Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

YAKIMA/UNION GAP

Northwest Pipeline · Loc 28259 · YAKIMA, Washington
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.002
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.003
Nov 25
30-day low
0.001
Nov 19
Operating capacity
0.039
Bcf/d as posted, evening cycle
Utilization
5%
headroom 95%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0010.0020.003Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.000
Nov 260.002-0.001
Nov 250.003+0.000
Nov 240.003+0.000
Nov 230.003+0.000
Nov 220.003+0.000
Nov 210.003+0.000
Nov 200.003+0.001
Nov 190.001-0.000
Nov 180.002-0.000
Nov 170.002+0.000
Nov 160.002+0.000
Nov 150.002+0.000
Nov 140.002+0.000
Nov 130.002+0.000
Nov 120.002+0.000
Nov 110.002+0.000
Nov 100.002+0.000
Nov 90.002+0.000
Nov 80.002+0.000
Nov 70.002+0.000
Nov 60.002+0.000
Nov 50.002+0.000
Nov 40.002+0.000
Nov 30.002+0.000
Nov 20.002+0.000
Nov 10.002-0.000
Oct 310.002+0.000
Oct 300.002-0.000
Oct 290.002—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineYAKIMA/UNION GAP

Northwest PipelinePlaced at the center of Yakima, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, YAKIMA/UNION GAP (Northwest Pipeline loc 28259) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/28259/