Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

WESTFLD/TGP SOUTHWICK : DIP 259C H

Tennessee Gas Pipeline (TGP) · Loc 421058 · HAMPDEN, Massachusetts
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
-0.007
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.007
Nov 24
30-day low
0.000
Nov 26
Operating capacity
0.042
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.0060.008Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.000-0.007
Nov 250.007-0.000
Nov 240.007+0.007
Nov 230.000-0.003
Nov 220.003-0.001
Nov 210.004+0.000
Nov 200.004+0.002
Nov 190.003+0.001
Nov 180.002+0.001
Nov 170.001+0.000
Nov 160.001-0.004
Nov 150.005-0.000
Nov 140.005-0.000
Nov 130.006+0.001
Nov 120.005+0.000
Nov 110.004+0.001
Nov 100.004-0.000
Nov 90.004+0.000
Nov 80.004+0.001
Nov 70.003+0.001
Nov 60.002+0.000
Nov 50.002+0.002
Nov 40.000-0.002
Nov 30.002+0.002
Nov 20.000-0.006
Nov 10.006+0.005
Oct 310.001+0.000
Oct 300.001+0.000
Oct 290.001-0.000
Oct 280.001—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineWESTFLD/TGP SOUTHWICK : DIP 259C H

Tennessee Gas PipelinePlaced at the center of Hampden, MA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WESTFLD/TGP SOUTHWICK : DIP 259C H (Tennessee Gas Pipeline (TGP) loc 421058) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/421058/