Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CON ED/TGP WHITE PLAINS NY WESTCHES

Tennessee Gas Pipeline (TGP) · Loc 420093 · WESTCHESTER, New York
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.163
Bcf/d scheduled
Δ Day-over-day
-0.057
vs Nov 25
7-day average
0.157
Bcf/d
30-day average
0.145
30 of 30 days posted
30-day high
0.220
Nov 25
30-day low
0.079
Nov 4
Operating capacity
0.410
Bcf/d as posted, evening cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.163-0.057
Nov 250.220+0.016
Nov 240.203+0.072
Nov 230.131+0.016
Nov 220.115-0.012
Nov 210.127-0.013
Nov 200.140-0.015
Nov 190.155-0.009
Nov 180.164-0.004
Nov 170.168-0.031
Nov 160.200-0.003
Nov 150.203-0.010
Nov 140.213+0.000
Nov 130.213+0.078
Nov 120.135+0.005
Nov 110.130-0.007
Nov 100.137-0.016
Nov 90.153+0.025
Nov 80.128+0.006
Nov 70.122+0.032
Nov 60.090+0.004
Nov 50.086+0.007
Nov 40.079-0.026
Nov 30.105-0.030
Nov 20.135-0.008
Nov 10.142-0.002
Oct 310.144+0.028
Oct 300.116+0.018
Oct 290.099-0.032
Oct 280.130—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCON ED/TGP WHITE PLAINS NY WESTCHES

Tennessee Gas PipelinePlaced at the center of Westchester, NY — approximate; the exact meter site is not published.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-17 · effective 2026-11-18 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-13 · effective 2026-10-14 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CON ED/TGP WHITE PLAINS NY WESTCHES (Tennessee Gas Pipeline (TGP) loc 420093) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420093/