx 57% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 27,229 Dths

·         STA 224 (Segment 224 FH) - through approx 17% of SOP due to nominations in excess of operational capacity; 26,144 Dths

·         Z5hc North (Segment 299 FH) - through approx 82% of SOP due to nominations in excess of operational capacity; 524,808 Dths

·         STA 245 (Segment 245 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 627,604 Dths

·         STA 249 (Segment 249 FH) - through approx 68% of SOP due to nominations in excess of operational capacity; 383,163 Dths

·         MLV 256 East (Segment 256 FH) - through approx 12% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 15,688 Dths

·         MLV 273 (Segment 284 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 208,517 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-25-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/25/2026 3:39:09PM	Notice End Date/Time:  04/26/2026 9:00:00am
Post Date/Time:  4/25/2026 3:39:09 PM	Notice ID: 400888
Reqrd Rsp:  1	Rsp Date:  04/25/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-25-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Saturday, April 25, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

METER RESTRICTIONS

·         Greenbrier Tn 2 (Dual) Receipt Meter (Pin 420289) - through approx 17% of SIPss increases receipts due to displacement gas unavailable for backhaul; 1,257 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 17,642 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 338,369 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 218,900 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 205,501 Dths

·         STA 317 (Segment 317 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 63,545 Dths

·         STA 321 (Segment 321 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 324,650 Dths

·         Z5 HC North (Segment 299 FH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 152,753 Dths

·         STA 245 (Segment 245 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 219,943 Dths

·         STA 249 (Segment 249 FH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 118,107 Dths

·         MLV 273 (Segment 284 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 74,525 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-26-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/25/2026 6:58:24PM	Notice End Date/Time:  04/26/2026 9:00:00am
Post Date/Time:  4/25/2026 6:58:24 PM	Notice ID: 400895
Reqrd Rsp:  1	Rsp Date:  04/25/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-26-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Sunday, April 26, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through approx 60% of SOP increases due to operational concerns; 33,103 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 344,014 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 220,530 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 209,793 Dths

·         STA 317 (Segment 317 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 77,595 Dths

·         STA 321 (Segment 321 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 566,595 Dths

·         MLV 330 (Segment 324 FH) - through approx 48% of SOP increases due to nominations in excess of operational capacity; 64,542 Dths

·         MLV 336 East (Segment 336 FH) - through approx 67% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 22,593 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 223,705 Dths

·         STA 245 (Segment 245 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 234,650 Dths

·         STA 249 (Segment 249 FH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 161,703 Dths

·         MLV 256 East (Segment 256 FH) - through approx 8% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 1,606 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 208,517 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/25/2026- NEXUS Pipeline Conditions for 04/26/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 04/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/26/2026
Notice End Date: 04/27/2026
Posting Date: 04/25/2026
Notice Identifier: 177060
Required Response Indicator Description: No response required

For Gas Day April 26, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
30%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
43%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
40%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/25/2026- AGT Pipeline Conditions for 04/26/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 04/26/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/26/2026
Notice End Date: 04/27/2026
Posting Date: 04/25/2026
Notice Identifier: 177088
Required Response Indicator Description: No response required

For Gas Day April 26, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
67%
Cromwell
100%
100%
58%
Burrillville
100%
100%
53%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
65%
Iroquois Receipts
100%
100%
49%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
42%
G System
100%
100%
45%
C System
Yes
Centerville-Transco Receipts (1)
100%
100%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-25-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/24/2026 2:22:56PM	Notice End Date/Time:  04/25/2026 9:00:00am
Post Date/Time:  4/24/2026 2:22:56 PM	Notice ID: 400866
Reqrd Rsp:  1	Rsp Date:  04/24/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-25-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Saturday, April 25, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

METER RESTRICTIONS

·         Greenbrier Tn 2 (Dual) Receipt Meter (Pin 420289) - through 100% of SIPss receipts due to displacement gas unavailable for backhaul; 9,800 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 35% of SIPss due to nominations in excess of operational capacity; 27,768 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through approx 52% of SOP due to operational concerns; 83,209 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 95% of SOP due to nominations in excess of operational capacity; 338,369 Dths

·         MLV 314 East (Segment 314 BH) - through approx 90% of SOP due to nominations in excess of operational capacity; 475,205 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP due to nominations in excess of operational capacity; 545,055 Dths

·         STA 317 (Segment 317 BH) - through approx 63% of SOP due to nominations in excess of operational capacity; 92,460 Dths

·         STA 321 (Segment 321 FH) - through approx 80% of SOP due to nominations in excess of operational capacity; 875,472 Dths

·         STA 325 (Segment 324 FH) - through approx 32% of SOP due to nominations in excess of operational capacity; 160,696 Dths

·         MLV 330 (Segment 324 FH) - through approx 23% of SOP due to nominations in excess of operational capacity; 119,211 Dths

·         MLV 336 East (Segment 336 FH) - through approx 58% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 28,890 Dths

·         STA 224 (Segment 224 FH) - through approx 4% of SOP due to nominations in excess of operational capacity; 4,691 Dths

·         Z5 HC North (Segment 299 FH) - through approx 82% of SOP due to nominations in excess of operational capacity; 524,981 Dths

·         STA 245 (Segment 245 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 627,768 Dths

·         STA 249 (Segment 249 FH) - through approx 70% of SOP due to nominations in excess of operational capacity; 412,900 Dths

·         MLV 256 East (Segment 256 FH) - through approx 14% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 17,240 Dths

·         MLV 273 (Segment 284 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 208,529 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-25-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/24/2026 7:12:04PM	Notice End Date/Time:  04/25/2026 9:00:00am
Post Date/Time:  4/24/2026 7:12:04 PM	Notice ID: 400874
Reqrd Rsp:  1	Rsp Date:  04/24/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-25-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Saturday, April 25, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE #400859) FOR LMPA, SA ACTING AS BALANCING PARTIES AND LMMA ONLY

 

METER RESTRICTIONS

·         Greenbrier Tn 2 (Dual) Receipt Meter (Pin 420289) - through 100% of SIPss increases receipts due to displacement gas unavailable for backhaul; 9,800 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through approx 56% of SOP increases due to operational concerns; 33,209 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 338,369 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 221,798 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 212,260 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 74,572 Dths

·         STA 321 (Segment 321 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 588,422 Dths

·         STA 325 (Segment 324 FH) - through approx 6% of SOP increases due to nominations in excess of operational capacity; 8,142 Dths

·         MLV 330 (Segment 324 FH) - through approx 52% of SOP increases due to nominations in excess of operational capacity; 78,794 Dths

·         MLV 336 East (Segment 336 FH) - through approx 66% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 22,248 Dths

·         STA 224 (Segment 224 FH) - through approx 6% of SOP increases due to nominations in excess of operational capacity; 1,470 Dths

·         Z5 HC North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 223,479 Dths

·         STA 245 (Segment 245 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 253,370 Dths

·         STA 249 (Segment 249 FH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 164,836 Dths

·         MLV 256 East (Segment 256 FH) - through approx 23% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 5,187 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 208,529 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-24-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/24/2026 7:51:08PM	Notice End Date/Time:  04/25/2026 9:00:00am
Post Date/Time:  4/24/2026 7:51:08 PM	Notice ID: 400875
Reqrd Rsp:  1	Rsp Date:  04/24/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-24-2026 ID3
Notice Text:

Effective ITRD3 for the gas day of Friday, April 24, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

METER  RESTRICTIONS

                NONE

 

SEGMENT RESTRICTIONS

                NONE

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Texas Eastern Transmission (TETCO)

04/24/2026- Somerset to Summerfield Line 3 Valve Section 4C Isolation -- COMPLETE

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Somerset to Summerfield Line 3 Valve Section 4C Isolation -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 07/23/2026
Posting Date: 04/24/2026
Notice Identifier: 177014
Required Response Indicator Description: No response required

BAT
LEB
5Pts
SOM
SAR
BER
April 24 -27
595
595
496
496
496
Sabal Trail Transmission

04/24/2026- STT Operational Advisory

UNSCORED
Informational
View original notice text
TSP Name: Sabal Trail Transmission, LLC
Subject: STT Operational Advisory
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 07/23/2026
Posting Date: 04/24/2026
Notice Identifier: 177016
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/24/2026- Nexus Pipeline Conditions for 4/25/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 04/26/2026
Posting Date: 04/24/2026
Notice Identifier: 177017
Required Response Indicator Description: No response required

For Gas Day April 25, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
30%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
43%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
40%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/24/2026- AGT Pipeline Conditions for 4/25/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/25/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/25/2026
Notice End Date: 04/26/2026
Posting Date: 04/24/2026
Notice Identifier: 177025
Required Response Indicator Description: No response required

For Gas Day April 25, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
68%
Cromwell
100%
100%
58%
Burrillville
100%
100%
53%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
65%
Iroquois Receipts
100%
100%
49%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
42%
G System
100%
100%
45%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Southern Star

Planned Service Outage - April 23, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11120
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-23 09:15 UTC
Effective Date: 4/23/2026 09:15 AM
Expiration Date: None
Subject: Planned Service Outage - April 23, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. The Station unit maintenance at the Otis CS is scheduled to begin May 19th, 2026, and return to normal
May 29th, 2026. The following customers will be afftected: 165,000 dth/d Levant CS (location:445577).
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 23, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11121
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-23 10:24 UTC
Effective Date: 4/23/2026 10:24 AM
Expiration Date: None
Subject: Planned Service Outage - April 23, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Removed (1)
1. The Station unit maintenance at Otis has been cancelled. This work will be rescheduled to be completed
during the Line Q reconfirmation so no PSO will be posted.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-24-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/23/2026 2:21:21PM	Notice End Date/Time:  04/24/2026 9:00:00am
Post Date/Time:  4/23/2026 2:21:21 PM	Notice ID: 400840
Reqrd Rsp:  1	Rsp Date:  04/23/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-24-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Friday, April 24, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienville Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         NRGBM/TGP Beirne Hill Sales Bradford Delivery Meter (Pin 48061) - through approx 17% of IT (through a rate of .1701) due to nominations in excess of operational capacity; 15,241 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 26% of SIPss due to nominations in excess of operational capacity; 31,153 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through approx 45% of SOP due to operational concerns; 89,188 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 75% of SOP due to nominations in excess of operational capacity; 14,786 Dths

·         STA 823 (Segment 823 BH) - through approx 7% of SOP due to nominations in excess of operational capacity; 2,620 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 325,886 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 467,366 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP due to nominations in excess of operational capacity; 547,055 Dths

·         STA 317 (Segment 317 BH) - through approx 70% of SOP due to nominations in excess of operational capacity; 136,986 Dths

·         STA 321 (Segment 321 FH) - through approx 76% of SOP due to nominations in excess of operational capacity; 831,767 Dths

·         MLV 330 (Segment 324 FH) - through approx 28% of SOP due to nominations in excess of operational capacity; 162,037 Dths

·         MLV 336 East (Segment 336 FH) - through approx 77% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 38,919 Dths

·         Z5hc North (Segment 299 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 521,284 Dths

·         STA 245 (Segment 245 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 840,205 Dths

·         STA 249 (Segment 249 FH) - through approx 71% of SOP due to nominations in excess of operational capacity; 487,536 Dths

·         MLV 256 East (Segment 256 FH) - through approx 7% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 8,737 Dths

·         MLV 273 (Segment 284 FH) - through approx 87% of SOP due to nominations in excess of operational capacity; 255,205 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-24-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/23/2026 6:56:30PM	Notice End Date/Time:  04/24/2026 9:00:00am
Post Date/Time:  4/23/2026 6:56:30 PM	Notice ID: 400850
Reqrd Rsp:  1	Rsp Date:  04/23/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-24-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Friday, April 24, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         NRGBM/TGP Beirne Hill Sales Bradfor Delivery Meter (Pin 48061) - through approx 10% of IT increases due to nominations in excess of operational capacity; 9,464 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 69,433 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 14,786 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 49% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 325,886 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 304,638 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 381,746 Dths

·         STA 317 (Segment 317 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 130,581 Dths

·         STA 321 (Segment 321 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 672,253 Dths

·         MLV 330 (Segment 324 FH) - through approx 46% of SOP increases due to nominations in excess of operational capacity; 60,489 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 228,473 Dths

·         STA 245 (Segment 245 FH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 244,666 Dths

·         STA 249 (Segment 249 FH) - through approx 70% of SOP increases due to nominations in excess of operational capacity; 143,325 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 220,729 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-23-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/23/2026 7:58:09PM	Notice End Date/Time:  04/24/2026 9:00:00am
Post Date/Time:  4/23/2026 7:58:09 PM	Notice ID: 400851
Reqrd Rsp:  1	Rsp Date:  04/23/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-23-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Thursday, April 23, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

NONE

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 9,782 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/23/2026- NEXUS Pipeline Conditions for 04/24/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 04/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 04/25/2026
Posting Date: 04/23/2026
Notice Identifier: 176962
Required Response Indicator Description: No response required

For Gas Day April 24, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
35%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
48%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
46%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/23/2026- AGT Pipeline Conditions for 04/24/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 04/24/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/24/2026
Notice End Date: 04/25/2026
Posting Date: 04/23/2026
Notice Identifier: 176980
Required Response Indicator Description: No response required

For Gas Day April 24, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
69%
Cromwell
100%
100%
58%
Burrillville
100%
100%
66%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
43%
Iroquois Receipts
100%
100%
47%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
56%
G System
100%
100%
43%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Florida Gas Transmission

[Florida Gas Transmission] [Planned Service Outage] APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 3RD UPDATE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 63190
Notice Type: Planned Service Outage
Subject: APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 3RD UPDATE
Posted: Apr 23 2026 8:15 AM
Effective: Apr 23 2026 8:15 AM
End Date: May 1 2026 9:00 AM

Notice ID: 63190
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 23 2026 8:15 AM
Subject: APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 3RD UPDATE
Notice Effective Date/Time: Apr 23 2026 8:15 AM
Notice End Date/Time: May 1 2026 9:00 AM
Notice Text: FGT pipeline maintenance on the mainline between FGT Compressor Stations 6 and 7 has been completed. FGT is returning to normal operations scheduling up to 300,000 MMBtu/day through Station 6 and 465,000 MMBtu/day through Station 7.FGT maintenance at FGT Compressor Station 75 continues. This maintenance is to now be completed by the end of gas day April 30, 2026. During this maintenance FGT may continue to schedule up to 900,000 MMBtu/day through Station 75. During normal operations, FGT schedules up to 980,000 MMBtu/day through Station 75.FGT continues maintenance downstream of FGT Compressor Station 12. This maintenance will continue through the end of April 2026. During this maintenance FGT may schedule up to 2,800,000 MMBtu/day through Station 12, During normal operations, FGT schedules up to 3,175,000 MMBtu/day through Station 12.e
Florida Gas Transmission

[Florida Gas Transmission] [Planned Service Outage] MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE - 1ST UPDATE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 63192
Notice Type: Planned Service Outage
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE - 1ST UPDATE
Posted: Apr 23 2026 1:20 PM
Effective: May 11 2026 9:00 AM
End Date: May 16 2026 9:00 AM

Notice ID: 63192
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 23 2026 1:20 PM
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE - 1ST UPDATE
Notice Effective Date/Time: May 11 2026 9:00 AM
Notice End Date/Time: May 16 2026 9:00 AM
Notice Text: FGT will perform maintenance at FGT Compressor Station 8. The start date has been modified. This maintenance will now start May 11, 2026, and is to be completed by the end of gas day May 15, 2026. During this maintenance FGT may continue to schedule up to 1,000,000 MMBtu/day through Station 8. During normal operations, FGT schedules up to 1,075,000 MMBtu/day through Station 8.FGT maintenance previously scheduled for May 2026 has been completed. FGT will schedule up to the normal capacity of 1,250,000 MMBtu/day through Station 9.
Tallgrass Energy

[Cheyenne Connector] [MAINTENANCE] CHEYENNE CONNECTOR MAINTENANCE SCHEDULE FOR MAY 2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Cheyenne Connector
Notice ID: 13678
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: CHEYENNE CONNECTOR MAINTENANCE SCHEDULE FOR MAY 2026
Posted: 4/23/2026 1:04:07 PM
Effective: 4/23/2026 1:04:07 PM
End Date: 12/31/9000

CHEYENNE CONNECTOR MAY 2026 MAINTENANCE SCHEDULE
Cheyenne Connector does not have any scheduled maintenance directly affecting capacity for May
2026. However, if conditions change, Cheyenne Connector will keep you informed with future bulletins.
In the event Cheyenne Connector cannot schedule the firm service nominations from Primary Receipt
to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to Section
7.14, D, 2, a, and are based upon a firm shipper’s average daily usage at Primary Points during the
seven (7) complete Gas Days prior to the day Cheyenne Connector posts the Monthly Maintenance
Schedule, except where the 7-Day period is limited by pre-existing firm service curtailments pursuant
to Section 7.14, D, 2, d.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Receipt
Points to Primary Delivery Points and along Primary Paths and remaining capacity will be scheduled
pro rata based on nominations and consistent with Section 3.1 of the General Terms and Conditions of
the Cheyenne Connector FERC Gas Tariff.
Tallgrass Energy

[Ruby Pipeline] [MAINTENANCE] RUBY MAINTENANCE SCHEDULE FOR MAY 2026

UNSCORED
Informational
View original notice text
Pipeline: Ruby Pipeline
Notice ID: 13674
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: RUBY MAINTENANCE SCHEDULE FOR MAY 2026
Posted: 4/23/2026 12:54:01 PM
Effective: 4/23/2026 12:54:01 PM
End Date: 12/31/9000

RUBY MAINTENANCE SCHEDULE FOR MAY 2026
SEGMENT 40 MAINTENANCE
On Gas Day Monday, May 4, 2026, through Gas Day Friday, May 8, 2026, Ruby will be conducting a pig
run in its Segment 40. There is no anticipated impact to the capacity through Segment 40.
In the event Ruby cannot schedule the firm service nominations from Primary Receipt to Primary
Delivery on a Day during the scheduled maintenance outlined above, Reservation Charge Credit
Quantities are calculated pursuant to Section 16.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 6.5, of the General Terms and Conditions of the Ruby FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906.
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR MAY 2026

UNSCORED
Informational
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13683
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR MAY 2026
Posted: 4/23/2026 2:14:51 PM
Effective: 4/23/2026 2:14:51 PM
End Date: 12/31/9000

TRAILBLAZER MAINTENANCE SCHEDULE MAY 2026
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026, Rockies Express Pipeline LLC
(“REX”) will be performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity.
This maintenance event is posted under notice ID 13682 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to the following through Segment 20
• Gas Day Tuesday, May 5, 2026: 802 MDth/d
• Gas Day Wednesday, May 6, 2026, through Gas Day Thursday, May 7, 2026: 810 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
REDTAIL COMPRESSOR STATION MAINTENANCE (LOCATION 56111)
On Gas Day Wednesday, May 20, 2026, Trailblazer will be performing maintenance at
its Redtail Compressor Station. TPC is not expecting this outage to impact shippers, however, TPC will
provide as much notice as possible with individual postings on the EBB in the event capacity will be
impacted.
THIRD PARTY MAINTENANCE NOTIFICATION – CHEYENNE HUB COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 200 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13682 on REX’s
Electronic Bulletin Board (“EBB”). The following receipt locations in the Cheyenne Hub will be impacted:
• WIC/TPC Dull Knife (Location 5001)
• CIG/TPC Tomahawk (Location 3856)
• TIGT/TPC Beacon Camp (Location 56127P)
• REX/TPC Lone Tree (Location 42717PR)
• PSCO/TPC Weld (Location 3907)
These locations will be scheduled the following net receipts quantities by day:
• Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026: 351 MDth/d.
• Gas Day Monday, May 18, 2026: 785 MDth/d
• Gas Day Tuesday, May 26, 2026: 782 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION

On Gas Day Friday, May 8, 2026, Rockies Express Pipeline LLC (“REX”) will be performing maintenance in
its Segment 250 that will affect Trailblazer‘s leased capacity. This maintenance event is posted under
notice ID 13682 on REX’s Electronic Bulletin Board (“EBB”). Operating capacity will be limited to 747
MDth/d through Segment 20:
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
THIRD PARTY MAINTENANCE NOTIFICATION – STEELE CITY COMPRESSOR STATION
Rockies Express Pipeline LLC (“REX”) will be performing maintenance in its Segment 260 that will affect
Trailblazer‘s leased capacity. This maintenance event is posted under notice ID 13682 on REX’s
Electronic Bulletin Board (“EBB”). Operating capacity will be limited to the following through Segment
20:
• Gas Day Tuesday, May 26, 2026: 782 MDth/d
• Gas Day Wednesday, May 27, 2026: 800 MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Tallgrass Energy

[Tallgrass Interstate Gas Transmission (TIGT)] [MAINTENANCE] TIGT MAINTENANCE SCHEDULE FOR MAY 2026

UNSCORED
Informational
View original notice text
Pipeline: Tallgrass Interstate Gas Transmission (TIGT)
Notice ID: 13673
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TIGT MAINTENANCE SCHEDULE FOR MAY 2026
Posted: 4/23/2026 12:53:02 PM
Effective: 4/23/2026 12:53:02 PM
End Date: 12/31/9000

TIGT MAINTENANCE SCHEDULE FOR MAY 2026
GRAND ISLAND COMPRESSOR STATION
On Gas Day Wednesday, May 6, 2026, through Gas Day Thursday, May 7, 2026, TIGT will be
performing an ESD test at its Grand Island Compressor Station. TIGT is not expecting this outage
to impact shippers, however, TIGT will provide as much notice as possible with individual
postings on the EBB in the event capacity will be impacted.
BIG SPRINGS COMPRESSOR STATION (SEG 190)
On Gas Day Tuesday, May 19, 2026, through Gas Day, Thursday, May 21, 2026, TIGT will be
performing maintenance at its Big Springs Compressor Station (Seg 190). TIGT is not expecting
this outage to impact shippers, however, TIGT will provide as much notice as possible with
individual postings on the EBB in the event capacity will be impacted.
In the event TIGT cannot schedule the firm service nominations from Primary Receipt to
Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 9.14 D 2 a) and are based upon a firm shipper’s average daily usage at Primary Points
during the 7 complete Gas Days prior to the day TIGT posts the Monthly Maintenance
Schedule, except where the 7-Day period is limited by pre-existing firm service curtailments
pursuant to Section 9.14 D 2 d).
To the extent there is a limitation to scheduling or curtailment of firm service nominations,
available pipeline capacity will be scheduled first to firm transportation nominations from
Primary Points and along Primary Paths and remaining capacity will be scheduled pro rata
based on nominations and consistent with Section 4.2 of the General Terms and Conditions of
the TIGT FERC Gas Tariff.
For questions, please contact your Account Director or Scheduling Representative at 303-763-
2906.
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR MAY 2026

UNSCORED
Informational
View original notice text
Pipeline: Rockies Express
Notice ID: 13682
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR MAY 2026
Posted: 4/23/2026 2:14:25 PM
Effective: 4/23/2026 2:14:25 PM
End Date: 12/31/9000

REX MAINTENANCE SCHEDULE FOR MAY 2026
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026, REX will be performing
maintenance at its Bertrand Compressor Station (Seg 250). Operating capacity will be limited to the
following capacitieis in the West to East direction through Segment 250.
• Gas Day Tuesday, May 5, 2026: 1,093 MDth/d
• Gas Day Wednesday, May 6, 2026, through Gas Day Thursday, May 7, 2026: 1,106 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHEYENNE HUB COMPRESSOR STATION MAINTENANCE (SEG 160 and 200)
REX will be performing maintenance at its Cheyenne Hub Compressor Station in May. Operating capacity
will be limited to the following capacities on the following gas days in the West to East direction through
Segment 200:
• Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026: 478 MDth/d.
• Gas Day Monday, May 18, 2026: 1,071 MDth/d
• Gas Day Tuesday, May 26, 2026: 1,066 MDth/d
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 160:
• Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026: 1,790 MDth/d.
• Gas Day Monday, May 18, 2026 and Gas Day Tuesday, May 26, 2026: 1,847 MDth/d
• Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026 : WIC/REX SITTING BULL
WELD #2 and WIC/REX SITTING BULL WELD #1 (LOCATIONS 60348 and 42722) will be limited to
0.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
COLUMBUS COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, May 12, 2026, through Gas Day Friday, May 15, 2026, REX will be performing
maintenance at its Columbus Compressor Station (Segment 380). Operating capacity will be limited to
the following capacities on the following gas days in the East to West direction through Segment 380.
• Gas Day Tuesday, May 12, 2026, through Gas Day Wednesday, May 13, 2026: 2,493 MDth/d.

• Gas Day Thursday, May 14, 2026: 2,660 MDth/d.
• Gas Day Friday, May 15, 2026: 2,950 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
On Gas Day Friday, May 8, 2026, REX will be performing maintenance at the Julesburg Compressor
Station (Segment 240). Operating capacity will be limited to 1,019 MDth/d in the West to East direction
through Segment 240.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
ST PAUL COMPRESSOR STATION MAINTENANCE (SEG 340)
REX will be performing maintenance at its St Paul Compressor Station (Segment 340) in May. Operating
capacity will be limited to the following capacities on the following gas days in the East to West direction
through Segment 340:
• Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026: 2,421 MDth/d.
• Gas Day Tuesday, May 12, 2026, through Gas Day Wednesday, May 13, 2026: 2,018 MDth/d.
• Gas Day Thursday, May 14, 2026: 2,185 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
STEELE CITY COMPRESSOR STATION MAINTENANCE (SEG 260)
REX will be performing maintenance at its Steele City Compressor Station (Segment 260) in May.
Operating capacity will be limited to the following capacities on the following gas days in the West to
East direction through Segment 260:
• Gas Day Tuesday, May 26, 2026: 1,066 MDth/d.
• Gas Day Wednesday, May 27, 2026: 1,091 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)

REX will be performing maintenance at its Washington Courthouse Compressor Station (Segment 380) in
May. Operating capacity will be limited to the following capacities on the following gas days in the East
to West direction through Segment 380:
• Gas Day Tuesday, May 5, 2026, through Gas Day Thursday, May 7, 2026: 2,896 MDth/d.
• Gas Day Tuesday, May 19, 2026, through Gas Day Wednesday, May 20, 2026: 2,666 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
Southern Star

Planned Service Outage - March 16th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11100
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-03-16 10:33 UTC
Effective Date: 3/16/2026 10:33 AM
Expiration Date: None
Subject: Planned Service Outage - March 16th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. The Pipeline Maintenance in the Alva CS is scheduled to begin April 7th, 2026, and return to service April
17th, 2026. The following customers will be affected: 0 dth/d ETC Beaver (location:16453).
Revised (1)
1. The Hawthorn Regulator project has been updated with new dates. The work will now begin April 6th,
2026, and Return to service April 24th, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - March 17th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11101
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-03-17 11:08 UTC
Effective Date: 3/17/2026 11:08 AM
Expiration Date: None
Subject: Planned Service Outage - March 17th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (2)
1. The Pipeline Maintenance in the Ottawa CS is scheduled to begin September 14th, 2026, and return to
service September 25th, 2026. The following customers will be affected: 0 dth/d Kansas Hugoton
Delivery (location:441301), 0 dth/d Rawlins Hesston Delivery (location: 444901), and 50,000 dth/d
Hesston CS (location: 445536).
2. The Pipeline Maintenance in the Americus CS is scheduled to begin October 5th, 2026, and return to
service October 16th, 2026. The following customers will be affected: 0 dth/d Emporia Energy Center
(location:16933), 0 dth/d Kansas Hugoton Delivery (location:441301), 0 dth/d Rawlins Hesston Delivery
(location: 444901), and 50,000 dth/d Hesston CS (location: 445536)
Revised (1)
1. The Pipeline Maintenance in the Ottawa CS has been updated with new dates. The maintenance will still
begin May 4th, 2026, but will now conclude May 22nd, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - March 18th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11102
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-03-18 10:54 UTC
Effective Date: 3/18/2026 10:54 AM
Expiration Date: None
Subject: Planned Service Outage - March 18th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Revised (1)
1. The Pipeline Integrity Smart tool had the wrong dates updated on the PSO PDF. The dates for this smart
tool run are March 24th, 2026 through March 26th, 2026. The following customers will be affected: 0
dth/d Cheyenne Plains -Sand Dunes (location:16813), and 0 dth/d NGPL- Ford County Receipt (location:
17113).
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - March 19th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11104
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-03-19 10:48 UTC
Effective Date: 3/19/2026 10:48 AM
Expiration Date: None
Subject: Planned Service Outage - March 19th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
NEW (1)
1. The Station maintenance at our Ratliff CS will begin March 31st, 2026, and Return to service April 3rd,
2026. The following customers will be affected: 45,000 dth/d NGPL Carter (location: 17069).
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - March 30th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11106
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-03-30 13:51 UTC
Effective Date: 3/30/2026 01:51 PM
Expiration Date: None
Subject: Planned Service Outage - March 30th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Revised (1)
1. The Pipeline Integrity smart tool run in the Levant CS has been extended by one day. The maintenance
will now return to service on April 4th, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - March 31th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11107
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-03-31 10:42 UTC
Effective Date: 3/31/2026 10:42 AM
Expiration Date: None
Subject: Planned Service Outage - March 31th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Revised (1)
1. The Pipeline Maintenance at the ETC Beaver Location, which was set to begin April 7th, 2026, has been
cancelled. This work will occur later in the year when we have a reschedule date.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 6th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11108
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-06 11:10 UTC
Effective Date: 4/6/2026 11:10 AM
Expiration Date: None
Subject: Planned Service Outage - April 6th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Cancelled (2)
1. The Unit Maintenance at Saginaw Station that was scheduled to begin April 7th, 2026, has been cancelled.
2. The Unit Maintenance at Saginaw Station that was scheduled to begin April 21st, 2026, has been
cancelled
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 6th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11109
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-06 11:17 UTC
Effective Date: 4/6/2026 11:17 AM
Expiration Date: None
Subject: Planned Service Outage - April 6th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Revised (1)
1. The Unit Maintenance at Saginaw Station is scheduled to begin April 21st, 2026, and return to service
April 24th, 2026. The Following Customers will be affected: 175,000 Dth/d Saginaw CS Area Deliveries
(Location 444550). 
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 13th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11111
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-13 09:37 UTC
Effective Date: 4/13/2026 09:37 AM
Expiration Date: None
Subject: Planned Service Outage - April 13th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. The Unit Maintenance at Saginaw Station is scheduled to begin May 12th, 2026, and return to service
May 26th, 2026. The Following Customers will be affected: 175,000 Dth/d Saginaw CS Area Deliveries
(Location 444550). 
Revised (1)
1. The Pipeline Integrity ILI run in the Edmond CS has been extended by one day. The run will now go from
April 21st, 2026, and return to service April 25th, 2026.
2. The Nash Station maintenance has been extended. The maintenance is now expected to be completed by
April 24th, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 14th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11112
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-14 08:55 UTC
Effective Date: 4/14/2026 08:55 AM
Expiration Date: None
Subject: Planned Service Outage - April 14th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. The Station Maintenance at our Ratliff CS is scheduled to begin April 29th, 2026, and Return to service
April 30th, 2026. The following Customers will be affected: 0 dth/d NGPL Carter (location:17069)
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 16th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11114
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-16 12:54 UTC
Effective Date: 4/16/2026 12:54 PM
Expiration Date: None
Subject: Planned Service Outage - April 16th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. The Pipeline Maintenance at the Welda CS is scheduled to begin August 18th, 2026, and return to service
August 28th, 2026. The following customers will be affected: 425,000 dth/d Hesston CS (location:
445536), 380,000 dth/d Blackwell CS (location: 445511), 0 dth/d TIGT Glavin (location:16593), 10,000
dth/d TIGT Sugar Creek (location: 16952), 50,000 dth/d PEPL Princeton Receipt (location 17131), and 0
dth/d Rex St. Joe (location: 17087).
Revised (1)
1. The Station Maintenance at the Saginaw CS has a new return to service date. The Maintenance will return
to service May 1st, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 20th, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11116
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-20 14:23 UTC
Effective Date: 4/20/2026 02:23 PM
Expiration Date: None
Subject: Planned Service Outage - April 20th, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
Revised (1)
1. The Pipeline Maintenance at the Nash CS is being extended. The new return to service date is now May
1st, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Southern Star

Planned Service Outage - April 22, 2026

UNSCORED
Informational
View original notice text
TSP Name: Southern Star
Notice ID: 11118
Notice Type: Planned Service Outage
Status: Supersede
Post Date: 2026-04-22 11:52 UTC
Effective Date: 4/22/2026 11:52 AM
Expiration Date: None
Subject: Planned Service Outage - April 22, 2026

Southern Star’s 2026 “Planned Service Outage” has been posted to the “Notices” area under the Planned Service
Outage category and includes upcoming planned maintenance scheduled for this year. Changes to this schedule
are always possible and will be posted to the bulletin board as soon as firm dates are known.
New (1)
1. Hoxie Station Unit Inspection - Levant CS 160,000 Dth/d Effective April 24, 2026, return to normal May
2, 2026.
The PSO Dashboard provides an interactive way to find and filter information related to the PSO items.
PSO Dashboard link: Planned Service Outage
PSO PDF: PSO
 
