LGE/TGP CALVARY MARION

Tennessee Gas Pipeline (TGP) · Loc 420844 · MARION, Kentucky
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.025
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.012
Bcf/d
30-day average
0.012
30 of 30 days posted
30-day high
0.030
Nov 25
30-day low
0.000
Nov 23
Operating capacity
0.104
Bcf/d as posted, evening cycle
Utilization
24%
headroom 76%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.025-0.005
Nov 250.030+0.000
Nov 240.030+0.030
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000-0.020
Nov 190.020+0.000
Nov 180.020+0.000
Nov 170.020+0.000
Nov 160.020+0.000
Nov 150.020+0.000
Nov 140.020+0.000
Nov 130.020+0.005
Nov 120.015+0.000
Nov 110.015-0.005
Nov 100.020+0.005
Nov 90.015+0.000
Nov 80.015+0.000
Nov 70.015+0.010
Nov 60.005+0.000
Nov 50.005+0.000
Nov 40.005+0.000
Nov 30.005+0.000
Nov 20.005+0.000
Nov 10.005+0.000
Oct 310.005+0.002
Oct 300.003-0.002
Oct 290.005-0.000
Oct 280.005—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineLGE/TGP CALVARY MARION

Tennessee Gas PipelinePlaced at the center of Marion, KY — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LGE/TGP CALVARY MARION (Tennessee Gas Pipeline (TGP) loc 420844) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420844/