Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

MERIDIAN/BOISE

Northwest Pipeline · Loc 3466 · ADA, Idaho
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.018
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.018
Bcf/d
30-day average
0.019
30 of 30 days posted
30-day high
0.020
Nov 13
30-day low
0.017
Oct 29
Operating capacity
0.058
Bcf/d as posted, evening cycle
Utilization
31%
headroom 69%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.018+0.000
Nov 250.017+0.000
Nov 240.017+0.000
Nov 230.017+0.000
Nov 220.017+0.000
Nov 210.017-0.002
Nov 200.019+0.000
Nov 190.019+0.000
Nov 180.019+0.000
Nov 170.019+0.000
Nov 160.019+0.000
Nov 150.019+0.000
Nov 140.019-0.000
Nov 130.020+0.000
Nov 120.020+0.000
Nov 110.020+0.000
Nov 100.020+0.000
Nov 90.020+0.000
Nov 80.020+0.000
Nov 70.020+0.001
Nov 60.019+0.000
Nov 50.019+0.000
Nov 40.019+0.000
Nov 30.019+0.000
Nov 20.019+0.000
Nov 10.019+0.002
Oct 310.017+0.000
Oct 300.017+0.000
Oct 290.017-0.001
Oct 280.017—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineMERIDIAN/BOISE

Northwest PipelinePlaced at the center of Ada, ID — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MERIDIAN/BOISE (Northwest Pipeline loc 3466) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/northwest/3466/