Scott Warren                      Office: 270.852.4559                      Cell: 270.302.6433
Buster Ashley                     Office: 270.852.4546                      Cell: 270.314.1436
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-23-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/22/2026 3:10:14PM	Notice End Date/Time:  04/23/2026 9:00:00am
Post Date/Time:  4/22/2026 3:10:14 PM	Notice ID: 400819
Reqrd Rsp:  1	Rsp Date:  04/22/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-23-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Thursday, April 23, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through approx 70% of SOP due to operational concerns; 128,905 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 24,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 97% of SOP due to nominations in excess of operational capacity; 346,897 Dths

·         MLV 314 East (Segment 314 BH) - through approx 91% of SOP due to nominations in excess of operational capacity; 482,286 Dths

·         STA 315 (Segment 315 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 548,431 Dths

·         STA 317 (Segment 317 BH) - through approx 79% of SOP due to nominations in excess of operational capacity; 156,501 Dths

·         STA 321 (Segment 321 FH) - through approx 77% of SOP due to nominations in excess of operational capacity; 840,614 Dths

·         STA 325 (Segment 324 FH) - through approx 14% of SOP due to nominations in excess of operational capacity; 61,750 Dths

·         MLV 330 (Segment 324 FH) - through approx 22% of SOP due to nominations in excess of operational capacity; 123,582 Dths

·         MLV 336 East (Segment 336 FH) - through approx 44% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 21,389 Dths

·         Z5 HC North (Segment 299 FH) - through approx 88% of SOP due to nominations in excess of operational capacity; 641,280 Dths

·         STA 245 (Segment 245 FH) - through approx 87% of SOP due to nominations in excess of operational capacity; 758,189 Dths

·         STA 249 (Segment 249 FH) - through approx 72% of SOP due to nominations in excess of operational capacity; 434,567 Dths

·         MLV 256 East (Segment 256 FH) - through approx 31% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 43,717 Dths

·         MLV 273 (Segment 284 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 244,924 Dths

LINEPACK RESTRICTIONS

PAYBACK NOMINATIONS WILL BE EVALUATED AT EACH CYCLE AND SCHEDULED ONLY IF OPERATIONALLY FEASIBLE.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-23-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/22/2026 6:59:23PM	Notice End Date/Time:  04/23/2026 9:00:00am
Post Date/Time:  4/22/2026 6:59:23 PM	Notice ID: 400827
Reqrd Rsp:  1	Rsp Date:  04/22/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-23-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Thursday, April 23, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

NONE

SEGMENT RESTRICTIONS

·         STA 40 South Of Carthage (Segment 132 FH) - through 100% of SOP increases due to operational concerns; 138,806 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 24,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 346,897 Dths

·         MLV 314 East (Segment 314 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 327,545 Dths

·         STA 315 (Segment 315 BH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 491,868 Dths

·         STA 317 (Segment 317 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 144,298 Dths

·         STA 321 (Segment 321 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 675,741 Dths

·         MLV 330 (Segment 324 FH) - through approx 45% of SOP increases due to nominations in excess of operational capacity; 67,996 Dths

·         Z5 HC North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 238,159 Dths

·         STA 245 (Segment 245 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 244,469 Dths

·         STA 249 (Segment 249 FH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 166,848 Dths

·         MLV 256 East (Segment 256 FH) - through approx 65% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 29,720 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 210,798 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/22/2026- Nexus Pipeline Conditions for 4/23/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/23/2026
Notice End Date: 04/24/2026
Posting Date: 04/22/2026
Notice Identifier: 176920
Required Response Indicator Description: No response required

For Gas Day April 23, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
36%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
52%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
50%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/22/2026- AGT Pipeline Conditions for 4/23/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/23/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/23/2026
Notice End Date: 04/24/2026
Posting Date: 04/22/2026
Notice Identifier: 176936
Required Response Indicator Description: No response required

For Gas Day April 23, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
42%
Cromwell
100%
100%
47%
Burrillville
100%
100%
50%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
43%
Iroquois Receipts
100%
100%
51%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
27%
G System
100%
100%
12%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Rover Pipeline

[Rover Pipeline] [Other] Nominations to Vector on Rover

UNSCORED
Informational
View original notice text
Pipeline: Rover Pipeline
Notice ID: 63010
Notice Type: Other
Subject: Nominations to Vector on Rover
Posted: 2026-04-16 10:39:00.0
Effective: 2026-04-16 10:39:00.0
End Date: 

Notice ID: 63010
Notice Type: GEN
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-16 10:39:00.0
Subject: Nominations to Vector on Rover
Notice Effective Date/Time: 2026-04-16 10:39:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 04/16/2026 Nominations to Vector on Rover Due to increased utilization on Vector Pipeline, Rover is encouraging all shippers to enter their nominations to Vector during the Timely cycle each day. All new or increased nominations entered in subsequent cycles, including firm primary, are subject to scheduling reductions. If you have any questions, please contact your Marketing or Customer Service Representative.
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Maintenance] LINE ST-1 PIGGING PROJECT

UNSCORED
Informational
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6362
Notice Type: Maintenance
Subject: LINE ST-1 PIGGING PROJECT
Posted: Tue Mar 31 13:05:00 CDT 2026
Effective: Tue May 05 09:00:00 CDT 2026
End Date: Fri May 29 09:00:00 CDT 2026

EGT Critical Notices
TSP:                                     872670161
TSP Name:                                ENABLE GAS TRANSMISSION, LLC
Critical Notice Description:             Critical notice
Notice Effective Date:                   05/05/2026
Notice Effective Time:                   09:00
Notice End Date:                         05/29/2026
Notice End Time:                         09:00
Notice Identifier:                       6362
Notice Status Description:               Initiate
Notice Type:                             Maintenance
Posting Date/Time:                       03/31/2026 13:04
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject:                                 LINE ST-1 PIGGING PROJECT
Notice Text:
This Operational Alert is being issued pursuant to Section 20, GT&C of EGT s Tariff to notify shippers of
upcoming planned maintenance on EGT s Line ST-1 in the South Pooling Area.
As part of EGT s integrity management plan, a series of pig runs have been scheduled to begin May 5th,
2026, with an anticipated completion date of May 30th, 2026, at 9:00 a.m.
Based on current nominations, EGT does not anticipate impacts to its services.  However, unforeseen
issues, including, but not limited to, nominations, weather conditions, storage needs, etc., may result in
scheduling reductions.  In the event that unforeseen issues do occur, EGT will evaluate nominations, on
a case by case basis, based on daily operations to alleviate impacts to the extent possible.
Should any of the details with this plan change, EGT will notify Shippers by updating this posting.  If you
have any questions concerning this Alert, please contact your Scheduling Representative.
For a more readable version of this document click
Here
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Maintenance] LINE O-1-O PIGGING PROJECT

UNSCORED
Informational
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6363
Notice Type: Maintenance
Subject: LINE O-1-O PIGGING PROJECT
Posted: Tue Mar 31 13:41:00 CDT 2026
Effective: Tue May 12 09:00:00 CDT 2026
End Date: Sat Jun 06 09:00:00 CDT 2026

EGT Critical Notices
TSP:                                     872670161
TSP Name:                                ENABLE GAS TRANSMISSION, LLC
Critical Notice Description:             Critical notice
Notice Effective Date:                   05/12/2026
Notice Effective Time:                   09:00
Notice End Date:                         06/06/2026
Notice End Time:                         09:00
Notice Identifier:                       6363
Notice Status Description:               Initiate
Notice Type:                             Maintenance
Posting Date/Time:                       03/31/2026 13:41
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject:                                 LINE O-1-O PIGGING PROJECT
Notice Text:
This Operational Alert is being issued pursuant to Section 20, GT&C of EGT s Tariff to notify shippers of
upcoming planned maintenance on EGT s Line O-1-O located in EGT s North Pooling Area.
As part of EGT s integrity management plan, a series of pig runs have been scheduled to begin May 12th,
2026, with an anticipated completion date of June 6th, 2026, at 9:00 a.m.
Based on current nominations, EGT does not anticipate impacts to its services.  However, unforeseen
issues, including, but not limited to, nominations, weather conditions, storage needs, etc., may result in
scheduling reductions.  In the event that unforeseen issues do occur, EGT will evaluate nominations, on
a case by case basis, based on daily operations to alleviate impacts to the extent possible.
Should any of the details with this plan change, EGT will notify Shippers by updating this posting.  If you
have any questions concerning this Alert, please contact your Scheduling Representative.
For a more readable version of this document click
Here
Enable Gas Transmission (EGT)

[Enable Gas Transmission (EGT)] [Maintenance] MRT FOUNTAIN HILL MAINTENANCE

UNSCORED
Informational
View original notice text
Pipeline: Enable Gas Transmission (EGT)
Notice ID: 6370
Notice Type: Maintenance
Subject: MRT FOUNTAIN HILL MAINTENANCE
Posted: Tue Apr 07 15:24:00 CDT 2026
Effective: Tue May 19 09:00:00 CDT 2026
End Date: Thu May 21 09:00:00 CDT 2026

EGT Critical Notices
TSP:                                     872670161
TSP Name:                                ENABLE GAS TRANSMISSION, LLC
Critical Notice Description:             Critical notice
Notice Effective Date:                   05/19/2026
Notice Effective Time:                   09:00
Notice End Date:                         05/21/2026
Notice End Time:                         09:00
Notice Identifier:                       6370
Notice Status Description:               Initiate
Notice Type:                             Maintenance
Posting Date/Time:                       04/07/2026 15:24
Required Response Indicator Description: No response required
Response Date:
Response Time:
Subject:                                 MRT FOUNTAIN HILL MAINTENANCE
Notice Text:
EGT received the following notification from MRT regarding planned maintenance on its Fountain Hill
Compressor Station which could impact the EGT Transportation Agreements on MRT utilized to deliver
to the Perryville Hub. Based on current nominations, EGT anticipates that primary firm services through
Perryville will be scheduled to approximately 81% of MDO quantities during the outage.
POSTED ON MRT ON 4/7/26
This System Protection Warning (SPW) is being issued by MRT to notify shippers of a planned
maintenance on MRT s Fountain Hill Compressor Station located in Ashley County, Arkansas. This will
result in a throughput limit of 300,000 Dth/D through the station.
The planned maintenance on the Fountain Hill Compressor Station will begin Tuesday May 19th, 2026, at
09:00 and an anticipated completion date of Thursday May 21st, 2026, at 09:00.
.  During this time, nominations and allocations to delivery points located south of MRT s Fountain Hill
compressor station will be subject to the following criteria:
*	Nominations and allocations will need to be within their primary path and primary direction of
flow.
*	Nominations and allocations will not be allowed to exceed their Line Priority, Rate Zone Capacity
or Line Capacity.
*	Daily activity resulting in long positions may not be allowed during this period.
*	Make up of short positions may not be allowed during this period.
Based on current nominations, MRT anticipates impacts to primary firm services.
If you have any questions concerning this Alert, please contact your Scheduling Representative.
For a more readable version of this document click
Here
South Pass Pipeline

[South Pass Pipeline] [Maint] Stingray Pigging Operations Update #1

UNSCORED
Informational
View original notice text
Pipeline: South Pass Pipeline
Notice ID: 62614
Notice Type: Maint
Subject: Stingray Pigging Operations Update #1
Posted: 2026-03-31 10:38:00.0
Effective: 2026-03-31 10:38:00.0
End Date: 

Notice ID: 62614
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-03-31 10:38:00.0
Subject: Stingray Pigging Operations Update #1
Notice Effective Date/Time: 2026-03-31 10:38:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 03/31/2026 Stingray Pigging Operations Update #1 Please Note: changes from the previous posting are shown in bold type. Stingray pigging operations will end on May 19, 2026. Beginning Saturday, March 21, 2026, Stingray Pipeline Company, L.L.C. will initiate pigging operations from West Cameron 509. Due to anticipated higher liquid levels at the Stingray Onshore Separation facility, offshore operators could experience higher daily line pressures and pressure fluctuations while pigging operations are in progress. Stingray will update this posting as more information becomes available. If you have any questions, please contact your Marketing Representative or your Nominations Analyst.
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Vernon Planned Maintenance Termination

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 62628
Notice Type: Maint
Subject: Vernon Planned Maintenance Termination
Posted: 2026-03-31 15:05:00.0
Effective: 2026-04-01 09:00:00.0
End Date: 

Notice ID: 62628
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-03-31 15:05:00.0
Subject: Vernon Planned Maintenance Termination
Notice Effective Date/Time: 2026-04-01 09:00:00.0
Notice End Date/Time: 2026-07-01 00:00:00.0
Notice Text: New Information Posted on 3/31/26: The planned maintenance at Gulf Run’s Vernon Compressor Station has been completed. Effective April 1st, 2026 at 09:00, all restrictions associated with Critical Notice #61691 are lifted. Previous Information Posted on 2/19/26: The maintenance is now anticipated to start Tuesday March 24th, 2026, at 09:00 through Friday April 3rd, 2026, at 9:00 a.m. During this maintenance period: · March 24th o Vernon will be limited to a throughput capacity of 900,000 dth/d. · March 25th- April 2nd o Vernon will be limited to a throughput capacity of 1,200,000 dth/d. All other details from the previous posting (Critical Notice #61552) remain unchanged. Previous Information Posted on 2/10/26: This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Vernon Compressor Station located in Jackson Parish, Louisiana and in Gulf Run’s Zone 1. The planned maintenance will begin Tuesday April 7th, 2026, with an anticipated completion date of Friday, April 17th, 2026, at 09:00. During this maintenance period: · April 7th o Vernon will be limited to a throughput capacity of 900,000 dth/d. · April 8th-16th o Vernon will be limited to a throughput capacity of 1,200,000 dth/d. Gulf Run does anticipate impacts to its primary firm services. Gulf Run will evaluate nominations, on a case by case basis, based on daily operations to alleviate impacts to the extent possible. During this planned maintenance, shippers should nominate from their contractual MRO location to their contractual MDO location to reduce risk of scheduling reductions. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Customer Solutions Representative.
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Westdale Planned Maintenance Update

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 62843
Notice Type: Maint
Subject: Westdale Planned Maintenance Update
Posted: 2026-04-10 08:11:00.0
Effective: 2026-04-21 09:00:00.0
End Date: 

Notice ID: 62843
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-10 08:11:00.0
Subject: Westdale Planned Maintenance Update
Notice Effective Date/Time: 2026-04-21 09:00:00.0
Notice End Date/Time: 2026-04-25 09:00:00.0
Notice Text: New Information Posted 4/10/26: This planned maintenance is still scheduled to begin Tuesday, April 21st, 2026, with an expected completion date of Saturday, April 25th, 2026, at 09:00. · April 21st o There will be zero flow to Golden Pass Pipeline (MP# 808311), Gulf Run will still be accepting nominations at Trunkline Vinton (MP# 292545). · April 22nd through April 25th o During this planned maintenance, Zone 2 deliveries will be limited to 1,200,000 Dth/d. All other details from the previous posting (Critical Notice #62324) remain unchanged. Previously Posted 3/13/2026 This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Westdale Compressor Station located in Red River Parish, Louisiana and in Gulf Run’s Zone 1. This planned maintenance is scheduled to begin Tuesday, April 21st, 2026, with an expected completion date of Saturday, April 25th, 2026, at 09:00. · April 21st o there will be zero flow to Zone 2 · April 22nd through April 25th o During this planned maintenance, Zone 2 deliveries will be limited to 1,200,000 Dth/d. Gulf Run will evaluate nominations, on a case-by-case basis, based on daily operations to alleviate impacts to the extent possible. During this planned maintenance, shippers should nominate from their contractual MRO location to their contractual MDO location to reduce risk of scheduling reductions. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Scheduling Representative.
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Alto Planned Maintenance Termination

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 63036
Notice Type: Maint
Subject: Alto Planned Maintenance Termination
Posted: 2026-04-17 07:25:00.0
Effective: 2026-04-17 09:00:00.0
End Date: 

Notice ID: 63036
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-17 07:25:00.0
Subject: Alto Planned Maintenance Termination
Notice Effective Date/Time: 2026-04-17 09:00:00.0
Notice End Date/Time: 2026-07-17 09:00:00.0
Notice Text: New Information Posted on 4/17/26:The planned maintenance at Gulf Run’s Alto Compressor Station has been completed. Effective April 17th, 2026 at 09:00, all restrictions associated with Critical Notice #61651 are lifted.New Information Posted on 2/17/26:The maintenance is now anticipated to start Monday April 13th 2026, at 09:00 through Saturday April 18th , 2026 at 9:00 a.m. All other details from the previous posting (Critical Notice #61307) remain unchanged.Previous Information Posted on 2/03/26:This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Alto Compressor Station located in Richland Parish, Louisiana and in Gulf Run’s Zone 1.This planned maintenance is scheduled to occur on Tuesday, March 10th, 2026 through Sunday, March 15th, 2026 at 09:00.During this time, Gulf Run will be unable to deliver to CGT GR (#13548).Gulf Run does anticipate impacts to its primary firm services. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance.If you have any questions concerning this alert, please contact your Scheduling Representative.
Gulf Run Transmission

[Gulf Run Transmission] [Maint] Regency Logansport Unplanned Maintenance

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 63152
Notice Type: Maint
Subject: Regency Logansport Unplanned Maintenance
Posted: 2026-04-21 09:11:00.0
Effective: 2026-05-07 09:00:00.0
End Date: 

Notice ID: 63152
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-21 09:11:00.0
Subject: Regency Logansport Unplanned Maintenance
Notice Effective Date/Time: 2026-05-07 09:00:00.0
Notice End Date/Time: 2026-05-08 09:00:00.0
Notice Text: This Action Alert is being issued pursuant to Section 7, GT&C, of Gulf Run’s Tariff to notify shippers of unplanned maintenance at Gulf Run’s Regency @ Logansport (#822072) meter located in Caddo Parish, Louisiana and in Gulf Run’s Zone 1. This unplanned maintenance will begin Thursday, May 7th, 2026, at 09:00 with a completion date of May 8th, 2026, at 09:00 During this maintenance, Receipts from Regency@Logansport (#822072) will be limited to 0 Dth/D. Gulf Run does anticipate impacts to its primary firm services. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Scheduling Representative.
Trunkline Gas Company

[Trunkline Gas Company] [Other] TGC Kaplan 300-1 line Hydrotest Update

UNSCORED
Informational
View original notice text
Pipeline: Trunkline Gas Company
Notice ID: 63175
Notice Type: Other
Subject: TGC Kaplan 300-1 line Hydrotest Update
Posted: 2026-04-22 13:19:00.0
Effective: 2026-04-22 13:19:00.0
End Date: 

Notice ID: 63175
Notice Type: GEN
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-22 13:19:00.0
Subject: TGC Kaplan 300-1 line Hydrotest Update
Notice Effective Date/Time: 2026-04-22 13:19:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 04/22/2026 TGC Kaplan 300-1 line Hydrotest Update Please Note: changes from the previous posting are shown in bold type. Beginning Gas Day April 14, 2026, Trunkline will perform a hydrotest on the Kaplan 300-1 line from MP -55.23 to MP -69.49. During the period of April 14, 2026 through April 22, 2026, delivery capacity into ELA will be limited. Scheduling reductions may occur at all ELA locations and 82708 Florida-TGC Interconnect-Vermilion location to reduce imbalances and maintain the safety and integrity of operations on the pipe. If the scheduling reductions impact firm shippers, the Reservation Charge Crediting Mechanism of Section 29.1 (A) (2) shall apply. Updates to this maintenance will be posted as they become available. If you have any questions, please contact your Customer Service or Marketing Representative.
Florida Gas Transmission

[Florida Gas Transmission] [Planned Service Outage] APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 2ND UPDATE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 62915
Notice Type: Planned Service Outage
Subject: APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 2ND UPDATE
Posted: Apr 13 2026 11:50 AM
Effective: Apr 13 2026 11:50 AM
End Date: May 1 2026 9:00 AM

Notice ID: 62915
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 13 2026 11:50 AM
Subject: APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 2ND UPDATE
Notice Effective Date/Time: Apr 13 2026 11:50 AM
Notice End Date/Time: May 1 2026 9:00 AM
Notice Text: FGT will be performing pipeline maintenance on the mainline between FGT Compressor Stations 6 and 7. This work will begin on April 14, 2026 and continue approximately through the end of gas day April 30, 2026. During this maintenance, FGT will schedule up to approximately 150,000 MMBtu/day through Station 6 and approximately 300,000 MMBtu/day through Station 7. During normal operations, FGT schedules up to 300,000 MMBtu/day through Station 6 and 465,000 MMBtu/day through Station 7.FGT maintenance at FGT Compressor Station 75 has been extended. This maintenance is to now be completed by the end of gas day April 30, 2026. During this maintenance FGT may continue to schedule up to 900,000 MMBtu/day through Station 75. During normal operations, FGT schedules up to 980,000 MMBtu/day through Station 75.FGT maintenance downstream of FGT Compressor Station 8 has been extended. This maintenance is to now be completed by the end of gas day April 20, 2026. During this maintenance FGT may continue to schedule up to 950,000 MMBtu/day through Station 8. During normal operations, FGT schedules up to 1,075,000 MMBtu/day through Station 8.FGT will be performing maintenance at FGT Compressor Station 10. This maintenance will start April 13, 2026, and is to be completed by end of gas day April 16, 2026. During this maintenance FGT may schedule up to 1,100,000 MMBtu/day through Station 10. During normal operations, FGT schedules up to 1,300,000 MMBtu/day through Station 10.FGT will continue maintenance downstream of FGT Compressor Station 12. This maintenance will continue through the end of April 2026. During this maintenance FGT may schedule up to 2,800,000 MMBtu/day through Station 12, During normal operations, FGT schedules up to 3,175,000 MMBtu/day through Station 12.
Florida Gas Transmission

[Florida Gas Transmission] [Planned Service Outage] MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 63156
Notice Type: Planned Service Outage
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE
Posted: Apr 21 2026 1:17 PM
Effective: May 1 2026 9:00 AM
End Date: Jun 1 2026 9:00 AM

Notice ID: 63156
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 21 2026 1:17 PM
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE
Notice Effective Date/Time: May 1 2026 9:00 AM
Notice End Date/Time: Jun 1 2026 9:00 AM
Notice Text: FGT will be performing maintenance at FGT Compressor Station 8. This maintenance will start May 4, 2026, and is to be completed by the end of gas day May 10, 2026. During this maintenance FGT may continue to schedule up to 1,000,000 MMBtu/day through Station 8. During normal operations, FGT schedules up to 1,075,000 MMBtu/day through Station 8.FGT will be performing maintenance at FGT Compressor Station 9. This maintenance will start May 1, 2026, and is to be completed by the end of gas May 10, 2026. During this maintenance FGT may schedule up to 1,150,000 MMBtu/day through Station 9. During normal operations, FGT schedules up to 1,250,000 MMBtu/day through Station 9.
MountainWest Pipelines

[MountainWest Pipeline (MWP)] [CLAY BASIN CAPACITIES AND OFO RESTRICTIONS] CLAY BASIN CAPACITIES AND OFO RESTRICTIONS

UNSCORED
Informational
View original notice text
Pipeline: MountainWest Pipeline (MWP)
Notice ID: 38211
Notice Type: CLAY BASIN CAPACITIES AND OFO RESTRICTIONS
Subject: CLAY BASIN CAPACITIES AND OFO RESTRICTIONS
Posted: 04/01/2026 02:15 PM
Effective: 04/08/2026 09:00 AM
End Date: 38211

MountainWest Pipeline Customer Access myQuorum Login Access Agreements User Access Requests Transmission Services MountainWest Pipeline Informational Postings Capacity Gas Quality Index of Customers Locations Notices Critical Non-Critical Planned Services Outages Request to Purchase Releasable Capacity Waste Heat Posted Imbalances Standards of Conduct Tariff Transactional Reporting Other Downloads Search Customer Activites Site Map System Operations MWP Home MountainWest Overthrust Pipeline White River Hub System Wide Notices - MountainWest Pipeline TSP Name: MountainWest Pipeline, LLC TSP: 092027077 Critical: Y Notice Type Desc Post Date/Time Notice Eff Date/Time Notice ID Subject Rsp Date/Time Notice Stat Prior Notice Reqrd Rsp STORAGE 04/01/2026 02:15 PM 04/08/2026 09:00 AM 38211 CLAY BASIN CAPACITIES AND OFO RESTRICTIONS 1 5 All listed times are CCT CLAY BASIN CAPACITIES AND OFO RESTRICTIONS At the conclusion of the Clay Basin test beginning gas day April 8, 2026, injection capacity will be 275,000 Dth/d plus 25,000 Dth/d Park and Loan for a total of 300,000 Dth/d. Withdrawal capacity will be 650,000 Dth/d. Also, effective gas day April 8, 2026, MountainWest Pipeline will lift the current OFO restriction and allow payback to and from the pipeline. If you have any questions, please contact your MWP Marketing or Contract Services Representative or Scheduling on the Customer Service Hotline at 801-584-6034. MountainWest Pipeline Home | Contact Us | Code of Business Conduct & Ethics | Site Map © 2009–2026 MountainWest Pipeline
MountainWest Pipelines

[MountainWest Pipeline (MWP)] [ANNUAL OAK SPRING MAINTENANCE AND DOT'S] ANNUAL OAK SPRING MAINTENANCE AND DOT'S

UNSCORED
Informational
View original notice text
Pipeline: MountainWest Pipeline (MWP)
Notice ID: 38291
Notice Type: ANNUAL OAK SPRING MAINTENANCE AND DOT'S
Subject: ANNUAL OAK SPRING MAINTENANCE AND DOT'S
Posted: 04/10/2026 02:00 PM
Effective: 04/20/2026 09:00 AM
End Date: 38291

MountainWest Pipeline Customer Access myQuorum Login Access Agreements User Access Requests Transmission Services MountainWest Pipeline Informational Postings Capacity Gas Quality Index of Customers Locations Notices Critical Non-Critical Planned Services Outages Request to Purchase Releasable Capacity Waste Heat Posted Imbalances Standards of Conduct Tariff Transactional Reporting Other Downloads Search Customer Activites Site Map System Operations MWP Home MountainWest Overthrust Pipeline White River Hub System Wide Notices - MountainWest Pipeline TSP Name: MountainWest Pipeline, LLC TSP: 092027077 Critical: Y Notice Type Desc Post Date/Time Notice Eff Date/Time Notice ID Subject Rsp Date/Time Notice Stat Prior Notice Reqrd Rsp PLND OUTAGE/MAINT/CONSTRAINT 04/10/2026 02:00 PM 04/20/2026 09:00 AM 38291 ANNUAL OAK SPRING MAINTENANCE AND DOT'S 1 5 All listed times are CCT ANNUAL OAK SPRING MAINTENANCE AND DOT'S MountainWest Pipeline, LLC (MWP) would like to remind its customers of the following: MWP will be performing annual ESD testing and unit maintenance at the Oak Spring Compressor Station facility GD April 20 through GD April 24. To facilitate the work, the ML 104 Goshen segment will be constrained by 120,000 Dth/d from 384,500 Dth/d down to 264,500 Dth/d for a total reduction of 31%. If nominations fall in line with what is scheduled for today, there would be an approximate cut to nominations of 89,000 Dth. If you have any questions, please contact your MWP Marketing or Contract Services Representative or Scheduling on the Customer Service Hotline at 801-584-6034. MountainWest Pipeline Home | Contact Us | Code of Business Conduct & Ethics | Site Map © 2009–2026 MountainWest Pipeline
MountainWest Pipelines

[MountainWest Pipeline (MWP)] [ANNUAL SIMON STATION MAINTENANCE AND DOT'S] ANNUAL SIMON STATION MAINTENANCE AND DOT'S

UNSCORED
Informational
View original notice text
Pipeline: MountainWest Pipeline (MWP)
Notice ID: 38292
Notice Type: ANNUAL SIMON STATION MAINTENANCE AND DOT'S
Subject: ANNUAL SIMON STATION MAINTENANCE AND DOT'S
Posted: 04/10/2026 02:03 PM
Effective: 04/14/2026 09:00 AM
End Date: 38292

MountainWest Pipeline Customer Access myQuorum Login Access Agreements User Access Requests Transmission Services MountainWest Pipeline Informational Postings Capacity Gas Quality Index of Customers Locations Notices Critical Non-Critical Planned Services Outages Request to Purchase Releasable Capacity Waste Heat Posted Imbalances Standards of Conduct Tariff Transactional Reporting Other Downloads Search Customer Activites Site Map System Operations MWP Home MountainWest Overthrust Pipeline White River Hub System Wide Notices - MountainWest Pipeline TSP Name: MountainWest Pipeline, LLC TSP: 092027077 Critical: Y Notice Type Desc Post Date/Time Notice Eff Date/Time Notice ID Subject Rsp Date/Time Notice Stat Prior Notice Reqrd Rsp PLND OUTAGE/MAINT/CONSTRAINT 04/10/2026 02:03 PM 04/14/2026 09:00 AM 38292 ANNUAL SIMON STATION MAINTENANCE AND DOT'S 1 5 All listed times are CCT ANNUAL SIMON STATION MAINTENANCE AND DOT'S MountainWest Pipeline, LLC (MWP) would like to remind its customers of the following: MWP will be performing annual ESD testing and unit maintenance at the Simon Compressor Station GD April 14 and GD April 27 through GD May 1. To facilitate the work, Simon Compressor Station will be offline. The Nightingale ML22 Segment capacity will be reduced from 206,650 Dth/d to 175,000 Dth/d, JL 65 will be reduced from 25,500 Dth/d to 21,700 Dth/d, ML 26 will be reduced from 7,750 Dth/d to 6,600 Dth/d, ML 23 will be reduced from 30,250 Dth/d to 25,800 Dth/d, MAP 967 reduced from 45,850 to 38,490 Dth/d and expect increased pressures for Vermillion Plant MAP 293. If nominations remain at current levels, we do not anticipate any required reductions. If you have any questions, please contact your MWP Marketing or Contract Services Representative or Scheduling on the Customer Service Hotline at 801-584-6034. MountainWest Pipeline Home | Contact Us | Code of Business Conduct & Ethics | Site Map © 2009–2026 MountainWest Pipeline
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending Low

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260023
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 01/20/2026 11:25
Notice Effective Date: 01/20/2026 11:25
Notice End Date: 02/04/2026 11:25
Subject: Kern River - Warning - Line Pack is Trending Low

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260029
Prior Notice Identifier: 20260023
Notice Type:  Pipe Cond
Notice Status: 2
Posting Date: 01/22/2026 07:32
Notice Effective Date: 01/22/2026 07:32
Notice End Date: 01/23/2026 07:32
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260047
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 02/12/2026 07:25
Notice Effective Date: 02/12/2026 07:25
Notice End Date: 02/27/2026 07:25
Subject: Kern River - Warning - Line Pack is Trending High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260048
Prior Notice Identifier: 20260047
Notice Type:  Pipe Cond
Notice Status: 2
Posting Date: 02/16/2026 11:25
Notice Effective Date: 02/16/2026 11:25
Notice End Date: 02/17/2026 11:25
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260058
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 02/24/2026 07:24
Notice Effective Date: 02/24/2026 07:24
Notice End Date: 03/11/2026 07:24
Subject: Kern River - Warning - Line Pack is Trending High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260060
Prior Notice Identifier: 20260058
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 02/24/2026 16:10
Notice Effective Date: 02/24/2026 16:10
Notice End Date: 03/11/2026 16:10
Subject: Kern River - Warning - Line Pack is High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260069
Prior Notice Identifier: 20260060
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 02/27/2026 08:09
Notice Effective Date: 02/27/2026 08:09
Notice End Date: 03/14/2026 08:09
Subject: Kern River - Warning - Line Pack is High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260076
Prior Notice Identifier: 20260069
Notice Type:  Pipe Cond
Notice Status: 2
Posting Date: 03/02/2026 10:07
Notice Effective Date: 03/02/2026 10:07
Notice End Date: 03/03/2026 10:07
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260082
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 03/08/2026 07:51
Notice Effective Date: 03/08/2026 07:51
Notice End Date: 03/23/2026 07:51
Subject: Kern River - Warning - Line Pack is Trending High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260084
Prior Notice Identifier: 20260082
Notice Type:  Pipe Cond
Notice Status: 2
Posting Date: 03/10/2026 07:21
Notice Effective Date: 03/10/2026 07:21
Notice End Date: 03/11/2026 07:21
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260085
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 03/15/2026 07:20
Notice Effective Date: 03/15/2026 07:20
Notice End Date: 03/30/2026 07:20
Subject: Kern River - Warning - Line Pack is Trending High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260087
Prior Notice Identifier: 20260085
Notice Type:  Pipe Cond
Notice Status: 2
Posting Date: 03/20/2026 07:25
Notice Effective Date: 03/20/2026 07:25
Notice End Date: 03/21/2026 07:25
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260102
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 04/04/2026 07:33
Notice Effective Date: 04/04/2026 07:33
Notice End Date: 04/19/2026 07:33
Subject: Kern River - Warning - Line Pack is Trending High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260116
Prior Notice Identifier: 20260102
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 04/08/2026 07:27
Notice Effective Date: 04/08/2026 07:27
Notice End Date: 04/09/2026 07:27
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Warning - Line Pack is Trending High

