CONN NG/TGP PUTNAM LAKE CT FAIRFIEL

Tennessee Gas Pipeline (TGP) · Loc 420217 · FAIRFIELD, Connecticut
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.022
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.022
Bcf/d
30-day average
0.022
30 of 30 days posted
30-day high
0.024
Nov 16
30-day low
0.018
Oct 31
Operating capacity
0.058
Bcf/d as posted, evening cycle
Utilization
38%
headroom 62%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.022-0.002
Nov 250.023+0.000
Nov 240.023+0.002
Nov 230.022+0.000
Nov 220.022+0.000
Nov 210.022+0.000
Nov 200.022+0.000
Nov 190.022+0.000
Nov 180.022+0.000
Nov 170.022-0.002
Nov 160.024+0.000
Nov 150.024+0.000
Nov 140.024+0.000
Nov 130.024+0.002
Nov 120.022+0.000
Nov 110.022+0.000
Nov 100.022+0.000
Nov 90.022+0.000
Nov 80.022+0.000
Nov 70.022+0.000
Nov 60.022+0.000
Nov 50.022+0.000
Nov 40.022+0.000
Nov 30.022+0.000
Nov 20.022+0.000
Nov 10.022+0.003
Oct 310.018+0.000
Oct 300.018+0.000
Oct 290.018+0.000
Oct 280.018—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineCONN NG/TGP PUTNAM LAKE CT FAIRFIEL

Tennessee Gas PipelinePlaced at the center of Fairfield, CT — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CONN NG/TGP PUTNAM LAKE CT FAIRFIEL (Tennessee Gas Pipeline (TGP) loc 420217) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420217/