April 2026, by week · month overview
All
Force Majeure
Maintenance
Capacity
Compressor
Sev 4–5 Only
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [OPERATIONAL ALERT] THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #12
SEV 4/5
Compressor Issue
0.813 Bcf/d
Until Further Notice
Trailblazer Pipeline Segment 20 capacity is restricted to 0.813 Bcf/d effective evening cycle April 1, 2026, until further notice due to a third-party operational issue at Bertrand Compressor Station. This is Update #12, indicating an ongoing multi-revision unresolved outage. Primary firm, secondary firm, and interruptible service are all at risk of curtailment. No restoration timeline has been provided.
Trailblazer Segment 20 restricted to 0.813 Bcf/d with primary firm at risk and no restoration timeline; simultaneous REX/Trailblazer Bertrand CS constraint removes independent reroute options, bearish pressure on Rockies/CIG basis as eastbound Rockies gas remains stranded with no alternative takeaway.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both pipelines are simultaneously constrained by the same third-party facility, meaning REX cannot serve as an independent reroute for Trailblazer volumes affected at Bertrand CS.
View original notice text Loading…
Rockies Express
[OPERATIONAL ALERT] BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #12
SEV 4/5
Compressor Issue
1.174 Bcf/d
Until Further Notice
Rockies Express Pipeline is restricting Segment 250 (Zone 1, West-to-East direction) to 1,174 MDth/d (1.174 Bcf/d) due to an ongoing operational issue at Bertrand Compressor Station, effective evening cycle April 1, 2026, until further notice. This is Update #12, indicating a prolonged unresolved event. Primary firm, secondary firm, and interruptible service are all at risk of curtailment at this capacity level.
Bertrand CS constraint caps REX Zone 1 eastbound at 1.174 Bcf/d until further notice, with all service classes at curtailment risk; Trailblazer shares this facility and is simultaneously constrained, leaving zero independent reroute -- expect bearish Rockies basis pressure and bullish Midcontinent/Chicago Citygate basis widening vs Henry Hub.
Reroute: None: REX and Trailblazer share Bertrand Compressor Station -- both are simultaneously constrained by the same facility, and no independent reroute exists for Rockies eastbound volumes affected by this outage.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 129 Pipeline Maintenane
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure To Take Confirmed Quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mccomb Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL FLOW ORDER] OFO CD1 EXPANDED EFF 4-4 LIFTED 4-6
SEV 3/5
lifted ✓
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Vixen Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70-4 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update:Index 70-7 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update:Index 70-6 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129-20 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Olla Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 270-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Kiln Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70-8 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 59-8 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Marksville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 133 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 192 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Index 270-65 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Kiln Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Index 301-8-11-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mccomb Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 130 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Arnaudville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 818 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 04/03/2026 - 04/09/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-6 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 287-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 391-1-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 03/27/2026 - 04/02/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 391-1-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 59-22 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] TGP Outage Impact Report
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Wilson Compressor Station Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 4/6/26 (Intraday 2 & 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - 3 Bear - POI 100734 - (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #4
UNSCORED
Informational
View original notice text Loading…
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #3
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/5/26 (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - DCP Artesia - POI 10703 - (Intraday 1, 2 and 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/4/26 (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - DCP Artesia POI 10703 - (Intraday 2 and 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple points - Gas Day 4/3/26 (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Gulf South Pipeline
Black Creek Compressor Station Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 4/2/26 (Intraday 2 & 3)
UNSCORED
Informational
View original notice text Loading…
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #3
UNSCORED
Informational
View original notice text Loading…
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR APRIL 2026 - UPDATE #2
UNSCORED
Informational
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
03/31/2026- NEXUS Pipeline Conditions for 04/1/2026
UNSCORED
Informational
View original notice text Loading…
Algonquin Gas Transmission
03/31/2026- AGT Pipeline Conditions for 04/1/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Kings Landing POI 100816 (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
UNSCORED
Informational
View original notice text Loading…