Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

SEDRO/WOOLLEY

Northwest Pipeline · Loc 28162 · SKAGIT, Washington
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.070
Bcf/d scheduled
Δ Day-over-day
-0.010
vs Nov 25
7-day average
0.075
Bcf/d
30-day average
0.074
30 of 30 days posted
30-day high
0.085
Nov 11
30-day low
0.066
Nov 4
Operating capacity
0.172
Bcf/d as posted, evening cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.070-0.010
Nov 250.079+0.004
Nov 240.075-0.000
Nov 230.075+0.000
Nov 220.075+0.000
Nov 210.075-0.000
Nov 200.075-0.003
Nov 190.078-0.001
Nov 180.079-0.001
Nov 170.079+0.004
Nov 160.075+0.000
Nov 150.075+0.000
Nov 140.075-0.008
Nov 130.083+0.000
Nov 120.082-0.003
Nov 110.085+0.001
Nov 100.084+0.014
Nov 90.071+0.001
Nov 80.069-0.001
Nov 70.071+0.004
Nov 60.066-0.002
Nov 50.068+0.002
Nov 40.066-0.006
Nov 30.072+0.002
Nov 20.070+0.001
Nov 10.069+0.000
Oct 310.069-0.004
Oct 300.073+0.003
Oct 290.070+0.001
Oct 280.069—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineSEDRO/WOOLLEY

Northwest PipelinePlaced at the center of Skagit, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SEDRO/WOOLLEY (Northwest Pipeline loc 28162) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/northwest/28162/