Stated capacity and stated dates for LNG export projects, each traced to its source.
The website and free subscribers get updates weekly. Pro subscribers get them daily.
New LNG Export lists LNG export projects that liquefy U.S. natural gas: new terminals, new trains at existing terminals, uprates and floating LNG, on the Gulf Coast, the East Coast, Alaska and in Mexico. Each has a status, a stated capacity in Bcf/d with the basis it was stated on, MTPA where given, the sponsor’s stated timing, dated milestones train by train, and a change log. It sits beside New Pipelines and New Storage.
Everything is stated by someone else. Enercast does not estimate how big an LNG project is or when it will start. The page reports what FERC, DOE, MARAD, EIA, the sponsor or the trade press has said, shows which of them said it, and records each time it changes. Where Enercast measures feed gas into a terminal, the project page links to that daily data.
| Status | Meaning |
|---|---|
| Announced | The sponsor has named the project. No regulatory filing and no final investment decision. |
| Pre-filing | In FERC’s pre-filing process: a docket exists, but no application yet. |
| Applied | Application filed with FERC (or MARAD for an offshore terminal) and not yet decided. |
| Approved | FERC (or MARAD) authorization issued, but no final investment decision yet. |
| Under construction | Final investment decision taken; construction under way. |
| Commissioning | First LNG produced or feed gas flowing into the trains, before the whole project is in commercial operation. |
| In service | The whole project is complete and in commercial operation. |
| On hold | The sponsor has suspended or paused development without a new date. |
| Cancelled | The sponsor has withdrawn it. |
Every night Enercast re-reads the FERC docket of every open project, checks for a new issue of FERC’s LNG export terminal list and DOE’s summary of export applications, and reads a list of sponsor pages. Anything that changed becomes a proposed update with the passage it came from, and is checked automatically: a figure or date must appear word for word in the quoted passage, a status may not move backwards, a plan (“expects to take FID in 2027”) is not a fact, one train in service is not the whole project, and a site-wide or contract volume is not the project’s capacity. Changes that pass are recorded the same night; the riskier kinds are held until a person at Enercast has checked them. These pages are rebuilt weekly, on Sunday.
The website and free subscribers get this weekly. Pro subscribers get it daily. Free subscribers see the week’s LNG export changes in Monday’s brief. Pro subscribers see each night’s findings the next morning in the Opening brief, by email and Telegram: status changes, new timing, capacity revisions, FERC and DOE authorizations, FID, first LNG and first cargo, in the LNG export part of the New capacity section. Any change held for a manual check is marked as such. The tracker is also on the Pro downloads page as CSV, updated daily, and in the Institutional API.
From FERC (its list of LNG export terminals, and each project’s docket), the Department of Energy (export authorizations), MARAD for offshore terminals, EIA’s U.S. liquefaction capacity file, the sponsor (project pages, press releases) and trade press. Every row on a project page links the source behind it.
Bcf/d is the unit of the gas that flows into the terminals, so it lines up with Enercast’s LNG feedgas data. Sources state capacity differently: FERC lists an authorized figure, EIA a nominal (baseload) and a peak figure, sponsors often a rounded MTPA. Each project shows the figure and the basis it was stated on, and MTPA beside it where given. The units are never added together, and totals across different bases are indicative.
The project has started producing LNG, or feed gas is flowing into its trains, but it is not yet all in commercial operation. Big terminals start one train or block at a time over a year or more, so a project can sit in Commissioning for a long time. Train-by-train dates are on the project page.
It means the sponsor has taken a final investment decision. FERC can authorize construction to start on parts of a site before that; those letters are recorded as milestones but do not change the status.
Several Mexican LNG export projects would liquefy U.S. gas delivered by pipeline, so their start-up is U.S. demand. They hold DOE authorizations to re-export U.S. gas. They are tagged by region so they can be filtered out.
Enercast has no FERC docket, DOE or MARAD document or other permit on file for the project. What is shown comes from the sponsor or trade press.
These pages are updated weekly, on Sunday. The sources are checked every night, and a change appears here only after it has passed automatic checks against its source; the riskier kinds (a new project, a status moving backwards or skipping Commissioning, a capacity change over 25% or of basis, or two sources that disagree) are held for a manual check first. “Verified” moves forward only when the project’s sources were fetched successfully.
The website and free subscribers get this weekly: the pages update on Sunday and Monday’s free brief lists the week’s LNG export changes. Pro subscribers get it daily: each night’s LNG export project changes arrive in the Opening brief, by email and Telegram, the morning after they are detected; any held for a manual check are marked. Pro and Institutional subscribers can also download the tracker as CSV, updated daily, and Institutional subscribers can pull it through the API.
No. It adds up the capacity sources state, by the year they say each project will start. Trains start one at a time, projects slip, and approved projects may never be built.
The tracker covers LNG export projects of at least 0.1 Bcf/d that liquefy U.S. gas, from announcement until 12 months after they enter service. Small-scale plants and import terminals are left out. If something that qualifies is missing, email [email protected].
More questions? See the general FAQ or email [email protected].
More guides: How Enercast works · Critical notices · Capacity offline · Supply & demand · Getting alerts · Glossary · Scraping a pipeline EBB · Pipeline flow data sources