Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CONN NG/TGP NORTH BLOOMFIELD CT HAR

Tennessee Gas Pipeline (TGP) · Loc 420453 · HARTFORD, Connecticut
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.008
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.008
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.009
Nov 25
30-day low
0.000
Nov 6
Operating capacity
0.054
Bcf/d as posted, evening cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0030.0050.0070.010Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.008+0.000
Nov 260.008-0.001
Nov 250.009+0.000
Nov 240.009+0.001
Nov 230.008+0.000
Nov 220.008+0.000
Nov 210.008+0.000
Nov 200.008+0.000
Nov 190.008+0.000
Nov 180.008+0.000
Nov 170.008-0.001
Nov 160.009+0.000
Nov 150.009+0.000
Nov 140.009+0.000
Nov 130.009+0.001
Nov 120.008+0.000
Nov 110.008+0.000
Nov 100.008+0.004
Nov 90.004+0.000
Nov 80.004+0.000
Nov 70.004+0.004
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000-0.000
Nov 30.000-0.007
Nov 20.008+0.000
Nov 10.008+0.008
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCONN NG/TGP NORTH BLOOMFIELD CT HAR

Tennessee Gas PipelinePlaced at the center of Hartford, CT — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CONN NG/TGP NORTH BLOOMFIELD CT HAR (Tennessee Gas Pipeline (TGP) loc 420453) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420453/