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260121
Prior Notice Identifier:
Notice Type:  Pipe Cond
Notice Status: 3
Posting Date: 04/14/2026 16:15
Notice Effective Date: 04/14/2026 16:15
Notice End Date: 04/29/2026 16:15
Subject: Kern River - Warning - Line Pack is Trending High

Notice Text:
Services Portal > Informational Postings > Notices > Critical Skip to main content // // Menu Informational Postings Informational Postings Capacity Operationally Available Unsubscribed Capacity Allocation Log Gas Quality Gas Quality Report Gas Quality Methodology Gas Quality Tariff Provisions Biomethane Operating Policy Mojave Gas Quality Interconnect Party Gas Quality Index of Customers Locations Pooling Locations Notices Critical Non-Critical Planned Service Outage Request to Purchase Releasable Capacity Waste Heat Capacity Release Indices Posted Imbalances Regulatory Standards of Conduct Affiliate Names & Addresses Affiliate Tariff Waivers Chief Compliance Officer Employee Transfers Implementation Procedures Information Disclosure Job Titles & Descriptions Potential Mergers Shared Facilities Voluntary Consent Tariff Title Sheet/Section Table of Contents Preliminary Statement Map Currently Effective Rates Rate Schedules General Terms and Conditions Form of Service Agreement Entire Tariff Sheet/Section Index Transactional Reporting Firm Interruptible Capacity Release Maps System Map High Desert Lateral Wyoming Receipts Nevada Deliveries California Deliveries Utah Deliveries Downloads Search Customer Activities Site Map Customer Activities Nominations Nomination Confirmation Scheduled Quantity -Scheduled Quantity for Shipper -Scheduled Quantity for Operator -View Scheduling Results Flowing Gas Pre-determined Allocation Allocation -Shipper Imbalance -Allocation for Operator Imbalance -TSA Imbalance History -OBA Imbalance History -Shipper Imbalance Measurement -Measurement Information Netting and Trading -Net Imbal -Auth to Post Imbal -Post Imbal Dwnld -Imbal Trd Invoicing Invoice Payment Remittance Statement of Account Negotiated Rate Details Park and Loan Imbalance Rate Case Reports Capacity Release Offers Bids Awards Pre-approved Bidders List Recall Reput Contracts Agreement Request Contract Maintenance Pooling Contracts Transportation Sales Support -Contact Manager -Fuel and L&U Matrix -Hist Fuel and L&U Rates -Capacity Release Log -Contact Us -Notices -Tariff -Rapids Tips & Tricks Rapids Setup -New Customer Setup Form -Rapids Installation -Firewall Settings Informational Postings Site Map Transportation Sales News Announcements Presentations Customer Information Agreements and Forms FERC 809/NAESB 3.0 Info Miscellaneous Info Contact Us Contact List //PRN 15119 KevinH Refactor how the menu works, apply IE PDF preview overlay fix (function($){ $(document).ready(function(){ $('.accordion').each(function(index,value){ var parent = $(value).parent(); var parentId = index; if (!!parent.attr('id')) parentId = parent.attr('id').split('-')[2]; $(value).parent().attr('id','acc-parent-' + parentId); $(value).find('> .accordion-toggle' ).attr('data-target','#acc-body-' + index); $(value).find('> .accordion-body').attr('data-parent','#acc-parent-' + parentId).attr('href','#acc-body-' + index); }); $('.nav .accordion-toggle').on('click', function(event){ var target = $(event.target), parent = target.parent().parent(), parentId = parent.attr('id'); $('[data-parent*="#' + parentId + '"]').each(function(index,value){ if ( $(value).hasClass('in') ) { $(value).collapse('toggle'); } }); $('[href="' + target.attr('data-target') + '"]').collapse('toggle'); if (target.hasClass('collapsed')) { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); } else { parent.find('.collapsed').removeClass('collapsed'); parent.find('.in').prev().addClass('collapsed'); target.addClass('collapsed'); } return false; }); if (window.navigator.userAgent.indexOf("MSIE ") > 0 || !!navigator.userAgent.match(/Trident.*rv\:11\./) && ($('.objectPDF').length > 0) ) { $('#navdttg').addClass('ie-pdf-fix'); $('.nav > .accordion').each(function(index,value){ $(value).append(' '); }); $('.nav > .accordion > .accordion-toggle').on('click', function (event) { var target = $(event.target); $('.ie-accordion-fix').removeClass('ie-accordion-fix'); if (target.hasClass('collapsed')) { $('.ie-accordion-fix').removeClass('ie-accordion-fix'); target.parent().addClass('ie-accordion-fix'); } else $('.ie-accordion-fix').removeClass('ie-accordion-fix'); }); function adjustHeight(event) { $('.ie-accordion-fix').height(function(){ return parseInt($('.ie-accordion-fix > .accordion-body').height()) + 20; }); $('html').animate({ scrollTop: 1 },20); } $('.accordion-toggle').on('click', function (event) { $('.ie-accordion-fix').off('shown'); $('.ie-accordion-fix .accordion').off('shown'); $('.ie-accordion-fix').on('shown', adjustHeight); $('.ie-accordion-fix .accordion').on('shown', adjustHeight); }); } }); })(jQuery); Launch Rapids A critical error has occurred. Please check the Event Viewer for further details. ©2026 Kern River Gas Transmission Company. All rights reserved.
Kern River Gas Transmission

Kern River - Line Pack Has Returned to Normal

UNSCORED
Informational
View original notice text
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP DUNS: 621617372
Notice Identifier: 20260124
Prior Notice Identifier: 20260116
Notice Type:  Pipe Cond
Notice Status: 2
Posting Date: 04/15/2026 07:23
Notice Effective Date: 04/15/2026 07:23
Notice End Date: 04/16/2026 07:23
Subject: Kern River - Line Pack Has Returned to Normal

Notice Text:
--------------------------------
TSP Name: KERN RIVER GAS TRANSMISSION COMPANY
TSP: 621617372
Critical Notice Indicator: Y
Notice Status: 2
Notice Type: Pipeline Conditions
Posting Date: 04/15/2026
Posting Time: 07:23 AM
Notice Effective Date: 04/15/2026
Notice Effective Time: 07:23 AM
Notice End Date: 04/16/2026
Notice End Time: 07:23 AM
Notice Identifier: 20260124
Prior Notice Identifier: 20260116
Required Response Indicator: 5
Response Date: N/A
Response Time: N/A
Subject: Kern River - Line Pack Has Returned to Normal
--------------------------------
Notice Text:
(1) Line pack has returned to normal.
(2) All shippers and delivery point operators should align daily scheduled nominations and physical
receipts and deliveries.
(3) Requested on- and off-system balancing subject to approval by Kern River.
Important information is posted to Kern River's Daily Operational Report page at
https://services.kernrivergas.com.
Contact your Marketing & Customer Services representative or the Customer Services hotline at 801-
937-6111 if you have questions.
Thank you for your cooperation.
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 25, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/26/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 26, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/27/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 27, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/28/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 28, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/29/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 29, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/30/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 30, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/31/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day March 31, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/1/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 1, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/2/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 2, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/3/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 2, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/3/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Critical Notice Effective Timely Cycle, Gas Day April 3, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): -       Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -       Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 04/04/2026 09:00 CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Critical Notice Effective Timely Cycle, Gas Day April 4, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): -       Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -       Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 04/05/2026 09:00 CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Critical Notice Effective Timely Cycle, Gas Day April 5, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): -       Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -       Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 04/06/2026 09:00 CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Critical Notice Effective Timely Cycle, Gas Day April 6, 2026, Iroquois nominations are at capacity and sealed from all increases for the following meter: -       Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -       Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 04/07/2026 09:00 CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Critical Notice Effective Timely Cycle, Gas Day April 7, 2026, Iroquois nominations are at capacity and sealed from all increases for the following location(s): -       Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -       Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100%. Customers will be advised if further capacity becomes available during the day as volumes are nominated and confirmed. Please contact your account representative or Gas Control for further information. End date 04/08/2026 09:00 CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 8, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/9/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 9, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/10/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 10, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/11/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 11, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/12/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 12, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/13/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 13, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/14/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 14, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 98%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/15/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 15, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 98%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/16/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 16, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 96%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/17/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 17, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 97%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/18/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 18, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 93%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/19/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 19, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 93%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/20/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 20, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 98%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/21/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 21, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 96%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/22/2026 09:00 AM CCT
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Capacity Constraint Effective Timely Cycle, Gas Day April 22, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: -     Brookfield Interconnect – Park and Interruptible receipt nominations are reduced by 100% and Secondary receipt nominations at the Brookfield Interconnect are reduced by 97%. If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 04/23/2026 09:00 AM CCT
Tennessee Gas Pipeline (TGP)

TGP FIRST SUMMER MAINTENANCE MTG TODAY

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/21/2026 7:16:13AM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 7:16:13 AM	Notice ID: 400790
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  SUPERSEDE	Prior Notice:  400518
Subject:  TGP FIRST SUMMER MAINTENANCE MTG TODAY
Notice Text:

TGP's FIRST 2026 SUMMER MAINTENANCE TEAMS MEETING 4-21-2026 TODAY

As a reminder, Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its first 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of April and all of May and June 2026 today, Tuesday, April 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only.  Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems.  There will be a question and answer segment immediately following.

The presentation will be posted to the EBB no later than 12:00 PM CST today.

Please see TEAMS info below:

TGP Summer Maintenance and Outages TEAMS Meeting

 

Join on your computer, mobile app or room device

________________________________________________________________________________

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK

Meeting ID: 235 794 931 318 69

Passcode: Vg6AB2AN

Need help | System reference

Dial in by phone

+1 346-410-0970,,694003306# United States, Houston

Find a local number

Phone conference ID: 694 003 306#

For organizers: Meeting options | Reset dial-in PIN

________________________________________________________________________________

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-21-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/21/2026 11:21:14AM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 11:21:14 AM	Notice ID: 400791
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-21-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Tuesday, April 21, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         NONE

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 7,306 Dths

·         STA 823 (Segment 823 BH) - through approx 71% of SOP increases due to nominations in excess of operational capacity; 25,172 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 316,586 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 208,393 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 195,935 Dths

·         STA 317 (Segment 317 BH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 68,899 Dths

·         STA 321 (Segment 321 FH) - through approx 55% of SOP increases due to nominations in excess of operational capacity; 197,596 Dths

·         MLV 330 (Segment 324 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 162,313 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 36,000 Dths

·         STA 224 (Segment 224 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 58,395 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 205,605 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 283,320 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 181,882 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 77,122 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 27,613 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 156,750 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-22-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/21/2026 2:36:00PM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 2:36:00 PM	Notice ID: 400796
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-22-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Wednesday, April 22, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 66% of SIPss due to nominations in excess of operational capacity; 63,697 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 29,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,100 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 94% of SOP due to nominations in excess of operational capacity; 339,611 Dths

·         MLV 314 East (Segment 314 BH) - through approx 89% of SOP due to nominations in excess of operational capacity; 372,985 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP due to nominations in excess of operational capacity; 436,647 Dths

·         STA 317 (Segment 317 BH) - through approx 77% of SOP due to nominations in excess of operational capacity; 159,641 Dths

·         STA 321 (Segment 321 FH) - through approx 60% of SOP due to nominations in excess of operational capacity; 656,767 Dths

·         STA 325 (Segment 324 FH) - through approx 33% of SOP due to nominations in excess of operational capacity; 163,896 Dths

·         MLV 330 (Segment 324 FH) - through approx 32% of SOP due to nominations in excess of operational capacity; 151,629 Dths

·         MLV 336 East (Segment 336 FH) - through approx 94% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 44,456 Dths

·         STA 224 (Segment 224 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 137,641 Dths

·         Z5hc North (Segment 299 FH) - through approx 88% of SOP due to nominations in excess of operational capacity; 640,831 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP due to nominations in excess of operational capacity; 853,702 Dths

·         STA 249 (Segment 249 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 452,362 Dths

·         MLV 256 East (Segment 256 FH) - through approx 82% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 114,690 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 19% of SOP due to nominations in excess of operational capacity; 29,706 Dths

·         MLV 273 (Segment 284 FH) - through approx 87% of SOP due to nominations in excess of operational capacity; 247,272 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-21-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/21/2026 3:34:07PM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 3:34:07 PM	Notice ID: 400798
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-21-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Tuesday, April 21, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         NONE

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 2,509 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 316,586 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 218,950 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 276,420 Dths

·         STA 317 (Segment 317 BH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 49,176 Dths

·         STA 321 (Segment 321 FH) - through approx 64% of SOP increases due to nominations in excess of operational capacity; 84,936 Dths

·         MLV 330 (Segment 324 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 83,586 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 58,395 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 205,605 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 296,158 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 181,882 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 77,122 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 156,750 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-22-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/21/2026 6:59:39PM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 6:59:39 PM	Notice ID: 400804
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-22-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Wednesday, April 22, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 19,746 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,100 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 339,611 Dths

·         MLV 314 East (Segment 314 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 217,266 Dths

·         STA 315 (Segment 315 BH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 212,462 Dths

·         STA 317 (Segment 317 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 68,994 Dths

·         STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 354,620 Dths

·         STA 325 (Segment 324 FH) - through approx 35% of SOP increases due to nominations in excess of operational capacity; 52,076 Dths

·         MLV 330 (Segment 324 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 79,789 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 37,538 Dths

·         STA 224 (Segment 224 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 85,717 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 207,475 Dths

·         STA 245 (Segment 245 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 273,787 Dths

·         STA 249 (Segment 249 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 179,683 Dths

·         MLV 256 East (Segment 256 FH) - through approx 93% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 99,833 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 68% of SOP increases due to nominations in excess of operational capacity; 19,247 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 212,818 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-21-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/21/2026 7:34:54PM	Notice End Date/Time:  04/22/2026 9:00:00am
Post Date/Time:  4/21/2026 7:34:54 PM	Notice ID: 400805
Reqrd Rsp:  1	Rsp Date:  04/21/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-21-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Tuesday, April 21, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 2,509 Dths

·         STA 317 (Segment 317 BH) - through approx 43% of SOP increases due to nominations in excess of operational capacity; 7,640 Dths

·         STA 245 (Segment 245 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 46,262 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/21/2026- Nexus Pipeline Conditions for 4/22/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/22/2026
Notice End Date: 04/23/2026
Posting Date: 04/21/2026
Notice Identifier: 176882
Required Response Indicator Description: No response required

For Gas Day April 22, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
36%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
53%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
51%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/21/2026- AGT Pipeline Conditions for 4/22/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/22/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/22/2026
Notice End Date: 04/23/2026
Posting Date: 04/21/2026
Notice Identifier: 176910
Required Response Indicator Description: No response required

For Gas Day April 22, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
80%
Cromwell
100%
100%
66%
Burrillville
100%
100%
82%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
64%
Iroquois Receipts
100%
100%
57%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
44%
G System
100%
100%
45%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Gulf Run Transmission] [Maint] Regency Logansport Unplanned Maintenance

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 63152
Notice Type: Maint
Subject: Regency Logansport Unplanned Maintenance
Posted: 2026-04-21 09:11:00.0
Effective: 2026-05-07 09:00:00.0
End Date: 

Notice ID: 63152
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-21 09:11:00.0
Subject: Regency Logansport Unplanned Maintenance
Notice Effective Date/Time: 2026-05-07 09:00:00.0
Notice End Date/Time: 2026-05-08 09:00:00.0
Notice Text: This Action Alert is being issued pursuant to Section 7, GT&C, of Gulf Run’s Tariff to notify shippers of unplanned maintenance at Gulf Run’s Regency @ Logansport (#822072) meter located in Caddo Parish, Louisiana and in Gulf Run’s Zone 1. This unplanned maintenance will begin Thursday, May 7th, 2026, at 09:00 with a completion date of May 8th, 2026, at 09:00 During this maintenance, Receipts from Regency@Logansport (#822072) will be limited to 0 Dth/D. Gulf Run does anticipate impacts to its primary firm services. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Scheduling Representative.
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116715
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Apr 21 2026 7:58AM
Effective: Apr 21 2026 7:57AM
End Date: Apr 22 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116715
Critical Notice Description: Critical notice
Posting Date/Time: Apr 21 2026 7:58AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 21 2026 7:57AM
Notice End Date/Time: Apr 22 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAApril 21, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, April 21, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/21/26 (Intraday 1,2,3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116718
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/21/26 (Intraday 1,2,3)
Posted: Apr 21 2026 10:33AM
Effective: Apr 21 2026 10:20AM
End Date: Apr 22 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116718
Critical Notice Description: Critical notice
Posting Date/Time: Apr 21 2026 10:33AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/21/26 (Intraday 1,2,3)
Notice Effective Date/Time: Apr 21 2026 10:20AM
Notice End Date/Time: Apr 22 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/21/26 (Intraday 1,2, and 3) Notice to Customers, Gas Day 4/21/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 1, 2, and 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 500515- Enterprise Pecos (Receipt)POI 500538 - Red Cedar Ark LoopFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Energy Transfer

[Transwestern Pipeline] [Force Majeure] Force Majeure - WT-1 Compressor Station (Carlsbad, NM)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116726
Notice Type: Force Majeure
Subject: Force Majeure - WT-1 Compressor Station (Carlsbad, NM)
Posted: Apr 21 2026 12:50PM
Effective: Apr 21 2026 12:39PM
End Date: Apr 22 2026 8:59AM

Notice Type Description: Force Majeure
Notice Identifier: 116726
Critical Notice Description: Critical notice
Posting Date/Time: Apr 21 2026 12:50PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Force Majeure - WT-1 Compressor Station (Carlsbad, NM)
Notice Effective Date/Time: Apr 21 2026 12:39PM
Notice End Date/Time: Apr 22 2026 8:59AM
Notice Text: April 21, 2026To: All Transwestern CustomersSubject: Force Majeure - WT-1 Compressor Station (Carlsbad, NM).Reason: Unit 102 Compressor at WT-1 Station has experienced a mechanical failure.This Force Majeure event will affect receipt volumes flowing through WT-1 Station (Carlsbad, NM).Gas Day April 21, 2026 (Intraday 2)WT1 Capacity reduced from 630,000 MMBtu/d to 500,000 MMBtu/d.Gas Day April 22, 2026 (Evening Cycle)WT1 Capacity back to normal at 630,000 MMBtu/d.Transwestern reserves the right to revise the above listed schedule. Please continue to monitor Transwestern website for updates and schedule changes.
Energy Transfer

[Transwestern Pipeline] [Capacity Constraint] WT-1 SYSTEM

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116736
Notice Type: Capacity Constraint
Subject: WT-1 SYSTEM
Posted: Apr 21 2026 3:45PM
Effective: Apr 21 2026 9:00AM
End Date: Apr 22 2026 8:59AM

Notice Type Description: Capacity Constraint
Notice Identifier: 116736
Critical Notice Description: Critical notice
Posting Date/Time: Apr 21 2026 3:45PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: WT-1 SYSTEM
Notice Effective Date/Time: Apr 21 2026 9:00AM
Notice End Date/Time: Apr 22 2026 8:59AM
Reason: Force Majeure
Location: WT-1 SYSTEM
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Palo Duro - POI 79064 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116741
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Palo Duro - POI 79064 (Intraday 3)
Posted: Apr 21 2026 6:28PM
Effective: Apr 21 2026 6:00PM
End Date: Apr 22 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116741
Critical Notice Description: Critical notice
Posting Date/Time: Apr 21 2026 6:28PM
Notice Status Description: Supersede
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Palo Duro - POI 79064 (Intraday 3)
Notice Effective Date/Time: Apr 21 2026 6:00PM
Notice End Date/Time: Apr 22 2026 8:59AM
Notice Text: Critical Notice Underperformance - Palo Duro- POI 79064 (Intraday 3)Notice to Customers 4/21/26, (Palo Duro) location performance, Transwestern Pipeline is concerned about the performance of the following (Palo Duro) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID-3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 79064 - Palo DuroFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather shouldcontact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 79064 - Palo Duro
Energy Transfer

[Transwestern Pipeline] [Capacity Constraint] WT-1 SYSTEM

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116753
Notice Type: Capacity Constraint
Subject: WT-1 SYSTEM
Posted: Apr 21 2026 7:52PM
Effective: Apr 21 2026 9:00AM
End Date: Apr 22 2026 8:59AM

Notice Type Description: Capacity Constraint
Notice Identifier: 116753
Critical Notice Description: Critical notice
Posting Date/Time: Apr 21 2026 7:52PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: WT-1 SYSTEM
Notice Effective Date/Time: Apr 21 2026 9:00AM
Notice End Date/Time: Apr 22 2026 8:59AM
Reason: Force Majeure
Location: WT-1 SYSTEM
Energy Transfer

[Florida Gas Transmission] [Planned Service Outage] MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 63156
Notice Type: Planned Service Outage
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE
Posted: Apr 21 2026 1:17 PM
Effective: May 1 2026 9:00 AM
End Date: Jun 1 2026 9:00 AM

Notice ID: 63156
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 21 2026 1:17 PM
Subject: MAY 2026 --- FGT ZONES 2 AND 3 MAINTENANCE
Notice Effective Date/Time: May 1 2026 9:00 AM
Notice End Date/Time: Jun 1 2026 9:00 AM
Notice Text: FGT will be performing maintenance at FGT Compressor Station 8. This maintenance will start May 4, 2026, and is to be completed by the end of gas day May 10, 2026. During this maintenance FGT may continue to schedule up to 1,000,000 MMBtu/day through Station 8. During normal operations, FGT schedules up to 1,075,000 MMBtu/day through Station 8.FGT will be performing maintenance at FGT Compressor Station 9. This maintenance will start May 1, 2026, and is to be completed by the end of gas May 10, 2026. During this maintenance FGT may schedule up to 1,150,000 MMBtu/day through Station 9. During normal operations, FGT schedules up to 1,250,000 MMBtu/day through Station 9.
Iroquois Gas Transmission

Capacity Constraint

UNSCORED
Informational
View original notice text
Tools > Informational Postings > Iroquois Gas Transmission System > Critical Notices > Notice 7190 Iroquois Gas Transmission System Notice 7190 Source Link All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information. Capacity Constraint Effective Timely Cycle, Gas Day March 24, 2026, nominations are sealed from all increases through the following locations: - Brookfield Interconnect with Algonquin Gas Transmission. In addition, the following capacity has been reduced: - Brookfield Interconnect – Park, Interruptible, and Secondary receipt nominations at the Brookfield Interconnect are reduced by 100% If you have any further questions, please contact the Iroquois Scheduling or Gas Control Group. End date 03/25/2026 09:00 AM CCT
CPL

Cove Point System Alerts Termination

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: CPL
Notice ID: 1008486
Subject: Cove Point System Alerts Termination
Notice Type: Notices
Posted: 2026-02-12T12:54:40.651
Effective: 2026-02-13T15:00:00
subcategory: Critical
naesbNoticeTypeDescription: Operational Alert
EGTS

Elimination of Minimum Turnover Obligation for All GSS Rate Schedules

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010164
Subject: Elimination of Minimum Turnover Obligation for All GSS Rate Schedules
Notice Type: Notices
Posted: 2026-02-09T14:16:22.685
Effective: 2026-02-09T14:16:22.685
subcategory: Critical
naesbNoticeTypeDescription: Storage
EGTS

Notice of Revised Fuel Retention Percentages

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1010800
Subject: Notice of Revised Fuel Retention Percentages
Notice Type: Notices
Posted: 2026-03-20T15:38:49.724
Effective: 2026-04-01T14:00:00
subcategory: Critical
naesbNoticeTypeDescription: Rates and Charges
EGTS

Tennessee Gas Pipeline EDI Issue - Resolved

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: EGTS
Notice ID: 1011119
Subject: Tennessee Gas Pipeline EDI Issue - Resolved
Notice Type: Notices
Posted: 2026-04-09T20:44:51.355
Effective: 2026-04-09T20:44:51.355
subcategory: Critical
naesbNoticeTypeDescription: Scheduling Alert
Northwest Pipeline

Stage III (13%) Overrun Entitlement

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Stage III (13%) Overrun Entitlement
Notice ID: 32622

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-007

Stage III (13%) Overrun Entitlement

 posted on
 
Jan 21 2026 3:24PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 01/21/2026 3:24 PM MCT
Notice Eff D/T: 01/21/2026 3:24 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-007
Prior Notice: 
Subject: Stage III (13%) Overrun Entitlement

Notice Text:

Due to forecasted cooler weather across the nation, Northwest is 
requesting customers to secure adequate supply to meet demand and 
avoid drafting the system. Northwest is declaring a Stage III 
(13%) Overrun Entitlement for all Receiving Parties north of the 
Kemmerer compressor station effective Gas Day Friday, January 23, 
2026. This entitlement includes all points on the Spokane, 
Wenatchee and Grants Pass laterals, and shall continue until 
further notice.
If you have any questions, please contact your Commercial 
Services Representative or the hotline at 713-215-6301.
Northwest Pipeline

Underrun Entitlement Warning North of Kemmerer

UNSCORED
Informational
View original notice text
Pipeline: Northwest Pipeline
Notice: Underrun Entitlement Warning North of Kemmerer
Notice ID: 32718

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-041

Underrun Entitlement Warning North of Kemmerer

 posted on
 
Mar 23 2026 12:14PM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 03/23/2026 12:08 PM MCT
Notice Eff D/T: 03/23/2026 12:08 PM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-041
Prior Notice: 
Subject: Underrun Entitlement Warning North of Kemmerer

Notice Text:

As communicated in MountainWest Pipeline Notice ID #38071, the
annual Clay Basin Withdrawal Test is scheduled to occur during
Gas Days March 30 through April 8, 2026. Beginning Gas Day March
27, 2026, MountainWest will not accept any injection nominations
into Clay Basin.
As a result, Northwest will have limited flexibility and is
declaring an Underrun Entitlement warning for all Receiving
Parties north of the Kemmerer compressor station beginning Gas
Day Wednesday, March 25, 2026. 
With limited flexibility, Northwest encourages all shippers to
balance their supply and demand needs.
As a reminder and pursuant to Section 14.6(c) of its Tariff,
customer-specific entitlements may be issued to Receiving 
Parties that:
1)
 
have contributed to the adverse operating conditions for
at least two consecutive days; and 
2)
 
whose actual measured deliveries have deviated from 
scheduled deliveries for the previous Gas Day by the greater of
10,000 Dth or 5 percent.
Please remain diligent in managing supply and demand and avoid
banking the system. 
If you have any questions, please call your Commercial Services
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Underrun Entitlement Warning Lifted

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Pipeline: Northwest Pipeline
Notice: Underrun Entitlement Warning Lifted
Notice ID: 32754

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-043

Underrun Entitlement Warning Lifted

 posted on
 
Apr 6 2026 11:31AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: SUPERSEDE
Notice Type Desc: PIPELINE CONDITIONS
Post D/T: 04/06/2026 11:31 AM MCT
Notice Eff D/T: 04/06/2026 11:31 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-043
Prior Notice: 26-041
Subject: Underrun Entitlement Warning Lifted

Notice Text:

Effective immediately, Northwest is lifting the Underrun 
Entitlement Warning that was originally issued in All Shipper’s 
Notice 26-041.
Northwest requests that shippers continue to be diligent in 
managing their supply and demand needs.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Northwest Pipeline

Willard ESD/DOT S/D's & Mt. Vernon Solar Inspections

UNSCORED
Informational
View original notice text
Pipeline: Northwest Pipeline
Notice: Willard ESD/DOT S/D's & Mt. Vernon Solar Inspections
Notice ID: 32757

Capacity

Operationally Available
Unsubscribed

Gas Quality

Gas Quality
Gas Quality Tariff Provisions
Gas Quality Sampling Procedures
 Gas Quality Resolution Report
RNG Operating Policy

Index of Customers

Locations

Notices

Critical
Non-Critical
Planned Service Outage
Request to Purchase Releasable Capacity
Waste Heat

Posted Imbalances

Regulatory

FERC Watch
Proposed Tariff Filings

Standards of Conduct

Affiliate Names & Addresses
Affiliate Tariff Waivers
Chief Compliance Officer
Employee Transfers
Implementation Procedures
Information Disclosure
Job Titles & Descriptions
Potential Mergers
Shared Facilities
Voluntary Consent

Tariff

Title Sheet/Section
Table Of Contents
Preliminary Statement
Map
Currently Effective Rates
Rate Schedules
General Terms and Conditions
Form Of Service Agreement
 Entire Tariff
Sheet/Section Index

Transactional Reporting

Capacity Release
Firm
Interruptible

Capacity Release Indices

TSP Capacity Offering

Maintenance Schedule

Commercial Contacts

Agreements/Forms

Portal History

Other

Downloads

Search

Search - Tariff
Search - Rate Schedules
Search - General Terms
Search - Form of Service Agreement
Search - Entire Portal

Customer Activities

Site Map

Northwest Pipeline LLC Notice Detail

Print

Northwest Pipeline LLC

NOTICE # 26-045

Willard ESD/DOT S/D's & Mt. Vernon Solar Inspections

 posted on
 
Apr 9 2026 8:53AM

TSP Name: Northwest Pipeline LLC TSP: 67977322

Critical: Y
Notice Stat Desc: INITIATE
Notice Type Desc: MAINTENANCE
Post D/T: 04/09/2026 8:39 AM MCT
Notice Eff D/T: 04/09/2026 8:39 AM MCT
Notice End D/T: 
Reqrd Rsp Desc: No response required
Rsp D/T: 

Notice ID: 26-045
Prior Notice: 
Subject: Willard ESD/DOT S/D's & Mt. Vernon Solar Inspections

Notice Text:

As posted in the maintenance schedule on Northwest Pipeline's 
website, Northwest will be performing maintenance at the 
following locations next week:
-
 
Willard CS
: located at MP 1175.2 in Skamania County, 
        Washington on gas day April 14, 2026.
-
 
Mt. Vernon CS
: located at MP 1440.18 in Skagit County, 
        Washington beginning gas day April 14, 2026, through 
        gas day April 15, 2026.
The Willard CS will be limited to 380,000 Dth/d northbound and 
383,000 Dth/d southbound for the duration of the outage.
If primary nomination requests through the Willard CS exceeds 
the available capacity of 380,000 Dth/d northbound or 383,000 
Dth/d southbound (or whatever NWP cannot mitigate during any
 day of the maintenance), pursuant to Sections 10.2 and 10.3 of 
Rate Schedule TF-1 in Northwest's Tariff, Northwest will give 
notice of a Declared Deficiency Period based on a design 
capacity of 540,000 Dth/d northbound or 431,000 Dth/d 
southbound. The deficiency period will continue until the work 
has been completed. 
The Mt. Vernon CS will be limited to 1,177,000 Dth/d southbound 
on gas day April 14, 2026, and limited to 1,240,000 Dth/d 
southbound on gas day April 15, 2026.
If primary nomination requests through the Mt. Vernon CS 
exceeds the available capacity of 1,177,000 Dth/d southbound on 
gas day April 14, 2026, or 1,240,000 Dth/d southbound on gas 
day April 15, 2026 (or whatever NWP cannot mitigate during any 
day of the maintenance), pursuant to Sections 10.2 and 10.3 of 
Rate Schedule TF-1 in Northwest's Tariff, Northwest will give 
notice of a Declared Deficiency Period based on a design 
capacity of 1,277,000 Dth/d southbound. The deficiency period 
will continue until the work has been completed.
Please reference the Maintenance Schedule tab at 
www.northwest.williams.com for more information.
If you have any questions, please call your Commercial Services 
Representative or the hotline at 713-215-6301.
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 555 REVOLVED

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/20/2026 9:18:14AM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 9:18:14 AM	Notice ID: 400767
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  TERMINATE	Prior Notice:  400544
Subject:  EMERGENT REPAIR AT STA 555 REVOLVED
Notice Text:

 

EMERGENT REPAIR AT STA 555 UNIT 1B RESOLVED

 

Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee posted notice of an emergent repair issue at Station 555 near Collinwood, TN (Segment 548) on April 10, 2026 (Notice Identifier #400544). Tennessee discovered an issue with Unit 1B at the station. The issue has now been resolved and the area is in the process of returning to normal operations. As such, nomination increases pathed through Segment 548 BH will be accepted effective Intraday Cycle 1 for the Gas Day of Monday, April 20, 2026 up to segment capacity as posted on TGP's EBB.

 

This will be the final notice for this emergent repair.

 

Please contact your Scheduler if you have any questions.

