Gas day Nov 27
0.013
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.012
Bcf/d
30-day average
0.009
30 of 30 days posted
30-day high
0.018
Oct 31
30-day low
0.004
Nov 6
Operating capacity
0.051
Bcf/d as posted, evening cycle
Utilization
25%
headroom 75%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.013+0.000
Nov 260.013+0.004
Nov 250.009-0.002
Nov 240.011-0.002
Nov 230.013+0.000
Nov 220.013+0.000
Nov 210.013-0.000
Nov 200.013+0.007
Nov 190.006-0.001
Nov 180.007-0.001
Nov 170.008+0.001
Nov 160.007+0.000
Nov 150.007+0.000
Nov 140.007-0.001
Nov 130.008+0.003
Nov 120.005+0.000
Nov 110.005+0.000
Nov 100.005-0.001
Nov 90.005-0.001
Nov 80.006-0.002
Nov 70.008+0.004
Nov 60.004+0.000
Nov 50.004-0.000
Nov 40.004-0.001
Nov 30.005-0.003
Nov 20.008+0.000
Nov 10.008-0.010
Oct 310.018+0.000
Oct 300.018+0.001
Oct 290.017—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineUGI/TGP MANSFIELD PA TIOGA

Tennessee Gas PipelinePlaced at the center of Tioga, PA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGI/TGP MANSFIELD PA TIOGA (Tennessee Gas Pipeline (TGP) loc 420213) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420213/