Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

WNG ZONE 30

Northwest Pipeline · Loc 222158 · KING, Washington
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.143
Bcf/d scheduled
Δ Day-over-day
+0.027
vs Nov 26
7-day average
0.163
Bcf/d
30-day average
0.173
30 of 30 days posted
30-day high
0.262
Nov 4
30-day low
0.045
Nov 14

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.143+0.027
Nov 260.116-0.017
Nov 250.133-0.052
Nov 240.185+0.001
Nov 230.184-0.020
Nov 220.204+0.026
Nov 210.178-0.026
Nov 200.204-0.005
Nov 190.209+0.000
Nov 180.209+0.042
Nov 170.168-0.000
Nov 160.168+0.060
Nov 150.107+0.063
Nov 140.045-0.095
Nov 130.140+0.035
Nov 120.105-0.032
Nov 110.137-0.033
Nov 100.170-0.010
Nov 90.180-0.010
Nov 80.190+0.040
Nov 70.149-0.038
Nov 60.187-0.034
Nov 50.220-0.041
Nov 40.262+0.091
Nov 30.171-0.032
Nov 20.203-0.015
Nov 10.217+0.009
Oct 310.208+0.001
Oct 300.208+0.019
Oct 290.188—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineWNG ZONE 30

Northwest PipelinePlaced at the center of King, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WNG ZONE 30 (Northwest Pipeline loc 222158) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/222158/