Gas day Nov 27
+0.012
Bcf/d scheduled
Δ Day-over-day
+0.012
vs Nov 26
7-day average
+0.002
Bcf/d
30-day average
+0.000
30 of 30 days posted
30-day high
+0.012
Nov 27
30-day low
+0.000
Nov 26
Operating capacity
0.250
Bcf/d as posted, evening cycle
Utilization
5%
headroom 95%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | +0.012 | +0.012 |
| Nov 26 | +0.000 | +0.000 |
| Nov 25 | +0.000 | +0.000 |
| Nov 24 | +0.000 | +0.000 |
| Nov 23 | +0.000 | +0.000 |
| Nov 22 | +0.000 | +0.000 |
| Nov 21 | +0.000 | +0.000 |
| Nov 20 | +0.000 | +0.000 |
| Nov 19 | +0.000 | +0.000 |
| Nov 18 | +0.000 | +0.000 |
| Nov 17 | +0.000 | +0.000 |
| Nov 16 | +0.000 | +0.000 |
| Nov 15 | +0.000 | +0.000 |
| Nov 14 | +0.000 | +0.000 |
| Nov 13 | +0.000 | +0.000 |
| Nov 12 | +0.000 | +0.000 |
| Nov 11 | +0.000 | +0.000 |
| Nov 10 | +0.000 | +0.000 |
| Nov 9 | +0.000 | +0.000 |
| Nov 8 | +0.000 | +0.000 |
| Nov 7 | +0.000 | +0.000 |
| Nov 6 | +0.000 | +0.000 |
| Nov 5 | +0.000 | +0.000 |
| Nov 4 | +0.000 | +0.000 |
| Nov 3 | +0.000 | +0.000 |
| Nov 2 | +0.000 | +0.000 |
| Nov 1 | +0.000 | +0.000 |
| Oct 31 | +0.000 | +0.000 |
| Oct 30 | +0.000 | +0.000 |
| Oct 29 | +0.000 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Notices that name this point
Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.
Tennessee Gas Pipeline (TGP) · posted 2026-10-15 · effective 2026-10-06 · restoration
Tennessee Gas Pipeline has resolved the force majeure declared October 6, 2026 on the HC Line between valve sections MLV 313A-403 and 313A-404 just south of Avoca, New York (Segment 399 FH, Zone 4 End). Repairs to the discovered anomaly are complete and the area is returning to n…
Tennessee Gas Pipeline (TGP) · posted 2026-10-05 · effective 2026-10-06 · force majeure
Tennessee Gas Pipeline declared a force majeure on October 2, 2026 between valve sections 313A-403 to 313A-404 on the HC Line just south of Avoca, New York, following discovery of an anomaly requiring immediate repair. This is Revision 3, issued as a reminder that repair work is …
Tennessee Gas Pipeline (TGP) · posted 2026-10-02 · effective 2026-10-06 · force majeure
Tennessee Gas Pipeline has declared a Force Majeure between valve sections 313A-403 and 313A-404 on the HC Line just south of Avoca, New York, effective October 6, 2026 starting with the Timely Cycle. An anomaly requiring immediate repair was discovered; repair work begins Octobe…
Tennessee Gas Pipeline (TGP) · posted 2026-09-26 · informational
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Storage meters on Tennessee Gas Pipeline (TGP)
- Monroe Gas Storage (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.346 Bcf/d
- De Quincy Gas Storage (withdrawal, Tennessee Gas Pipeline (TGP)) +0.197 Bcf/d
- Caledonia Storage (TGP interconnect) (injection, Tennessee Gas Pipeline (TGP)) -0.072 Bcf/d
- Freebird Storage (TGP interconnect) (injection, Tennessee Gas Pipeline (TGP)) -0.029 Bcf/d
- Hebron Storage Withdrawal (Potter Co.) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.020 Bcf/d
- Petal Storage Field (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.020 Bcf/d
- Nashville Storage (injection, Tennessee Gas Pipeline (TGP)) -0.010 Bcf/d
- Portland Storage (Sumner Co., TN) (injection, Tennessee Gas Pipeline (TGP)) -0.002 Bcf/d
Cite thisEnercast PipeScrape, Wyckoff Storage (Steuben Co.) (withdrawal, Tennessee Gas Pipeline (TGP)) (Tennessee Gas Pipeline (TGP) loc 421068) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/421068/