Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CONN NG/TGP BRIDGEPORT CT FAIRFIELD

Tennessee Gas Pipeline (TGP) · Loc 420126 · FAIRFIELD, Connecticut
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.034
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.027
30 of 30 days posted
30-day high
0.036
Oct 28
30-day low
0.013
Nov 5
Operating capacity
0.128
Bcf/d as posted, evening cycle
Utilization
27%
headroom 73%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.034-0.001
Nov 250.035-0.000
Nov 240.035+0.014
Nov 230.022+0.001
Nov 220.021+0.000
Nov 210.021-0.005
Nov 200.025-0.009
Nov 190.034+0.000
Nov 180.034-0.000
Nov 170.034+0.000
Nov 160.034+0.000
Nov 150.034-0.000
Nov 140.034-0.001
Nov 130.035+0.001
Nov 120.034+0.000
Nov 110.034+0.013
Nov 100.021-0.000
Nov 90.021+0.000
Nov 80.021+0.000
Nov 70.021+0.004
Nov 60.017+0.003
Nov 50.013-0.000
Nov 40.013-0.005
Nov 30.018-0.003
Nov 20.021+0.000
Nov 10.021-0.014
Oct 310.035+0.000
Oct 300.035+0.014
Oct 290.020-0.015
Oct 280.036—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCONN NG/TGP BRIDGEPORT CT FAIRFIELD

Tennessee Gas PipelinePlaced at the center of Fairfield, CT — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CONN NG/TGP BRIDGEPORT CT FAIRFIELD (Tennessee Gas Pipeline (TGP) loc 420126) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420126/