Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NSTAR/TGP HOPKINTON MIDDLESEX

Tennessee Gas Pipeline (TGP) · Loc 420509 · MIDDLESEX, Massachusetts
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.009
Bcf/d scheduled
Δ Day-over-day
-0.014
vs Nov 25
7-day average
0.010
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.026
Nov 12
30-day low
0.000
Nov 8
Operating capacity
0.079
Bcf/d as posted, evening cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.009-0.014
Nov 250.022+0.008
Nov 240.014+0.008
Nov 230.006+0.005
Nov 220.001-0.002
Nov 210.003-0.013
Nov 200.016+0.003
Nov 190.013-0.007
Nov 180.020+0.009
Nov 170.011-0.006
Nov 160.017+0.003
Nov 150.014+0.007
Nov 140.007-0.007
Nov 130.014-0.012
Nov 120.026+0.012
Nov 110.014-0.003
Nov 100.018+0.014
Nov 90.003+0.003
Nov 80.000+0.000
Nov 70.000-0.004
Nov 60.004+0.004
Nov 50.000-0.001
Nov 40.001-0.007
Nov 30.008-0.008
Nov 20.016-0.001
Nov 10.017+0.002
Oct 310.015+0.003
Oct 300.012+0.011
Oct 290.001-0.007
Oct 280.008—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineNSTAR/TGP HOPKINTON MIDDLESEX

Tennessee Gas PipelinePlaced at the center of Middlesex, MA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NSTAR/TGP HOPKINTON MIDDLESEX (Tennessee Gas Pipeline (TGP) loc 420509) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420509/