Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

De Quincy Gas Storage (withdrawal, Tennessee Gas Pipeline (TGP))

Tennessee Gas Pipeline (TGP) · Loc 412737 · Gulf Coast
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.197
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.147
Bcf/d
30-day average
+0.166
30 of 30 days posted
30-day high
+0.239
Nov 3
30-day low
+0.071
Nov 22
Operating capacity
0.700
Bcf/d as posted, evening cycle
Utilization
28%
headroom 72%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.197+0.000
Nov 26+0.197+0.010
Nov 25+0.187-0.007
Nov 24+0.194+0.120
Nov 23+0.074+0.003
Nov 22+0.071-0.035
Nov 21+0.106-0.085
Nov 20+0.192+0.032
Nov 19+0.160+0.012
Nov 18+0.148+0.003
Nov 17+0.145-0.015
Nov 16+0.160+0.000
Nov 15+0.160+0.000
Nov 14+0.160-0.014
Nov 13+0.175+0.014
Nov 12+0.160+0.000
Nov 11+0.160-0.010
Nov 10+0.170-0.016
Nov 9+0.186+0.029
Nov 8+0.157+0.000
Nov 7+0.157+0.002
Nov 6+0.155+0.019
Nov 5+0.136-0.068
Nov 4+0.203-0.036
Nov 3+0.239+0.023
Nov 2+0.217+0.013
Nov 1+0.204+0.034
Oct 31+0.171+0.000
Oct 30+0.171+0.000
Oct 29+0.171—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, De Quincy Gas Storage (withdrawal, Tennessee Gas Pipeline (TGP)) (Tennessee Gas Pipeline (TGP) loc 412737) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/412737/