Gas day Nov 26
-0.010
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
-0.010
Bcf/d
30-day average
-0.008
30 of 30 days posted
30-day high
-0.000
Nov 5
30-day low
-0.011
Nov 23
Operating capacity
0.031
Bcf/d as posted, timely cycle
Utilization
33%
headroom 67%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | -0.010 | -0.001 |
| Nov 25 | -0.009 | -0.002 |
| Nov 24 | -0.007 | +0.003 |
| Nov 23 | -0.011 | +0.000 |
| Nov 22 | -0.011 | +0.000 |
| Nov 21 | -0.011 | +0.000 |
| Nov 20 | -0.011 | -0.000 |
| Nov 19 | -0.011 | -0.001 |
| Nov 18 | -0.010 | -0.000 |
| Nov 17 | -0.010 | -0.001 |
| Nov 16 | -0.009 | +0.000 |
| Nov 15 | -0.009 | +0.000 |
| Nov 14 | -0.009 | -0.000 |
| Nov 13 | -0.009 | +0.001 |
| Nov 12 | -0.009 | +0.000 |
| Nov 11 | -0.009 | +0.000 |
| Nov 10 | -0.009 | +0.000 |
| Nov 9 | -0.009 | +0.000 |
| Nov 8 | -0.009 | +0.000 |
| Nov 7 | -0.009 | -0.002 |
| Nov 6 | -0.007 | -0.007 |
| Nov 5 | -0.000 | +0.000 |
| Nov 4 | -0.000 | +0.000 |
| Nov 3 | -0.000 | +0.005 |
| Nov 2 | -0.005 | +0.000 |
| Nov 1 | -0.005 | +0.005 |
| Oct 31 | -0.010 | +0.000 |
| Oct 30 | -0.010 | +0.000 |
| Oct 29 | -0.010 | +0.001 |
| Oct 28 | -0.010 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on ANR Pipeline (TC Energy)
- DUGAS RD REC 0.623 Bcf/d
- WEEKS ISLA/LIG PL -0.192 Bcf/d
- RIVERWAY (TO BRIDGELINE) -0.125 Bcf/d
- FORT ELLIOTT RECEIPT 0.095 Bcf/d
- BARNITZ CREEK 0.069 Bcf/d
- OPELOUSAS -0.069 Bcf/d
- LIDDIEVILLE 42 0.054 Bcf/d
- SPEARMAN 0.020 Bcf/d
Cite thisEnercast PipeScrape, WAUSEON (ANR Pipeline (TC Energy) loc 198847) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/198847/