Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

LIBERTYU/TGP MANCHESTER NH HILLSBOR

Tennessee Gas Pipeline (TGP) · Loc 420133 · HILLSBOROUGH, New Hampshire
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.016
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
0.021
Bcf/d
30-day average
0.020
30 of 30 days posted
30-day high
0.031
Nov 24
30-day low
0.011
Nov 6
Operating capacity
0.068
Bcf/d as posted, evening cycle
Utilization
24%
headroom 76%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.016-0.001
Nov 260.017-0.012
Nov 250.029-0.002
Nov 240.031+0.009
Nov 230.022+0.009
Nov 220.013-0.003
Nov 210.017-0.004
Nov 200.021-0.002
Nov 190.022-0.001
Nov 180.024-0.003
Nov 170.026-0.001
Nov 160.027+0.002
Nov 150.025+0.002
Nov 140.023-0.003
Nov 130.026+0.002
Nov 120.024+0.001
Nov 110.023+0.003
Nov 100.020-0.001
Nov 90.021+0.004
Nov 80.017+0.002
Nov 70.014+0.003
Nov 60.011-0.000
Nov 50.011-0.001
Nov 40.012-0.002
Nov 30.015-0.002
Nov 20.016-0.000
Nov 10.017-0.007
Oct 310.024+0.001
Oct 300.023+0.008
Oct 290.015—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineLIBERTYU/TGP MANCHESTER NH HILLSBOR

Tennessee Gas PipelinePlaced at the center of Hillsborough, NH — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LIBERTYU/TGP MANCHESTER NH HILLSBOR (Tennessee Gas Pipeline (TGP) loc 420133) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/420133/