Gas day Nov 26
0.104
Bcf/d scheduled
Δ Day-over-day
-0.064
vs Nov 25
7-day average
0.125
Bcf/d
30-day average
0.117
30 of 30 days posted
30-day high
0.188
Nov 13
30-day low
0.057
Oct 30
Operating capacity
0.363
Bcf/d as posted, evening cycle
Utilization
29%
headroom 71%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.104 | -0.064 |
| Nov 25 | 0.167 | -0.000 |
| Nov 24 | 0.167 | +0.057 |
| Nov 23 | 0.110 | +0.003 |
| Nov 22 | 0.107 | +0.002 |
| Nov 21 | 0.105 | -0.009 |
| Nov 20 | 0.114 | -0.002 |
| Nov 19 | 0.117 | +0.000 |
| Nov 18 | 0.117 | -0.016 |
| Nov 17 | 0.133 | -0.026 |
| Nov 16 | 0.159 | -0.001 |
| Nov 15 | 0.160 | -0.003 |
| Nov 14 | 0.163 | -0.025 |
| Nov 13 | 0.188 | +0.076 |
| Nov 12 | 0.113 | +0.000 |
| Nov 11 | 0.112 | -0.003 |
| Nov 10 | 0.116 | +0.001 |
| Nov 9 | 0.115 | +0.010 |
| Nov 8 | 0.105 | +0.001 |
| Nov 7 | 0.104 | +0.017 |
| Nov 6 | 0.086 | -0.001 |
| Nov 5 | 0.087 | +0.003 |
| Nov 4 | 0.085 | -0.016 |
| Nov 3 | 0.101 | -0.008 |
| Nov 2 | 0.109 | -0.024 |
| Nov 1 | 0.133 | +0.034 |
| Oct 31 | 0.099 | +0.042 |
| Oct 30 | 0.057 | -0.012 |
| Oct 29 | 0.069 | -0.033 |
| Oct 28 | 0.102 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelinePlaced at the center of Middlesex, MA — approximate; the exact meter site is not published.
Notices
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on Tennessee Gas Pipeline (TGP)
- CON ED/TGP WHITE PLAINS NY WESTCHES 0.163 Bcf/d
- EVRSRC/TGP AGAWAM MASS HAMPDEN 0.070 Bcf/d
- NSTAR/TGP WORCESTER MA WORCHESTER 0.070 Bcf/d
- BOSTN/TGP 261 CDP - BOSTON 0.057 Bcf/d
- CONN NG/TGP BLOOMFIELD CT HARTFORD 0.045 Bcf/d
- BOSTN/TGP 267 CDP - BOSTON GAS 0.042 Bcf/d
- UGI UT/TGP AUBURN PA SUSQUEHANNA 0.039 Bcf/d
- CONN NG/TGP BRIDGEPORT CT FAIRFIELD 0.034 Bcf/d
Cite thisEnercast PipeScrape, BOSTN/TGP 268 CDP - BOSTON GAS (Tennessee Gas Pipeline (TGP) loc 47861) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/47861/