Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Petal Storage Field (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP))

Tennessee Gas Pipeline (TGP) · Loc 420797 · Gulf Coast
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.020
Bcf/d scheduled
Δ Day-over-day
-0.012
vs Nov 26
7-day average
+0.075
Bcf/d
30-day average
+0.047
30 of 30 days posted
30-day high
+0.152
Nov 18
30-day low
+0.000
Nov 10
Operating capacity
0.359
Bcf/d as posted, evening cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.020-0.012
Nov 26+0.032-0.019
Nov 25+0.051-0.013
Nov 24+0.064-0.058
Nov 23+0.121+0.012
Nov 22+0.110-0.017
Nov 21+0.127+0.057
Nov 20+0.069+0.029
Nov 19+0.040-0.112
Nov 18+0.152+0.008
Nov 17+0.144+0.123
Nov 16+0.021+0.000
Nov 15+0.021+0.000
Nov 14+0.021-0.031
Nov 13+0.051+0.032
Nov 12+0.019+0.000
Nov 11+0.019+0.019
Nov 10+0.000-0.013
Nov 9+0.013+0.007
Nov 8+0.007-0.012
Nov 7+0.019-0.028
Nov 6+0.047+0.030
Nov 5+0.017-0.003
Nov 4+0.020-0.014
Nov 3+0.034+0.018
Nov 2+0.016-0.017
Nov 1+0.033+0.024
Oct 31+0.009-0.051
Oct 30+0.060+0.017
Oct 29+0.043—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-10-27 · effective 2026-10-28 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Petal Storage Field (TGP interconnect) (withdrawal, Tennessee Gas Pipeline (TGP)) (Tennessee Gas Pipeline (TGP) loc 420797) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420797/