Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

UGI/TGP WELLSBORO PA TIOGA

Tennessee Gas Pipeline (TGP) · Loc 420253 · TIOGA, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.034
Oct 31
30-day low
0.001
Nov 4
Operating capacity
0.114
Bcf/d as posted, evening cycle
Utilization
2%
headroom 98%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.000
Nov 260.002-0.001
Nov 250.003-0.000
Nov 240.003+0.000
Nov 230.003+0.000
Nov 220.002-0.000
Nov 210.003+0.000
Nov 200.002-0.000
Nov 190.003+0.000
Nov 180.002-0.000
Nov 170.003+0.000
Nov 160.003+0.000
Nov 150.003-0.000
Nov 140.003+0.000
Nov 130.003+0.001
Nov 120.002+0.000
Nov 110.002+0.000
Nov 100.002-0.000
Nov 90.002+0.000
Nov 80.002-0.000
Nov 70.003+0.000
Nov 60.002+0.001
Nov 50.002+0.000
Nov 40.001-0.001
Nov 30.002-0.000
Nov 20.003+0.000
Nov 10.003-0.031
Oct 310.034+0.000
Oct 300.034+0.000
Oct 290.033—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineUGI/TGP WELLSBORO PA TIOGA

Tennessee Gas PipelinePlaced at the center of Tioga, PA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGI/TGP WELLSBORO PA TIOGA (Tennessee Gas Pipeline (TGP) loc 420253) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420253/