Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

DELTA NG/TGP NICHOLASVILLE KY GARRA

Tennessee Gas Pipeline (TGP) · Loc 420248 · GARRARD, Kentucky
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.006
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.010
Nov 18
30-day low
0.000
Nov 23
Operating capacity
0.046
Bcf/d as posted, evening cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0030.0050.0070.010Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.006+0.000
Nov 260.006+0.001
Nov 250.005+0.003
Nov 240.002+0.001
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000-0.004
Nov 200.004+0.000
Nov 190.004-0.005
Nov 180.010+0.005
Nov 170.004+0.000
Nov 160.004+0.000
Nov 150.004+0.004
Nov 140.000-0.004
Nov 130.004-0.004
Nov 120.008+0.000
Nov 110.008+0.000
Nov 100.008+0.000
Nov 90.008+0.008
Nov 80.000-0.008
Nov 70.008+0.000
Nov 60.008+0.000
Nov 50.008+0.000
Nov 40.008+0.000
Nov 30.008+0.000
Nov 20.008+0.000
Nov 10.008-0.001
Oct 310.009-0.000
Oct 300.009+0.000
Oct 290.009—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineDELTA NG/TGP NICHOLASVILLE KY GARRA

Tennessee Gas PipelinePlaced at the center of Garrard, KY — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational