Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

SYMMETRY/TGP COLBERT COLBERT

Tennessee Gas Pipeline (TGP) · Loc 421031 · COLBERT, Alabama
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.019
Bcf/d scheduled
Δ Day-over-day
-0.006
vs Nov 25
7-day average
0.022
Bcf/d
30-day average
0.020
30 of 30 days posted
30-day high
0.026
Nov 16
30-day low
0.016
Oct 28
Operating capacity
0.097
Bcf/d as posted, evening cycle
Utilization
20%
headroom 80%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.019-0.006
Nov 250.025+0.001
Nov 240.024+0.004
Nov 230.020-0.001
Nov 220.021-0.001
Nov 210.021-0.002
Nov 200.023-0.001
Nov 190.024+0.005
Nov 180.019-0.005
Nov 170.025-0.001
Nov 160.026+0.000
Nov 150.026+0.001
Nov 140.025+0.004
Nov 130.020+0.001
Nov 120.019+0.002
Nov 110.017+0.000
Nov 100.017+0.001
Nov 90.017-0.000
Nov 80.017-0.000
Nov 70.017+0.001
Nov 60.017+0.000
Nov 50.017+0.000
Nov 40.017-0.001
Nov 30.017+0.001
Nov 20.017-0.002
Nov 10.018-0.000
Oct 310.018+0.000
Oct 300.018+0.001
Oct 290.017+0.001
Oct 280.016—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineSYMMETRY/TGP COLBERT COLBERT

Tennessee Gas PipelinePlaced at the center of Colbert, AL — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SYMMETRY/TGP COLBERT COLBERT (Tennessee Gas Pipeline (TGP) loc 421031) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/421031/