SPOKANE WEST

Northwest Pipeline · Loc 28194 · SPOKANE, Washington
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.035
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.029
30 of 30 days posted
30-day high
0.036
Nov 6
30-day low
0.014
Oct 29
Operating capacity
0.043
Bcf/d as posted, evening cycle
Utilization
80%
headroom 20%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.035+0.001
Nov 250.034+0.008
Nov 240.026+0.001
Nov 230.025+0.000
Nov 220.025-0.000
Nov 210.025-0.001
Nov 200.026-0.003
Nov 190.029-0.002
Nov 180.030+0.001
Nov 170.030-0.006
Nov 160.035+0.000
Nov 150.035-0.001
Nov 140.036+0.005
Nov 130.031+0.001
Nov 120.030+0.000
Nov 110.030-0.002
Nov 100.032-0.002
Nov 90.033+0.000
Nov 80.033+0.006
Nov 70.028-0.009
Nov 60.036+0.003
Nov 50.034+0.003
Nov 40.031-0.000
Nov 30.031-0.000
Nov 20.032-0.000
Nov 10.032-0.004
Oct 310.036+0.021
Oct 300.015+0.001
Oct 290.014-0.003
Oct 280.017—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineSPOKANE WEST

Northwest PipelinePlaced at the center of Spokane, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…