YANK GAS/TGP LONG RIDGE CT FAIRFIEL

Tennessee Gas Pipeline (TGP) · Loc 420434 · FAIRFIELD, Connecticut
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.022
Bcf/d scheduled
Δ Day-over-day
-0.003
vs Nov 25
7-day average
0.019
Bcf/d
30-day average
0.020
30 of 30 days posted
30-day high
0.026
Nov 24
30-day low
0.012
Nov 6
Operating capacity
0.063
Bcf/d as posted, evening cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.022-0.003
Nov 250.025-0.001
Nov 240.026+0.012
Nov 230.014+0.002
Nov 220.012-0.000
Nov 210.013-0.009
Nov 200.021-0.001
Nov 190.022+0.001
Nov 180.022-0.002
Nov 170.024-0.000
Nov 160.024+0.001
Nov 150.023+0.001
Nov 140.023-0.001
Nov 130.024+0.002
Nov 120.022-0.000
Nov 110.022-0.000
Nov 100.022+0.007
Nov 90.015+0.002
Nov 80.013+0.001
Nov 70.013+0.001
Nov 60.012-0.000
Nov 50.012-0.001
Nov 40.012-0.010
Nov 30.022-0.000
Nov 20.023+0.001
Nov 10.022+0.000
Oct 310.021-0.001
Oct 300.023+0.001
Oct 290.022-0.001
Oct 280.023—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineYANK GAS/TGP LONG RIDGE CT FAIRFIEL

Tennessee Gas PipelinePlaced at the center of Fairfield, CT — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, YANK GAS/TGP LONG RIDGE CT FAIRFIEL (Tennessee Gas Pipeline (TGP) loc 420434) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420434/