BP ENERG/TGP US METHANOL KANAWHA

Tennessee Gas Pipeline (TGP) · Loc 54003 · KANAWHA, West Virginia
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.020
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.020
Bcf/d
30-day average
0.020
30 of 30 days posted
30-day high
0.021
Nov 3
30-day low
0.011
Nov 4
Operating capacity
0.053
Bcf/d as posted, evening cycle
Utilization
38%
headroom 62%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.020+0.000
Nov 260.020-0.000
Nov 250.020-0.000
Nov 240.020+0.000
Nov 230.020+0.000
Nov 220.020+0.000
Nov 210.020+0.000
Nov 200.020+0.000
Nov 190.020+0.000
Nov 180.020+0.000
Nov 170.020+0.000
Nov 160.020+0.000
Nov 150.020+0.000
Nov 140.020+0.000
Nov 130.020+0.000
Nov 120.020+0.000
Nov 110.020-0.000
Nov 100.020+0.000
Nov 90.020+0.000
Nov 80.020+0.000
Nov 70.020+0.000
Nov 60.020+0.000
Nov 50.020+0.009
Nov 40.011-0.010
Nov 30.021+0.001
Nov 20.020+0.000
Nov 10.020-0.000
Oct 310.020+0.000
Oct 300.020-0.000
Oct 290.021—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineBP ENERG/TGP US METHANOL KANAWHA

Tennessee Gas PipelinePlaced at the center of Kanawha, WV — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BP ENERG/TGP US METHANOL KANAWHA (Tennessee Gas Pipeline (TGP) loc 54003) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/54003/