Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CONN NG/TGP BLOOMFIELD CT HARTFORD

Tennessee Gas Pipeline (TGP) · Loc 420205 · HARTFORD, Connecticut
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.045
Bcf/d scheduled
Δ Day-over-day
-0.017
vs Nov 25
7-day average
0.049
Bcf/d
30-day average
0.045
30 of 30 days posted
30-day high
0.061
Nov 25
30-day low
0.018
Nov 5
Operating capacity
0.293
Bcf/d as posted, evening cycle
Utilization
15%
headroom 85%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.045-0.017
Nov 250.061+0.000
Nov 240.061+0.015
Nov 230.046+0.009
Nov 220.037-0.009
Nov 210.046-0.000
Nov 200.046+0.000
Nov 190.046+0.000
Nov 180.046-0.001
Nov 170.047-0.014
Nov 160.061+0.000
Nov 150.060+0.000
Nov 140.060-0.000
Nov 130.060+0.015
Nov 120.046+0.000
Nov 110.045+0.000
Nov 100.045+0.002
Nov 90.043+0.001
Nov 80.043+0.008
Nov 70.035+0.003
Nov 60.032+0.014
Nov 50.018-0.007
Nov 40.025-0.013
Nov 30.037+0.000
Nov 20.037-0.007
Nov 10.045+0.003
Oct 310.042+0.000
Oct 300.042+0.007
Oct 290.035-0.008
Oct 280.043—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCONN NG/TGP BLOOMFIELD CT HARTFORD

Tennessee Gas PipelinePlaced at the center of Hartford, CT — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CONN NG/TGP BLOOMFIELD CT HARTFORD (Tennessee Gas Pipeline (TGP) loc 420205) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420205/