Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

UGI UT/TGP TROY PA BRADFORD

Tennessee Gas Pipeline (TGP) · Loc 420444 · BRADFORD, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.003
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.002
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.005
Nov 24
30-day low
0.000
Nov 23
Operating capacity
0.033
Bcf/d as posted, evening cycle
Utilization
9%
headroom 91%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.003-0.001
Nov 250.004-0.001
Nov 240.005+0.005
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000-0.002
Nov 200.002+0.001
Nov 190.001-0.001
Nov 180.002-0.001
Nov 170.003+0.001
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003-0.001
Nov 130.003+0.001
Nov 120.002+0.000
Nov 110.002+0.000
Nov 100.001+0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001-0.000
Nov 60.001+0.001
Nov 50.001+0.000
Nov 40.001+0.001
Nov 30.000-0.001
Nov 20.001+0.000
Nov 10.001-0.000
Oct 310.002+0.000
Oct 300.002+0.002
Oct 290.000-0.002
Oct 280.002—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineUGI UT/TGP TROY PA BRADFORD

Tennessee Gas PipelinePlaced at the center of Bradford, PA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.