Gas day Nov 27
-0.010
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
-0.003
Bcf/d
30-day average
-0.010
30 of 30 days posted
30-day high
-0.000
Nov 25
30-day low
-0.026
Oct 29
Operating capacity
0.124
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%
Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | -0.010 | +0.000 |
| Nov 26 | -0.010 | -0.010 |
| Nov 25 | -0.000 | +0.000 |
| Nov 24 | -0.000 | +0.000 |
| Nov 23 | -0.000 | +0.000 |
| Nov 22 | -0.000 | +0.000 |
| Nov 21 | -0.000 | +0.000 |
| Nov 20 | -0.000 | +0.000 |
| Nov 19 | -0.000 | +0.000 |
| Nov 18 | -0.000 | +0.005 |
| Nov 17 | -0.005 | -0.005 |
| Nov 16 | -0.000 | +0.000 |
| Nov 15 | -0.000 | +0.000 |
| Nov 14 | -0.000 | +0.000 |
| Nov 13 | -0.000 | +0.015 |
| Nov 12 | -0.015 | +0.001 |
| Nov 11 | -0.016 | +0.000 |
| Nov 10 | -0.016 | +0.000 |
| Nov 9 | -0.016 | +0.000 |
| Nov 8 | -0.016 | +0.000 |
| Nov 7 | -0.016 | +0.000 |
| Nov 6 | -0.016 | +0.000 |
| Nov 5 | -0.016 | +0.000 |
| Nov 4 | -0.016 | -0.000 |
| Nov 3 | -0.016 | +0.006 |
| Nov 2 | -0.022 | -0.000 |
| Nov 1 | -0.021 | +0.003 |
| Oct 31 | -0.024 | +0.000 |
| Oct 30 | -0.024 | +0.002 |
| Oct 29 | -0.026 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Recent notices on Tennessee Gas Pipeline (TGP)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →
Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Storage meters on Tennessee Gas Pipeline (TGP)
- Monroe Gas Storage (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.346 Bcf/d
- De Quincy Gas Storage (withdrawal, Tennessee Gas Pipeline (TGP)) +0.197 Bcf/d
- Caledonia Storage (TGP interconnect) (injection, Tennessee Gas Pipeline (TGP)) -0.072 Bcf/d
- Freebird Storage (TGP interconnect) (injection, Tennessee Gas Pipeline (TGP)) -0.029 Bcf/d
- Hebron Storage Withdrawal (Potter Co.) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.020 Bcf/d
- Petal Storage Field (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.020 Bcf/d
- Wyckoff Storage (Steuben Co.) (withdrawal, Tennessee Gas Pipeline (TGP)) +0.012 Bcf/d
- Portland Storage (Sumner Co., TN) (injection, Tennessee Gas Pipeline (TGP)) -0.002 Bcf/d
Cite thisEnercast PipeScrape, Nashville Storage (injection, Tennessee Gas Pipeline (TGP)) (Tennessee Gas Pipeline (TGP) loc 420243) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420243/