 

 

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-20-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/20/2026 11:46:22AM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 11:46:22 AM	Notice ID: 400769
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-20-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Monday, April 20, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 532 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 34,768 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,007 Dths

·         STA 307 (Segment 307 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 342,516 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 207,739 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 195,976 Dths

·         STA 317 (Segment 317 BH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 60,556 Dths

·         STA 321 (Segment 321 FH) - through approx 50% of SOP increases due to nominations in excess of operational capacity; 165,192 Dths

·         STA 325 (Segment 324 FH) - through approx 64% of SOP increases due to nominations in excess of operational capacity; 97,312 Dths

·         MLV 330 (Segment 324 FH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 41,678 Dths

·         MLV 336 East (Segment 336 FH) - through approx 73% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,914 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 39,613 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 204,610 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 227,714 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 131,278 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 25,915 Dths

·         MLV 273 (Segment 284 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 197,956 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-21-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/20/2026 3:16:34PM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 3:16:34 PM	Notice ID: 400777
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-21-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Tuesday, April 21, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         CARROLL/TGP County Home Carroll Delivery Meter (Pin 49198) - through approx 21% of IT due to nominations in excess of operational capacity; 8,025 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 65% of SIPss due to nominations in excess of operational capacity; 62,118 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 71% of SOP due to nominations in excess of operational capacity; 12,244 Dths

·         STA 823 (Segment 823 BH) - through approx 58% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 33,634 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through approx 89% of SOP due to nominations in excess of operational capacity; 316,586 Dths

·         MLV 314 East (Segment 314 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 359,947 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP due to nominations in excess of operational capacity; 405,052 Dths

·         STA 317 (Segment 317 BH) - through approx 75% of SOP due to nominations in excess of operational capacity; 164,637 Dths

·         STA 321 (Segment 321 FH) - through approx 65% of SOP due to nominations in excess of operational capacity; 719,915 Dths

·         MLV 330 (Segment 324 FH) - through approx 52% of SOP due to nominations in excess of operational capacity; 297,705 Dths

·         MLV 336 East (Segment 336 FH) - through approx 93% of SOP due to nominations in excess of operational capacity; 42,251 Dths

·         STA 224 (Segment 224 FH) - through approx 67% of SOP due to nominations in excess of operational capacity; 134,877 Dths

·         Z5hc North (Segment 299 FH) - through approx 88% of SOP due to nominations in excess of operational capacity; 639,775 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP due to nominations in excess of operational capacity; 855,817 Dths

·         STA 249 (Segment 249 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 426,180 Dths

·         MLV 256 East (Segment 256 FH) - through approx 99% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 138,417 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 37% of SOP due to nominations in excess of operational capacity; 55,635 Dths

·         MLV 273 (Segment 284 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 239,200 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-20-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/20/2026 3:34:22PM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 3:34:22 PM	Notice ID: 400778
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-20-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Monday, April 20, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 532 Dths

·         Pine PRA/TGP Pine Prairie North Rap Delivery Meter (Pin 421043) - through approx 33% of SOP increases due to operational concerns; 2,236 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 17,310 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,291 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,007 Dths

·         STA 307 (Segment 307 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 334,038 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 205,769 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 189,778 Dths

·         STA 317 (Segment 317 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 56,495 Dths

·         STA 321 (Segment 321 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 130,003 Dths

·         STA 325 (Segment 324 FH) - through approx 69% of SOP increases due to nominations in excess of operational capacity; 40,979 Dths

·         MLV 330 (Segment 324 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 18,477 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 39,613 Dths

·         Z5hc North (Segment 299 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 197,619 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 224,844 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 131,278 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 169,072 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-21-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/20/2026 7:19:59PM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 7:19:59 PM	Notice ID: 400784
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-21-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Tuesday, April 21, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         NONE

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 9,545 Dths

·         STA 823 (Segment 823 BH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 33,634 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 316,586 Dths

·         MLV 314 East (Segment 314 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 203,315 Dths

·         STA 315 (Segment 315 BH) - through approx 71% of SOP increases due to nominations in excess of operational capacity; 172,233 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 149,473 Dths

·         STA 321 (Segment 321 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 584,580 Dths

·         MLV 330 (Segment 324 FH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 145,304 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 36,846 Dths

·         STA 224 (Segment 224 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 110,256 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 205,675 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 296,158 Dths

·         STA 249 (Segment 249 FH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 181,882 Dths

·         MLV 256 East (Segment 256 FH) - through approx 98% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 124,810 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 48,367 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 209,979 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-20-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/20/2026 8:25:44PM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 8:25:44 PM	Notice ID: 400785
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-20-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Monday, April 20, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 532 Dths

·         Pine PRA/TGP Pine Prairie North Rap Delivery Meter (Pin 421043) - through 100% of SOP increases due to operational concerns; 2,236 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 17,310 Dths

·         STA 317 (Segment 317 BH) - through approx 56% of SOP increases due to nominations in excess of operational capacity; 15,562 Dths

·         STA 245 (Segment 245 FH) - through approx 4% of SOP increases due to nominations in excess of operational capacity; 1,874 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/20/2026- Nexus Pipeline Conditions for 4/21/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/21/2026
Notice End Date: 04/22/2026
Posting Date: 04/20/2026
Notice Identifier: 176840
Required Response Indicator Description: No response required

For Gas Day April 21, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
43%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
59%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
56%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/20/2026- AGT Pipeline Conditions for 4/21/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/21/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/21/2026
Notice End Date: 04/22/2026
Posting Date: 04/20/2026
Notice Identifier: 176857
Required Response Indicator Description: No response required

For Gas Day April 21, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
91%
Cromwell
100%
100%
88%
Burrillville
100%
100%
70%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
42%
Iroquois Receipts
100%
100%
43%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
42%
G System
100%
100%
43%
C System
Yes
Transco Centerville Receipts
74%
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 4/16/26. 500 Dth / 5% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Enterprise Pecos (Receipt) - POI 500515 (Intraday 2 and 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116693
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Enterprise Pecos (Receipt) - POI 500515 (Intraday 2 and 3)
Posted: Apr 20 2026 1:57PM
Effective: Apr 20 2026 1:53PM
End Date: Apr 21 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116693
Critical Notice Description: Critical notice
Posting Date/Time: Apr 20 2026 1:57PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Enterprise Pecos (Receipt) - POI 500515 (Intraday 2 and 3)
Notice Effective Date/Time: Apr 20 2026 1:53PM
Notice End Date/Time: Apr 21 2026 8:59AM
Notice Text: Critical Notice Underperformance - Enterprise Pecos (Receipt) - POI 500515 (Intraday 2 and 3)Notice to Customers 4/20/26 (Enterprise Pecos Receipt) location performance, Transwestern Pipeline is concerned about the performance of the following (Enterprise Pecos Receipt) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID-2 and 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 500515- Enterprise Pecos (Receipt) For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 500515- Enterprise Pecos (Receipt)
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/20/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116701
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/20/26 (Intraday 3)
Posted: Apr 20 2026 5:56PM
Effective: Apr 20 2026 5:52PM
End Date: Apr 21 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116701
Critical Notice Description: Critical notice
Posting Date/Time: Apr 20 2026 5:56PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/20/26 (Intraday 3)
Notice Effective Date/Time: Apr 20 2026 5:52PM
Notice End Date/Time: Apr 21 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/20/26 (Intraday 3) Notice to Customers, Gas Day 4/20/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 10703 - DCP ArtesiaPOI 100734 - 3 BearFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers shouldnot exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-17-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/16/2026 2:40:23PM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 2:40:23 PM	Notice ID: 400685
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-17-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Friday, April 17, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 39% of SOP due to nominations in excess of operational capacity; 25,814 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         MLV 548 (Segment 542 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 14,832 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,876 Dths

·         MLV 314 East (Segment 314 BH) - through approx 89% of SOP due to nominations in excess of operational capacity; 372,204 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP due to nominations in excess of operational capacity; 460,283 Dths

·         STA 317 (Segment 317 BH) - through approx 79% of SOP due to nominations in excess of operational capacity; 138,711 Dths

·         STA 321 (Segment 321 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 488,333 Dths

·         MLV 330 (Segment 324 FH) - through approx 23% of SOP due to nominations in excess of operational capacity; 160,226 Dths

·         MLV 355 (Segment 355 BH) - through 100% of SOP due to operational concerns; 5,000 Dths

·         Z5hc North (Segment 299 FH) - through approx 79% of SOP due to nominations in excess of operational capacity; 569,279 Dths

·         STA 245 (Segment 245 FH) - through approx 78% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 630,673 Dths

·         STA 249 (Segment 249 FH) - through approx 53% of SOP due to nominations in excess of operational capacity; 276,656 Dths

·         MLV 273 (Segment 284 FH) - through approx 94% of SOP due to nominations in excess of operational capacity; 267,800 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-16-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/16/2026 3:17:55PM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 3:17:55 PM	Notice ID: 400686
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-16-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Thursday, April 16, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 5,585 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 12,823 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 211,866 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 217,028 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 67,617 Dths

·         Z5hc North (Segment 299 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 181,312 Dths

·         STA 245 (Segment 245 FH) - through approx 99% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 246,557 Dths

·         STA 249 (Segment 249 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 133,033 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 43,018 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 95,411 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-16-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/16/2026 7:01:46PM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 7:01:46 PM	Notice ID: 400693
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-16-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Friday, April 17, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 25,814 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         MLV 548 (Segment 542 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 14,832 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 225,263 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 288,348 Dths

·         STA 317 (Segment 317 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 118,438 Dths

·         STA 321 (Segment 321 FH) - through approx 73% of SOP increases due to nominations in excess of operational capacity; 202,141 Dths

·         MLV 330 (Segment 324 FH) - through approx 49% of SOP increases due to nominations in excess of operational capacity; 48,167 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 201,074 Dths

·         STA 245 (Segment 245 FH) - through approx 85% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 243,603 Dths

·         STA 249 (Segment 249 FH) - through approx 68% of SOP increases due to nominations in excess of operational capacity; 92,282 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 239,855 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-16-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/16/2026 7:25:34PM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 7:25:34 PM	Notice ID: 400694
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-16-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Thursday, April 16, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 4,592 Dths

·         MLV 314 East (Segment 314 BH) - through approx 14% of SOP increases due to nominations in excess of operational capacity; 3,825 Dths

·         STA 245 (Segment 245 FH) - through approx 32% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 9,520 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-17-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/17/2026 11:26:44AM	Notice End Date/Time:  04/18/2026 9:00:00am
Post Date/Time:  4/17/2026 11:26:44 AM	Notice ID: 400702
Reqrd Rsp:  1	Rsp Date:  04/17/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-17-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Friday, April 17, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,817 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 213,560 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 220,441 Dths

·         STA 317 (Segment 317 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 117,771 Dths

·         MLV 330 (Segment 324 FH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 33,409 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 190,332 Dths

·         STA 245 (Segment 245 FH) - through approx 98% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 180,603 Dths

·         STA 249 (Segment 249 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 87,832 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 206,813 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-18-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/17/2026 2:38:34PM	Notice End Date/Time:  04/18/2026 9:00:00am
Post Date/Time:  4/17/2026 2:38:34 PM	Notice ID: 400708
Reqrd Rsp:  1	Rsp Date:  04/17/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-18-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Saturday, April 18, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 38% of SIPss due to nominations in excess of operational capacity; 40,322 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 87% of SOP due to nominations in excess of operational capacity; 44,768 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to operational concerns; 68,007 Dths

·         STA 307 (Segment 307 BH) - through approx 96% of SOP due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 89% of SOP due to nominations in excess of operational capacity; 372,341 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP due to nominations in excess of operational capacity; 457,432 Dths

·         STA 317 (Segment 317 BH) - through approx 80% of SOP due to nominations in excess of operational capacity; 163,207 Dths

·         STA 321 (Segment 321 FH) - through approx 46% of SOP due to nominations in excess of operational capacity; 515,376 Dths

·         STA 325 (Segment 324 FH) - through approx 11% of SOP due to nominations in excess of operational capacity; 54,934 Dths

·         MLV 330 (Segment 324 FH) - through approx 19% of SOP due to nominations in excess of operational capacity; 119,523 Dths

·         STA 224 (Segment 224 FH) - through approx 18% of SOP due to nominations in excess of operational capacity; 28,576 Dths

·         Z5hc North (Segment 299 FH) - through approx 80% of SOP due to nominations in excess of operational capacity; 553,630 Dths

·         STA 245 (Segment 245 FH) - through approx 80% of SOP due to nominations in excess of operational capacity; 697,027 Dths

·         STA 249 (Segment 249 FH) - through approx 60% of SOP due to nominations in excess of operational capacity; 339,622 Dths

·         MLV 273 (Segment 284 FH) - through approx 95% of SOP due to nominations in excess of operational capacity; 282,947 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-17-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/17/2026 3:16:46PM	Notice End Date/Time:  04/18/2026 9:00:00am
Post Date/Time:  4/17/2026 3:16:46 PM	Notice ID: 400709
Reqrd Rsp:  1	Rsp Date:  04/17/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-17-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Friday, April 17, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 7,581 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 224,776 Dths

·         STA 315 (Segment 315 BH) - through approx 84% of SOP increases due to nominations in excess of operational capacity; 291,921 Dths

·         STA 317 (Segment 317 BH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 102,454 Dths

·         Z5hc North (Segment 299 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 179,987 Dths

·         STA 245 (Segment 245 FH) - through approx 91% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 168,561 Dths

·         STA 249 (Segment 249 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 72,419 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 106,190 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-18-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/17/2026 7:30:04PM	Notice End Date/Time:  04/18/2026 9:00:00am
Post Date/Time:  4/17/2026 7:30:04 PM	Notice ID: 400715
Reqrd Rsp:  1	Rsp Date:  04/17/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-18-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Saturday, April 18, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through 100% of SA increases due to operational concerns; 598 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 61% of SIPss increases due to nominations in excess of operational capacity; 28,487 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 44,768 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 225,794 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 284,788 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 142,020 Dths

·         STA 321 (Segment 321 FH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 234,733 Dths

·         MLV 330 (Segment 324 FH) - through approx 46% of SOP increases due to nominations in excess of operational capacity; 50,815 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 188,000 Dths

·         STA 245 (Segment 245 FH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 168,056 Dths

·         STA 249 (Segment 249 FH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 101,357 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 245,173 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-17-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/17/2026 7:31:07PM	Notice End Date/Time:  04/18/2026 9:00:00am
Post Date/Time:  4/17/2026 7:31:07 PM	Notice ID: 400716
Reqrd Rsp:  1	Rsp Date:  04/17/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-17-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Friday, April 17, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 7,581 Dths

·         MLV 314 East (Segment 314 BH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 94,618 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 4,438 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-19-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/18/2026 2:44:42PM	Notice End Date/Time:  04/19/2026 9:00:00am
Post Date/Time:  4/18/2026 2:44:42 PM	Notice ID: 400729
Reqrd Rsp:  1	Rsp Date:  04/18/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-19-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Sunday, April 19, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through approx 11% of SA due to operational concerns; 534 Dths

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through approx 11% of SA due to operational concerns; 64 Dths

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 67% of SIPss due to nominations in excess of operational capacity; 71,399 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP due to nominations in excess of operational capacity; 49,986 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 52% of SOP due to nominations in excess of operational capacity; 6,422 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through approx 96% of SOP due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 367,500 Dths

·         STA 315 (Segment 315 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 452,059 Dths

·         STA 317 (Segment 317 BH) - through approx 78% of SOP due to nominations in excess of operational capacity; 161,589 Dths

·         STA 321 (Segment 321 FH) - through approx 55% of SOP due to nominations in excess of operational capacity; 606,304 Dths

·         MLV 330 (Segment 324 FH) - through approx 37% of SOP due to nominations in excess of operational capacity; 225,147 Dths

·         STA 224 (Segment 224 FH) - through approx 38% of SOP due to nominations in excess of operational capacity; 61,912 Dths

·         Z5hc North (Segment 299 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 576,279 Dths

·         STA 245 (Segment 245 FH) - through approx 86% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 717,916 Dths

·         STA 249 (Segment 249 FH) - through approx 68% of SOP due to nominations in excess of operational capacity; 370,532 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP due to nominations in excess of operational capacity; 296,685 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-19-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/18/2026 7:07:14PM	Notice End Date/Time:  04/19/2026 9:00:00am
Post Date/Time:  4/18/2026 7:07:14 PM	Notice ID: 400736
Reqrd Rsp:  1	Rsp Date:  04/18/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-19-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Sunday, April 19, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 534 Dths

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through 100% of SA increases due to operational concerns; 64 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 96% of SIPss increases due to nominations in excess of operational capacity; 61,394 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 49,986 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,422 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 244,545 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 248,116 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 145,279 Dths

·         STA 321 (Segment 321 FH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 492,673 Dths

·         MLV 330 (Segment 324 FH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 102,807 Dths

·         STA 224 (Segment 224 FH) - through approx 64% of SOP increases due to nominations in excess of operational capacity; 25,949 Dths

·         Z5hc North (Segment 299 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 195,033 Dths

·         STA 245 (Segment 245 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 191,530 Dths

·         STA 249 (Segment 249 FH) - through approx 69% of SOP increases due to nominations in excess of operational capacity; 120,419 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 256,793 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-19-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/19/2026 11:15:02AM	Notice End Date/Time:  04/20/2026 9:00:00am
Post Date/Time:  4/19/2026 11:15:02 AM	Notice ID: 400743
Reqrd Rsp:  1	Rsp Date:  04/19/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-19-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Sunday, April 19, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 534 Dths

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through 100% of SA increases due to operational concerns; 64 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 49,986 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,422 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 211,019 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 194,055 Dths

·         STA 317 (Segment 317 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 74,376 Dths

·         STA 321 (Segment 321 FH) - through approx 42% of SOP increases due to nominations in excess of operational capacity; 99,887 Dths

·         MLV 330 (Segment 324 FH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 47,461 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 25,949 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 195,033 Dths

·         STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 181,923 Dths

·         STA 249 (Segment 249 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 113,810 Dths

·         MLV 273 (Segment 284 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 174,422 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-20-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/19/2026 2:50:10PM	Notice End Date/Time:  04/20/2026 9:00:00am
Post Date/Time:  4/19/2026 2:50:10 PM	Notice ID: 400750
Reqrd Rsp:  1	Rsp Date:  04/19/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-20-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Monday, April 20, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through approx 11% of SA due to operational concerns; 532 Dths

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through approx 11% of SA due to operational concerns; 64 Dths

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 68% of SIPss due to nominations in excess of operational capacity; 71,895 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 87% of SOP due to nominations in excess of operational capacity; 44,768 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,007 Dths

·         STA 307 (Segment 307 BH) - through approx 96% of SOP due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 370,502 Dths

·         STA 315 (Segment 315 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 454,994 Dths

·         STA 317 (Segment 317 BH) - through approx 79% of SOP due to nominations in excess of operational capacity; 160,963 Dths

·         STA 321 (Segment 321 FH) - through approx 60% of SOP due to nominations in excess of operational capacity; 666,355 Dths

·         STA 325 (Segment 324 FH) - through approx 36% of SOP due to nominations in excess of operational capacity; 189,049 Dths

·         MLV 330 (Segment 324 FH) - through approx 27% of SOP due to nominations in excess of operational capacity; 124,238 Dths

·         MLV 336 East (Segment 336 FH) - through approx 73% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 64,437 Dths

·         STA 224 (Segment 224 FH) - through approx 38% of SOP due to nominations in excess of operational capacity; 61,626 Dths

·         Z5hc North (Segment 299 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 591,229 Dths

·         STA 245 (Segment 245 FH) - through approx 88% of SOP due to nominations in excess of operational capacity; 745,019 Dths

·         STA 249 (Segment 249 FH) - through approx 72% of SOP due to nominations in excess of operational capacity; 410,504 Dths

·         MLV 256 East (Segment 256 FH) - through approx 37% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 51,221 Dths

·         MLV 273 (Segment 284 FH) - through approx 98% of SOP due to nominations in excess of operational capacity; 288,049 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-19-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/19/2026 3:22:32PM	Notice End Date/Time:  04/20/2026 9:00:00am
Post Date/Time:  4/19/2026 3:22:32 PM	Notice ID: 400751
Reqrd Rsp:  1	Rsp Date:  04/19/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-19-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Sunday, April 19, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 534 Dths

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through 100% of SA increases due to operational concerns; 64 Dths

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 4,080 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to operational concerns; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 206,711 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 187,303 Dths

·         STA 317 (Segment 317 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 56,936 Dths

·         STA 321 (Segment 321 FH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 118,784 Dths

·         MLV 330 (Segment 324 FH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 83,770 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 25,949 Dths

·         Z5hc North (Segment 299 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 268,505 Dths

·         STA 245 (Segment 245 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 167,941 Dths

·         STA 249 (Segment 249 FH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 100,221 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 174,422 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-20-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/19/2026 6:59:31PM	Notice End Date/Time:  04/20/2026 9:00:00am
Post Date/Time:  4/19/2026 6:59:31 PM	Notice ID: 400757
Reqrd Rsp:  1	Rsp Date:  04/19/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-20-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Monday, April 20, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 532 Dths

·         TGP/PHP Sheridan Colorado Receipt Meter (Pin 54086) - through 100% of SA increases due to operational concerns; 64 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 91% of SIPss increases due to nominations in excess of operational capacity; 60,060 Dths

SEGMENT RESTRICTIONS

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 44,768 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 5,364 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,007 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 342,540 Dths

·         MLV 314 East (Segment 314 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 213,505 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 215,522 Dths

·         STA 317 (Segment 317 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 143,136 Dths

·         STA 321 (Segment 321 FH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 542,842 Dths

·         STA 325 (Segment 324 FH) - through approx 41% of SOP increases due to nominations in excess of operational capacity; 76,471 Dths

·         MLV 330 (Segment 324 FH) - through approx 55% of SOP increases due to nominations in excess of operational capacity; 61,143 Dths

·         MLV 336 East (Segment 336 FH) - through approx 67% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 19,373 Dths

·         STA 224 (Segment 224 FH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 73,913 Dths

·         Z5hc North (Segment 299 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 204,598 Dths

·         STA 245 (Segment 245 FH) - through approx 86% of SOP increases due to nominations in excess of operational capacity; 213,877 Dths

·         STA 249 (Segment 249 FH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 132,259 Dths

·         MLV 256 East (Segment 256 FH) - through approx 69% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 36,114 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 249,318 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-19-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/19/2026 7:32:41PM	Notice End Date/Time:  04/20/2026 9:00:00am
Post Date/Time:  4/19/2026 7:32:41 PM	Notice ID: 400759
Reqrd Rsp:  1	Rsp Date:  04/19/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-19-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Sunday, April 19, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 534 Dths

SEGMENT RESTRICTIONS

·         STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 14 Dths

·         STA 204 (Segment 204 BH) - through 100% of IT increases due to operational concerns; 7 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

TGP FIRST SUMMER MAINTENANCE MTG REM

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/20/2026 6:40:17AM	Notice End Date/Time:  04/21/2026 9:00:00am
Post Date/Time:  4/20/2026 6:40:17 AM	Notice ID: 400766
Reqrd Rsp:  1	Rsp Date:  04/20/2026
Notice Stat Desc:  SUPERSEDE	Prior Notice:  400518
Subject:  TGP FIRST SUMMER MAINTENANCE MTG REM
Notice Text:

TGP's FIRST 2026 SUMMER MAINTENANCE TEAMS MEETING 4-21-2026 REMINDER

As a reminder, Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its first 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of April and all of May and June 2026 on Tuesday, April 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only.  Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems.  There will be a question and answer segment immediately following.

Please see TEAMS info below:

TGP Summer Maintenance and Outages TEAMS Meeting

 

Join on your computer, mobile app or room device

________________________________________________________________________________

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK

Meeting ID: 235 794 931 318 69

Passcode: Vg6AB2AN

Need help | System reference

Dial in by phone

+1 346-410-0970,,694003306# United States, Houston

Find a local number

Phone conference ID: 694 003 306#

For organizers: Meeting options | Reset dial-in PIN

________________________________________________________________________________

 

...
NEXUS Gas Transmission (U.S.)

04/19/2026- Nexus Pipeline Conditions for 4/20/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/20/2026
Notice End Date: 04/21/2026
Posting Date: 04/19/2026
Notice Identifier: 176802
Required Response Indicator Description: No response required

For Gas Day April 20, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
100%
41%
Due to Nexus Posted Outage
Meter N2001 Receipts
N/A
100%
100%
100%
100%
100%
100%
100%
Due to Nexus Posted Outage
All Vector Meters Downstream of Milford Junction N4MJ1
N/A
100%
100%
100%
100%
100%
100%
100%
Due to DTE Posted Outage
Belle River
N/A
100%
100%
100%
100%
100%
100%
59%
Due to DTE Posted Outage
Ypsilanti
N/A
100%
100%
100%
100%
100%
100%
57%
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/19/2026- AGT Pipeline Conditions for 4/20/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/20/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/20/2026
Notice End Date: 04/21/2026
Posting Date: 04/19/2026
Notice Identifier: 176830
Required Response Indicator Description: No response required

For Gas Day April 20, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
71%
Cromwell
100%
100%
60%
Burrillville
100%
100%
65%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
48%
Iroquois Receipts
100%
100%
55%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
55%
G System
100%
100%
53%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 4/16/26. 500 Dth / 5% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 20, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116651
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Apr 19 2026 7:44AM
Effective: Apr 19 2026 7:37AM
End Date: Apr 20 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116651
Critical Notice Description: Critical notice
Posting Date/Time: Apr 19 2026 7:44AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 19 2026 7:37AM
Notice End Date/Time: Apr 20 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAApril 19, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, April 19, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/19/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116668
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/19/26 (Intraday 3)
Posted: Apr 19 2026 6:18PM
Effective: Apr 19 2026 6:06PM
End Date: Apr 20 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116668
Critical Notice Description: Critical notice
Posting Date/Time: Apr 19 2026 6:18PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/19/26 (Intraday 3)
Notice Effective Date/Time: Apr 19 2026 6:06PM
Notice End Date/Time: Apr 20 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/19/26 (Intraday 3) Notice to Customers, Gas Day 4/19/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may beallocated due to Underperformanceissues.POI 500515- Enterprise Pecos (Receipt)POI 100816 - Kings LandingFor scheduling questions please contact your Customer Service Representative. The information contained in thisnotice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rathershould contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple points
NEXUS Gas Transmission (U.S.)

04/18/2026- Nexus Pipeline Conditions for 4/19/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/19/2026
Notice End Date: 04/20/2026
Posting Date: 04/18/2026
Notice Identifier: 176770
Required Response Indicator Description: No response required

For Gas Day April 19, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
Yes
Due to NEXUS Posted Outage
Meter N2001 Receipts
100%
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/18/2026- AGT Pipeline Conditions for 4/19/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/19/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/19/2026
Notice End Date: 04/20/2026
Posting Date: 04/18/2026
Notice Identifier: 176784
Required Response Indicator Description: No response required

For Gas Day April 19, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
64%
Cromwell
100%
100%
54%
Burrillville
100%
100%
48%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
37%
Iroquois Receipts
100%
100%
55%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
40%
Transco Centerville Receipts
84%
G System
100%
100%
46%
C System
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 04/18/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 2 and 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116633
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 2 and 3)
Posted: Apr 18 2026 2:13PM
Effective: Apr 18 2026 2:10PM
End Date: Apr 19 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116633
Critical Notice Description: Critical notice
Posting Date/Time: Apr 18 2026 2:13PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 2 and 3)
Notice Effective Date/Time: Apr 18 2026 2:10PM
Notice End Date/Time: Apr 19 2026 8:59AM
Notice Text: Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 2 and 3)Notice to Customers 4/18/26 (ETC Grey Wolf) location performance, Transwestern Pipeline is concerned about the performance of the following (ETC Grey Wolf) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID-2 and 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 100771 - ETC Grey Wolf For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 100771 - ETC Grey Wolf
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-06-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/05/2026 3:58:38PM	Notice End Date/Time:  04/06/2026 9:00:00am
Post Date/Time:  4/5/2026 3:58:38 PM	Notice ID: 400439
Reqrd Rsp:  1	Rsp Date:  04/05/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-06-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Monday, April 06, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of IT due to operational concerns; 10,000 Dths

·         ETNG/TGP East Lobelville Tn Perry Delivery Meter (Pin 420042) - through 100% of SIPss receipts due to displacement gas unavailable for backhaul; 4,944 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 78% of SIPss due to nominations in excess of operational capacity; 93,003 Dths

·         Ocean ST/TGP Pro Delivery Meter (Pin 420707) - through 100% of SOP receipts due to displacement gas unavailable for backhaul; 4,207 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 36% of SOP due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through approx 87% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 33,938 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 329,253 Dths

·         MLV 314 East (Segment 314 BH) - through approx 87% of SOP due to nominations in excess of operational capacity; 331,931 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP due to nominations in excess of operational capacity; 412,188 Dths

·         STA 317 (Segment 317 BH) - through approx 79% of SOP due to nominations in excess of operational capacity; 148,885 Dths

·         STA 321 (Segment 321 FH) - through approx 57% of SOP due to nominations in excess of operational capacity; 620,609 Dths

·         STA 325 (Segment 324 FH) - through approx 28% of SOP due to nominations in excess of operational capacity; 136,082 Dths

·         MLV 330 (Segment 324 FH) - through approx 35% of SOP due to nominations in excess of operational capacity; 172,960 Dths

·         MLV 336 East (Segment 336 FH) - through approx 68% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 40,861 Dths

·         STA 233 (Segment 233 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 112,312 Dths

·         Z5hc North (Segment 299 FH) - through approx 84% of SOP due to nominations in excess of operational capacity; 521,430 Dths

·         STA 245 (Segment 245 FH) - through approx 85% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 676,285 Dths

·         STA 249 (Segment 249 FH) - through approx 63% of SOP due to nominations in excess of operational capacity; 316,205 Dths

·         MLV 273 (Segment 284 FH) - through approx 88% of SOP due to nominations in excess of operational capacity; 258,424 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-06-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/05/2026 7:11:27PM	Notice End Date/Time:  04/06/2026 9:00:00am
Post Date/Time:  4/5/2026 7:11:27 PM	Notice ID: 400444
Reqrd Rsp:  1	Rsp Date:  04/05/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-06-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Monday, April 06, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 94% of SIPss increases due to nominations in excess of operational capacity; 80,850 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 33,938 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 329,253 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 206,755 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 188,632 Dths

·         STA 317 (Segment 317 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 90,879 Dths

·         STA 321 (Segment 321 FH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 238,427 Dths

·         MLV 330 (Segment 324 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 123,192 Dths

·         STA 233 (Segment 233 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 6,547 Dths

·         Z5hc North (Segment 299 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 164,987 Dths

·         STA 245 (Segment 245 FH) - through approx 70% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 191,193 Dths

·         STA 249 (Segment 249 FH) - through approx 63% of SOP increases due to nominations in excess of operational capacity; 100,966 Dths

·         MLV 273 (Segment 284 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 168,581 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-06-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/06/2026 11:11:43AM	Notice End Date/Time:  04/07/2026 9:00:00am
Post Date/Time:  4/6/2026 11:11:43 AM	Notice ID: 400451
Reqrd Rsp:  1	Rsp Date:  04/06/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-06-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Monday, April 06, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 3,797 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 329,253 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 199,066 Dths

·         STA 315 (Segment 315 BH) - through approx 73% of SOP increases due to nominations in excess of operational capacity; 173,878 Dths

·         STA 317 (Segment 317 BH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 82,607 Dths

·         MLV 330 (Segment 324 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 89,388 Dths

·         STA 233 (Segment 233 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 4,274 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 161,818 Dths

·         STA 245 (Segment 245 FH) - through approx 80% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 267,583 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 113,203 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 168,581 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-07-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/06/2026 2:52:18PM	Notice End Date/Time:  04/07/2026 9:00:00am
Post Date/Time:  4/6/2026 2:52:18 PM	Notice ID: 400458
Reqrd Rsp:  1	Rsp Date:  04/06/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-07-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Tuesday, April 07, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through approx 10% of SA due to nominations in excess of operational capacity; 17,295 Dths

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         TET/TGP Dry Creek Sales Casey Delivery Meter (Pin 420886) - through approx 11% of SIPps due to operational concerns; 6,944 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 91% of SIPss due to nominations in excess of operational capacity; 97,771 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 28% of SOP due to nominations in excess of operational capacity; 9,663 Dths

·         STA 823 (Segment 823 BH) - through approx 53% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 17,123 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 22,966 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,729 Dths

·         MLV 314 East (Segment 314 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 318,923 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP due to nominations in excess of operational capacity; 389,418 Dths

·         STA 317 (Segment 317 BH) - through approx 61% of SOP due to nominations in excess of operational capacity; 94,734 Dths

·         STA 321 (Segment 321 FH) - through approx 70% of SOP due to nominations in excess of operational capacity; 751,956 Dths

·         STA 325 (Segment 324 FH) - through approx 49% of SOP due to nominations in excess of operational capacity; 235,121 Dths

·         MLV 330 (Segment 324 FH) - through approx 34% of SOP due to nominations in excess of operational capacity; 129,712 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 92,737 Dths

·         STA 224 (Segment 224 FH) - through approx 43% of IT due to nominations in excess of operational capacity; 51,128 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 629,569 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 772,660 Dths

·         STA 249 (Segment 249 FH) - through approx 92% of SOP due to nominations in excess of operational capacity; 461,907 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 141,324 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 61% of SOP due to nominations in excess of operational capacity; 93,739 Dths

·         MLV 273 (Segment 284 FH) - through approx 94% of SOP due to nominations in excess of operational capacity; 262,079 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-06-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/06/2026 3:32:32PM	Notice End Date/Time:  04/07/2026 9:00:00am
Post Date/Time:  4/6/2026 3:32:32 PM	Notice ID: 400459
Reqrd Rsp:  1	Rsp Date:  04/06/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-06-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Monday, April 06, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         NONE

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 3,797 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 329,253 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 198,431 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 177,094 Dths

·         STA 317 (Segment 317 BH) - through approx 88% of SOP increases due to nominations in excess of operational capacity; 71,079 Dths

·         MLV 330 (Segment 324 FH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 60,462 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 162,674 Dths

·         STA 245 (Segment 245 FH) - through approx 84% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 240,411 Dths

·         STA 249 (Segment 249 FH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 93,065 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 168,581 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-07-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/06/2026 7:10:00PM	Notice End Date/Time:  04/07/2026 9:00:00am
Post Date/Time:  4/6/2026 7:10:00 PM	Notice ID: 400465
Reqrd Rsp:  1	Rsp Date:  04/06/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-07-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Tuesday, April 07, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through 100% of SA increases due to nominations in excess of operational capacity; 27,295 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,250 Dths

·         STA 823 (Segment 823 BH) - through approx 89% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 6,985 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,693 Dths

·         MLV 314 East (Segment 314 BH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 181,169 Dths

·         STA 315 (Segment 315 BH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 159,717 Dths

·         STA 317 (Segment 317 BH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 85,716 Dths

·         STA 321 (Segment 321 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 504,091 Dths

·         STA 325 (Segment 324 FH) - through approx 70% of SOP increases due to nominations in excess of operational capacity; 146,460 Dths

·         MLV 330 (Segment 324 FH) - through approx 56% of SOP increases due to nominations in excess of operational capacity; 36,634 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 41,862 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 202,205 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 286,520 Dths

·         STA 249 (Segment 249 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 213,629 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 130,138 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 89,227 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 227,164 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 542 UNIT 2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/07/2026 9:59:15AM	Notice End Date/Time:  04/08/2026 9:00:00am
Post Date/Time:  4/7/2026 9:59:15 AM	Notice ID: 400471
Reqrd Rsp:  1	Rsp Date:  04/07/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  EMERGENT REPAIR AT STA 542 UNIT 2
Notice Text:

 

EMERGENT REPAIR AT STA 542 UNIT 2 EFFECTIVE 4-7-2026

 

Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of an emergent repair issue at Station 542 near De Kalb, MS.  Tennessee has discovered an issue with Unit 2 at the station.  Personnel are on site evaluating necessary repairs.   Anticipated impact is approximately 250,000 Dths pathed through Station 542.  Based upon current nominations, restrictions through a portion of Secondary Out of the Path nominations pathed through STA 542 (Segment 542 BH) may be required. Previously scheduled nominations for the gas day of April 7, 2026, will not be curtailed; however, all increases pathed through Segment 542 BH for the remainder of today's gas day may be at risk.

