Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

FITCHBRG/TGP FITCHBURG MA WORCHESTE

Tennessee Gas Pipeline (TGP) · Loc 420112 · WORCESTER, Massachusetts
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.010
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.008
Bcf/d
30-day average
0.007
30 of 30 days posted
30-day high
0.011
Nov 24
30-day low
0.002
Nov 6
Operating capacity
0.041
Bcf/d as posted, evening cycle
Utilization
25%
headroom 75%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.010-0.001
Nov 250.011-0.000
Nov 240.011+0.002
Nov 230.009+0.004
Nov 220.005-0.000
Nov 210.005-0.002
Nov 200.007-0.001
Nov 190.007-0.000
Nov 180.007-0.002
Nov 170.009-0.002
Nov 160.011+0.000
Nov 150.010+0.000
Nov 140.010+0.000
Nov 130.010+0.002
Nov 120.008+0.000
Nov 110.008+0.001
Nov 100.007-0.000
Nov 90.008+0.001
Nov 80.007+0.003
Nov 70.004+0.001
Nov 60.002-0.001
Nov 50.003-0.000
Nov 40.003-0.001
Nov 30.004-0.000
Nov 20.005-0.000
Nov 10.005-0.000
Oct 310.005+0.000
Oct 300.005+0.001
Oct 290.004-0.002
Oct 280.006—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas PipelineFITCHBRG/TGP FITCHBURG MA WORCHESTE

Tennessee Gas PipelinePlaced at the center of Worcester, MA — approximate; the exact meter site is not published.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, FITCHBRG/TGP FITCHBURG MA WORCHESTE (Tennessee Gas Pipeline (TGP) loc 420112) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/420112/