Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

VALLEY/TGP TOWANDA PA BRADFORD

Tennessee Gas Pipeline (TGP) · Loc 420216 · BRADFORD, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.020
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.019
Bcf/d
30-day average
0.015
30 of 30 days posted
30-day high
0.021
Nov 23
30-day low
0.006
Nov 3
Operating capacity
0.026
Bcf/d as posted, evening cycle
Utilization
78%
headroom 22%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.020+0.004
Nov 250.016+0.000
Nov 240.016-0.005
Nov 230.021+0.001
Nov 220.019-0.000
Nov 210.020-0.000
Nov 200.020+0.000
Nov 190.020+0.000
Nov 180.019+0.005
Nov 170.015+0.003
Nov 160.011+0.001
Nov 150.010-0.000
Nov 140.011-0.000
Nov 130.011+0.000
Nov 120.011+0.001
Nov 110.010-0.001
Nov 100.010-0.004
Nov 90.014+0.001
Nov 80.013-0.000
Nov 70.013+0.004
Nov 60.009+0.002
Nov 50.007+0.000
Nov 40.007+0.001
Nov 30.006-0.010
Nov 20.017-0.001
Nov 10.017-0.001
Oct 310.018-0.000
Oct 300.018+0.001
Oct 290.017-0.000
Oct 280.017—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineVALLEY/TGP TOWANDA PA BRADFORD

Tennessee Gas PipelinePlaced at the center of Bradford, PA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, VALLEY/TGP TOWANDA PA BRADFORD (Tennessee Gas Pipeline (TGP) loc 420216) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420216/