Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Monroe Gas Storage (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP))

Tennessee Gas Pipeline (TGP) · Loc 421061 · Northeast
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.346
Bcf/d scheduled
Δ Day-over-day
-0.009
vs Nov 26
7-day average
+0.382
Bcf/d
30-day average
+0.374
30 of 30 days posted
30-day high
+0.440
Nov 6
30-day low
+0.286
Nov 15
Operating capacity
0.500
Bcf/d as posted, evening cycle
Utilization
69%
headroom 31%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.346-0.009
Nov 26+0.355-0.037
Nov 25+0.392-0.006
Nov 24+0.399+0.006
Nov 23+0.393-0.001
Nov 22+0.394-0.001
Nov 21+0.395+0.011
Nov 20+0.384+0.005
Nov 19+0.379+0.025
Nov 18+0.354-0.022
Nov 17+0.376+0.087
Nov 16+0.289+0.002
Nov 15+0.286-0.001
Nov 14+0.287-0.122
Nov 13+0.410+0.003
Nov 12+0.406-0.003
Nov 11+0.410+0.036
Nov 10+0.373+0.044
Nov 9+0.330+0.034
Nov 8+0.295-0.035
Nov 7+0.330-0.110
Nov 6+0.440+0.012
Nov 5+0.429+0.032
Nov 4+0.397+0.034
Nov 3+0.363-0.005
Nov 2+0.367-0.002
Nov 1+0.369-0.053
Oct 31+0.422-0.000
Oct 30+0.422+0.001
Oct 29+0.421—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-17 · effective 2026-11-18 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-10-13 · effective 2026-10-14 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Monroe Gas Storage (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP)) (Tennessee Gas Pipeline (TGP) loc 421061) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/421061/