Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

ELMORE DELIVERY M/S

Northwest Pipeline · Loc 304210 · Elmore, Idaho
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.064
Bcf/d scheduled
Δ Day-over-day
-0.010
vs Nov 26
7-day average
0.061
Bcf/d
30-day average
0.031
30 of 30 days posted
30-day high
0.074
Nov 26
30-day low
0.000
Nov 3
Operating capacity
0.077
Bcf/d as posted, evening cycle
Utilization
83%
headroom 17%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.064-0.010
Nov 260.074+0.000
Nov 250.074+0.005
Nov 240.069+0.020
Nov 230.049+0.000
Nov 220.049+0.000
Nov 210.049+0.000
Nov 200.049+0.010
Nov 190.039+0.000
Nov 180.039+0.002
Nov 170.037+0.000
Nov 160.037+0.000
Nov 150.037+0.000
Nov 140.037+0.003
Nov 130.034+0.000
Nov 120.034+0.000
Nov 110.034+0.026
Nov 100.008+0.002
Nov 90.006+0.000
Nov 80.006+0.000
Nov 70.006+0.001
Nov 60.005+0.002
Nov 50.003+0.000
Nov 40.003+0.003
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000-0.015
Oct 310.015-0.015
Oct 300.029-0.005
Oct 290.034—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineELMORE DELIVERY M/S

Northwest PipelinePlaced at the center of Elmore, ID — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ELMORE DELIVERY M/S (Northwest Pipeline loc 304210) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/304210/