Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

GOLDENDALE ENERGY DELIVERY

Northwest Pipeline · Loc 618 · KLICKITAT, Washington
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.048
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 25
7-day average
0.047
Bcf/d
30-day average
0.047
30 of 30 days posted
30-day high
0.050
Nov 24
30-day low
0.037
Nov 20
Operating capacity
0.055
Bcf/d as posted, evening cycle
Utilization
88%
headroom 12%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.048+0.002
Nov 250.046-0.004
Nov 240.050+0.000
Nov 230.050+0.000
Nov 220.050+0.000
Nov 210.050+0.013
Nov 200.037-0.002
Nov 190.039-0.010
Nov 180.049-0.000
Nov 170.049-0.000
Nov 160.049+0.000
Nov 150.049-0.000
Nov 140.050+0.006
Nov 130.044-0.003
Nov 120.047+0.000
Nov 110.047+0.001
Nov 100.046-0.001
Nov 90.047+0.000
Nov 80.047+0.000
Nov 70.047-0.002
Nov 60.049+0.002
Nov 50.047-0.001
Nov 40.048-0.001
Nov 30.050+0.005
Nov 20.045-0.000
Nov 10.045-0.004
Oct 310.049+0.004
Oct 300.044-0.005
Oct 290.050+0.000
Oct 280.050—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineGOLDENDALE ENERGY DELIVERY

Northwest PipelinePlaced at the center of Klickitat, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GOLDENDALE ENERGY DELIVERY (Northwest Pipeline loc 618) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/northwest/618/