Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NJ NATGS/TGP NEW CLINTON ROAD NJ BE

Tennessee Gas Pipeline (TGP) · Loc 420608 · Bergen, New Jersey
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.017
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.016
Bcf/d
30-day average
0.014
30 of 30 days posted
30-day high
0.023
Nov 16
30-day low
0.006
Nov 5
Operating capacity
0.138
Bcf/d as posted, evening cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.017+0.000
Nov 260.017-0.003
Nov 250.020-0.002
Nov 240.022+0.011
Nov 230.011+0.000
Nov 220.011+0.000
Nov 210.011-0.003
Nov 200.013-0.001
Nov 190.015-0.002
Nov 180.017-0.001
Nov 170.018-0.005
Nov 160.023+0.000
Nov 150.023+0.000
Nov 140.023+0.001
Nov 130.022+0.009
Nov 120.013+0.000
Nov 110.013+0.000
Nov 100.013+0.002
Nov 90.011+0.000
Nov 80.011+0.000
Nov 70.011+0.004
Nov 60.007+0.001
Nov 50.006-0.001
Nov 40.007-0.003
Nov 30.010-0.003
Nov 20.013+0.000
Nov 10.013+0.001
Oct 310.011+0.003
Oct 300.009+0.001
Oct 290.008—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineNJ NATGS/TGP NEW CLINTON ROAD NJ BE

Tennessee Gas PipelinePlaced at the center of Bergen, NJ — approximate; the exact meter site is not published.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-10-21 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NJ NATGS/TGP NEW CLINTON ROAD NJ BE (Tennessee Gas Pipeline (TGP) loc 420608) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420608/