 

Updates will be posted as more information becomes available.

 

Please contact your Scheduler if you have any questions.

 

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-07-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/07/2026 11:16:45AM	Notice End Date/Time:  04/08/2026 9:00:00am
Post Date/Time:  4/7/2026 11:16:45 AM	Notice ID: 400472
Reqrd Rsp:  1	Rsp Date:  04/07/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-07-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Tuesday, April 07, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through approx 86% of SA increases due to nominations in excess of operational capacity; 3,187 Dths

·         TRNSCO/TGP Heidelberg Missisippi Ja Receipt Meter (Pin 420291) - through 100% of SA increases receipts due to displacement gas unavailable for backhaul; 15,000 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 16,970 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 184,155 Dths

·         STA 315 (Segment 315 BH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 182,473 Dths

·         STA 317 (Segment 317 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 75,205 Dths

·         STA 321 (Segment 321 FH) - through approx 12% of SOP increases due to nominations in excess of operational capacity; 21,203 Dths

·         STA 325 (Segment 324 FH) - through approx 63% of SOP increases due to nominations in excess of operational capacity; 75,582 Dths

·         MLV 330 (Segment 324 FH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 33,394 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 961 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 202,205 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 306,467 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 213,629 Dths

·         MLV 256 East (Segment 256 FH) - through approx 99% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 79,047 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 51,774 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 199,302 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-08-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/07/2026 2:45:47PM	Notice End Date/Time:  04/08/2026 9:00:00am
Post Date/Time:  4/7/2026 2:45:47 PM	Notice ID: 400479
Reqrd Rsp:  1	Rsp Date:  04/07/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-08-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Wednesday, April 08, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         GULF SOUTH/TGP Kiln Miss Exchange Hanc Delivery Meter (Pin 420383) - through 100% of SOP due to operational concerns; 504 Dths

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 98% of SIPss due to nominations in excess of operational capacity; 104,298 Dths

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 28,705 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 19,046 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,337 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 551,983 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 333,132 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP due to nominations in excess of operational capacity; 397,271 Dths

·         STA 317 (Segment 317 BH) - through approx 65% of SOP due to nominations in excess of operational capacity; 89,041 Dths

·         STA 321 (Segment 321 FH) - through approx 70% of SOP due to nominations in excess of operational capacity; 758,494 Dths

·         STA 325 (Segment 324 FH) - through approx 48% of SOP due to nominations in excess of operational capacity; 219,775 Dths

·         MLV 330 (Segment 324 FH) - through approx 32% of SOP due to nominations in excess of operational capacity; 120,207 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 71,755 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 145,866 Dths

·         STA 233 (Segment 233 FH) - through 100% of IT due to scheduled maintenance and nominations in excess of operational capacity; 151,693 Dths

·         Z5 HC North (Segment 299 FH) - through approx 92% of SOP due to nominations in excess of operational capacity; 599,326 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 753,642 Dths

·         STA 249 (Segment 249 FH) - through approx 94% of SOP due to nominations in excess of operational capacity; 508,811 Dths

·         MLV 256 East (Segment 256 FH) - through approx 92% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 129,846 Dths

·         MLV 273 (Segment 284 FH) - through approx 87% of SOP due to nominations in excess of operational capacity; 245,939 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-08-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/07/2026 7:05:51PM	Notice End Date/Time:  04/08/2026 9:00:00am
Post Date/Time:  4/7/2026 7:05:51 PM	Notice ID: 400487
Reqrd Rsp:  1	Rsp Date:  04/07/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-08-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Wednesday, April 08, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 8,890 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,895 Dths

·         MLV 314 East (Segment 314 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 182,711 Dths

·         STA 315 (Segment 315 BH) - through approx 64% of SOP increases due to nominations in excess of operational capacity; 166,283 Dths

·         STA 317 (Segment 317 BH) - through approx 65% of SOP increases due to nominations in excess of operational capacity; 64,268 Dths

·         STA 321 (Segment 321 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 440,298 Dths

·         STA 325 (Segment 324 FH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 124,370 Dths

·         MLV 330 (Segment 324 FH) - through approx 59% of SOP increases due to nominations in excess of operational capacity; 36,823 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 122,654 Dths

·         STA 233 (Segment 233 FH) - through 100% of IT increases due to scheduled maintenance and nominations in excess of operational capacity; 1,888 Dths

·         Z5 HC North (Segment 299 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 191,061 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 293,063 Dths

·         STA 249 (Segment 249 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 222,834 Dths

·         MLV 256 East (Segment 256 FH) - through approx 98% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 116,764 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 50% of SOP increases due to nominations in excess of operational capacity; 41,543 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 213,156 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-08-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/08/2026 11:28:05AM	Notice End Date/Time:  04/09/2026 9:00:00am
Post Date/Time:  4/8/2026 11:28:05 AM	Notice ID: 400495
Reqrd Rsp:  1	Rsp Date:  04/08/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-08-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Wednesday, April 08, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 6,085 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 173,174 Dths

·         STA 315 (Segment 315 BH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 140,559 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 65,765 Dths

·         STA 321 (Segment 321 FH) - through approx 19% of SOP increases due to nominations in excess of operational capacity; 33,474 Dths

·         STA 325 (Segment 324 FH) - through approx 62% of SOP increases due to nominations in excess of operational capacity; 68,655 Dths

·         MLV 330 (Segment 324 FH) - through approx 87% of SOP increases due to nominations in excess of operational capacity; 33,683 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 109,938 Dths

·         Z5 HC North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 191,061 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 303,739 Dths

·         STA 249 (Segment 249 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 222,825 Dths

·         MLV 256 East (Segment 256 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 72,361 Dths

·         STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 41,441 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 159,114 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-15-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/14/2026 6:49:43PM	Notice End Date/Time:  04/15/2026 9:00:00am
Post Date/Time:  4/14/2026 6:49:43 PM	Notice ID: 400641
Reqrd Rsp:  1	Rsp Date:  04/14/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-15-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Wednesday, April 15, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 97% of SIPss increases due to nominations in excess of operational capacity; 60,323 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 34,633 Dths

·         STA 9 (Segment 109 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 85,594 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 33,755 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 210,846 Dths

·         STA 315 (Segment 315 BH) - through approx 73% of SOP increases due to nominations in excess of operational capacity; 188,100 Dths

·         STA 317 (Segment 317 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 125,335 Dths

·         STA 321 (Segment 321 FH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 196,601 Dths

·         MLV 330 (Segment 324 FH) - through approx 33% of SOP increases due to nominations in excess of operational capacity; 30,055 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 194,026 Dths

·         STA 245 (Segment 245 FH) - through approx 88% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 228,573 Dths

·         STA 249 (Segment 249 FH) - through approx 69% of SOP increases due to nominations in excess of operational capacity; 101,081 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 241,044 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-14-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/14/2026 7:40:27PM	Notice End Date/Time:  04/15/2026 9:00:00am
Post Date/Time:  4/14/2026 7:40:27 PM	Notice ID: 400644
Reqrd Rsp:  1	Rsp Date:  04/14/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-14-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Tuesday, April 14, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

SEGMENT RESTRICTIONS

·         STA 9 (Segment 109 FH) - through approx 86% of SA increases due to scheduled maintenance and nominations in excess of operational capacity; 8,266 Dths

·         MLV 314 East (Segment 314 BH) - through approx 40% of SOP increases due to nominations in excess of operational capacity; 10,915 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-16-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/15/2026 2:39:44PM	Notice End Date/Time:  04/16/2026 9:00:00am
Post Date/Time:  4/15/2026 2:39:44 PM	Notice ID: 400659
Reqrd Rsp:  1	Rsp Date:  04/15/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-16-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Thursday, April 16, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         IROQUOIS/TGP Shelton Interconnect F Receipt Meter (Pin 412180) - through 100% of SOP deliveries due to displacement gas unavailable for backhaul; 2,500 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through approx 37% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 64,295 Dths

·         STA 9 (Segment 109 FH) - through approx 18% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 53,393 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 36% of SOP due to nominations in excess of operational capacity; 23,723 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 87% of SOP due to nominations in excess of operational capacity; 369,295 Dths

·         STA 315 (Segment 315 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 474,722 Dths

·         STA 317 (Segment 317 BH) - through approx 74% of SOP due to nominations in excess of operational capacity; 134,797 Dths

·         STA 321 (Segment 321 FH) - through approx 40% of SOP due to nominations in excess of operational capacity; 433,621 Dths

·         MLV 330 (Segment 324 FH) - through approx 22% of SOP due to nominations in excess of operational capacity; 154,915 Dths

·         MLV 355 (Segment 355 BH) - through 100% of SOP due to operational concerns; 5,000 Dths

·         Z5hc North (Segment 299 FH) - through approx 82% of SOP due to nominations in excess of operational capacity; 543,485 Dths

·         STA 245 (Segment 245 FH) - through approx 91% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 746,504 Dths

·         STA 249 (Segment 249 FH) - through approx 72% of SOP due to nominations in excess of operational capacity; 376,379 Dths

·         MLV 256 East (Segment 256 FH) - through approx 18% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 24,321 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 42% of SOP due to nominations in excess of operational capacity; 78,209 Dths

·         MLV 273 (Segment 284 FH) - through approx 89% of SOP due to nominations in excess of operational capacity; 256,010 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-15-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/15/2026 3:48:04PM	Notice End Date/Time:  04/16/2026 9:00:00am
Post Date/Time:  4/15/2026 3:48:04 PM	Notice ID: 400660
Reqrd Rsp:  1	Rsp Date:  04/15/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-15-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Wednesday, April 15, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 1,012 Dths

·         STA 9 (Segment 109 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 22,315 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 209,453 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP increases due to nominations in excess of operational capacity; 188,281 Dths

·         STA 317 (Segment 317 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 76,582 Dths

·         MLV 330 (Segment 324 FH) - through approx 32% of SOP increases due to nominations in excess of operational capacity; 9,402 Dths

·         Z5hc North (Segment 299 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 180,542 Dths

·         STA 245 (Segment 245 FH) - through approx 84% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 180,751 Dths

·         STA 249 (Segment 249 FH) - through approx 70% of SOP increases due to nominations in excess of operational capacity; 68,484 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 160,659 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-16-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/15/2026 7:07:42PM	Notice End Date/Time:  04/16/2026 9:00:00am
Post Date/Time:  4/15/2026 7:07:42 PM	Notice ID: 400667
Reqrd Rsp:  1	Rsp Date:  04/15/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-16-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Thursday, April 16, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         IROQUOIS/TGP Shelton Interconnect F Receipt Meter (Pin 412180) - through 100% of SOP delivery increases due to displacement gas unavailable for backhaul; 2,500 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 15,997 Dths

·         STA 9 (Segment 109 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 39,126 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 23,723 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 242,905 Dths

·         STA 315 (Segment 315 BH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 295,795 Dths

·         STA 317 (Segment 317 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 78,185 Dths

·         STA 321 (Segment 321 FH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 193,258 Dths

·         MLV 330 (Segment 324 FH) - through approx 47% of SOP increases due to nominations in excess of operational capacity; 46,650 Dths

·         Z5hc North (Segment 299 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 191,835 Dths

·         STA 245 (Segment 245 FH) - through approx 93% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 274,466 Dths

·         STA 249 (Segment 249 FH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 138,572 Dths

·         MLV 256 East (Segment 256 FH) - through approx 43% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 12,234 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 66,335 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 226,852 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-15-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/15/2026 7:31:24PM	Notice End Date/Time:  04/16/2026 9:00:00am
Post Date/Time:  4/15/2026 7:31:24 PM	Notice ID: 400668
Reqrd Rsp:  1	Rsp Date:  04/15/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-15-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Wednesday, April 15, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 1,012 Dths

·         STA 9 (Segment 109 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 14,564 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

TGP FIRST SUMMER MAINTENANCE MTG REM

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/16/2026 6:40:19AM	Notice End Date/Time:  04/17/2026 9:00:00am
Post Date/Time:  4/16/2026 6:40:19 AM	Notice ID: 400675
Reqrd Rsp:  1	Rsp Date:  04/16/2026
Notice Stat Desc:  SUPERSEDE	Prior Notice:  400518
Subject:  TGP FIRST SUMMER MAINTENANCE MTG REM
Notice Text:

TGP's FIRST 2026 SUMMER MAINTENANCE TEAMS MEETING 4-21-2026 REMINDER

As a reminder, Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its first 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of April and all of May, June and July 2026 on Tuesday, April 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only.  Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems.  There will be a question and answer segment immediately following.

Please see TEAMS info below:

TGP Summer Maintenance and Outages TEAMS Meeting

 

Join on your computer, mobile app or room device

________________________________________________________________________________

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK

Meeting ID: 235 794 931 318 69

Passcode: Vg6AB2AN

Need help | System reference

Dial in by phone

+1 346-410-0970,,694003306# United States, Houston

Find a local number

Phone conference ID: 694 003 306#

For organizers: Meeting options | Reset dial-in PIN

________________________________________________________________________________

 

..
NEXUS Gas Transmission (U.S.)

04/17/2026- Nexus Operational Advisory

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Operational Advisory
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 07/16/2026
Posting Date: 04/17/2026
Notice Identifier: 176721
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/17/2026- Nexus Pipeline Conditions for 4/18/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Nexus Pipeline Conditions for 4/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/19/2026
Posting Date: 04/17/2026
Notice Identifier: 176746
Required Response Indicator Description: No response required

For Gas Day April 18, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
Yes
Due to NEXUS Posted Outage
Meter N2001 Receipts
100%
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
No DP - effective 4/17/26. 4% / 500 Dth Tolerance
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/17/2026- AGT Pipeline Conditions for 04/18/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 04/18/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/18/2026
Notice End Date: 04/19/2026
Posting Date: 04/17/2026
Notice Identifier: 176751
Required Response Indicator Description: No response required

For Gas Day April 18, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
57%
Cromwell
100%
100%
47%
Burrillville
100%
100%
41%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
37%
Iroquois Receipts
100%
100%
53%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
40%
Transco Centerville Receipts
90%
G System
100%
100%
38%
C System
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 04/18/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Gulf Run Transmission] [Maint] Alto Planned Maintenance Termination

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 63036
Notice Type: Maint
Subject: Alto Planned Maintenance Termination
Posted: 2026-04-17 07:25:00.0
Effective: 2026-04-17 09:00:00.0
End Date: 

Notice ID: 63036
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-17 07:25:00.0
Subject: Alto Planned Maintenance Termination
Notice Effective Date/Time: 2026-04-17 09:00:00.0
Notice End Date/Time: 2026-07-17 09:00:00.0
Notice Text: New Information Posted on 4/17/26:The planned maintenance at Gulf Run’s Alto Compressor Station has been completed. Effective April 17th, 2026 at 09:00, all restrictions associated with Critical Notice #61651 are lifted.New Information Posted on 2/17/26:The maintenance is now anticipated to start Monday April 13th 2026, at 09:00 through Saturday April 18th , 2026 at 9:00 a.m. All other details from the previous posting (Critical Notice #61307) remain unchanged.Previous Information Posted on 2/03/26:This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Alto Compressor Station located in Richland Parish, Louisiana and in Gulf Run’s Zone 1.This planned maintenance is scheduled to occur on Tuesday, March 10th, 2026 through Sunday, March 15th, 2026 at 09:00.During this time, Gulf Run will be unable to deliver to CGT GR (#13548).Gulf Run does anticipate impacts to its primary firm services. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance.If you have any questions concerning this alert, please contact your Scheduling Representative.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-05-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/04/2026 2:49:25PM	Notice End Date/Time:  04/05/2026 9:00:00am
Post Date/Time:  4/4/2026 2:49:25 PM	Notice ID: 400416
Reqrd Rsp:  1	Rsp Date:  04/04/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-05-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Sunday, April 05, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

 

METER RESTRICTIONS

·         ETNG/TGP East Lobelville TN Perry Receipt Meter (Pin 420042) - through 100% of SIPss receipts due to displacement gas unavailable for backhaul; 4,944 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 41% of SIPss due to nominations in excess of operational capacity; 56,722 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 36% of SOP due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through approx 87% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 33,938 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to operational concerns; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through approx 99% of SOP due to nominations in excess of operational capacity; 543,642 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 333,362 Dths

·         STA 315 (Segment 315 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 418,034 Dths

·         STA 317 (Segment 317 BH) - through approx 80% of SOP due to nominations in excess of operational capacity; 149,147 Dths

·         STA 321 (Segment 321 FH) - through approx 53% of SOP due to nominations in excess of operational capacity; 592,359 Dths

·         STA 325 (Segment 324 FH) - through approx 21% of SOP due to nominations in excess of operational capacity; 110,990 Dths

·         MLV 330 (Segment 324 FH) - through approx 39% of SOP due to nominations in excess of operational capacity; 214,094 Dths

·         MLV 336 East (Segment 336 FH) - through approx 19% of SOP due to nominations in excess of operational capacity; 11,375 Dths

·         Z5 HC North (Segment 299 FH) - through approx 83% of SOP due to nominations in excess of operational capacity; 514,801 Dths

·         STA 245 (Segment 245 FH) - through approx 81% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 642,309 Dths

·         STA 249 (Segment 249 FH) - through approx 58% of SOP due to nominations in excess of operational capacity; 297,733 Dths

·         MLV 273 (Segment 284 FH) - through approx 88% of SOP due to nominations in excess of operational capacity; 256,481 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-04-2026 ID2

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/04/2026 3:11:30PM	Notice End Date/Time:  04/05/2026 9:00:00am
Post Date/Time:  4/4/2026 3:11:30 PM	Notice ID: 400418
Reqrd Rsp:  1	Rsp Date:  04/04/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-04-2026 ID2
Notice Text:

Effective Intraday 2 Cycle (18:00) for the gas day of Saturday, April 04, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

SEGMENT RESTRICTIONS

·         STA 823 (Segment 823 BH) - through approx 60% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 8,956 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 328,999 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 204,287 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 183,788 Dths

·         STA 317 (Segment 317 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 80,109 Dths

·         MLV 330 (Segment 324 FH) - through approx 31% of SOP increases due to nominations in excess of operational capacity; 12,877 Dths

·         Z5hc North (Segment 299 FH) - through approx 90% of SOP increases due to nominations in excess of operational capacity; 142,597 Dths

·         STA 245 (Segment 245 FH) - through approx 65% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 117,289 Dths

·         STA 249 (Segment 249 FH) - through approx 35% of SOP increases due to nominations in excess of operational capacity; 32,007 Dths

·         MLV 273 (Segment 284 FH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 83,185 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-05-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/04/2026 7:03:24PM	Notice End Date/Time:  04/05/2026 9:00:00am
Post Date/Time:  4/4/2026 7:03:24 PM	Notice ID: 400424
Reqrd Rsp:  1	Rsp Date:  04/04/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-05-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Sunday, April 05, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

 

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 33,938 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 344,620 Dths

·         MLV 314 East (Segment 314 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 203,560 Dths

·         STA 315 (Segment 315 BH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 188,998 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 135,090 Dths

·         STA 321 (Segment 321 FH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 228,079 Dths

·         STA 325 (Segment 324 FH) - through approx 10% of SOP increases due to nominations in excess of operational capacity; 14,024 Dths

·         MLV 330 (Segment 324 FH) - through approx 83% of SOP increases due to nominations in excess of operational capacity; 106,319 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 166,611 Dths

·         STA 245 (Segment 245 FH) - through approx 77% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 169,091 Dths

·         STA 249 (Segment 249 FH) - through approx 54% of SOP increases due to nominations in excess of operational capacity; 78,718 Dths

·         MLV 273 (Segment 284 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 170,654 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-14-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/13/2026 2:42:15PM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 2:42:15 PM	Notice ID: 400613
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-14-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Tuesday, April 14, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         TET/TGP Dry Creek Sales Casey Delivery Meter (Pin 420886) - through approx 4% of SIPps due to operational concerns; 2,493 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 26% of SIPss due to nominations in excess of operational capacity; 21,244 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through approx 44% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 24,936 Dths

·         STA 9 (Segment 109 FH) - through approx 21% of SA due to scheduled maintenance and nominations in excess of operational capacity; 109,094 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 35% of SOP due to nominations in excess of operational capacity; 13,220 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 80% of SOP due to nominations in excess of operational capacity; 308,096 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP due to nominations in excess of operational capacity; 374,580 Dths

·         STA 317 (Segment 317 BH) - through approx 66% of SOP due to nominations in excess of operational capacity; 133,381 Dths

·         STA 321 (Segment 321 FH) - through approx 38% of SOP due to nominations in excess of operational capacity; 414,118 Dths

·         MLV 330 (Segment 324 FH) - through approx 14% of SOP due to nominations in excess of operational capacity; 96,346 Dths

·         Z5hc North (Segment 299 FH) - through approx 76% of SOP due to nominations in excess of operational capacity; 517,126 Dths

·         STA 245 (Segment 245 FH) - through approx 68% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 482,371 Dths

·         STA 249 (Segment 249 FH) - through approx 45% of SOP due to nominations in excess of operational capacity; 233,344 Dths

·         MLV 273 (Segment 284 FH) - through approx 93% of SOP due to nominations in excess of operational capacity; 263,489 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-14-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/13/2026 6:49:38PM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 6:49:38 PM	Notice ID: 400619
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-14-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Tuesday, April 14, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         TET/TGP Dry Creek Sales Casey Delivery Meter (Pin 420886) - through 100% of SIPps increases due to operational concerns; 1,077 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 66% of SIPss increases due to nominations in excess of operational capacity; 13,749 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through SIPsp increases due to scheduled maintenance and nominations in excess of operational capacity

·         STA 9 (Segment 109 FH) - through approx 77% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 92,256 Dths

·         STA 823 Muskrat Line (Segment 509 BH) - through approx 53% of SOP increases due to nominations in excess of operational capacity; 13,220 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,685 Dths

·         MLV 314 East (Segment 314 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 189,030 Dths

·         STA 315 (Segment 315 BH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 190,837 Dths

·         STA 317 (Segment 317 BH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 80,327 Dths

·         STA 321 (Segment 321 FH) - through approx 79% of SOP increases due to nominations in excess of operational capacity; 171,208 Dths

·         MLV 330 (Segment 324 FH) - through approx 8% of SOP increases due to nominations in excess of operational capacity; 6,123 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 161,598 Dths

·         STA 245 (Segment 245 FH) - through approx 60% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 133,035 Dths

·         STA 249 (Segment 249 FH) - through approx 21% of SOP increases due to nominations in excess of operational capacity; 26,834 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 226,829 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-13-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/13/2026 7:26:36PM	Notice End Date/Time:  04/14/2026 9:00:00am
Post Date/Time:  4/13/2026 7:26:36 PM	Notice ID: 400621
Reqrd Rsp:  1	Rsp Date:  04/13/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-13-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Monday, April 13, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

SEGMENT RESTRICTIONS

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 2,500 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-14-2026 ID1

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/14/2026 11:06:28AM	Notice End Date/Time:  04/15/2026 9:00:00am
Post Date/Time:  4/14/2026 11:06:28 AM	Notice ID: 400626
Reqrd Rsp:  1	Rsp Date:  04/14/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-14-2026 ID1
Notice Text:

Effective Intraday 1 Cycle (14:00) for the gas day of Tuesday, April 14, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         NRGBM/TGP Beirne Hill Sales Bradfor Delivery Meter (Pin 48061) - through approx 3% of IT increases due to nominations in excess of operational capacity; 348 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through SIPsp increases due to scheduled maintenance and nominations in excess of operational capacity

·         STA 9 (Segment 109 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 22,514 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,685 Dths

·         MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 188,712 Dths

·         STA 315 (Segment 315 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 178,647 Dths

·         STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 73,783 Dths

·         Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 152,968 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 128,494 Dths

·         STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 23,855 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 226,829 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-15-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/14/2026 2:57:44PM	Notice End Date/Time:  04/15/2026 9:00:00am
Post Date/Time:  4/14/2026 2:57:44 PM	Notice ID: 400635
Reqrd Rsp:  1	Rsp Date:  04/14/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-15-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Wednesday, April 15, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR ALL AREAS EAST AND NORTH OF STA 219 FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 74% of SIPss due to nominations in excess of operational capacity; 70,328 Dths

·         LIBERTYU/TGP Granite Ridge Rockingh Delivery Meter (Pin 420931) - through approx 29% of IT due to nominations in excess of operational capacity; 6,145 Dths

SEGMENT RESTRICTIONS

·         Pemex Lateral (Segment 492 FH) - through approx 71% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 47,665 Dths

·         STA 9 (Segment 109 FH) - through 100% of SA due to scheduled maintenance and nominations in excess of operational capacity; 94,671 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,923 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 18,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,652 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 370,375 Dths

·         STA 315 (Segment 315 BH) - through approx 82% of SOP due to nominations in excess of operational capacity; 447,775 Dths

·         STA 317 (Segment 317 BH) - through approx 73% of SOP due to nominations in excess of operational capacity; 137,728 Dths

·         STA 321 (Segment 321 FH) - through approx 43% of SOP due to nominations in excess of operational capacity; 463,285 Dths

·         MLV 330 (Segment 324 FH) - through approx 22% of SOP due to nominations in excess of operational capacity; 141,608 Dths

·         Z5hc North (Segment 299 FH) - through approx 80% of SOP due to nominations in excess of operational capacity; 576,186 Dths

·         STA 245 (Segment 245 FH) - through approx 80% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 652,698 Dths

·         STA 249 (Segment 249 FH) - through approx 56% of SOP due to nominations in excess of operational capacity; 287,069 Dths

·         MLV 273 (Segment 284 FH) - through approx 94% of SOP due to nominations in excess of operational capacity; 262,741 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/16/2026- NEXUS Pipeline Conditions for 4/17/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/17/2026
Notice End Date: 04/18/2026
Posting Date: 04/16/2026
Notice Identifier: 176688
Required Response Indicator Description: No response required

For Gas Day April 17, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/16/2026- AGT Pipeline Conditions for 4/17/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/17/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/17/2026
Notice End Date: 04/18/2026
Posting Date: 04/16/2026
Notice Identifier: 176693
Required Response Indicator Description: No response required

For Gas Day April 17, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
64%
Cromwell
100%
100%
31%
Burrillville
100%
100%
32%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
89%
Iroquois Receipts
100%
100%
59%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
28%
Transco Centerville Receipts
71%
G System
100%
100%
23%
C System
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Rover Pipeline] [Other] Nominations to Vector on Rover

UNSCORED
Informational
View original notice text
Pipeline: Rover Pipeline
Notice ID: 63010
Notice Type: Other
Subject: Nominations to Vector on Rover
Posted: 2026-04-16 10:39:00.0
Effective: 2026-04-16 10:39:00.0
End Date: 

Notice ID: 63010
Notice Type: GEN
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-16 10:39:00.0
Subject: Nominations to Vector on Rover
Notice Effective Date/Time: 2026-04-16 10:39:00.0
Notice End Date/Time: 2200-01-01 00:00:00.0
Notice Text: 04/16/2026 Nominations to Vector on Rover Due to increased utilization on Vector Pipeline, Rover is encouraging all shippers to enter their nominations to Vector during the Timely cycle each day. All new or increased nominations entered in subsequent cycles, including firm primary, are subject to scheduling reductions. If you have any questions, please contact your Marketing or Customer Service Representative.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-04-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/03/2026 2:43:31PM	Notice End Date/Time:  04/04/2026 9:00:00am
Post Date/Time:  4/3/2026 2:43:31 PM	Notice ID: 400397
Reqrd Rsp:  1	Rsp Date:  04/03/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-04-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Saturday, April 04, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         ETNG/TGP East Lobelville Tn Perry Delivery Meter (Pin 420042) - through 100% of SIPss receipts due to displacement gas unavailable for backhaul; 4,944 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 37% of SIPss due to nominations in excess of operational capacity; 51,780 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through approx 36% of SOP due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through approx 61% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 23,920 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through approx 98% of SOP due to nominations in excess of operational capacity; 350,399 Dths

·         MLV 314 East (Segment 314 BH) - through approx 88% of SOP due to nominations in excess of operational capacity; 334,811 Dths

·         STA 315 (Segment 315 BH) - through approx 83% of SOP due to nominations in excess of operational capacity; 415,725 Dths

·         STA 317 (Segment 317 BH) - through approx 80% of SOP due to nominations in excess of operational capacity; 149,231 Dths

·         STA 321 (Segment 321 FH) - through approx 46% of SOP due to nominations in excess of operational capacity; 492,662 Dths

·         MLV 330 (Segment 324 FH) - through approx 27% of SOP due to nominations in excess of operational capacity; 178,859 Dths

·         MLV 336 East (Segment 336 FH) - through approx 20% of SOP due to nominations in excess of operational capacity; 12,028 Dths

·         Z5hc North (Segment 299 FH) - through approx 82% of SOP due to nominations in excess of operational capacity; 512,293 Dths

·         STA 245 (Segment 245 FH) - through approx 83% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 659,226 Dths

·         STA 249 (Segment 249 FH) - through approx 60% of SOP due to nominations in excess of operational capacity; 308,466 Dths

·         MLV 273 (Segment 284 FH) - through approx 89% of SOP due to nominations in excess of operational capacity; 260,475 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-04-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/03/2026 7:05:17PM	Notice End Date/Time:  04/04/2026 9:00:00am
Post Date/Time:  4/3/2026 7:05:17 PM	Notice ID: 400404
Reqrd Rsp:  1	Rsp Date:  04/03/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-04-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Saturday, April 04, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES OR UNDER-TAKES FROM THE SYSTEM FOR ALL LMPAS, SAS ACTING AS BALANCING PARTIES AND LMMAS FOR THE BELOW LISTED AREAS:

ZONE 0 EXCLUDING ALL AREAS SOUTH OF STA 1

ZONE L EXCLUDING THE MUSKRAT LINE SEGMENTS (EXCLUDING SEGMENTS 509, 515, 516, 523, 524, 526)

ZONE L EXCLUDING THE 500 LINE SEGMENTS (EXCLUDING SEGMENTS 527, 529, 530)

ZONE 1 EXCLUDING 500 LINE SEGMENTS (EXCLUDING SEGMENTS 534, 539, 542)

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

METER RESTRICTIONS

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 79% of SIPss increases due to nominations in excess of operational capacity; 41,775 Dths

SEGMENT RESTRICTIONS

·         MLV 509 Muskrat Line (Segment 515 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 13,928 Dths

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 23,920 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 40,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 686 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 350,399 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 206,132 Dths

·         STA 315 (Segment 315 BH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 187,523 Dths

·         STA 317 (Segment 317 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 90,732 Dths

·         STA 321 (Segment 321 FH) - through approx 15% of SOP increases due to nominations in excess of operational capacity; 31,606 Dths

·         MLV 330 (Segment 324 FH) - through approx 56% of SOP increases due to nominations in excess of operational capacity; 57,286 Dths

