Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Hebron Storage Withdrawal (Potter Co.) (withdrawal, Tennessee Gas Pipeline (TGP))

Tennessee Gas Pipeline (TGP) · Loc 470001 · Northeast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
+0.020
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.006
Bcf/d
30-day average
+0.001
30 of 30 days posted
30-day high
+0.020
Nov 27
30-day low
+0.000
Nov 25
Operating capacity
0.332
Bcf/d as posted, evening cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.020+0.000
Nov 26+0.020+0.020
Nov 25+0.000+0.000
Nov 24+0.000+0.000
Nov 23+0.000+0.000
Nov 22+0.000+0.000
Nov 21+0.000+0.000
Nov 20+0.000+0.000
Nov 19+0.000+0.000
Nov 18+0.000+0.000
Nov 17+0.000+0.000
Nov 16+0.000+0.000
Nov 15+0.000+0.000
Nov 14+0.000+0.000
Nov 13+0.000+0.000
Nov 12+0.000+0.000
Nov 11+0.000+0.000
Nov 10+0.000+0.000
Nov 9+0.000+0.000
Nov 8+0.000+0.000
Nov 7+0.000+0.000
Nov 6+0.000+0.000
Nov 5+0.000+0.000
Nov 4+0.000+0.000
Nov 3+0.000+0.000
Nov 2+0.000+0.000
Nov 1+0.000+0.000
Oct 31+0.000+0.000
Oct 30+0.000+0.000
Oct 29+0.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Hebron Storage Withdrawal (Potter Co.) (withdrawal, Tennessee Gas Pipeline (TGP)) (Tennessee Gas Pipeline (TGP) loc 470001) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/470001/