Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

BOSTN/TGP 267 CDP - BOSTON GAS

Tennessee Gas Pipeline (TGP) · Loc 47860 · MIDDLESEX, Massachusetts
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.042
Bcf/d scheduled
Δ Day-over-day
-0.009
vs Nov 25
7-day average
0.045
Bcf/d
30-day average
0.044
30 of 30 days posted
30-day high
0.054
Nov 24
30-day low
0.028
Nov 6
Operating capacity
0.222
Bcf/d as posted, evening cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.042-0.009
Nov 250.050-0.004
Nov 240.054+0.009
Nov 230.046+0.007
Nov 220.038-0.003
Nov 210.041-0.004
Nov 200.045-0.003
Nov 190.049+0.000
Nov 180.048-0.001
Nov 170.049-0.004
Nov 160.053+0.006
Nov 150.046+0.001
Nov 140.045-0.004
Nov 130.049+0.004
Nov 120.045+0.000
Nov 110.045+0.001
Nov 100.044+0.000
Nov 90.044+0.004
Nov 80.040+0.003
Nov 70.037+0.010
Nov 60.028-0.008
Nov 50.035-0.001
Nov 40.036-0.004
Nov 30.041-0.002
Nov 20.043-0.000
Nov 10.043+0.000
Oct 310.042+0.002
Oct 300.040-0.002
Oct 290.043-0.004
Oct 280.047—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineBOSTN/TGP 267 CDP - BOSTON GAS

Tennessee Gas PipelinePlaced at the center of Middlesex, MA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BOSTN/TGP 267 CDP - BOSTON GAS (Tennessee Gas Pipeline (TGP) loc 47860) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/47860/