·         Z5hc North (Segment 299 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 161,072 Dths

·         STA 245 (Segment 245 FH) - through approx 80% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 179,096 Dths

·         STA 249 (Segment 249 FH) - through approx 60% of SOP increases due to nominations in excess of operational capacity; 91,927 Dths

·         MLV 273 (Segment 284 FH) - through approx 98% of SOP increases due to nominations in excess of operational capacity; 199,102 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-13-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/12/2026 2:17:17PM	Notice End Date/Time:  04/13/2026 9:00:00am
Post Date/Time:  4/12/2026 2:17:17 PM	Notice ID: 400592
Reqrd Rsp:  1	Rsp Date:  04/12/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-13-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Monday, April 13, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through approx 1% of SA due to nominations in excess of operational capacity; 927 Dths

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         ETNG/TGP East Lobelville TN Perry Receipt Meter (Pin 420042) - through 100% of SIPss receipts due to displacement gas unavailable for backhaul; 54,022 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 51% of SIPss due to nominations in excess of operational capacity; 40,920 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,896 Dths

·         MLV 314 East (Segment 314 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 293,254 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP due to nominations in excess of operational capacity; 345,603 Dths

·         STA 317 (Segment 317 BH) - through approx 56% of SOP due to nominations in excess of operational capacity; 60,977 Dths

·         STA 321 (Segment 321 FH) - through approx 43% of SOP due to nominations in excess of operational capacity; 466,190 Dths

·         STA 325 (Segment 324 FH) - through approx 5% of SOP due to nominations in excess of operational capacity; 26,230 Dths

·         MLV 330 (Segment 324 FH) - through approx 20% of SOP due to nominations in excess of operational capacity; 130,338 Dths

·         Z5 HC North (Segment 299 FH) - through approx 80% of SOP due to nominations in excess of operational capacity; 540,863 Dths

·         STA 245 (Segment 245 FH) - through approx 69% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 479,806 Dths

·         STA 249 (Segment 249 FH) - through approx 44% of SOP due to nominations in excess of operational capacity; 211,508 Dths

·         MLV 273 (Segment 284 FH) - through approx 92% of SOP due to nominations in excess of operational capacity; 247,423 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-13-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/12/2026 7:14:00PM	Notice End Date/Time:  04/13/2026 9:00:00am
Post Date/Time:  4/12/2026 7:14:00 PM	Notice ID: 400599
Reqrd Rsp:  1	Rsp Date:  04/12/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-13-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Monday, April 13, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through 100% of SA increases due to nominations in excess of operational capacity; 927 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,671 Dths

·         MLV 314 East (Segment 314 BH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 178,011 Dths

·         STA 315 (Segment 315 BH) - through approx 76% of SOP increases due to nominations in excess of operational capacity; 170,237 Dths

·         STA 317 (Segment 317 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 94,921 Dths

·         STA 321 (Segment 321 FH) - through approx 68% of SOP increases due to nominations in excess of operational capacity; 167,977 Dths

·         Z5 HC North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 161,464 Dths

·         STA 245 (Segment 245 FH) - through approx 70% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 134,223 Dths

·         STA 249 (Segment 249 FH) - through approx 39% of SOP increases due to nominations in excess of operational capacity; 44,038 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 224,716 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-12-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/12/2026 7:40:20PM	Notice End Date/Time:  04/13/2026 9:00:00am
Post Date/Time:  4/12/2026 7:40:20 PM	Notice ID: 400600
Reqrd Rsp:  1	Rsp Date:  04/12/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-12-2026 ID3
Notice Text:

Effective ITRD3 for the gas day of Sunday, April 12, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

 

METER RESTRICTIONS

NONE

SEGMENT RESTRICTIONS

NONE

 

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/15/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116556
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/15/26 (Intraday 3)
Posted: Apr 15 2026 6:31PM
Effective: Apr 15 2026 6:19PM
End Date: Apr 16 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116556
Critical Notice Description: Critical notice
Posting Date/Time: Apr 15 2026 6:31PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/15/26 (Intraday 3)
Notice Effective Date/Time: Apr 15 2026 6:19PM
Notice End Date/Time: Apr 16 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/15/26 (Intraday 3) Notice to Customers, Gas Day 4/15/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 100771 - ETC Grey WolfPOI 79087 - ETC HalleyPOI 79028 - Targa Rojo BancoPOI 100819 - Targa BullmoosePOI 100730 - Targa WildcatPOI 100816 - Kings LandingPOI 56339 - Dagger DrawPOI 10703 - DCP ArtesiaPOI 100734 - 3 BearFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Texas Eastern Transmission (TETCO)

04/15/2026- AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 07/14/2026
Posting Date: 04/15/2026
Notice Identifier: 176619
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/15/2026- NEXUS Pipeline Conditions for 4/16/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/16/2026
Notice End Date: 04/17/2026
Posting Date: 04/15/2026
Notice Identifier: 176646
Required Response Indicator Description: No response required

For Gas Day April 16, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
N/A
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Ypsilanti
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/15/2026- AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT/TE Mahwah (00201/78201) and Ramapo (00214/7814) Changes Effective 5/1/2026 Gas Day
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 07/14/2026
Posting Date: 04/15/2026
Notice Identifier: 176618
Required Response Indicator Description: No response required
Algonquin Gas Transmission

04/15/2026- AGT Pipeline Conditions for 04/16/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 04/16/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/16/2026
Notice End Date: 04/17/2026
Posting Date: 04/15/2026
Notice Identifier: 176674
Required Response Indicator Description: No response required

For Gas Day April 16, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
100%
100%
100%
100%
100%
28%
Planned Outage
Cromwell
100%
100%
100%
100%
Planned Outage
Burrillville
100%
100%
100%
Planned Outage
Weymouth
100%
100%
90%
Iroquois Deliveries
100%
100%
100%
Iroquois Receipts
100%
100%
54%
Hanover West
100%
100%
90%
Mendon Receipts
100%
100%
100%
100%
100%
Transco Centerville Receipts
100%
100%
11%
G System
100%
100%
38%
C System
Yes
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 4/16/26. 500 Dth / 4% Tolerance
Customer Specific OFO
---
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf South Pipeline

Update: Wilson Compressor Station Maintenance

UNSCORED
Informational
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037996
Notice Type: Maintenance
Status: Supersede
Posted: 2026-04-15T14:08:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-14T09:00:00+00:00
Subject: Update: Wilson Compressor Station Maintenance

Gulf South Pipeline Notice 5037996
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Supersede
Notice ID :
5037996
Prior Notice :
5037781
Reqrd Rsp Desc :
No response required
Subject :
Update: Wilson Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
04/15/2026 02:08:00 PM
Notice Effective Date/Time :
05/11/2026 09:00:00 AM
Notice End Date/Time :
05/14/2026 09:00:00 AM
Response Date/Time :
Critical :
Notice Text :
Revised Description:
-------------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Wilson Compressor Station.
Due to required compliance testing at Wilson Compressor Station, the following meter will need to
be shut-in during the duration of the 9-hr maintenance on Gas Day 5/11:
- Loc 23376 (Coastal Bend (Enterprise))
The following groups are subject to impact:
-Wilson Compressor South Scheduling Group
Gas Day 5/11:
Due to required compliance testing at Wilson Compressor Station, capacity could be impacted by as
much as 1,270,000 Dth/d until ID2 before dropping to a 150,000 Dth/d impact for the remainder of
the gas day. Capacity will be impacted by as much as 570,000 Dth/d for the gas day. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 5/12-5/13:
Capacity could be impacted by as much as 150,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
04/15/2026 2:09:00 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
04/15/2026 02:08:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
05/11/2026 09:00:00 AM
Notice Stat Desc :
Supersede
Notice End Date/Time :
05/14/2026 09:00:00 AM
Notice ID :
5037996
Response Date/Time :
Prior Notice :
5037781
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Update: Wilson Compressor Station Maintenance
Notice Text :
Revised Description:
-------------------------------------------------------------------------------------
Gulf South will be performing maintenance at the Wilson Compressor Station.
Due to required compliance testing at Wilson Compressor Station, the following meter will need to
be shut-in during the duration of the 9-hr maintenance on Gas Day 5/11:
- Loc 23376 (Coastal Bend (Enterprise))
The following groups are subject to impact:
-Wilson Compressor South Scheduling Group
Gas Day 5/11:
Due to required compliance testing at Wilson Compressor Station, capacity could be impacted by as
much as 1,270,000 Dth/d until ID2 before dropping to a 150,000 Dth/d impact for the remainder of
the gas day. Capacity will be impacted by as much as 570,000 Dth/d for the gas day. This
maintenance has the potential to impact all services, including Primary Firm Service.
Gas Day 5/12-5/13:
Capacity could be impacted by as much as 150,000 Dth/d for the duration of the maintenance. This
maintenance has the potential to impact all services, including Primary Firm Service.
Demand charge credits will not be issued during the maintenance period unless Primary Firm
Service is scheduled down during the Timely Nomination Cycle. Any demand charge credits will be
calculated pursuant to Section 6.25 of the General Terms and Conditions of Gulf South`s NGA Gas
Tariff.
If you have any questions, please contact your customer service representative.
04/15/2026 2:09:00 PM
Page 1 of 1
Texas Eastern Transmission (TETCO)

04/14/2026- Colerain to Salineville Line 73 Valve Section 1 Isolation -- COMPLETE

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Colerain to Salineville Line 73 Valve Section 1 Isolation -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 07/13/2026
Posting Date: 04/14/2026
Notice Identifier: 176549
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/14/2026- Colerain to Salineville Line 73 Valve Section 1 Isolation -- COMPLETE

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: Colerain to Salineville Line 73 Valve Section 1 Isolation -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 07/13/2026
Posting Date: 04/14/2026
Notice Identifier: 176550
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/14/2026- NEXUS Pipeline Conditions for 4/15/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 04/16/2026
Posting Date: 04/14/2026
Notice Identifier: 176573
Required Response Indicator Description: No response required

For Gas Day April 15, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Hanoverton
Yes
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/14/2026- AGT Pipeline Conditions for 4/15/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/15/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/15/2026
Notice End Date: 04/16/2026
Posting Date: 04/14/2026
Notice Identifier: 176575
Required Response Indicator Description: No response required

For Gas Day April 15, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
48%
Cromwell
100%
100%
67%
Burrillville
100%
100%
67%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
42%
Iroquois Receipts
100%
100%
54%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
25%
G System
100%
100%
47%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DS - System Wide issued 4/9/26. 250 Dth / 6% Tolerance
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/14/2026- AGT Customer Specific Operational Flow Order -- LIFTED EFF 4/16

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Customer Specific Operational Flow Order -- LIFTED EFF 4/16
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/16/2026
Notice End Date: 07/13/2026
Posting Date: 04/14/2026
Notice Identifier: 176560
Prior Notice Identifier: 175690
Required Response Indicator Description: No response required

Operational Area
Gas Day April 14 - 15
Gas Day April 16
System Wide - All Customers
OFO in Effect: No DS 6% / 250
No OFO*
Customer Specific
OFO in Effect: No DS 5% / 250
No OFO*
Hourly Customer Specific
No OFO*
No OFO*
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 1, 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116498
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 1, 2 & 3)
Posted: Apr 14 2026 9:08AM
Effective: Apr 14 2026 9:03AM
End Date: Apr 15 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116498
Critical Notice Description: Critical notice
Posting Date/Time: Apr 14 2026 9:08AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 1, 2 & 3)
Notice Effective Date/Time: Apr 14 2026 9:03AM
Notice End Date/Time: Apr 15 2026 8:59AM
Notice Text: Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 1, 2 & 3)Notice to Customers 4/14/26, (ANR Red Deer) location performance, Transwestern Pipeline is concerned about the performance of the following (ANR Red Deer) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 1, 2 & 3. This could result in reductionsto the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 57274- ANR Red Deer (delivery)For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: ANR Red Deer (delivery) POI 57274
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116510
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 2 & 3)
Posted: Apr 14 2026 2:08PM
Effective: Apr 14 2026 2:06PM
End Date: Apr 15 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116510
Critical Notice Description: Critical notice
Posting Date/Time: Apr 14 2026 2:08PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 2 & 3)
Notice Effective Date/Time: Apr 14 2026 2:06PM
Notice End Date/Time: Apr 15 2026 8:59AM
Notice Text: Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 2 & 3)Notice to Customers 4/14/26, (3 Bear) location performance, Transwestern Pipeline is concerned about the performance of the following (3 Bear) location. If performance has not improved at this location during thecurrent gas day, Transwestern may limit volumes to actual on the indicated location for ID 2 & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 100734 - 3 Bear For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 100734 - 3 Bear
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #6

UNSCORED
Informational
View original notice text
Pipeline: Rockies Express Pipeline
Notice ID: 13656
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #6
Posted: 4/14/2026 9:06:43 AM
Effective: 4/14/2026 9:06:43 AM
End Date: 12/31/9000

REX MAINTENANCE SCHEDULE FOR APRIL 2026 – UPDATE #6
REX is updating the Chandlersville Compressor Station Maintenance for April 14th through April 17th to
2,972 MDth/d effective Gas Day Tuesday, April 14, 2026 ID1 Cycle.
All other items remain the same as posted under notice ID 13654.
DUKE MADISON LOCATION MAINTENANCE (LOC 60783)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Duke Madison Location (Location 60783). Operating capacity will be limited to 0
MDth/d at the DEI Madison Station (Location 60783).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
MEXICO COMPRESSOR STATION MAINTENANCE (SEG 300)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at its Mexico Compressor Station (Segment 300). There is no anticipated impact to the
capacity in the West to East direction through Segment 300.
SENECA COMPRESSOR STATION MAINTENANCE (SEG 400)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Seneca Compressor Station (Segment 400). Operating capacity will be limited to 0
MDth/d at the following Receipts:
• Markwest Seneca (Location 56116)
• Rover Noble (Location 60167)
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Monday, April 13, 2026, through Gas Day Friday, April 17, 2026, and Gas Day Tuesday, April
21, 2026, through Gas Day Sunday, April 26, 2026, REX will be performing maintenance at its
Chandlersville Compressor Station (Segment 380). Operating capacity will be limited to the following in
the East to West direction through Segment 380:
• Gas Day Monday, April 13, 2026: 3,023 MDth/d.
• Gas Day Tuesday, April 14, 2026, through Gas Day Friday, April 17, 2026: 2,972 MDth/d.
• Gas Day Tuesday, April 21, 2026, through Gas Day Friday, April 24, 2026: 2,837 MDth/d.

• Gas Day Saturday, April 25, 2026, through Gas Day Sunday, April 26, 2026: 2,935 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
COLUMBUS COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, April 14, 2026, through Gas Day Friday, Friday, April 17, 2026, REX will be
performing maintenance at its Columbus Compressor Station (Segment 380). Operating capacity will be
limited to 2,972 MDth/d in the East to West direction through Segment 380.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BAINBRIDGE COMPRESSOR STATION MAINTENANCE (SEG 330)
On Gas Day Monday, April 20, 2026, through Gas Day Friday, April 24, 2026, REX will be performing
maintenance at the Bainbridge Compressor Station (Segment 330). Operating capacity will be limited to
1,840 MDth/d in the East to West direction through Segment 330.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026, REX will be performing
maintenance at the Julesburg Compressor Station (Segment 240). Operating capacity will be limited to
1,079 MDth/d in the West to East direction through Segment 240.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
LOGAN COMPRESSOR STATION MAINTENANCE (LOC 60992)
On Gas Day Tuesday, April 21, 2026, REX will be performing maintenance at the Logan Compressor
Station (Location 60992). Operating capacity will be limited to 0 MDth/d at the REX/TIGT Logan Location
(60992).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Wednesday, April 22, 2026, REX will be performing maintenance at its Bertrand Compressor
Station (Seg 250). Operating capacity will be limited to 1,159 MDth/d in the West to East direction
through Segment 250.

At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026, and Gas Day Tuesday, April
28, 2026, through Gas Day Thursday, April 30, 2026, REX will be performing maintenance at its
Washington Courthouse Compressor Station (Segment 380). Operating capacity will be limited to the
following in the East to West direction through Segment 380:
• Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026: 2,981 MDth/d
• Gas Day Gas Day Tuesday, April 28, 2026: 2,954 MDth/d
• Gas Day Gas Day Wednesday, April 29, 2026, through Gas Day Thursday, April 30, 2026: 2,981
MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
DUKE MADISON
NEXUS Gas Transmission (U.S.)

04/13/2026- NEXUS Pipeline Conditions for 4/14/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 04/15/2026
Posting Date: 04/13/2026
Notice Identifier: 176504
Required Response Indicator Description: No response required

For Gas Day April 14, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Salinville
N/A
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Hanoverton
N/A
100%
100%
100%
67%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/13/2026- AGT Pipeline Conditions for 4/14/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/14/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/14/2026
Notice End Date: 04/15/2026
Posting Date: 04/13/2026
Notice Identifier: 176534
Required Response Indicator Description: No response required

For Gas Day April 14, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
38%
Cromwell
100%
100%
35%
Burrillville
100%
100%
12%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
70%
Iroquois Receipts
100%
100%
51%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
25%
G System
100%
100%
16%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DS - System Wide issued 4/9/26. 250 Dth / 6% Tolerance
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Gulf South Pipeline

Wilson Compressor Station Maintenance

UNSCORED
Informational
View original notice text
Pipeline: Gulf South Pipeline
Notice ID: 5037781
Notice Type: Maintenance
Status: Initiate
Posted: 2026-03-10T09:56:00+00:00
Effective: 2026-05-11T09:00:00+00:00
End: 2026-05-14T09:00:00+00:00
Subject: Wilson Compressor Station Maintenance
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116480
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 2 & 3)
Posted: Apr 13 2026 2:51PM
Effective: Apr 13 2026 2:45PM
End Date: Apr 14 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116480
Critical Notice Description: Critical notice
Posting Date/Time: Apr 13 2026 2:51PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 2 & 3)
Notice Effective Date/Time: Apr 13 2026 2:45PM
Notice End Date/Time: Apr 14 2026 8:59AM
Notice Text: Critical Notice Underperformance - ANR Red Deer (delivery) POI 57274 - (Intraday 2 & 3)Notice to Customers 4/13/26, (ANR Red Deer) location performance, Transwestern Pipeline is concerned about the performance of the following (ANR Red Deer) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 2 & 3. This could result in reductionsto the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 57274- ANR Red Deer (delivery)For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: ANR Red Deer (delivery) POI 57274
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116485
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 3)
Posted: Apr 13 2026 6:01PM
Effective: Apr 13 2026 6:01PM
End Date: Apr 14 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116485
Critical Notice Description: Critical notice
Posting Date/Time: Apr 13 2026 6:01PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 3)
Notice Effective Date/Time: Apr 13 2026 6:01PM
Notice End Date/Time: Apr 14 2026 8:59AM
Notice Text: Critical Notice Underperformance - ETC Grey Wolf - POI 100771 (Intraday 3)Notice to Customers 4/13/26 (ETC Grey Wolf) location performance, Transwestern Pipeline is concerned about the performance of the following (ETC Grey Wolf) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID-3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 100771 - ETC Grey Wolf For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomesreadily available.
Location: POI 100771 - ETC Grey Wolf
Energy Transfer

[Florida Gas Transmission] [Planned Service Outage] APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 2ND UPDATE

UNSCORED
Informational
View original notice text
Pipeline: Florida Gas Transmission
Notice ID: 62915
Notice Type: Planned Service Outage
Subject: APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 2ND UPDATE
Posted: Apr 13 2026 11:50 AM
Effective: Apr 13 2026 11:50 AM
End Date: May 1 2026 9:00 AM

Notice ID: 62915
Notice Type: Planned Service Outage
Critical: Y
Notice Status Description: Initiate
Reqrd Rsp Desc: No Response Required
Posting Date/Time: Apr 13 2026 11:50 AM
Subject: APRIL 2026 --- FGT WESTERN DIVISION AND MARKET AREA MAINTENANCE – 2ND UPDATE
Notice Effective Date/Time: Apr 13 2026 11:50 AM
Notice End Date/Time: May 1 2026 9:00 AM
Notice Text: FGT will be performing pipeline maintenance on the mainline between FGT Compressor Stations 6 and 7. This work will begin on April 14, 2026 and continue approximately through the end of gas day April 30, 2026. During this maintenance, FGT will schedule up to approximately 150,000 MMBtu/day through Station 6 and approximately 300,000 MMBtu/day through Station 7. During normal operations, FGT schedules up to 300,000 MMBtu/day through Station 6 and 465,000 MMBtu/day through Station 7.FGT maintenance at FGT Compressor Station 75 has been extended. This maintenance is to now be completed by the end of gas day April 30, 2026. During this maintenance FGT may continue to schedule up to 900,000 MMBtu/day through Station 75. During normal operations, FGT schedules up to 980,000 MMBtu/day through Station 75.FGT maintenance downstream of FGT Compressor Station 8 has been extended. This maintenance is to now be completed by the end of gas day April 20, 2026. During this maintenance FGT may continue to schedule up to 950,000 MMBtu/day through Station 8. During normal operations, FGT schedules up to 1,075,000 MMBtu/day through Station 8.FGT will be performing maintenance at FGT Compressor Station 10. This maintenance will start April 13, 2026, and is to be completed by end of gas day April 16, 2026. During this maintenance FGT may schedule up to 1,100,000 MMBtu/day through Station 10. During normal operations, FGT schedules up to 1,300,000 MMBtu/day through Station 10.FGT will continue maintenance downstream of FGT Compressor Station 12. This maintenance will continue through the end of April 2026. During this maintenance FGT may schedule up to 2,800,000 MMBtu/day through Station 12, During normal operations, FGT schedules up to 3,175,000 MMBtu/day through Station 12.
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #5

UNSCORED
Informational
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13648
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #5
Posted: 4/13/2026 1:10:12 PM
Effective: 4/13/2026 1:10:12 PM
End Date: 12/31/9000

TRAILBLAZER MAINTENANCE SCHEDULE APRIL 2026 – UPDATE #5
Trailblazer is rescheduling the Third Pary Bertrand Compressor Station Maintenance scheduled for Gas
Day Wednesday, April 15, 2026, to Gas Day Wednesday, April 22, 2026.
All other items remain the same as posted under notice ID 13634.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Gas Day Wednesday, April 22, 2026, Rockies Express Pipeline LLC (“REX”) will be performing
maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This maintenance event is
posted under notice ID 13647 on REX’s Electronic Bulletin Board (“EBB”). Operating capacity will be
limited to 803 MDth/d through Segment 20.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
TPC/SUMMIT HEREFORD RANCH LOCATION MAINTENANCE (LOCATION 60361)
On Gas Day Tuesday, April 7, 2026, through Gas Day Thursday, April 9, 2026 TPC will be performing
maintenance at the TPC/SUMMIT HEREFORD RANCH location (location 60361). TPC is not expecting this
outage to impact shippers, however, TPC will provide as much notice as possible with individual postings
on the EBB in the event capacity will be impacted.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026. Rockies Express Pipeline LLC
(“REX”) will be performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity.
This maintenance event is posted under notice ID 13588 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to 747 MDth/d through Segment 20.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #4

UNSCORED
Informational
View original notice text
Pipeline: Rockies Express Pipeline
Notice ID: 13647
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #4
Posted: 4/13/2026 1:08:53 PM
Effective: 4/13/2026 1:08:53 PM
End Date: 12/31/9000

REX MAINTENANCE SCHEDULE FOR APRIL 2026 – UPDATE #4
REX is rescheduling the Bertrand Compressor Station Maintenance scheduled for Gas Day Wednesday,
April 15, 2026, to Gas Day Wednesday, April 22, 2026.
All other items remain the same as posted under notice ID 13635.
DUKE MADISON LOCATION MAINTENANCE (LOC 60783)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Duke Madison Location (Location 60783). Operating capacity will be limited to 0
MDth/d at the DEI Madison Station (Location 60783).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
MEXICO COMPRESSOR STATION MAINTENANCE (SEG 300)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at its Mexico Compressor Station (Segment 300). There is no anticipated impact to the
capacity in the West to East direction through Segment 300.
SENECA COMPRESSOR STATION MAINTENANCE (SEG 400)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Seneca Compressor Station (Segment 400). Operating capacity will be limited to 0
MDth/d at the following Receipts:
• Markwest Seneca (Location 56116)
• Rover Noble (Location 60167)
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Monday, April 13, 2026, through Gas Day Friday, April 17, 2026, and Gas Day Tuesday, April
21, 2026, through Gas Day Sunday, April 26, 2026, REX will be performing maintenance at its
Chandlersville Compressor Station (Segment 380). Operating capacity will be limited to the following in
the East to West direction through Segment 380:
• Gas Day Monday, April 13, 2026: 3,023 MDth/d.
• Gas Day Tuesday, April 14, 2026, through Gas Day Friday, April 17, 2026: 2,972 MDth/d.
• Gas Day Tuesday, April 21, 2026, through Gas Day Friday, April 24, 2026: 2,837 MDth/d.

• Gas Day Saturday, April 25, 2026, through Gas Day Sunday, April 26, 2026: 2,935 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
COLUMBUS COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, April 14, 2026, through Gas Day Friday, Friday, April 17, 2026, REX will be
performing maintenance at its Columbus Compressor Station (Segment 380). Operating capacity will be
limited to 2,972 MDth/d in the East to West direction through Segment 380.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BAINBRIDGE COMPRESSOR STATION MAINTENANCE (SEG 330)
On Gas Day Monday, April 20, 2026, through Gas Day Friday, April 24, 2026, REX will be performing
maintenance at the Bainbridge Compressor Station (Segment 330). Operating capacity will be limited to
1,840 MDth/d in the East to West direction through Segment 330.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026, REX will be performing
maintenance at the Julesburg Compressor Station (Segment 240). Operating capacity will be limited to
1,079 MDth/d in the West to East direction through Segment 240.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
LOGAN COMPRESSOR STATION MAINTENANCE (LOC 60992)
On Gas Day Tuesday, April 21, 2026, REX will be performing maintenance at the Logan Compressor
Station (Location 60992). Operating capacity will be limited to 0 MDth/d at the REX/TIGT Logan Location
(60992).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Wednesday, April 22, 2026, REX will be performing maintenance at its Bertrand Compressor
Station (Seg 250). Operating capacity will be limited to 1,159 MDth/d in the West to East direction
through Segment 250.

At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026, and Gas Day Tuesday, April
28, 2026, through Gas Day Thursday, April 30, 2026, REX will be performing maintenance at its
Washington Courthouse Compressor Station (Segment 380). Operating capacity will be limited to the
following in the East to West direction through Segment 380:
• Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026: 2,981 MDth/d
• Gas Day Gas Day Tuesday, April 28, 2026: 2,954 MDth/d
• Gas Day Gas Day Wednesday, April 29, 2026, through Gas Day Thursday, April 30, 2026: 2,981
MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
DUKE MADISON
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #5

UNSCORED
Informational
View original notice text
Pipeline: Rockies Express Pipeline
Notice ID: 13654
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #5
Posted: 4/13/2026 4:59:59 PM
Effective: 4/13/2026 4:59:59 PM
End Date: 12/31/9000

REX MAINTENANCE SCHEDULE FOR APRIL 2026 – UPDATE #5
REX is updating the Chandlersville Compressor Station Maintenance for April 14th through April 17th to
2,928 MDth/d.
All other items remain the same as posted under notice ID 13647.
DUKE MADISON LOCATION MAINTENANCE (LOC 60783)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Duke Madison Location (Location 60783). Operating capacity will be limited to 0
MDth/d at the DEI Madison Station (Location 60783).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
MEXICO COMPRESSOR STATION MAINTENANCE (SEG 300)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at its Mexico Compressor Station (Segment 300). There is no anticipated impact to the
capacity in the West to East direction through Segment 300.
SENECA COMPRESSOR STATION MAINTENANCE (SEG 400)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Seneca Compressor Station (Segment 400). Operating capacity will be limited to 0
MDth/d at the following Receipts:
• Markwest Seneca (Location 56116)
• Rover Noble (Location 60167)
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Monday, April 13, 2026, through Gas Day Friday, April 17, 2026, and Gas Day Tuesday, April
21, 2026, through Gas Day Sunday, April 26, 2026, REX will be performing maintenance at its
Chandlersville Compressor Station (Segment 380). Operating capacity will be limited to the following in
the East to West direction through Segment 380:
• Gas Day Monday, April 13, 2026: 3,023 MDth/d.
• Gas Day Tuesday, April 14, 2026, through Gas Day Friday, April 17, 2026: 2,928 MDth/d.
• Gas Day Tuesday, April 21, 2026, through Gas Day Friday, April 24, 2026: 2,837 MDth/d.

• Gas Day Saturday, April 25, 2026, through Gas Day Sunday, April 26, 2026: 2,935 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
COLUMBUS COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, April 14, 2026, through Gas Day Friday, Friday, April 17, 2026, REX will be
performing maintenance at its Columbus Compressor Station (Segment 380). Operating capacity will be
limited to 2,972 MDth/d in the East to West direction through Segment 380.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BAINBRIDGE COMPRESSOR STATION MAINTENANCE (SEG 330)
On Gas Day Monday, April 20, 2026, through Gas Day Friday, April 24, 2026, REX will be performing
maintenance at the Bainbridge Compressor Station (Segment 330). Operating capacity will be limited to
1,840 MDth/d in the East to West direction through Segment 330.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026, REX will be performing
maintenance at the Julesburg Compressor Station (Segment 240). Operating capacity will be limited to
1,079 MDth/d in the West to East direction through Segment 240.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
LOGAN COMPRESSOR STATION MAINTENANCE (LOC 60992)
On Gas Day Tuesday, April 21, 2026, REX will be performing maintenance at the Logan Compressor
Station (Location 60992). Operating capacity will be limited to 0 MDth/d at the REX/TIGT Logan Location
(60992).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Wednesday, April 22, 2026, REX will be performing maintenance at its Bertrand Compressor
Station (Seg 250). Operating capacity will be limited to 1,159 MDth/d in the West to East direction
through Segment 250.

At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026, and Gas Day Tuesday, April
28, 2026, through Gas Day Thursday, April 30, 2026, REX will be performing maintenance at its
Washington Courthouse Compressor Station (Segment 380). Operating capacity will be limited to the
following in the East to West direction through Segment 380:
• Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026: 2,981 MDth/d
• Gas Day Gas Day Tuesday, April 28, 2026: 2,954 MDth/d
• Gas Day Gas Day Wednesday, April 29, 2026, through Gas Day Thursday, April 30, 2026: 2,981
MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
DUKE MADISON
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-11-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/10/2026 2:22:43PM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 2:22:43 PM	Notice ID: 400552
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-11-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Saturday, April 11, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through approx 1% of SA due to nominations in excess of operational capacity; 922 Dths

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 57% of SIPss due to nominations in excess of operational capacity; 52,040 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         MLV 548 (Segment 542 BH) - through 100% of SA due to scheduled maintenance and nominations in excess of operational capacity; 1,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,691 Dths

·         MLV 314 East (Segment 314 BH) - through approx 86% of SOP due to nominations in excess of operational capacity; 291,527 Dths

·         STA 315 (Segment 315 BH) - through approx 78% of SOP due to nominations in excess of operational capacity; 343,429 Dths

·         STA 317 (Segment 317 BH) - through approx 54% of SOP due to nominations in excess of operational capacity; 57,051 Dths

·         STA 321 (Segment 321 FH) - through approx 46% of SOP due to nominations in excess of operational capacity; 495,670 Dths

·         STA 325 (Segment 324 FH) - through approx 9% of SOP due to nominations in excess of operational capacity; 46,584 Dths

·         MLV 330 (Segment 324 FH) - through approx 18% of SOP due to nominations in excess of operational capacity; 111,147 Dths

·         Z5 HC North (Segment 299 FH) - through approx 85% of SOP due to nominations in excess of operational capacity; 575,216 Dths

·         STA 245 (Segment 245 FH) - through approx 83% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 602,116 Dths

·         STA 249 (Segment 249 FH) - through approx 60% of SOP due to nominations in excess of operational capacity; 293,298 Dths

·         MLV 273 (Segment 284 FH) - through approx 97% of SOP due to nominations in excess of operational capacity; 262,654 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-11-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/10/2026 7:09:13PM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 7:09:13 PM	Notice ID: 400559
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-11-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Saturday, April 11, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

OFO DAILY CRITICAL DAY 1 FOR OVER-DELIVERIES INTO THE SYSTEM AND UNDER-TAKES OUT OF THE SYSTEM FOR VARIOUS PARTS OF THE SYSTEM (SEE NOTICE IDENTIFIER 400542) FOR ALL LMMAS, SAS ACTING AS BALANCING PARTIES AND LMPAS ONLY

METER RESTRICTIONS

·         ETP/TGP Wharton County Transport Ex Receipt Meter (Pin 411911) - through approx 11% of SA increases due to nominations in excess of operational capacity; 992 Dths

SEGMENT RESTRICTIONS

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,674 Dths

·         MLV 314 East (Segment 314 BH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 163,934 Dths

·         STA 315 (Segment 315 BH) - through approx 69% of SOP increases due to nominations in excess of operational capacity; 163,563 Dths

·         STA 317 (Segment 317 BH) - through approx 77% of SOP increases due to nominations in excess of operational capacity; 50,623 Dths

·         STA 321 (Segment 321 FH) - through approx 74% of SOP increases due to nominations in excess of operational capacity; 181,948 Dths

·         MLV 330 (Segment 324 FH) - through approx 7% of SOP increases due to nominations in excess of operational capacity; 6,255 Dths

·         Z5hc North (Segment 299 FH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 157,959 Dths

·         STA 245 (Segment 245 FH) - through approx 82% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 188,326 Dths

·         STA 249 (Segment 249 FH) - through approx 63% of SOP increases due to nominations in excess of operational capacity; 96,716 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 238,521 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

...
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-10-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/10/2026 7:45:09PM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 7:45:09 PM	Notice ID: 400560
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-10-2026 ID3
Notice Text:

Effective ITRD3 for the gas day of Friday, April 10, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

NONE

 

SEGMENT RESTRICTIONS

NONE

 

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

...
NEXUS Gas Transmission (U.S.)

