Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

ALERIS/TGP NEWPORT SALES TUSCARAWAS

Tennessee Gas Pipeline (TGP) · Loc 420809 · TUSCARAWAS, Ohio
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.004
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.004
Nov 27
30-day low
0.003
Oct 29
Operating capacity
0.020
Bcf/d as posted, evening cycle
Utilization
20%
headroom 80%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0010.0020.0030.004Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.004+0.000
Nov 260.004+0.000
Nov 250.004+0.000
Nov 240.004+0.000
Nov 230.004+0.000
Nov 220.004+0.000
Nov 210.004+0.000
Nov 200.004+0.000
Nov 190.004+0.000
Nov 180.004+0.000
Nov 170.004+0.000
Nov 160.004+0.000
Nov 150.004+0.000
Nov 140.004+0.000
Nov 130.004+0.000
Nov 120.004+0.000
Nov 110.004+0.000
Nov 100.004+0.000
Nov 90.004-0.000
Nov 80.004+0.000
Nov 70.004+0.000
Nov 60.004-0.000
Nov 50.004-0.000
Nov 40.004-0.000
Nov 30.004+0.000
Nov 20.004+0.001
Nov 10.003-0.001
Oct 310.004+0.000
Oct 300.004+0.001
Oct 290.003—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineALERIS/TGP NEWPORT SALES TUSCARAWAS

Tennessee Gas PipelinePlaced at the center of Tuscarawas, OH — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ALERIS/TGP NEWPORT SALES TUSCARAWAS (Tennessee Gas Pipeline (TGP) loc 420809) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420809/