04/12/2026- NEXUS Pipeline Conditions for 4/13/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/13/2026
Notice End Date: 04/14/2026
Posting Date: 04/12/2026
Notice Identifier: 176442
Required Response Indicator Description: No response required

For Gas Day April 13, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Salinville
N/A
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Hanoverton
N/A
100%
100%
100%
20%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/12/2026- AGT Pipeline Conditions for 4/13/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/13/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/13/2026
Notice End Date: 04/14/2026
Posting Date: 04/12/2026
Notice Identifier: 176471
Required Response Indicator Description: No response required

For Gas Day April 13, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
34%
Cromwell
100%
100%
24%
Burrillville
100%
100%
18%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
72%
Iroquois Receipts
100%
100%
60%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
32%
G System
100%
100%
34%
C System
Yes
Deliveries to Texas Eastern
100%
100%
100%
100%
87%
Planned Outage
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DS - System Wide issued 4/9/26. 250 Dth / 6% Tolerance
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
Due to the planned Hanover station maintenance, beginning Gas Day April 13, 2025, AGT will restrict 100% of 3B nominations delivering to Texas Eastern (TE). In addition, restrictions to 3A and 2C nominations delivering to TE may be necessary for future Gas Days.
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 4/12/26 (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116457
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/12/26 (Intraday 2 & 3)
Posted: Apr 12 2026 2:17PM
Effective: Apr 12 2026 2:07PM
End Date: Apr 13 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116457
Critical Notice Description: Critical notice
Posting Date/Time: Apr 12 2026 2:17PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/12/26 (Intraday 2 & 3)
Notice Effective Date/Time: Apr 12 2026 2:07PM
Notice End Date/Time: Apr 13 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple Points - Gas Day 4/12/26 (Intraday 2 & 3) Notice to Customers, Gas Day 4/12/26, Transwestern Pipeline is concerned about the performance of multiple locations.If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 2 & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 79087 - ETC HalleyPOI 100734 - 3 BearPOI 500538 - Red Cedar Arkansas LoopFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
NEXUS Gas Transmission (U.S.)

04/11/2026- NEXUS Pipeline Conditions for 4/12/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/12/2026
Notice End Date: 04/13/2026
Posting Date: 04/11/2026
Notice Identifier: 176418
Required Response Indicator Description: No response required

For Gas Day April 12, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Salinville
N/A
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Hanoverton
N/A
100%
100%
100%
11%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/11/2026- AGT Pipeline Conditions for 4/12/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/12/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/12/2026
Notice End Date: 04/13/2026
Posting Date: 04/11/2026
Notice Identifier: 176426
Required Response Indicator Description: No response required

For Gas Day April 12, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
50%
Cromwell
100%
100%
38%
Burrillville
100%
100%
39%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
77%
Iroquois Receipts
100%
100%
60%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
32%
G System
100%
100%
47%
C System
Yes
Centerville-Transco Receipts (1)
100%
100%
10%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116423
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Apr 11 2026 8:35AM
Effective: Apr 11 2026 8:31AM
End Date: Apr 12 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116423
Critical Notice Description: Critical notice
Posting Date/Time: Apr 11 2026 8:35AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 11 2026 8:31AM
Notice End Date/Time: Apr 12 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAApril 11, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, April 11, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-09-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/08/2026 2:15:52PM	Notice End Date/Time:  04/09/2026 9:00:00am
Post Date/Time:  4/8/2026 2:15:52 PM	Notice ID: 400502
Reqrd Rsp:  1	Rsp Date:  04/08/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-09-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Thursday, April 09, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of IT due to operational concerns; 10,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 53% of SIPss due to nominations in excess of operational capacity; 52,591 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through approx 20% of IT (through a rate of .1444) due to nominations in excess of operational capacity; 25,458 Dths

·         STA 823 (Segment 823 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 30,906 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,756 Dths

·         MLV 314 East (Segment 314 BH) - through approx 85% of SOP due to nominations in excess of operational capacity; 327,296 Dths

·         STA 315 (Segment 315 BH) - through approx 79% of SOP due to nominations in excess of operational capacity; 407,243 Dths

·         STA 317 (Segment 317 BH) - through approx 72% of SOP due to nominations in excess of operational capacity; 141,835 Dths

·         STA 321 (Segment 321 FH) - through approx 63% of SOP due to nominations in excess of operational capacity; 659,267 Dths

·         STA 325 (Segment 324 FH) - through approx 41% of SOP due to nominations in excess of operational capacity; 193,214 Dths

·         MLV 330 (Segment 324 FH) - through approx 33% of SOP due to nominations in excess of operational capacity; 142,113 Dths

·         MLV 336 East (Segment 336 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 47,250 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 135,059 Dths

·         Z5hc North (Segment 299 FH) - through approx 89% of SOP due to nominations in excess of operational capacity; 560,620 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 864,553 Dths

·         STA 249 (Segment 249 FH) - through approx 90% of SOP due to nominations in excess of operational capacity; 449,267 Dths

·         MLV 256 East (Segment 256 FH) - through approx 47% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 66,184 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 10% of SOP due to nominations in excess of operational capacity; 15,945 Dths

·         MLV 273 (Segment 284 FH) - through approx 95% of SOP due to nominations in excess of operational capacity; 276,321 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-09-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/08/2026 6:54:49PM	Notice End Date/Time:  04/09/2026 9:00:00am
Post Date/Time:  4/8/2026 6:54:49 PM	Notice ID: 400510
Reqrd Rsp:  1	Rsp Date:  04/08/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-09-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Thursday, April 09, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through approx 3% of PS IT (through a rate of .1444) due to nominations in excess of operational capacity; 28,459 Dths

·         STA 823 (Segment 823 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 13,286 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 359,016 Dths

·         MLV 314 East (Segment 314 BH) - through approx 78% of SOP increases due to nominations in excess of operational capacity; 171,121 Dths

·         STA 315 (Segment 315 BH) - through approx 59% of SOP increases due to nominations in excess of operational capacity; 148,666 Dths

·         STA 317 (Segment 317 BH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 80,126 Dths

·         STA 321 (Segment 321 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 303,505 Dths

·         STA 325 (Segment 324 FH) - through approx 57% of SOP increases due to nominations in excess of operational capacity; 96,753 Dths

·         MLV 330 (Segment 324 FH) - through approx 89% of SOP increases due to nominations in excess of operational capacity; 63,910 Dths

·         STA 224 (Segment 224 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 109,858 Dths

·         Z5hc North (Segment 299 FH) - through approx 96% of SOP increases due to nominations in excess of operational capacity; 172,456 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 390,004 Dths

·         STA 249 (Segment 249 FH) - through approx 90% of SOP increases due to nominations in excess of operational capacity; 204,768 Dths

·         MLV 256 East (Segment 256 FH) - through approx 80% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 51,526 Dths

·         STA 261 Discharge East (Segment 261 FH) - through approx 18% of SOP increases due to nominations in excess of operational capacity; 2,830 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 233,747 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-08-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/08/2026 7:41:02PM	Notice End Date/Time:  04/09/2026 9:00:00am
Post Date/Time:  4/8/2026 7:41:02 PM	Notice ID: 400511
Reqrd Rsp:  1	Rsp Date:  04/08/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-08-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Wednesday, April 08, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         HICKORY/TGP Mohawk Road Power Plt Delivery Meter (Pin 50789) - through approx 29% of PAYBACK TGP increases due to nominations in excess of operational capacity; 7,209 Dths

SEGMENT RESTRICTIONS

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 2,468 Dths

·         MLV 314 East (Segment 314 BH) - through approx 24% of SOP increases due to nominations in excess of operational capacity; 18,768 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 70,708 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

STORAGE RESTRICTIONS

NONE

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

 

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

TGP FIRST SUMMER MAINTENANCE MTG 4-21-26

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/09/2026 6:55:15AM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 6:55:15 AM	Notice ID: 400518
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  TGP FIRST SUMMER MAINTENANCE MTG 4-21-26
Notice Text:

TGP's FIRST 2026 SUMMER MAINTENANCE TEAMS MEETING 4-21-2026

Tennessee Gas Pipeline Company, LLC (“Tennessee”) will be hosting its first 2026 TEAMS Summer Maintenance meeting to provide customers and other interested parties an overview of Tennessee's upcoming Summer Scheduled Maintenance for the remaining days of April and all of May, June and July 2026 on Tuesday, April 21, 2026, from 1:30 PM CST to 2:30 PM CST via TEAMS only.  Additionally, there will be a review of upcoming scheduled maintenance on the Stagecoach, Arlington and Twin Tier systems.  There will be a question and answer segment immediately following.

Please see TEAMS info below:

TGP Summer Maintenance and Outages TEAMS Meeting

 

Join on your computer, mobile app or room device

________________________________________________________________________________

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/23579493131869?p=w4N7s4IHBI1GQNbITK

Meeting ID: 235 794 931 318 69

Passcode: Vg6AB2AN

Need help | System reference

Dial in by phone

+1 346-410-0970,,694003306# United States, Houston

Find a local number

Phone conference ID: 694 003 306#

For organizers: Meeting options | Reset dial-in PIN

________________________________________________________________________________

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-10-2026 TIMELY CYCLE

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/09/2026 2:26:56PM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 2:26:56 PM	Notice ID: 400527
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-10-2026 TIMELY CYCLE
Notice Text:

Effective Timely Cycle (9:00) for the gas day of Friday, April 10, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

METER RESTRICTIONS

·         TGP/SNG Bear Creek Injection Bienvi Delivery Meter (Pin 405367) - through 100% of SOP due to operational concerns; 20,000 Dths

·         AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 30% of SIPss due to nominations in excess of operational capacity; 36,859 Dths

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through approx 21% of IT due to nominations in excess of operational capacity; 25,532 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 5,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 358,689 Dths

·         MLV 314 East (Segment 314 BH) - through approx 87% of SOP due to nominations in excess of operational capacity; 332,542 Dths

·         STA 315 (Segment 315 BH) - through approx 80% of SOP due to nominations in excess of operational capacity; 401,882 Dths

·         STA 317 (Segment 317 BH) - through approx 74% of SOP due to nominations in excess of operational capacity; 141,745 Dths

·         STA 321 (Segment 321 FH) - through approx 54% of SOP due to nominations in excess of operational capacity; 581,854 Dths

·         STA 325 (Segment 324 FH) - through approx 24% of SOP due to nominations in excess of operational capacity; 117,848 Dths

·         MLV 330 (Segment 324 FH) - through approx 19% of SOP due to nominations in excess of operational capacity; 107,755 Dths

·         MLV 336 East (Segment 336 FH) - through approx 95% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 47,974 Dths

·         Z5hc North (Segment 299 FH) - through approx 80% of SOP due to nominations in excess of operational capacity; 493,293 Dths

·         STA 245 (Segment 245 FH) - through approx 88% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 746,044 Dths

·         STA 249 (Segment 249 FH) - through approx 69% of SOP due to nominations in excess of operational capacity; 365,477 Dths

·         MLV 273 (Segment 284 FH) - through approx 94% of SOP due to nominations in excess of operational capacity; 258,074 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-10-2026 EC

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/09/2026 6:44:54PM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 6:44:54 PM	Notice ID: 400536
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-10-2026 EC
Notice Text:

Effective Evening Cycle (9:00) for the gas day of Friday, April 10, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

 

SEGMENT RESTRICTIONS

·         MLV 406 (Segment 406 BH) - through 100% of IT increases due to nominations in excess of operational capacity; 25,532 Dths

·         STA 860 (Segment 860 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 20,000 Dths

·         STA 204 (Segment 204 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 5,000 Dths

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 358,657 Dths

·         MLV 314 East (Segment 314 BH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 211,228 Dths

·         STA 315 (Segment 315 BH) - through approx 75% of SOP increases due to nominations in excess of operational capacity; 205,666 Dths

·         STA 317 (Segment 317 BH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 83,292 Dths

·         STA 321 (Segment 321 FH) - through approx 82% of SOP increases due to nominations in excess of operational capacity; 276,980 Dths

·         STA 325 (Segment 324 FH) - through approx 26% of SOP increases due to nominations in excess of operational capacity; 36,483 Dths

·         MLV 330 (Segment 324 FH) - through approx 51% of SOP increases due to nominations in excess of operational capacity; 50,532 Dths

·         Z5hc North (Segment 299 FH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 148,013 Dths

·         STA 245 (Segment 245 FH) - through approx 88% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 219,441 Dths

·         STA 249 (Segment 249 FH) - through approx 70% of SOP increases due to nominations in excess of operational capacity; 122,256 Dths

·         MLV 273 (Segment 284 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 230,131 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

RESTRICTIONS FOR 04-09-2026 ID3

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  PIPELINE CONDITIONS	Notice Type Desc (2):  CURRENT PIPELINE CONDITIONS
Notice Eff Date/Time:  04/09/2026 7:35:55PM	Notice End Date/Time:  04/10/2026 9:00:00am
Post Date/Time:  4/9/2026 7:35:55 PM	Notice ID: 400537
Reqrd Rsp:  1	Rsp Date:  04/09/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  RESTRICTIONS FOR 04-09-2026 ID3
Notice Text:

Effective Intraday 3 Cycle (22:00) for the gas day of Thursday, April 09, 2026 Tennessee restricted the following:

OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS

NONE

SEGMENT RESTRICTIONS

·         STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 4,467 Dths

·         MLV 314 East (Segment 314 BH) - through approx 51% of SOP increases due to nominations in excess of operational capacity; 61,813 Dths

·         STA 317 (Segment 317 BH) - through approx 22% of SOP increases due to nominations in excess of operational capacity; 12,783 Dths

·         STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 37,582 Dths

LINEPACK RESTRICTIONS

Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.

 

 

 

 

STORAGE RESTRICTIONS

NONE

 

 

**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.

**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.

**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.

If you have any questions, please contact your Scheduler.

 

..
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 555 1B EFF 4-10

UNSCORED
Informational
View original notice text
Interstate
Other
Midstream
Informational Postings
Capacity
Gas Electric Coordination
Gas Quality
Index of Customers
Locations
Notices
Posted Imbalances
Regulatory
Standards of Conduct
Tariff
Transactional Reporting
Info Lookup
Other
Downloads
Search
Customer Activities
Site Map
	
	
NOTICE DETAIL
	
PDF
TEXT
Return To Results
TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE	Critical: Y
Notice Type Desc (1):  MAINTENANCE	Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  04/10/2026 10:27:36AM	Notice End Date/Time:  04/11/2026 9:00:00am
Post Date/Time:  4/10/2026 10:27:36 AM	Notice ID: 400544
Reqrd Rsp:  1	Rsp Date:  04/10/2026
Notice Stat Desc:  INITIATE	Prior Notice: 
Subject:  EMERGENT REPAIR AT STA 555 1B EFF 4-10
Notice Text:

 

EMERGENT REPAIR AT STA 555 UNIT 1B EFFECTIVE 4-10-2026

 

Pursuant to Article XII of the General Terms and Conditions of Tennessee's FERC Gas Tariff, Tennessee is posting notice of an emergent repair issue at Station 555 near Collinwood, TN (Segment 548).  Tennessee is evaluating an issue with Unit 1B at the station.  Tennessee is estimating the current impact to be up to 350,000 Dths.  Based upon current nominations, restrictions up to 100% of Secondary Out of the Path (SOP) nominations pathed through Segment 548 BH may be required. 

 

Updates will be posted as more information becomes available.

 

Please contact your Scheduler if you have any questions.

 

 

 

 

..
NEXUS Gas Transmission (U.S.)

04/10/2026- NEXUS Pipeline Conditions for 04/11/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 04/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/11/2026
Notice End Date: 04/12/2026
Posting Date: 04/10/2026
Notice Identifier: 176355
Required Response Indicator Description: No response required

For Gas Day April 11, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Salinville
N/A
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/10/2026- AGT Pipeline Conditions for 4/11/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/11/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/11/2026
Notice End Date: 04/12/2026
Posting Date: 04/10/2026
Notice Identifier: 176363
Required Response Indicator Description: No response required

For Gas Day April 11, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
57%
Cromwell
100%
100%
43%
Burrillville
100%
100%
36%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
77%
Iroquois Receipts
100%
100%
60%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
32%
G System
100%
100%
44%
C System
Yes
Centerville-Transco Receipts (1)
100%
100%
15%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Gulf Run Transmission] [Maint] Westdale Planned Maintenance Update

UNSCORED
Informational
View original notice text
Pipeline: Gulf Run Transmission
Notice ID: 62843
Notice Type: Maint
Subject: Westdale Planned Maintenance Update
Posted: 2026-04-10 08:11:00.0
Effective: 2026-04-21 09:00:00.0
End Date: 

Notice ID: 62843
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-10 08:11:00.0
Subject: Westdale Planned Maintenance Update
Notice Effective Date/Time: 2026-04-21 09:00:00.0
Notice End Date/Time: 2026-04-25 09:00:00.0
Notice Text: New Information Posted 4/10/26: This planned maintenance is still scheduled to begin Tuesday, April 21st, 2026, with an expected completion date of Saturday, April 25th, 2026, at 09:00. · April 21st o There will be zero flow to Golden Pass Pipeline (MP# 808311), Gulf Run will still be accepting nominations at Trunkline Vinton (MP# 292545). · April 22nd through April 25th o During this planned maintenance, Zone 2 deliveries will be limited to 1,200,000 Dth/d. All other details from the previous posting (Critical Notice #62324) remain unchanged. Previously Posted 3/13/2026 This Action Alert is being issued pursuant to Sections 4 and 7, GT&C, of Gulf Run’s Tariff to notify shippers of planned maintenance at Gulf Run’s Westdale Compressor Station located in Red River Parish, Louisiana and in Gulf Run’s Zone 1. This planned maintenance is scheduled to begin Tuesday, April 21st, 2026, with an expected completion date of Saturday, April 25th, 2026, at 09:00. · April 21st o there will be zero flow to Zone 2 · April 22nd through April 25th o During this planned maintenance, Zone 2 deliveries will be limited to 1,200,000 Dth/d. Gulf Run will evaluate nominations, on a case-by-case basis, based on daily operations to alleviate impacts to the extent possible. During this planned maintenance, shippers should nominate from their contractual MRO location to their contractual MDO location to reduce risk of scheduling reductions. Should any of the details of this posting change, Gulf Run will notify its shippers and update this notice accordingly. Gulf Run will schedule nominations, if needed, on each impacted day in accordance with its tariff. This alert will remain in effect until the completion of the maintenance. If you have any questions concerning this alert, please contact your Scheduling Representative.
Energy Transfer

[Enable Mississippi River Transmission] [Maint] Fountain Hill Maintenance

UNSCORED
Informational
View original notice text
Pipeline: Enable Mississippi River Transmission (MRT)
Notice ID: 62778
Notice Type: Maint
Subject: Fountain Hill Maintenance
Posted: 2026-04-07 14:51:00.0
Effective: 2026-05-19 21:00:00.0
End Date: 

Notice ID: 62778
Notice Type: MAI
Critical: Y
Reqrd Rsp Desc: No Response Required
Posting Date/Time: 2026-04-07 14:51:00.0
Subject: Fountain Hill Maintenance
Notice Effective Date/Time: 2026-05-19 21:00:00.0
Notice End Date/Time: 2026-05-21 09:00:00.0
Notice Text: This System Protection Warning (SPW) is being issued by MRT to notify shippers of a planned maintenance on MRT’s Fountain Hill Compressor Station located in Ashley County, Arkansas. This will result in a throughput limit of 300,000 Dth/D southbound through the station. The planned maintenance on the Fountain Hill Compressor Station will begin Tuesday May 19th, 2026, at 09:00 and an anticipated completion date of Thursday May 21st, 2026, at 09:00. During this time, nominations and allocations to delivery points located south of MRT’s Fountain Hill compressor station will be subject to the following criteria: · Nominations and allocations will need to be within their primary path and primary direction of flow. · Nominations and allocations will not be allowed to exceed their Line Priority, Rate Zone Capacity or Line Capacity. · Daily activity resulting in long positions may not be allowed during this period. · Make up of short positions may not be allowed during this period. Based on current nominations, MRT anticipates impacts to primary firm services. If you have any questions concerning this Alert, please contact your Scheduling Representative.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Red Cedar Arkansas Loop POI 500538 - (Intraday 1, 2, & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116384
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Red Cedar Arkansas Loop POI 500538 - (Intraday 1, 2, & 3)
Posted: Apr 10 2026 10:22AM
Effective: Apr 10 2026 10:18AM
End Date: Apr 11 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116384
Critical Notice Description: Critical notice
Posting Date/Time: Apr 10 2026 10:22AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Red Cedar Arkansas Loop POI 500538 - (Intraday 1, 2, & 3)
Notice Effective Date/Time: Apr 10 2026 10:18AM
Notice End Date/Time: Apr 11 2026 8:59AM
Notice Text: Critical Notice Underperformance - Red Cedar Arkansas Loop POI 500538 - (Intraday 1, 2, & 3)Notice to Customers 4/10/26, (Red Cedar Arkansas Loop) location performance, Transwestern Pipeline is concerned about the performance of the following (Red Cedar Arkansas Loop) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 1, 2, & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 500538 - Red Cedar Arkansas LoopFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time.All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updatedinformation. Updates to this notice will be posted as current information becomes readily available.
Location: POI 500538 - Red Cedar Arkansas Loop
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - BP IKAV Florida POI 500536 - (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116409
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - BP IKAV Florida POI 500536 - (Intraday 3)
Posted: Apr 10 2026 6:30PM
Effective: Apr 10 2026 6:26PM
End Date: Apr 11 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116409
Critical Notice Description: Critical notice
Posting Date/Time: Apr 10 2026 6:30PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - BP IKAV Florida POI 500536 - (Intraday 3)
Notice Effective Date/Time: Apr 10 2026 6:26PM
Notice End Date/Time: Apr 11 2026 8:59AM
Notice Text: Critical Notice Underperformance - BP IKAV Florida POI 500536 - (Intraday 3)Notice to Customers 4/10/26, (BP IKAV Florida) location performance, Transwestern Pipeline is concerned about the performance of the following (BP IKAV Florida) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. BP (IKAV) Florida - POI 500536For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: BP (IKAV) Florida - POI 500536
Texas Eastern Transmission (TETCO)

04/06/2026- TE Operational Flow Order -- LIFTED EFF 4/6

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: TE Operational Flow Order -- LIFTED EFF 4/6
Notice Type: Operational Flow Order
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/06/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176162
Prior Notice Identifier: 175950
Required Response Indicator Description: No response required

Zone
Gas Day April 5
Gas Day April 6 and until further notice
M1-24"
OFO in Effect: No Due Shipper 8%/250
No OFO*
M1-30"
OFO in Effect: No Due Shipper 8%/250
No OFO*
M2-24"
OFO in Effect: No Due Shipper 5%/250
No OFO*
M2-30"
OFO in Effect: No Due Shipper 5%/250
No OFO*
OFO in Effect: No Due Shipper 5%/250
No OFO*
ETX
OFO in Effect: No Due Shipper 8%/250
No OFO*
STX
OFO in Effect: No Due Shipper 8%/250
No OFO*
WLA
OFO in Effect: No Due Shipper 8%/250
No OFO*
ELA
OFO in Effect: No Due Shipper 8%/250
No OFO*
Customer Specific
System Wide OFO in Effect
No OFO
Texas Eastern Transmission (TETCO)

04/09/2026- Lebanon Station Planned Outage -- COMPLETE

UNSCORED
Informational
View original notice text
TSP Name: Texas Eastern Transmission, LP
Subject: Lebanon Station Planned Outage -- COMPLETE
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/09/2026
Notice End Date: 07/08/2026
Posting Date: 04/09/2026
Notice Identifier: 176302
Required Response Indicator Description: No response required
NEXUS Gas Transmission (U.S.)

04/06/2026- NEXUS Pipeline Conditions for 4/7/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/07/2026
Notice End Date: 04/08/2026
Posting Date: 04/06/2026
Notice Identifier: 176175
Required Response Indicator Description: No response required

For Gas Day April 7, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Colerain
N/A
100%
100%
100%
100%
100%
21%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)

04/07/2026- NEXUS Pipeline Conditions for 4/8/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/08/2026
Notice End Date: 04/09/2026
Posting Date: 04/07/2026
Notice Identifier: 176220
Required Response Indicator Description: No response required

For Gas Day April 8, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Colerain
N/A
100%
100%
100%
100%
100%
20%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)

04/08/2026- NEXUS Pipeline Conditions for 4/9/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/9/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/09/2026
Notice End Date: 04/10/2026
Posting Date: 04/08/2026
Notice Identifier: 176261
Required Response Indicator Description: No response required

For Gas Day April 9, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Colerain
N/A
100%
100%
100%
100%
100%
23%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
NEXUS Gas Transmission (U.S.)

04/09/2026- NEXUS Pipeline Conditions for 4/10/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 4/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/10/2026
Notice End Date: 04/11/2026
Posting Date: 04/09/2026
Notice Identifier: 176304
Required Response Indicator Description: No response required

For Gas Day April 10, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Salinville
N/A
100%
100%
100%
100%
100%
100%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Maritimes & Northeast U.S.

04/06/2026- MNUS Imbalance Notice -- Update

UNSCORED
Informational
View original notice text
TSP Name: Maritimes & Northeast Pipeline, L.L.C. (U.S.)
Subject: MNUS Imbalance Notice -- Update
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/06/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176164
Prior Notice Identifier: 175953
Required Response Indicator Description: No response required
Maritimes & Northeast Canada

04/06/2026- MNCA Imbalance Notice -- UPDATE

UNSCORED
Informational
View original notice text
TSP Name: Maritimes & Northeast Pipeline Limited Partnership (Canada)
Subject: MNCA Imbalance Notice -- UPDATE
Notice Type: Other
Critical Notice Description: Critical notice
Notice Status Description: Supersede
Notice Effective Date: 04/06/2026
Notice End Date: 07/05/2026
Posting Date: 04/06/2026
Notice Identifier: 176165
Prior Notice Identifier: 175952
Required Response Indicator Description: No response required
Algonquin Gas Transmission

04/06/2026- AGT Pipeline Conditions for 4/7/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/7/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/07/2026
Notice End Date: 04/08/2026
Posting Date: 04/06/2026
Notice Identifier: 176202
Required Response Indicator Description: No response required

For Gas Day April 7, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
83%
Cromwell
100%
100%
77%
Burrillville
100%
100%
79%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
63%
Iroquois Receipts
100%
100%
49%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
44%
G System
100%
100%
53%
C System
Yes
Centerville-Transco Receipts (1)
86%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 4/6/26. 250 Dth / 5% Tolerance
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/07/2026- AGT Pipeline Conditions for 4/8/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/8/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/08/2026
Notice End Date: 04/09/2026
Posting Date: 04/07/2026
Notice Identifier: 176239
Required Response Indicator Description: No response required

For Gas Day April 8, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
86%
Cromwell
100%
100%
82%
Burrillville
100%
100%
85%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
46%
Iroquois Receipts
100%
100%
48%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
38%
G System
100%
100%
61%
C System
Yes
Centerville-Transco Receipts (1)
85%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DP - System Wide issued 4/6/26. 250 Dth / 5% Tolerance
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/08/2026- AGT Pipeline Conditions for 4/9/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/9/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/09/2026
Notice End Date: 04/10/2026
Posting Date: 04/08/2026
Notice Identifier: 176271
Required Response Indicator Description: No response required

For Gas Day April 9, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
79%
Cromwell
100%
100%
71%
Burrillville
100%
100%
57%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
51%
Iroquois Receipts
100%
100%
47%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
39%
G System
100%
100%
47%
C System
Yes
Centerville-Transco Receipts (1)
71%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

04/09/2026- AGT Pipeline Conditions for 4/10/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 4/10/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/10/2026
Notice End Date: 04/11/2026
Posting Date: 04/09/2026
Notice Identifier: 176313
Required Response Indicator Description: No response required

For Gas Day April 10, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
62%
Cromwell
100%
100%
54%
Burrillville
100%
100%
35%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
45%
Iroquois Receipts
100%
100%
50%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
33%
G System
100%
100%
46%
C System
Yes
Centerville-Transco Receipts (1)
71%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
---
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
Stay Balanced
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 4/9/26 (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116360
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/9/26 (Intraday 2 & 3)
Posted: Apr 9 2026 2:18PM
Effective: Apr 9 2026 2:13PM
End Date: Apr 10 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116360
Critical Notice Description: Critical notice
Posting Date/Time: Apr 9 2026 2:18PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/9/26 (Intraday 2 & 3)
Notice Effective Date/Time: Apr 9 2026 2:13PM
Notice End Date/Time: Apr 10 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple Points - Gas Day 4/9/26 (Intraday 2 & 3) Notice to Customers, Gas Day 4/9/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 2 & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 78423 - Enterprise ChacoPOI 500238 - IACX Red BluffFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/9/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116368
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/9/26 (Intraday 3)
Posted: Apr 9 2026 5:56PM
Effective: Apr 9 2026 5:54PM
End Date: Apr 10 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116368
Critical Notice Description: Critical notice
Posting Date/Time: Apr 9 2026 5:56PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/9/26 (Intraday 3)
Notice Effective Date/Time: Apr 9 2026 5:54PM
Notice End Date/Time: Apr 10 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/9/26 (Intraday 3) Notice to Customers, Gas Day 4/9/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 100771 - ETC Grey WolfPOI 78423 - Enterprise ChacoPOI 500239 - IACX Bitter LakesPOI 500533 - NWPL La PlataPOI 500538 - Red Cedar Ark LoopPOI 100730 - Targa WildcatFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple points
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - IACX Red Bluff POI 500238- (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116326
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - IACX Red Bluff POI 500238- (Intraday 2 & 3)
Posted: Apr 8 2026 2:42PM
Effective: Apr 8 2026 2:40PM
End Date: Apr 9 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116326
Critical Notice Description: Critical notice
Posting Date/Time: Apr 8 2026 2:42PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - IACX Red Bluff POI 500238- (Intraday 2 & 3)
Notice Effective Date/Time: Apr 8 2026 2:40PM
Notice End Date/Time: Apr 9 2026 8:59AM
Notice Text: Critical Notice Underperformance - IACX Red Bluff POI 500238- (Intraday 2 & 3)Notice to Customers 4/8/26, (IACX Red Bluff) location performance, Transwestern Pipeline is concerned about the performance of the following (IACX Red Bluff) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 2 & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 500238 - IACX Red Bluff For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 500238 - IACX Red Bluff
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116273
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Apr 7 2026 7:55AM
Effective: Apr 7 2026 7:54AM
End Date: Apr 8 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116273
Critical Notice Description: Critical notice
Posting Date/Time: Apr 7 2026 7:55AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 7 2026 7:54AM
Notice End Date/Time: Apr 8 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAApril 7, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, April 7, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
Energy Transfer

[Transwestern Pipeline] [Force Majeure] Force Majeure Event - La Plata Compressor Station. 4/7 thru 4/14/26.

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116288
Notice Type: Force Majeure
Subject: Force Majeure Event - La Plata Compressor Station. 4/7 thru 4/14/26.
Posted: Apr 7 2026 2:19PM
Effective: Apr 7 2026 2:13PM
End Date: Apr 15 2026 8:59AM

Notice Type Description: Force Majeure
Notice Identifier: 116288
Critical Notice Description: Critical notice
Posting Date/Time: Apr 7 2026 2:19PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Force Majeure Event - La Plata Compressor Station. 4/7 thru 4/14/26.
Notice Effective Date/Time: Apr 7 2026 2:13PM
Notice End Date/Time: Apr 15 2026 8:59AM
Notice Text: April 7, 2026To: All Transwestern Pipeline CustomersSubject: Force Majeure Event - La Plata Compressor Station (Located on the San Juan Lateral) Reason: The La Plata Compressor Station has experienced a mechanical failure.Gas Day April 7, 2026 (Intraday 2)La Plata Compressor Station Capacity will be reduced from 500,000 MMBtu/d to 270,000 MMBtu/d.Gas Day April 15, 2026La Plata Compressor Station Capacity will increase from 270,000 MMBtu/d to 500,00 MMBtu/d.La Plata Interconnects affected:POI 500536 - BP Florida POI 500535 - Harvest/IgnacioPOI 500533 - Northwest/IgnacioTranswestern reserves the right to revise the above listed schedule. Please continue to monitor the Transwestern website for updates and schedule changes.
Energy Transfer

[Transwestern Pipeline] [Capacity Constraint] LA PLATA/IGNACIO

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116294
Notice Type: Capacity Constraint
Subject: LA PLATA/IGNACIO
Posted: Apr 7 2026 3:20PM
Effective: Apr 7 2026 9:00AM
End Date: Apr 8 2026 8:59AM

Notice Type Description: Capacity Constraint
Notice Identifier: 116294
Critical Notice Description: Critical notice
Posting Date/Time: Apr 7 2026 3:20PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: LA PLATA/IGNACIO
Notice Effective Date/Time: Apr 7 2026 9:00AM
Notice End Date/Time: Apr 8 2026 8:59AM
Reason: Force Majeure
Location: LA PLATA/IGNACIO
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/7/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116297
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/7/26 (Intraday 3)
Posted: Apr 7 2026 6:44PM
Effective: Apr 7 2026 6:34PM
End Date: Apr 8 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116297
Critical Notice Description: Critical notice
Posting Date/Time: Apr 7 2026 6:44PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/7/26 (Intraday 3)
Notice Effective Date/Time: Apr 7 2026 6:34PM
Notice End Date/Time: Apr 8 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/7/26 (Intraday 3) Notice to Customers, Gas Day 4/7/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 100771 - ETC Grey WolfPOI 56419 - Harvest MilagroPOI 100816 - Kings LandingPOI 78423 - Enterprise ChacoPOI 500533 - NWPL La PlataPOI 500538 - Red Cedar Ark LoopFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple points
Energy Transfer

[Transwestern Pipeline] [Capacity Constraint] LA PLATA/IGNACIO

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116302
Notice Type: Capacity Constraint
Subject: LA PLATA/IGNACIO
Posted: Apr 7 2026 8:03PM
Effective: Apr 7 2026 9:00AM
End Date: Apr 8 2026 8:59AM

Notice Type Description: Capacity Constraint
Notice Identifier: 116302
Critical Notice Description: Critical notice
Posting Date/Time: Apr 7 2026 8:03PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: LA PLATA/IGNACIO
Notice Effective Date/Time: Apr 7 2026 9:00AM
Notice End Date/Time: Apr 8 2026 8:59AM
Reason: Force Majeure
Location: LA PLATA/IGNACIO
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 4/6/26 (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116259
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/6/26 (Intraday 2 & 3)
Posted: Apr 6 2026 2:22PM
Effective: Apr 6 2026 2:18PM
End Date: Apr 7 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116259
Critical Notice Description: Critical notice
Posting Date/Time: Apr 6 2026 2:22PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/6/26 (Intraday 2 & 3)
Notice Effective Date/Time: Apr 6 2026 2:18PM
Notice End Date/Time: Apr 7 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple Points - Gas Day 4/6/26 (Intraday 2 & 3) Notice to Customers, Gas Day 4/6/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 2 & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 79069 - DCP ZiaPOI 56419 - Harvest MilagroPOI 100816 - Kings LandingFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116268
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 3)
Posted: Apr 6 2026 6:41PM
Effective: Apr 6 2026 6:37PM
End Date: Apr 7 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116268
Critical Notice Description: Critical notice
Posting Date/Time: Apr 6 2026 6:41PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 3)
Notice Effective Date/Time: Apr 6 2026 6:37PM
Notice End Date/Time: Apr 7 2026 8:59AM
Notice Text: Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 3)Notice to Customers 4/6/26, (3 Bear) location performance, Transwestern Pipeline is concerned about the performance of the following (3 Bear) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 100734 - 3 Bear For scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 100734 - 3 Bear
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #4

UNSCORED
Informational
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13634
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #4
Posted: 4/6/2026 3:21:14 PM
Effective: 4/6/2026 3:21:14 PM
End Date: 12/31/9000

TRAILBLAZER MAINTENANCE SCHEDULE APRIL 2026 – UPDATE #4
Trailblazer is rescheduling the Third Pary Bertrand Compressor Station Maintenance scheduled for Gas
Day Wednesday, April 8, 2026, to Gas Day Wednesday, April 15, 2026.
All other items remain the same as posted under notice ID 13627.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Gas Day Wednesday, April 15, 2026, Rockies Express Pipeline LLC (“REX”) will be performing
maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This maintenance event is
posted under notice ID 13626 on REX’s Electronic Bulletin Board (“EBB”). Operating capacity will be
limited to 803 MDth/d through Segment 20.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
TPC/SUMMIT HEREFORD RANCH LOCATION MAINTENANCE (LOCATION 60361)
On Gas Day Tuesday, April 7, 2026, through Gas Day Thursday, April 9, 2026 TPC will be performing
maintenance at the TPC/SUMMIT HEREFORD RANCH location (location 60361). TPC is not expecting this
outage to impact shippers, however, TPC will provide as much notice as possible with individual postings
on the EBB in the event capacity will be impacted.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026. Rockies Express Pipeline LLC
(“REX”) will be performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity.
This maintenance event is posted under notice ID 13588 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to 747 MDth/d through Segment 20.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #3

UNSCORED
Informational
View original notice text
Pipeline: Rockies Express Pipeline
Notice ID: 13635
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #3
Posted: 4/6/2026 3:22:05 PM
Effective: 4/6/2026 3:22:05 PM
End Date: 12/31/9000

REX MAINTENANCE SCHEDULE FOR APRIL 2026 – UPDATE #3
REX is rescheduling the Bertrand Compressor Station Maintenance scheduled for Gas Day Wednesday,
April 8, 2026, to Gas Day Wednesday, April 15, 2026.
All other items remain the same as posted under notice ID 13626.
DUKE MADISON LOCATION MAINTENANCE (LOC 60783)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Duke Madison Location (Location 60783). Operating capacity will be limited to 0
MDth/d at the DEI Madison Station (Location 60783).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Wednesday, April 15, 2026, REX will be performing maintenance at its Bertrand Compressor
Station (Seg 250). Operating capacity will be limited to 1,159 MDth/d in the West to East direction
through Segment 250.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
MEXICO COMPRESSOR STATION MAINTENANCE (SEG 300)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at its Mexico Compressor Station (Segment 300). There is no anticipated impact to the
capacity in the West to East direction through Segment 300.
SENECA COMPRESSOR STATION MAINTENANCE (SEG 400)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Seneca Compressor Station (Segment 400). Operating capacity will be limited to 0
MDth/d at the following Receipts:
• Markwest Seneca (Location 56116)
• Rover Noble (Location 60167)
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)

On Gas Day Monday, April 13, 2026, through Gas Day Friday, April 17, 2026, and Gas Day Tuesday, April
21, 2026, through Gas Day Sunday, April 26, 2026, REX will be performing maintenance at its
Chandlersville Compressor Station (Segment 380). Operating capacity will be limited to the following in
the East to West direction through Segment 380:
• Gas Day Monday, April 13, 2026: 3,023 MDth/d.
• Gas Day Tuesday, April 14, 2026, through Gas Day Friday, April 17, 2026: 2,972 MDth/d.
• Gas Day Tuesday, April 21, 2026, through Gas Day Friday, April 24, 2026: 2,837 MDth/d.
• Gas Day Saturday, April 25, 2026, through Gas Day Sunday, April 26, 2026: 2,935 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
COLUMBUS COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, April 14, 2026, through Gas Day Friday, Friday, April 17, 2026, REX will be
performing maintenance at its Columbus Compressor Station (Segment 380). Operating capacity will be
limited to 2,972 MDth/d in the East to West direction through Segment 380.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BAINBRIDGE COMPRESSOR STATION MAINTENANCE (SEG 330)
On Gas Day Monday, April 20, 2026, through Gas Day Friday, April 24, 2026, REX will be performing
maintenance at the Bainbridge Compressor Station (Segment 330). Operating capacity will be limited to
1,840 MDth/d in the East to West direction through Segment 330.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026, REX will be performing
maintenance at the Julesburg Compressor Station (Segment 240). Operating capacity will be limited to
1,079 MDth/d in the West to East direction through Segment 240.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
LOGAN COMPRESSOR STATION MAINTENANCE (LOC 60992)

On Gas Day Tuesday, April 21, 2026, REX will be performing maintenance at the Logan Compressor
Station (Location 60992). Operating capacity will be limited to 0 MDth/d at the REX/TIGT Logan Location
(60992).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026, and Gas Day Tuesday, April
28, 2026, through Gas Day Thursday, April 30, 2026, REX will be performing maintenance at its
Washington Courthouse Compressor Station (Segment 380). Operating capacity will be limited to the
following in the East to West direction through Segment 380:
• Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026: 2,981 MDth/d
• Gas Day Gas Day Tuesday, April 28, 2026: 2,954 MDth/d
• Gas Day Gas Day Wednesday, April 29, 2026, through Gas Day Thursday, April 30, 2026: 2,981
MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
DUKE MADISON
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116222
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Posted: Apr 5 2026 8:46AM
Effective: Apr 5 2026 8:44AM
End Date: Apr 6 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116222
Critical Notice Description: Critical notice
Posting Date/Time: Apr 5 2026 8:46AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 5 2026 8:44AM
Notice End Date/Time: Apr 6 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREAApril 5, 2026Due to high line pack in the Phoenix Area, Transwestern is declaring a Same Day Underage Alert for the Phoenix Area for gas day, April 5, 2026. Any Operator of a delivery point in the Phoenix Area at which actual quantities are less than scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section22.4of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this high line pack condition will continue at least for the entire gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.Please contact Gas Control or your marketing representative with any questions
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116223
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)
Posted: Apr 5 2026 9:46AM
Effective: Apr 5 2026 9:44AM
End Date: Apr 6 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116223
Critical Notice Description: Critical notice
Posting Date/Time: Apr 5 2026 9:46AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)
Notice Effective Date/Time: Apr 5 2026 9:44AM
Notice End Date/Time: Apr 6 2026 8:59AM
Notice Text: Critical Notice Underperformance - DCP Artesia- POI 10703 - (Intraday 1, 2 and 3)Notice to Customers 4/5/26, (DCP Artesia) location performance, Transwestern Pipeline is concerned about the performance of the following (DCP Artesia) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 1, 2 and 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 10703 - DCP ArtesiaFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: DCP Artesia - POI 10703
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/5/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116243
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/5/26 (Intraday 3)
Posted: Apr 5 2026 6:44PM
Effective: Apr 5 2026 6:30PM
End Date: Apr 6 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116243
Critical Notice Description: Critical notice
Posting Date/Time: Apr 5 2026 6:44PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/5/26 (Intraday 3)
Notice Effective Date/Time: Apr 5 2026 6:30PM
Notice End Date/Time: Apr 6 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/5/26 (Intraday 3) Notice to Customers, Gas Day 4/5/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 79069 - DCP Zia IIPOI 100734 - 3 BearPOI 56339 - Dagger DrawPOI 100816 - Kings LandingFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116183
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Posted: Apr 4 2026 7:53AM
Effective: Apr 4 2026 7:51AM
End Date: Apr 5 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116183
Critical Notice Description: Critical notice
Posting Date/Time: Apr 4 2026 7:53AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 4 2026 7:51AM
Notice End Date/Time: Apr 5 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREAApril 4, 2026Due to high line pack in the Phoenix Area, Transwestern is declaring a Same Day Underage Alert for the Phoenix Area for gas day, April 4, 2026. Any Operator of a delivery point in the Phoenix Area at which actual quantities are less than scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section22.4of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this high line pack condition will continue at least for the entire gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.Please contact Gas Control or your marketing representative with any questions
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116184
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)
Posted: Apr 4 2026 9:37AM
Effective: Apr 4 2026 9:34AM
End Date: Apr 5 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116184
Critical Notice Description: Critical notice
Posting Date/Time: Apr 4 2026 9:37AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)
Notice Effective Date/Time: Apr 4 2026 9:34AM
Notice End Date/Time: Apr 5 2026 8:59AM
Notice Text: Critical Notice Underperformance - DCP Artesia POI 10703 - (Intraday 1, 2 and 3)Notice to Customers 4/4/26, (DCP Artesia) location performance, Transwestern Pipeline is concerned about the performance of the following (DCP Artesia) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 1, 2 and 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 10703 - DCP ArtesiaFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: DCP Artesia - POI 10703
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/4/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116199
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/4/26 (Intraday 3)
Posted: Apr 4 2026 6:37PM
Effective: Apr 4 2026 6:30PM
End Date: Apr 5 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116199
Critical Notice Description: Critical notice
Posting Date/Time: Apr 4 2026 6:37PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/4/26 (Intraday 3)
Notice Effective Date/Time: Apr 4 2026 6:30PM
Notice End Date/Time: Apr 5 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/4/26 (Intraday 3) Notice to Customers, Gas Day 4/4/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 79069 - DCP Zia IIPOI 79028 - Targa Rojo BancoPOI 100727 - Targa RoadrunnerPOI 100730 - Targa WildcatPOI 100771 - ETC Grey WolfPOI 100734 - 3 BearFor scheduling questions please contact your Customer Service Representative. Theinformation contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116152
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Posted: Apr 3 2026 7:49AM
Effective: Apr 3 2026 7:45AM
End Date: Apr 4 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116152
Critical Notice Description: Critical notice
Posting Date/Time: Apr 3 2026 7:49AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 3 2026 7:45AM
Notice End Date/Time: Apr 4 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREAApril 3, 2026Due to high line pack in the Phoenix Area, Transwestern is declaring a Same Day Underage Alert for the Phoenix Area for gas day, April 3, 2026. Any Operator of a delivery point in the Phoenix Area at which actual quantities are less than scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section22.4of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this high line pack condition will continue at least for the entire gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.Please contact Gas Control or your marketing representative with any questions
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - DCP Artesia POI 10703 - (Intraday 2 and 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116161
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - DCP Artesia POI 10703 - (Intraday 2 and 3)
Posted: Apr 3 2026 2:48PM
Effective: Apr 3 2026 2:40PM
End Date: Apr 4 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116161
Critical Notice Description: Critical notice
Posting Date/Time: Apr 3 2026 2:48PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - DCP Artesia POI 10703 - (Intraday 2 and 3)
Notice Effective Date/Time: Apr 3 2026 2:40PM
Notice End Date/Time: Apr 4 2026 8:59AM
Notice Text: Critical Notice Underperformance - DCP Artesia- POI 10703 - (Intraday 2 and 3)Notice to Customers 4/3/26, (DCP Artesia) location performance, Transwestern Pipeline is concerned about theperformance of the following (DCP Artesia) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 2 and 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 10703 - DCP ArtesiaFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: DCP Artesia - POI 10703
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/3/26 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116171
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/3/26 (Intraday 3)
Posted: Apr 3 2026 6:55PM
Effective: Apr 3 2026 6:51PM
End Date: Apr 4 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116171
Critical Notice Description: Critical notice
Posting Date/Time: Apr 3 2026 6:55PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple points - Gas Day 4/3/26 (Intraday 3)
Notice Effective Date/Time: Apr 3 2026 6:51PM
Notice End Date/Time: Apr 4 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple points - Gas Day 4/3/26 (Intraday 3) Notice to Customers, Gas Day 4/3/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 79069 - DCP Zia IIPOI 100734 - 3 BearFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this noticewill be posted as current information becomes readilyavailable.
Location: Multiple Points
Gulf South Pipeline

Black Creek Compressor Station Maintenance

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Gulf South Pipeline Notice 5037920
Source Link
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name :
Gulf South Pipeline Company, LLC
Category :
Critical
Notice Type Desc :
Maintenance
Notice Stat Desc :
Terminate
Notice ID :
5037920
Prior Notice :
5037450
Reqrd Rsp Desc :
No response required
Subject :
Black Creek Compressor Station Maintenance
TSP :
078444247
Post Date/Time :
03/30/2026 01:08:00 PM
Notice Effective Date/Time :
03/30/2026 01:10:00 PM
Notice End Date/Time :
03/30/2026 01:30:00 PM
Response Date/Time :
Critical :
Notice Text :
Gulf South will be performing maintenance at the Black Creek Compressor Station.
No impact is expected for the following location:
- Loc 24529 (Plant Morrow - Cooperative Energy)
If you have any questions, please contact your customer service representative.
Notice
Page 1 of 1
03/30/2026 1:08:43 PM
Notice
TSP Name :
Gulf South Pipeline Company, LLC
TSP :
078444247
Category :
Critical
Post Date/Time :
03/30/2026 01:08:00 PM
Notice Type Desc :
Maintenance
Notice Effective Date/Time :
03/30/2026 01:10:00 PM
Notice Stat Desc :
Terminate
Notice End Date/Time :
03/30/2026 01:30:00 PM
Notice ID :
5037920
Response Date/Time :
Prior Notice :
5037450
Critical :
Reqrd Rsp Desc :
No response required
Subject :
Black Creek Compressor Station Maintenance
Notice Text :
Gulf South will be performing maintenance at the Black Creek Compressor Station.
No impact is expected for the following location:
- Loc 24529 (Plant Morrow - Cooperative Energy)
If you have any questions, please contact your customer service representative.
03/30/2026 1:08:43 PM
Page 1 of 1
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116137
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Posted: Apr 2 2026 8:52AM
Effective: Apr 2 2026 8:51AM
End Date: Apr 3 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116137
Critical Notice Description: Critical notice
Posting Date/Time: Apr 2 2026 8:52AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 2 2026 8:51AM
Notice End Date/Time: Apr 3 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREAApril 2, 2026Due to high line pack in the Phoenix Area, Transwestern is declaring a Same Day Underage Alert for the Phoenix Area for gas day, April 2, 2026. Any Operator of a delivery point in the Phoenix Area at which actual quantities are less than scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section22.4of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this high line pack condition will continue at least for the entire gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.Please contact Gas Control or your marketing representative with any questions
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 4/2/26 (Intraday 2 & 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116144
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/2/26 (Intraday 2 & 3)
Posted: Apr 2 2026 2:08PM
Effective: Apr 2 2026 2:04PM
End Date: Apr 3 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116144
Critical Notice Description: Critical notice
Posting Date/Time: Apr 2 2026 2:08PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Multiple Points - Gas Day 4/2/26 (Intraday 2 & 3)
Notice Effective Date/Time: Apr 2 2026 2:04PM
Notice End Date/Time: Apr 3 2026 8:59AM
Notice Text: Critical Notice Underperformance - Multiple Points - Gas Day 4/2/26 (Intraday 2 & 3) Notice to Customers, Gas Day 4/2/26, Transwestern Pipeline is concerned about the performance of multiple locations. If performance has not improved during the current gas day, Transwestern may limit volumes to actual on the indicated locations for Intraday 2 & 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at these locations, or from the pooling area in which these locations lie. The following locations may be allocated due to Underperformance issues.POI 79087 - ETC HalleyPOI 100771 - ETC Grey WolfFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: Multiple Points
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #3

UNSCORED
Informational
View original notice text
Pipeline: Trailblazer Pipeline (TPC)
Notice ID: 13627
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #3
Posted: 4/2/2026 2:26:55 PM
Effective: 4/2/2026 2:26:55 PM
End Date: 12/31/9000

TRAILBLAZER MAINTENANCE SCHEDULE APRIL 2026 – UPDATE #3
Trailblazer is removing the Third Pary Bertrand Compressor Station Maintenance scheduled for Gas
Day Thursday, April 2, 2026, through Gas Day Friday, April 10, 2026.
Trailblazer is adding the Third Pary Bertrand Compressor Station Maintenance scheduled for Gas Day
Wednesday, April 8, 2026.
All other items remain the same as posted under notice ID 13596.
THIRD PARTY MAINTENANCE NOTIFICATION – BERTRAND COMPRESSOR STATION
On Gas Day Gas Day Wednesday, April 8, 2026, Rockies Express Pipeline LLC (“REX”) will be performing
maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity. This maintenance event is
posted under notice ID 13626 on REX’s Electronic Bulletin Board (“EBB”). Operating capacity will be
limited to 803 MDth/d through Segment 20.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
TPC/SUMMIT HEREFORD RANCH LOCATION MAINTENANCE (LOCATION 60361)
On Gas Day Tuesday, April 7, 2026, through Gas Day Thursday, April 9, 2026 TPC will be performing
maintenance at the TPC/SUMMIT HEREFORD RANCH location (location 60361). TPC is not expecting this
outage to impact shippers, however, TPC will provide as much notice as possible with individual postings
on the EBB in the event capacity will be impacted.
THIRD PARTY MAINTENANCE NOTIFICATION – JULESBURG COMPRESSOR STATION
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026. Rockies Express Pipeline LLC
(“REX”) will be performing maintenance in its Segment 250 that will affect Trailblazer‘s leased capacity.
This maintenance event is posted under notice ID 13588 on REX’s Electronic Bulletin Board (“EBB”).
Operating capacity will be limited to 747 MDth/d through Segment 20.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 37.1 (c) of Trailblazer’s
currently effective FERC Gas Tariff. In the event Trailblazer cannot schedule the firm service
nominations from Primary Receipt to Primary Delivery on a Day during the scheduled maintenance
outlined above, Reservation Charge Credit Quantities are calculated pursuant to Section 7.14(d)(2)(i)
and are based upon a firm shipper’s average daily usage at Primary Points during the 7 complete Gas
Days prior to the day Trailblazer posts the Monthly Maintenance Schedule, except where the 7-Day
period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and

along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.2 (b), of the General Terms and Conditions of the Trailblazer FERC Gas Tariff. If you
have any questions, please contact your Account Director or Scheduling Representative
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #2

UNSCORED
Informational
View original notice text
Pipeline: Rockies Express Pipeline
Notice ID: 13626
Notice Type: Critical notice
Sub-Type: MAINTENANCE
Subject: REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #2
Posted: 4/2/2026 2:26:30 PM
Effective: 4/2/2026 2:26:30 PM
End Date: 12/31/9000

REX MAINTENANCE SCHEDULE FOR APRIL 2026 – UPDATE #2
REX is removing the Bertrand Compressor Station Maintenance scheduled for Gas Day Thursday, April
2, 2026, through Gas Day Friday, April 10, 2026.
REX is adding the Bertrand Compressor Station Maintenance scheduled for Gas Day Wednesday, April
8, 2026.
REX is adding the Duke Madison Location Maintenance scheduled for Gas Day Wednesday, April 8,
2026.
All other items remain the same as posted under notice ID 13595.
DUKE MADISON LOCATION MAINTENANCE (LOC 60783)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Duke Madison Location (Location 60783). Operating capacity will be limited to 0
MDth/d at the DEI Madison Station (Location 60783).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BERTRAND COMPRESSOR STATION MAINTENANCE (SEG 250)
On Gas Day Wednesday, April 8, 2026, REX will be performing maintenance at its Bertrand Compressor
Station (Seg 250). Operating capacity will be limited to 1,159 MDth/d in the West to East direction
through Segment 250.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
MEXICO COMPRESSOR STATION MAINTENANCE (SEG 300)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at its Mexico Compressor Station (Segment 300). There is no anticipated impact to the
capacity in the West to East direction through Segment 300.
SENECA COMPRESSOR STATION MAINTENANCE (SEG 400)
On Gas Day Tuesday, April 7, 2026, through Gas Day Wednesday, April 8, 2026, REX will be performing
maintenance at the Seneca Compressor Station (Segment 400). Operating capacity will be limited to 0
MDth/d at the following Receipts:
• Markwest Seneca (Location 56116)
• Rover Noble (Location 60167)

At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
CHANDLERSVILLE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Monday, April 13, 2026, through Gas Day Friday, April 17, 2026, and Gas Day Tuesday, April
21, 2026, through Gas Day Sunday, April 26, 2026, REX will be performing maintenance at its
Chandlersville Compressor Station (Segment 380). Operating capacity will be limited to the following in
the East to West direction through Segment 380:
• Gas Day Monday, April 13, 2026: 3,023 MDth/d.
• Gas Day Tuesday, April 14, 2026, through Gas Day Friday, April 17, 2026: 2,972 MDth/d.
• Gas Day Tuesday, April 21, 2026, through Gas Day Friday, April 24, 2026: 2,837 MDth/d.
• Gas Day Saturday, April 25, 2026, through Gas Day Sunday, April 26, 2026: 2,935 MDth/d.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
COLUMBUS COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Tuesday, April 14, 2026, through Gas Day Friday, Friday, April 17, 2026, REX will be
performing maintenance at its Columbus Compressor Station (Segment 380). Operating capacity will be
limited to 2,972 MDth/d in the East to West direction through Segment 380.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
BAINBRIDGE COMPRESSOR STATION MAINTENANCE (SEG 330)
On Gas Day Monday, April 20, 2026, through Gas Day Friday, April 24, 2026, REX will be performing
maintenance at the Bainbridge Compressor Station (Segment 330). Operating capacity will be limited to
1,840 MDth/d in the East to West direction through Segment 330.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
JULESBURG COMPRESSOR STATION MAINTENANCE (SEG 240)
On Gas Day Tuesday, April 21, 2026, and Gas Day Tuesday, April 28, 2026, REX will be performing
maintenance at the Julesburg Compressor Station (Segment 240). Operating capacity will be limited to
1,079 MDth/d in the West to East direction through Segment 240.
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.

LOGAN COMPRESSOR STATION MAINTENANCE (LOC 60992)
On Gas Day Tuesday, April 21, 2026, REX will be performing maintenance at the Logan Compressor
Station (Location 60992). Operating capacity will be limited to 0 MDth/d at the REX/TIGT Logan Location
(60992).
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
WASHINGTON COURTHOUSE COMPRESSOR STATION MAINTENANCE (SEG 380)
On Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026, and Gas Day Tuesday, April
28, 2026, through Gas Day Thursday, April 30, 2026, REX will be performing maintenance at its
Washington Courthouse Compressor Station (Segment 380). Operating capacity will be limited to the
following in the East to West direction through Segment 380:
• Gas Day Wednesday, April 1, 2026, through Gas Day Friday, April 3, 2026: 2,981 MDth/d
• Gas Day Gas Day Tuesday, April 28, 2026: 2,954 MDth/d
• Gas Day Gas Day Wednesday, April 29, 2026, through Gas Day Thursday, April 30, 2026: 2,981
MDth/d
At this capacity level, primary and secondary firm quantities, as well as ITS/AOR are at risk of not being
scheduled.
This Monthly Maintenance Schedule is posted in compliance with Section 36.1C of REX’s currently
effective FERC Gas Tariff. In the event REX cannot schedule the firm service nominations from Primary
Receipt to Primary Delivery on a Day, Reservation Charge Credit Quantities are calculated pursuant to
Section 7.14D and are based upon a firm shipper’s average daily usage at Primary Points during the 7
complete Gas Days prior to the day REX posts the Monthly Maintenance Schedule, except where the
7-Day period is limited by pre-existing firm service curtailments.
To the extent there is a limitation to scheduling or curtailment of firm service nominations, available
pipeline capacity will be scheduled first to firm transportation nominations from Primary Points and
along Primary Paths and remaining capacity will be scheduled pro rata based on MDQ and consistent
with Section 3.1A, of the General Terms and Conditions of the REX FERC Gas Tariff.
If you have any questions, please contact your Account Director or Scheduling Representative at 303-
763-2906
DUKE MADISON
NEXUS Gas Transmission (U.S.)

03/31/2026- NEXUS Pipeline Conditions for 04/1/2026

UNSCORED
Informational
View original notice text
TSP Name: NEXUS Gas Transmission, LLC (U.S.)
Subject: NEXUS Pipeline Conditions for 04/1/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/01/2026
Notice End Date: 04/02/2026
Posting Date: 03/31/2026
Notice Identifier: 175945
Required Response Indicator Description: No response required

For Gas Day April 1, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity. The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
TABS
Colerain
N/A
100%
100%
100%
28%
Due to NEXUS Posted Outage
Ypsilatini
Yes
Due to DTE Posted Outage
OFO / Imbalance Notice
OFO
---
Customer Specific OFO
---
Imbalances Warnings
---
Systemwide Notes:
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Algonquin Gas Transmission

03/31/2026- AGT Pipeline Conditions for 04/1/2026

UNSCORED
Informational
View original notice text
TSP Name: Algonquin Gas Transmission, LLC
Subject: AGT Pipeline Conditions for 04/1/2026
Notice Type: Capacity Constraint
Critical Notice Description: Critical notice
Notice Status Description: Initiate
Notice Effective Date: 04/01/2026
Notice End Date: 04/02/2026
Posting Date: 03/31/2026
Notice Identifier: 175940
Required Response Indicator Description: No response required

For Gas Day April 1, 2026, Algonquin Gas Transmission (AGT) has approved and scheduled nominations at each pipeline segment and meter station up to AGT's operational capacity. The following locations have been restricted due to requested nominations exceeding AGT's operational capacity:
Restricted Locations
Scheduled and Sealed
Priority % Restricted
Notes
Stony Point
100%
100%
54%
Cromwell
100%
100%
43%
Burrillville
100%
100%
22%
Weymouth
100%
100%
98%
Iroquois Deliveries
100%
100%
79%
Iroquois Receipts
100%
100%
58%
Hanover West
100%
100%
21%
Mendon Receipts
100%
100%
100%
100%
15%
G System
100%
100%
15%
C System
Yes
Centerville-Transco Receipts (1)
64%
No-Notice Restrictions
---
OFO / Imbalance Notice
System Wide OFO
No DS - System Wide issued 3/31/26. 250 Dth / 5% Tolerance
Customer Specific OFO
No DS - Customer Specific issued 3/26/26. 250 Dth / 5% Tolerance
Meter Specific OFO
---
Customer Specific Hourly OFO
---
Imbalances Warnings
---
FERC Order 698
Yes
Systemwide Notes:
(1) AGT has scheduled Transco Centerville receipts to the design meter capacity of 222,526 Dth/d.
AGT requests that customers/point operators on AGT be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.
AGT's system is not designed to sustain delivery pressures above contract levels while making non-ratable/accelerated deliveries above scheduled quantities for more than 6 consecutive hours, to be followed by flows below scheduled quantity for the balance of any 24-hour period. If customers/point operators don't manage hourly takes from the system, 1) delivery pressures will be impacted and /or 2) AGT may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system.
AGT may be required to issue system specific, meter specific and/or hourly OFO's pursuant to General Terms and Conditions Section 26.7(d) to impose further restrictions in order to maintain the operational integrity of the system.
Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.
Please contact your Operations Account Representative should you have any questions.
Energy Transfer

[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Kings Landing POI 100816 (Intraday 3)

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116087
Notice Type: Over-Under Performance
Subject: Critical Notice Underperformance - Kings Landing POI 100816 (Intraday 3)
Posted: Mar 31 2026 6:33PM
Effective: Mar 31 2026 6:29PM
End Date: Apr 1 2026 8:59AM

Notice Type Description: Over-Under Performance
Notice Identifier: 116087
Critical Notice Description: Critical notice
Posting Date/Time: Mar 31 2026 6:33PM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Critical Notice Underperformance - Kings Landing POI 100816 (Intraday 3)
Notice Effective Date/Time: Mar 31 2026 6:29PM
Notice End Date/Time: Apr 1 2026 8:59AM
Notice Text: Critical Notice Underperformance - Kings Landing POI 100816 (Intraday 3)Notice to Customers 3/31/26, (Kings Landing) location performance, Transwestern Pipeline is concerned about the performance of the following (Kings Landing) location. If performance has not improved at this location during the current gas day, Transwestern may limit volumes to actual on the indicated location for ID 3. This could result in reductions to the shipper and/or pooler nominations delivering gas at this location, or from the pooling area in which these locations lie. POI 100816 - Kings LandingFor scheduling questions please contact your Customer Service Representative. The information contained in this notice is intended to provide general information only and can change at any time. All transportation services are subject to Transwestern's FERC Gas Tariff. Readers should not exclusively rely on this information, but rather should contact their TW Gas Marketing Representative or Gas Control for further updated information. Updates to this notice will be posted as current information becomes readily available.
Location: POI 100816 - Kings Landing
Energy Transfer

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

UNSCORED
Informational
View original notice text
Pipeline: Transwestern Pipeline
Notice ID: 116095
Notice Type: Operational Alert
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Posted: Apr 1 2026 6:16AM
Effective: Apr 1 2026 6:11AM
End Date: Apr 2 2026 8:59AM

Notice Type Description: Operational Alert
Notice Identifier: 116095
Critical Notice Description: Critical notice
Posting Date/Time: Apr 1 2026 6:16AM
Notice Status Description: Initiate
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
Notice Effective Date/Time: Apr 1 2026 6:11AM
Notice End Date/Time: Apr 2 2026 8:59AM
Notice Text: CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREAApril 1, 2026Due to low line pack in the Phoenix Area, Transwestern is declaring a Same Day Overage Alert in the Phoenix Area for the current gas day, April 1, 2026.Any Operator of a delivery point in the Phoenix Area at which actual quantities exceed scheduled quantities on this Alert Day shall be subject to Alert Day charges in accordance with Section 22.4 of the General Terms and Conditions of Transwestern's FERC Gas Tariff.Based upon current operating conditions, Transwestern anticipates that this low line pack condition will continue at least for the entire current gas day. Transwestern will provide additional information concerning this Alert Day condition as necessary.
July 2026
384 notices
June 2026
757 notices
May 2026
683 notices
April 2026
1007 notices
March 2026
896 notices